Home / Financial Firm (Unknown - Insurer) / Determination 288252

Determination 288252

Denial of flood damage claim to home from Brisbane River inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for water inundation of their home during the January 2011 Queensland floods and their lawyers disputed the FSP's flood denial. AFCA found the inundation was caused by the rising Brisbane River rather than flash flood or stormwater runoff from heavy rain within 24 hours, so the claim was not covered.

The only potentially responding insured event was flash flood and stormwater runoff, which required the proximate cause to be heavy rain within 24 hours, and the evidence did not establish this, while the flood exclusion was clearly communicated under section 35(2).

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 288252 Determination Page 1 of 9 Case number: 288252 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision - Denial of claim (Flood) 29 May 2013 Background 1. The Applicants insured their home and contents with the Financial Services Provider (FSP) for their property in Sherwood. The relevant period of insurance operated for twelve months beginning from 23 May 2010. During this period, the building was insured up to a sum of $297,000 and the contents for $75,000. 2. On 17 January 2011, the Applicants lodged a claim under the policy due to extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was d ue to “flood”. The Applicants, through their solicitors, have disputed this. Summary of Applicants ’ position 4. For the sake of simplicity, reference to the Applicants will include their legal representatives. 5. The Applicants submit the following as alternati ve arguments in response to the FSP’s decision: a. The FSP’s policy failed to clearly inform them that stormwater runoff is not covered under the insured event of “storm”. In particular, they submit the inundation was due to stormwater runoff. b. The FSP’s policy failed to clearly inform them that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). In this regard, the Applicants rely upon a previous Determination, case number 41709. c. The FSP failed to clearly inform them about the policy caps for “Flash flood and stormwater runoff”. In this regard, the Applicants refer to three previous Determinations (41948, 231567 & 226459) as well as Section 14 of the Act. d. The damage was due to “Flash flood and stormwater runoff”, which is an insured event. In particular, the inundation was due to heavy rain that fell within 24 hours of the property’s initial inundation, which they Determination Case No: 288252 Determination Page 2 of 9 have estimated to have occurred on or around 9.00am 11 January 2011. e. The FSP is unable to discharge its onus in establishing the loss was proximately caused by “flood”. 6. The Applicants seeks to be indemnified for their claim as well as interest and also compensation for non-financial loss as a result of the delay and inconvenience experienced with the claims process. Summary of FSP’s position 7. In response to the Applicants’ arguments, the FSP submits the following: a. The policy structure and layout enables it to rely on its provisions pursuant to Section 35(2) of the Act. b. It denies its telephone consultant misrepresented the policy caps for the insured event of “Flash flood and stormwater runoff”. c. The Applicants are unable to establish their loss was proximately caused by an insured event. 8. The FSP relies on a number of hydrology reports authored by (SC) and the following policy provisions to deny the Applicants’ claim : Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off . ... Storm A violent disturbance of the atmosphere associated with strong w inds including a cyclone, light ning, heavy rain, hail or snow, but not continuous bad weather by Case No: 288252 Determination Page 3 of 9 itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher , but not exceeding your contents sum insured . ... ...” Case No: 288252 Determination Page 4 of 9 Issues 9. Whether the Applicants were “clearly informed” about what the policy did and did not cover. 10. Whether the cause of the Applicants’ loss was co vered under the policy. Reasons for decision 11. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 12. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 13. It is appropriate to consider the issues under the various headings. Section 35(2) of the Act 14. The Applicants have argued that the policy fails to clearly inform as to the derogation from flood cover and/or the limitations on the extent of cover for flash flood and stormwater runoff. 15. There is no dispute that the Applicants have received the policy documentation and Certificate of Insurance. 16. It is established law that in order to satisfy the requirement to clearly inform, the language of Section 35(2) allows for a proposed insured to be clearly informed by providing the relevant documentation in writing providing the relevant exclusion and/or limitation in this case is clear and unambiguous and in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding if that person reads the policy in question. 17. The Panel has reviewed the FSP’s policy on a number of occasions. The policy is indexed with relevant sections covering the insured events. The policy sets out the definitions of storm and flash flood and stormwater runoff. The policy clearly identifies that flood and storm surge is an optional cover but otherwise flood is excluded from cover. The Certificate of Insurance also clearly identifies that with respect to the Applicants ’ policy, flood and storm surge is not covered. 18. Having considered the Applicants ’ submissions and the FSP’s policy documents, the Panel is satisfied the Applicants would have little difficulty in finding and understanding the nature and extent of the limitations and exclusions and that the FSP has met its obligations to clearly inform the Case No: 288252 Determination Page 5 of 9 Applicants of the extent of the exclusions and limitations in accordance with the requirements of the Act. Water Inundation The Evidence 19. The Applicants provided the following relevant information regarding the events of the day:  There had been heavy downpours almost every day for at least a week prior to 11 January. This resulted in the ground in their yard becoming saturated and waterlogged.  Water pooled nearby after a heavy downpour on the Sunday afternoon (9 January) but the water receded by 6.30pm.  There was heavy rain during the night and by 6.00am on 11 January, the roads were covered with water and there was a substantial amount of water build-up both in the nearby parkland and in the further half of their neighbour’s yard.  When they noticed water almost reaching the rim of the stormwater drain directly in front of the house, they packed up their personal items in case of evacuation and carried all of their belongings to the upper level and the deck.  The home was first inundated at approximately 9.00am on 11 January. The water reached the upper floor at approximately lunchtime. 20. The FSP’s hydrolo gist (SC) provided a statutory declaration dated 27 July 2012 that contained the following of relevance:  A substantial amount of rain fell in the greater Brisbane area from 9 January 2011 and over the subsequent two days. This caused significant inflows into the Wivenhoe Dam which peaked on the evening of 11 January 2011.  Rain also fell in the area of the Bremer River from 6.00am on 11 January 2011. This rain travelled along the Bremer River to the junction of the Brisbane River and ultimately contributed approximately 15-25% of its peak flow.  A “small proportion” of the overall depth of the Brisbane River “may be partially attributable to the rain that fell in the Bremer River catchment on 11 January 2011”, although the “overwhelming influence” was the rain that had fallen in the previous days.  The property’s terrain varies between 3m AHD to 4.2m AHD. The level of the lowest point of the structure of the house on the land (the “benchmark level”) is approximately 3.3m AHD.  There is stormwater infrastructure on H Street (the street in which the Applicants’ property is located at), including curb and channelling. This leads to stormwater infrastructure in front of the property. Any local Case No: 288252 Determination Page 6 of 9 runoff on H Street would generally drain from west to east. There is a low point on H Street which varies from approximately 3 to 3.5m AHD. However, there are stormwater inlet pits at this low point which would drain local runoff from this low point.  Local runoff would drain from these stormwater pits via the stormwater pipe system, to Small Creek. Small Creek drains to Oxley Creek which in turn drains to the Brisbane River.  There is a local catchment to the north of the property. The portion of this local catchment that can drain directly to the property is limited to the lots immediately to the north of the property. Under intense rainfall, runoff from the lots to the north of the property can drain either through the stormwater pipe running down the western side of the property or alternatively via the low point in the rear. The low point to the rear of the property runs east, eventually leading to Small Creek.  There is a larger catchment leading to H Street but the drainage capacity of the stormwater pipe system combined with the drainage capacity of the streets themselves would direct runoff from the upstream catchment past the property rather than into the property itself.  Rainfall records were obtained from Corinda High Alert, which is approximately 1.8km from the property. 85mm of rain fell over the period 9 to 10 January 2011. An additional 43mm (approximately) fell during 11 January. The most intense period was recorded between 10.00 to 11.00am on 11 January during which approximately 15mm of rain fell. No rainfall was recorded after 5.00pm on 11 January.  The rainfall was of very low intensity throughout this period (i.e. a peak intensity that was less than a 1 in 1 year event for all durations from 5 minutes to 48 hours). It is unlikely that rainfall of this magnitude would cause stormwater or other runoff inundation.  The cause of the inundation was the rising levels of the Brisbane River. The rising level occurred due to the substantial volume of rain which fell over the upper catchment of the Brisbane River between 9 and 11 January and the subsequent releases from Wivenhoe Dam.  The quantify of the runoff caused by the rain falling over the upper catchment of the Brisbane River, compared to the runoff caused by the local rainfall, was several orders of magnitude greater. Consideration of the evidence 21. The only insured event which responds to the Applicants’ circumstances is “Flash flood and stormwater runoff” which requires the Panel to be satisfied that the proximate cause of their property’s water inundation was heavy rain which fell within 24 hours. 22. The Applicants have re ferred to a “broad approach” adopted by the Panel in regards to these extreme weather events in support of their position. In general terms, the “broad approach” is the Panel accepting that heavy Case No: 288252 Determination Page 7 of 9 rainfall which fell in the Brisbane River catchment between 4.00am and 8.00am on 11 January 2011 caused the need for the operators of the Wivenhoe Dam to adopt the W4 strategy at 8.00am on the same day. This in turn resulted in numerous properties being inundated as the flood wave created by the increased release from the Dam moved down the Brisbane River. 23. There is no dispute that the Applicants’ property was initially inundated on the morning of 11 January 2011. The Applicants own evidence is that the property was inundated at 9.00am with the upper level inundated at approximately lunch time on 11 January 2011. 24. The evidence before the Panel, in particular, the evidence of SC is that the property is approximately 109kms from the Wivenhoe Dam. According to SC, he estimates the effect of the W4 releases (the cause of the inundation referred to in the broad approach) first reached the vicinity of the Applicants’ property at approximately 2.39pm on 11 January. SC further notes that the level of the Brisbane River reached the bench mark level of the property at approximately 10.30am on 11 January 2011 that is prior to the effects of the W4 strategy releases reaching the Applicants’ property. 25. In these circumstances, based on the evidence that is available in this dispute, the broad approach could not apply to the inundation of the Applicants’ property as it is clear that the rainfall that fell between 4.00am and 8.00am on 11 January 2011 which caused the implementation of the W4 strategy would not have resulted in the property’s initial inundation. 26. It is likely that the prop erty’s initial inundation was due to the gradual increase in the level of the Brisbane River prior to the W4 release strategy being adopted. 27. In order to succeed with the claim, the Applicants must satisfy the Panel that the initial inundation of the property was caused by heavy rain that fell no more than 24 hours before the initial inundation. In other words, the Panel must be satisfied that the initial inundation of the property was due to heavy rain that fell from approximately 9.00am on 10 January 2011. As indicated, this would not include the heavy rain that fell over the Wivenhoe Dam as the evidence establishes that the effects of this rain would not have reached the Applicants’ property by 9.00am on 11 January 2011. 28. The Panel notes the Applicants have provided numerous submissions with respect to this and in particular, submissions as to the level of rainfall measured by the local rainfall stations, compared with the measured levels of the Oxley Creek. The Applicants have also referred to the rainfall affecting the Brisbane River catchment in the preceding 24 hours as an alternative cause of loss. 29. In this regard, the Panel finds the evidence of SC persuasive to the effect that the local rainfall would not have been sufficient to inundate the property given the stormwater infrastructure in place and the intensities of the rainfall being relatively minor. Case No: 288252 Determination Page 8 of 9 30. Although the Applicants have referred to the rainfall on the morning of 11 January 2011, there is no evidence that this rainfall was sufficient to cause significant stormwater runoff that would have led to the inundation of the Applicants’ property. 31. Instead, the evidence establishes that most likely the cause of the inundation was the rising levels of the Brisbane River backing up into the stormwater infrastructure before surcharging through the drains. This is consistent both with the Applicants’ evidence, SC’s opinion and the widely acknowledged fact that the Brisbane River was elevated during this period. 32. The issue is therefore whether the elevated levels of the Brisbane River, which ultimately caused the property’s initial inundation, was due to heavy rain that fell within 24 hours.. 33. The evidence of both SC and the hydrology reports from the Insurance Council of Australia (ICA) support the view that on the morning of 11 January 2011 the levels of the Brisbane River would not have been impacted by the W4 releases. Whilst it is acknowledged that the Brisbane River was rising at that stage, this was not due to the adoption of the W4 strategy at that time but predominately due to rain that had fallen across the Brisbane River catchment on 9 and 10 January 2011 (and earlier) leading to the gradual increase in the releases of the water from the Wivenhoe Dam. 34. Although various parts of the catchment may have been affected by local rainfall events of varying intensities (such as the upper Bremer River catchment), there is no evidence that this was the sole cause of the inundation in the Applicants circumstances. 35. Having considered the information exchanged, the Panel accepts that the proximate cause of the elevated levels of the Brisbane River that caused the property’s initial inundation was the heavy rain that fell between 9 and 10 January 2011 36. The Panel is therefore not satisfied, on the evidence, that the rain which fell in the catchment after 9.00am on 10 January 2011 was sufficient, by itself, to cause the property’s initial inundation. 37. The Panel accepts that the Applicants’ property was subsequently inundated as a result of the W4 releases and this impacted on the property. However, by that time, the damage caused as a result of the W4 releases would be due to a mixture of waters which had already inundated the property and, to the extent that the property was further inundated after 4.00am on 12 January 2011, by flood waters that were due to rainfall that fell more than 24 hours prior to the inundation of the property. In such cases, there is clear case law (the Wayne Tank principle ) that states the exclusion clause of “flood” would prevail to defeat the applica nts claim. 38. As such, after careful analysis of all of the available evidence, the Panel is not satisfied that the Applicants’ loss has been proximately caused by an insured event. As a result, the FSP is entitled to maintain its denial. Case No: 288252 Determination Page 9 of 9 39. As the Applicants are unable to establish that any of the loss was caused by the insured event of “Flash flood and stormwater run - off”, it is not necessary for the Panel to consider the Applicants’ arguments regarding the relevant policy caps for this insured event. Determination 40. On the basis of the available information the Panel determines the FSP is entitled to deny the Applicants’ claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.