Maladministration in lending, delay, hardship and debt collection on a line of credit

FirmFinancial Firm (Unknown - Credit)
Decided2014-05-28
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded$2,380
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

Elderly borrowers complained about line of credit increases, collection calls and handling of their hardship. AFCA found no lending maladministration, but ordered $2,380 for delay and $1,500 non-financial loss for a privacy breach and an unexplained demand letter.

A lender has no duty to advise on the suitability of a product, and the delay compensation reflects financial loss from a late funding decision.

Issues

Subjects and remedies

elderly or capacityfinancial hardshippay compensationpay non financial loss

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Case No: 288215 Determination Page 1 of 5 Case number: 288215 Credit - Consumer Credit - Home Loans - Financial Difficulty - Request to Suspend Enforcement Proceedings Credit - Consumer Credit - Home Loans - FSP Decision - Maladministration in lending 21 May 2014 Summary Description  The Applicants claim the FSP should not have given them various loan facilities and did not deal with them appropriately in relation to the debt on the loan facility after a proposed subdivision was delayed due to circumstances beyond their control. Basis of Determination  The FSP acted appropriately when granting the loans and generally did not harass the Applicants Determination  The FSP is to pay compensation totalling $3,880, being $2,380 for a delay in responding to the Applicants‟ request for additional funding in 2008, $500 non-financial loss for a breach of privacy and $1,000 for non-financial loss in relation to a letter of demand sent without explanation. Conclusions in Recommendation 1. The case manager provided the parties with a Recommendation on the issues in dispute. The Recommendation was in favour of the FSP in relation to whether or not it should have provided finance to the Applicants. The Recommendation was in favour of the Applicants in relation to a de lay in 2008 and a breach of privacy in 2010. A copy of the Recommendation is attached to this Determination. Determination Case No: 288215 Determination Page 2 of 5 2. The FSP accepted the Recommendation but it was not accepted by the Applicants. Further submissions 3. After the Recommendation was rejected, the Applicants made further submissions that can be summarised as follows:  The FSP had lost documents and this caused the Applicants stress in addition to the interest compensation they received in settlement of an earlier dispute with FOS;  When they exceeded their credit limit in late 2009 and early 2010, the FSP threatened to cancel their facilities. The FSP was in daily contact with them chasing payment and was “hounding” them. The Recommendation recognised that this would have been stressful, but no compensation was awarded.  After the sale of one property, the Applicants asked for an increase to their credit limit, but this was refused.  The Applicants were trying without success to sell the remaining property to repay the debt, and had to obtain an extension by contacting the CEO‟s office, rather than having the arrangement put in place by their branch.  The Applicants faced having their property repossessed on two occasions and had to fight for a fair and reasonable outcome.  The FSP failed in their duty of care towards them and this was maladministration. Ombudsman’s consideration 4. I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. 5. I have carefully considered the case manager ‟s Recommendation, together with the pa rties‟ further submissions. 6. I am satisfied that the case manager‟s Recommendation contains an accurate summary of the background to this dispute, the parties‟ positions, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 7. I agree with the case manager‟s reasons for the Recommendation and the recommended outcome, except as provided for below. Case No: 288215 Determination Page 3 of 5 8. In relation to the lost documents, this matter was dealt with and resolved in an earlier dispute lodged with FOS. It is therefore not appropriate to award compensation for non-financial loss in relation to this aspect of the Applicants‟ claim. I take it that this is issue is raised again to try and illustrate a course of conduct by the FSP. 9. The Applicants are of the view that the FSP should not have pursued the repayment of the loan. The purpose of the loan was to fund renovations and then subdivide and sell the property. The subdivision of the property was delayed because of a neighbourhood dispute and local council requirements. While neither the Applicants nor the FSP were the cause of these delays, given the loan had been outstanding for a number of years and interest only payments were not being met, it was not unreasonable for the FSP to seek repayment. In my view, given the delay in finalising the subdivision, the FSP was not required to provide continued support to the Applicants on an indefinite basis. 10. The FSP‟s notes do not show that that the FSP “hounded” the Applicants in 2010 about repaying the loans. The notes indicate that the FSP rang the Applicants on 4, 10 and 18 February 2010 and that the Applicants made contact with the FSP on 8 and 11 February 2010. While the Applicants have a clear recollection that they were contacted on a daily basis, the contemporaneous notes made by the FSP are consistent with what the Applicants say was discussed. They are not consistent with who called whom and when. In the end, I prefer to rely on the FSP‟s contemporaneous notes as to what is more likely than not to have occurred. The notes do not establish that the FSP harassed the Applicants. 11. At the time of the calls, the Applicants were approximately $11,000 over their credit limit and the purpose of the calls was to discuss how this would be repaid. In my view, it is not unreasonable for the FSP to contact the Applicants to discuss how they intended to operate the account within its limits. 12. As the case manager noted, it would have been “upsetting, confusing and stressful” for the Applicants to receive the letter of demand dated 27 January 2010 without further explanation. The FSP should pay to the Applicants the sum of $500 each in relation to this aspect of the dispute. 13. However, the subsequent contact in February 2010 was not unreasonable. The contact made by the FSP on 18 February 2010 included a discussion about a moratorium which the Applicants did not wish to pursue at that time. 14. The Applicants also say that having sold one of the subdivided lots in 2012, the FSP should have agreed to their request for an increased credit limit without having to escalate their request for an increased limit or more time to sell the remaining lost. Given the poor history of the account over the preceding two years, it was not unreasonable for the FSP to initially decline the request. Case No: 288215 Determination Page 4 of 5 15. The FSP agreed to the requests after escalation to the CEO‟s office. While this may have been stressful for the Applicants, the Applicants had written to the CEO‟s office before. In considering whether non -financial loss is payable, I consider that a person should be moderately robust and expect a certain degree of inconvenience. Escalating a complaint to the CEO‟s office comes within being moderately robust and does not warrant compensation. 16. The Applicants discussions with the CEO‟s office took place on 14 June 2012. On the same day a letter of cancellation was sent to the Applicants and received by them a few days later. This was no doubt stressful for the Applicants given that they had been in contact with the FSP. However, given the discuss ions with the CEO‟s office took place on the same day as the demand was sent, a robust person would have queried the timing of the two events given their proximity. 17. This is what the Applicants did, asking the CEO‟s office to contact collections to inform them of the prior discussions and agreement. The FSP confirmed the next day that the additional time to sell the property was approved. In the circumstances, while it may have been stressful, it is not sufficient to warrant compensation for non-financial loss. 18. I have considered the further information, but it does not change my view that the case manager‟s Recommendation was correct , save for an additional award for non-financial loss noted in paragraph 12. Determination 19. I determine: a. The FSP did not engage in maladministration when it advanced the various increases in funds under the LOC in 2005, 2006, 2007, 2008 and 2009. b. The FSP delayed in considering the Applicants‟ request for additional funding under the LOC in 2008. c. The FSP pay to the Applicants $2,380 in compensation for their financial loss arising from its delay in considering their request for additional funding under the LOC in 2008. d. The FSP breached its privacy obligations to the Applicants when it disclosed to a third party that it was collecting an outstanding debt from them. e. The FSP should compensate the Applicants for their non-financial loss arising from the FSP‟s breach of their privacy by paying each of them $250. f. The FSP should compensate the Applicants for their non-financial loss ari sing from the FSP‟s failure to provide an explanation for the letter of demand in January 2010 by paying each of them $500. Case No: 288215 Determination Page 5 of 5 g. The total amount of compensation to be paid by the FSP to the Applicants is $3,880. Payment is to be made within 14 days of the Applicants accepting this Determination. Case No: 288215 Recommendation Page 1 of 14 Case number: 288215 Credit - Consumer Credit - Home Loans - Financial Difficulty - Request to Suspend Enforcement Proceedings Credit - Consumer Credit - Home Loans - FSP Decision - Maladministration in lending 3 March 2014 Background 1. In 1999 the Applicants purchased a 40 acre property in M (the M property) for about $280,000 with the proceeds from the sale of their Sydney property. 2. In 2000, the Applicants obtained a line of credit facility with the FSP (the LOC) with an initial limit of $350,000 and the Applicants granted a mortgage to the FSP over the M property as security for the LOC. The Applicants used the LOC funds to purchase a property adjacent to the M property. They moved the boundary and added 10 acres from the adjacent property to the M property and then sold the adjacent property for $385,000 within 12 months with no capital gain. The Applicants used the proceeds from the sale of the adjacent property, comprised of about $344,000, to reduce the balance of the LOC and the limit of $350,000 remained in place. The Applicants do not dispute that lending. 3. The FSP granted to the Applicants the following limit changes to the LOC which are the subject of this dispute: Date New Limit Purpose of funds 25 June 2005 $369,000 Renovations to the M property 29 September 2006 $400,000 (Purpose of funds is disputed) 8 June 2007 $450,000 (Purpose of funds is disputed) 8 May 2008 $640,000 Additional $120,000 plus interest costs for subdivision of the M property 15 April 2009 $730,000 Additional costs for development of an access road required for the subdivision of $75,000 plus $15,000 for interest costs 4 November 2010 $350,000 Subdivided vacant land sold for $540,000. Sale proceeds applied to the LOC. 5 September 2013 $0 Remainder of M property sold for $1,040,000. Approximately $366,000 applied to the LOC. Applicants retained approximately $674,000. Recommendation Case No: 288215 Recommendation Page 2 of 14 Summary of Applicants’ p osition 4. The Applicants say that: a. In 1999, they purchased the M property with the intention of building and operating, as a business, three holiday cottages on the property. Due to numerous circumstances, including both the Applicants experiencing permanent and serious health issues, they built and operated only one cottage. They a veraged $16,500 gross takings from the business per year, which they wholly applied to business expenses and upkeep of the M property. b. In June 2005, they obtained an increase in the LOC limit to $369,000 for renovations to the M property which were necessary to accommodate Mrs M‟s disability. c. They intended to repay the LOC with the future subdivision (into two 25 acre plots) and sale of the M property. d. The FSP failed to advise them to do the subdivision before the renovations. It did not warn them of the possible pitfalls in undertaking a subdivision. e. The FSP‟s grant of the various increases to the LOC represented maladministration because it failed to properly assess their capacity to repay the LOC or have regard to their age and income and expenses. f. The FSP did not tell them that it had based its approval for the increases in credit under the LOC on the sale of the M property (including the subdivision) rather than an assessment they could service and repay the LOC. g. They were unable to complete the subdivision within the anticipated budget due to a complaint from a neighbour about the access road necessary for the subdivision. The local council required that they submit an additional Development Application for the road. The increased costs were $75,000 for the road plus $15,000 for interest paid to the FSP. h. The FSP delayed in considering their request for additional funding of $90,000 required to complete the subdivision and sale of the M property, and as such, they incurred additional interest and costs on the funds lent. i. On 29 November 2009, after they reached the $730,000 limit on the LOC, they told the FSP that they did not have the funds to make the monthly interest payments to the LOC. The FSP‟s representative, K, told them not to worry about it and that they would receive statements each month as to the interest accruing on the LOC. K knew the M property (then comprised of two lots) was for sale. Despite K‟s assurances not to worry, they received daily debt collection calls from the FSP for about three weeks. j. On 4 February 2010, the FSP‟s representative, A, breached their privacy when she told their real estate agent she was from the FSP‟s collections department. Case No: 288215 Recommendation Page 3 of 14 k. In November 2010, the vacant block of land was sold for $540,000 and they applied the sale proceeds to the LOC. l. The FSP agreed to allow them until the end of May 2011 to sell the remainder of the M property but failed to honour that agreement when it sent the Applicants a letter dated 31 March 2011 telling them to put the LOC account in order or it would take recovery action in two weeks. m. They did not reach the limit of the LOC account until January 2012, yet the FSP continued to send to them letters of foreclosure. They were only offered three and half months to sell the M property. n. After the sale of the M property in September 2013 for $1,040,000, they applied $366,000 to pay out the LOC and had $674,000 remaining before their solicitor‟s costs. This is insufficient to allow them to purchase an appropriate property in Sydney. Summary of FS P’ s position 5. In response, the FSP says: a. It denies it engaged in maladministration in lending when it approved the increases to the LOC limit. The Applicants are in a better financial position by virtue of the lending it provided to them than they would otherwise have been. The Applicants made a profit from the renovations to, and subdivision and sale of, the M property. b. It approved the increases to the LOC limit knowing that serviceability was not evident but on the basis that the Applicants were adding value to the M property, which they intended to sell to repay the LOC. c. The Applicants were aware that they could not service the debt and that the sale of the M property was necessary to repay the LOC. d. The Applicants did not request hardship assistance but asked for time to sell the M property. It responded to the Applicants‟ financial difficulty by giving them in excess of 12 months to sell the M property. It agreed to allow them until 30 November 2012 to sell the M property. e. It did not make any demands for payment to the Applicants. f. Its collections notes relate to the LOC limit being cancelled in June 2012. It placed debt recovery action on hold until November 2012 for the M property to be sold. g. It has no record of information being passed from A to the App licant‟s real estate agent. Issues 6. Whether the FSP engaged in maladministration in lending when it approved the limit increases to the LOC in June 2005, September 2006, June 2007, May 2008 and September 2009. Case No: 288215 Recommendation Page 4 of 14 7. Whether the FSP delayed in considering the App licants‟ request for additional funding of $90,000 to complete the subdivision and sale of the M property. 8. Whether the FSP breached its financial difficulty obligations to the Applicants in relation to the LOC. 9. Whether the FSP failed to meet its obligations to the Applicants under the ASIC Debt Collection Guideline for collectors and creditors, when conducting debt collection activity. 10. What, if any, loss have the Applicants suffered for which the FSP should compensate them? 11. What is an appropriate resolution to this dispute? Reasons for Recommendation Whether the FSP engaged in maladministration in lending when it approved the limit increases to the LOC in June 2005, September 2006, June 2007, May 2008 and September 2009. 12. The Applicants say: a. The FSP should never have granted them the increases in the LOC from June 2005 because: i) It never discussed the increases with them in person. ii) It did not obtain their financial information or make any assessment of their ability to service the LOC. iii) It did not make any enquiries about their income or expenses for the 2005, 2006 or 2007 increases to the LOC. iv) For the 2008 and 2009 increases, they did not receive or view the Customer Particulars Reports in their entirety before they signed them. Many of the figures contained in the Customer Particulars Report dated 16 April 2009 are incorrect. v) Knowing they were pensioners (aged 65 and 67 years old in 2005), it should not have provided them the credit increases under the LOC. b. It did not tell them that it had based its approval for the increases in credit under the LOC on the sale of the M property rather than on serviceability. c. They intended to repay the LOC with the future subdivision and sale of the M property. d. It was necessary to do the renovations before the subdivision because Mrs M‟s doctors told her she could not be released from hospital to the Case No: 288215 Recommendation Page 5 of 14 M property without alterations to the M property. Her doctors were concerned about further falls in her home causing her injury. e. They obtained the increases of $400,000 and $450,000 in 2006 and 2007 respectively to complete the renovations to the M property, not for the subdivision as the FSP alleges. 13. The FSP says: a. It approved the increases to the LOC limit knowing that serviceability was not evident but on the basis that the Applicants were adding value to the M property, which they intended to sell to repay the LOC. b. The Applicants were aware that they could not service the debt and that the sale of the M property was necessary to repay the LOC. c. Its notes on the application for the increase in May 2008 say: “It is acknowledged that applicants cannot service the debt and this has been discussed with them.” d. Its notes on the application for the increase in September 2009 say: “Customers are aware they cannot service the debt”. Assessment 14. The parties have different recollections as to what was discussed about the Applicants‟ ability to service the debt under the LOC. Where the parties have conflicting recollections which are not supported by contemporaneous documents, FOS‟s approach is to rely on the available documents to determine what is more likely to have occurred on the balance of probabilities. The Applicants have not provided material to support their recollections about their discussions with the FSP about repayment or afford ability of the LOC. The FSP‟s contemporaneous loan assessment notes say that it discussed with the Applicants its view that they could not service the debts. 15. Even if the FSP did not expressly tell the Applicants that its decision to advance the funds under the LOC was based on the subdivision and sale of the M property (rather than on a serviceability assessment) I am satisfied that, on balance, the Applicants understood that: a. they were not in position to repay the LOC from their income; and b. they intended to repay the LOC by subdividing and selling the M property. 16. The Applicants say that the FSP failed to advise them to undertake the subdivision before the renovations to the M property. In general, a financial services provider that is a bank or credi t provider does not have a „fiduciary‟ duty or responsibility to its customer. This means that it is not obliged to advise a customer that a service, product or course of action is not in their interests. Case No: 288215 Recommendation Page 6 of 14 17. A fiduciary responsibility arises only where the financial services p rovider‟s role is seen to extend beyond that of finance provider and into the area of advice. This happens if the financial services provider provides advice or otherwise causes the customer to reasonably believe that the financial services provider has assumed that responsibility. 18. The financial services provider is otherwise in a position of lender, not adviser, and it does not have to tell a customer whether a particular product or service is in the customer‟s interests. There can be some exceptions to this: for example, if a customer specifically asks a question about a product or service, the financial services provider is obliged to provide an accurate and complete response. 19. In this case, I understand that the Applicants expected the FSP to provide them with something like advice about their strategy for improving the M property. However, the FSP was not under a duty to provide such advice to the Applicants and there is no material before me to suggest that it caused the Applicants to reasonably believe that it had assumed that responsibility. 20. Further, the Applicants say they chose to undertake the renovations before the subdivision because Mrs M‟s doctors told them she could not safely return home without the renovations to modify the M property for her mobility restrictions. In these circumstances, I consider that even if the FSP had suggested that the Applicants undertake the subdivision first, the Applicants would likely have chosen to do the renovations first due to Mrs M‟s m obility requirements. 21. To assist in my consideration of whether the FSP‟s assessment and approval of the increases to the LOC limit comprised maladministration in lending , I obtained the views of FOS‟s Banking Advis or. The Banking Advisor has had extensive experience in the banking and financial services industry and regularly provides FOS with advice about banking and financial services practice and procedure and what constitutes good and standard industry practice. 22. The Banking Advisor‟s view was that as a matter of good lending practice, in circumstances where the FSP provided finance on the basis of property improvement and immediate sale, it should have obtained from the Applicants the following: a. A detailed estimated cost for the intended improvements to the M property. b. Documents in support of the estimated cost such as quotes or correspondence from industry professionals. c. A clear timeline for the improvements. This is particularly important for projects that require infrastructure improvements such as the access road in this case. 23. The Banking Advisor says the FSP should also have allowed for possible cost and time over runs and factored this into the finance requirement. Case No: 288215 Recommendation Page 7 of 14 24. Based on the available information, the FSP either did not obtain, or did not retain on its file, the above material when it approved the advance of funds under the LOC. 25. The FSP says that the Applicants had experience in the finance industry but has not provided any documents in support of that. The Applicants say they had no experience in subdivision, are not property developers and “simply took on this project, after much research with the local estate agents and other knowledgeable locals”. They say no FSP staff member warned them about the possible pitfalls of a subdivision project of this sort. The Banking Advisor‟s view is that unless the Applicants had direct experience in property development finance, they were unlikely to have been adequately prepared for this project (without external advice or assistance). 26. Based on the invoices provided by the Applicants, I am satisfied that from the outset, they engaged the professional services of a surveyor, and a town planning, agricultural and environmental consultancy firm, C, which advertises itself as specialist in the region in which the M property is located. Based on the description of services provided to the Applicants in those invoices, I am satisfied that the Applicants obtained, from the outset, professional advice and assistance with the subdivision project. If they did not obtain sufficient professional advice, or did not follow the advice they obtained, or if other events intervened to interfere with or disrupt their plans – including problems with neighbours, further requirements of council and the global financial crisis – these are not matters for which the FSP can be blamed or is liable. 27. The Banking Advisor also noted that the FSP appropriately had a credit manager making the credit decisions and reviewed the finance periodically. The FSP acknowledged throughout the lending process that the Applicants did not have the capacity to service the LOC and that the subdivision and sale of the M property was required to repay the LOC. Further to this, the funds advanced under the LOC made capital improvements to the M property. The Applicants made a profit from the M property, albeit, they say they did not make a sufficient profit to purchase a property of the kind they wanted in Sydney. However, for the matters touched on above, this is not the fault of the FSP. 28. I agree with the Bankin g Advisor‟s view that, on balance, the FSP did not engage in maladministration when it advanced the funds under the LOC. 29. Even if I considered that the FSP‟s advance of funds under the LOC represented maladministration in lending, based on the available information, it is apparent that the Applicants made a profit, or at least, did not suffer a loss, as a result of the advance of funds under the LOC. In that regard, I cannot recommend that the FSP pay compensation to the Applicants in circumstances where they did not suffer a loss. Case No: 288215 Recommendation Page 8 of 14 Whether the FSP delayed in considering the Applicants’ request for additional funding of $90,000 to complete the subdivision and sale of the M property? 30. The Applicants say that the FSP delayed their application for the final increase of $90,000 for 12 months, in part, because it took an unreasonably long time to arrange a valuation of the two lots comprising the M property. Based on my review of the available material, I am not satisfied that the FSP delayed for 12 months in approving the $90,000 increase to the LOC limit. 31. Below is a timeline of events relating to the FSP‟s advance of funds for the subdivision of the M property as I understand them and based on the available information: D ate on loan application Date of l etter of o ffer New LOC limit P urpose 9 January 2006 29 September 2006 $400,000 For subdivision costs 14 May 2007 8 June 2007 $450,000 $50,000 for subdivision comprised of $20,000 to connect power, $10,000 for legal fees and $20,000 interest costs. February 2008 First council approval for subdivision 2 May 2008 8 May 2008 $640,000 $120,000 for subdivision of the M property plus $60,000 interest costs August 2008 Neighbour complains and council request second Development Application for the road 19 February 2009 15 April 2009 $730,000 For development of the access road of $75,000 plus $15,000 for interest costs 32. In support of their claim that the FSP delayed in providing the funds required to complete the subdivision, the Applicants provided some email correspondence between them and the FSP‟s officers, “G” and “M”, dated from 15 April to 2 May 2008 about a valuation of the M property. 33. The Applicants said in an email dated 2 May 2008 that it had taken five weeks to obtain the FSP‟s required valuation. The FSP approved the LOC increase to $640,000 on 2 May 2008. On that basis, I consider the alleged delay in obtaining the valuation was for the 2008 increase not the 2009 increase in the LOC limit, as suggested by the Applicants. I consider that five weeks is a long time to obtain a valuation, even considering that the M property was located in a regional area. I consider that it should have taken no longer than, say, two weeks for the FSP to obtain a valuation of the M property in 2008. Therefore, it is appropriate that the FSP refund to the Applicants an amount equivalent to three weeks‟ interest paid on the LOC in April 2008 in compensation for the delay it caused. I calculate that amount to Case No: 288215 Recommendation Page 9 of 14 be approximately $2,380 (based on the amount of interest charged to the LOC on 30 April 2008, being $3,399.76). 34. The Applicants disputed the council‟s request for a second Develo pment Application made some six months after it had originally approved the road works. Further, the Applicants say: a. The council admitted its error in failing to require a separate Development Application for the road works at the outset. b. They received legal advice that they had an excellent case against the council but it was financially impossible to pursue that claim by way of legal action against the council. 35. The Applicants then instructed company C to complete the second Development Application, obtained two quotes for the road works, and valuations of the two lots comprising the M property before submitting their final application to the FSP for further funds of $90,000 under the LOC in January 2009. They provided some supporting financial information to the FSP in February 2009. I note from the Applicants‟ material that the second Development Application was lodged in March 2009. The FSP approved the increase in the LOC of $90,000 required to complete the subdivision in mid April 2009. In the circumstances, I do not consider that the FSP caused an unreasonable delay in providing funds to the Applicants. It was prudent, in the circumstances, for the FSP to ensure that the second Development Application had been lodged and approved before it advanced the funds to complete the road works. 36. Based on the available information, I consider that the delay in the subdivision project was in the majority attributable to the Applicants‟ dispute with their neighbour and the council‟s requirement for a second Develo pment Application, and all the events that flowed from that. Based on the available material, I understand that this process took about five to six months. I am not satisfied that the FSP could have foreseen such events in circumstances where the council had already approved the Development Application, including the road works, in February 2008. 37. I should note that I understand from the Applicants‟ letter to the FSP dated 9 March 2012 and email to FOS dated 1 March 2014, that the parties resolved their dispute with the FSP regarding lost documents in 2010-2011. I have therefore not investigated this issue as part of this dispute number 288215. Whether the FSP breached its financial difficulty obligations to the Applicants in relation to the LOC? What do the parties say? 38. The Applicants say: a. They both suffer from serious medical conditions and are aged in their mid 70s. Case No: 288215 Recommendation Page 10 of 14 b. After they reached the $730,000 limit on the LOC on 29 November 2009, they contacted the FSP to tell it that they did not have money to pay the monthly interest payments to the LOC. The FSP‟s representative, K, told them not to worry about it and that they would receive statements each month as to the interest accruing on the LOC. K knew the M property was for sale. c. Following their discussion with K, they received nasty debt collection telephone calls and letters from the FSP. d. The FSP agreed to allow them until the end of May 2011 to sell the remainder of the M property but failed to honour that agreement when it sent the Applicants a letter dated 31 March 2011 telling them to put their LOC account in order or it would take recovery action in two weeks. e. The FSP then granted their request for an extension of time to keep the LOC limit at $350,000 until the end of May 2011 to allow them time to sell the remainder of the M property. f. In April 2011, they requested an extension of time to November 2011 to keep the financial limit of $350,000 on the LOC. g. They did not reach the limit of their account until January 2012, yet the FSP continued to send to them letters of foreclosure. They were only offered three and half months to sell the M property. 39. The FSP says: a. The Applicants did not request hardship assistance but asked for time to sell the M property. It responded to the Applicants‟ financial difficulty by giving them in excess of 12 months to sell the M property. It agreed to allow them until 30 November 2012 to sell the M property. b. It is not willing to enter into a payment arrangement as the Applicants have not requested it. c. It did not make any demands for payment to the Applicants. d. Its collections notes relate to the LOC limit being cancelled in June 2012. It placed debt recovery action on hold until November 2012 for the M property to be sold. Assessment 40. During the course of this dispute FOS requested that the FSP provide: a. Details of all its demands for payment made to the Applicants including telephone calls and any written demands for payment. b. Details of any collection activity since the date of the Applicants‟ variation requests under the LOC. It responded that the only collections notes it has relate to the LOC limit being cancelled in June 2012. It says it provided all its collections notes which are dated 5 June 2012 to 1 October 2013. Case No: 288215 Recommendation Page 11 of 14 41. I do not accept the FSP‟s submission that they made no demand s for payment to the Applicants because: a. The Applicants provided a copy of a letter from the FSP to them dated 27 January 2010, which includes a demand for payment of the amount then outstanding under the LOC. b. The Applicants provided a copy of a letter from the FSP to Mrs M dated 14 June 2012, which includes notification that the LOC limit had been reduced to zero and that it required immediate repayment of the amount outstanding under the LOC. 42. In the absence of the FSP‟s complete records of its discussion s and correspondence with the Applicants, I am prepared to accept the Applicants‟ submission that they understood from the FSP‟s representative K that they did not need to be concerned about exceeding the LOC limit of $730,000. In these circumstances, I accept that it would have been upsetting, confusing and stressful for them to receive the letter dated 27 January 2010 without further explanation from the FSP. 43. On 14 June 2012, the FSP sent the Applicants an email regarding its agreement to allow them until 30 November 2012 to sell the M property during which it would hold all debt recovery action. 44. In an email to the FSP dated 18 June 2012, the Applicants complained that the FSP‟s representative had failed to communicate to its branch staff their initial agreement for the LOC limit of $350,000 to be extended by 12 months from 31 May 2011 to 31 May 2012. Consequently, they say they received a statement from the FSP that the LOC was being closed prematurely. 45. I understand from that email dated 18 June 2012 that the Applicants were not satisfied with the FSP‟s response and level of service provided to them. FOS expects Applicants to be moderately robust in their dealings with their financial services providers and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to reduce inconvenience. The Applicants appear to have done so in this case, when they contacted the FSP to clarify their agreement regarding time to te ll the M property. 46. On balance, I am satisfied that the FSP allowed the Applicants an extended period of time in which to sell the M property and that this was an appropriate response to their financial difficulty in circumstances where the sale of the M property was the Applicants‟ only way of repaying the LOC. In all the circumstances, I do not require the FSP to compensate the Applicants for the FSP‟s alleged failure to respond appropriately to them as customers experiencing financial difficulty. Whether the FSP failed to meet its obligations to the Applicants under the ASIC Debt Collection Guideline for collectors and creditors, when conducting debt collection activity? What do the parties say? Case No: 288215 Recommendation Page 12 of 14 47. The Applicants say that: a. They received daily debt collectio n calls from the FSP for about three weeks. b. On 4 February 2010, the FSP‟s representative, A, breached their privacy when she told their real estate agent she was from the FSP‟s collections department. 48. The FSP says: a. Its collection notes start in June 2012. It placed debt recovery action on hold until November 2012 pending the sale of the M property. b. It has no record of information being passed from A to the Applicant‟s real estate agent. Assessment 49. There is no material before me to support the Applicants‟ claim that they received daily debt collection calls from the FSP and I therefore cannot be satisfied that the FSP breached the ASIC Debt Collection Guideline for collectors and creditors (the Guidelines) in relation to frequency of contact with a debtor for debt collection purposes. I note, however, that the Guidelines say that a financial services provider should contact a debtor only where reasonably necessary and no more than three times per week. 50. The Applicants provided a letter from their real estate agent dated 15 July 2010 regarding his alleged telephone discussion with the FSP‟s representative, A, on 4 February 2010 during which he says A disclosed to him that she was calling from the FSP‟s collections department. I am prepared to accept that, on balance, the real estate agent likely did receive a telephone call to that effect from A. I can see no reason why the Applicants‟ real estate agent would fabricate this claim, and he has provided a letter recording the content of the call (albeit created some months after the event). On that basis, I consider that the FSP likely breached its privacy and confidentiality obligations to the Applicants when it disclosed to a third party (here, the real estate agent) information from which the agent could glean it was in the process of collecting an outstanding debt from the Applicants. Non-financial loss 51. Non-financial loss claims at FOS include claims for stress or inconvenience caused by an error of the financial services provider. The maximum amount we can award for non-financial loss is $3,000 for each claim. 52. We will only award compensation for non-financial loss if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss that an Applicant may incur as a result of pursuing a dispute or rectifying a financial services provider ‟s error. 53. When assessing whether the circumstances are of an unusual nature we will review: Case No: 288215 Recommendation Page 13 of 14  the degree or extent of physical inconvenience suffered  the general time taken to resolve the dispute  the extent to which the financial services provider ‟s actions interfered with the Applicant‟s expectation of enjoyment or peace of mind. 54. We will assess any claims for non-financial loss in accordance with the FOS Terms of Reference. If we do award compensation, it is unlikely to be substantial. 55. The Applicants say that the FSP caused them significant embarrassment and damage to their reputation in their small community. They say that because of the disclosures made by it, the real estate agent had “ammunition” to get them to reduce the asking price for the M property and to achieve a quick sale. 56. I am satisfied that it did not disclose its debt collection activity to the Applicants‟ community, but to their agent alone. The Applicants‟ real estate agent was presumably engaged by them to achieve the best possible price for the M property and assuming the agent was paid a commission based on the price obtained, it would have been in his best interests to obtain a sale at the best price possible. Even if I was satisfied that the agent used the information about the Applicants‟ financial situation to encourage them to reduce the asking price for the M property, I am not satisfied that the FSP is responsible for that alleged consequence. The FSP is not responsible for the actions of the real estate agent. In any event, the M property was sold more than three and a half years after the alleged disclos ure – by which time it must have been apparent to the real estate agent that any collections activity by the FSP was not pressing. 57. In all the circumstances, I consider that the FSP should compensate the Applicants for their non-financial loss resulting from the distress and embarrassment its breach of privacy caused them by paying them $250 each. Recommendation 58. On the basis of the available information I recommend that: a. The FSP did not engage in maladministration when it advanced the various increases in funds under the LOC in 2005, 2006, 2007, 2008 and 2009. b. The FSP delayed in considering the Applicants‟ request for additional funding under the LOC in 2008. c. The FSP pay to the Applicants $2,380 in compensation for their financial loss arising from its delay in considering their request for additional funding under the LOC in 2008. Case No: 288215 Recommendation Page 14 of 14 d. The FSP breached its privacy obligations to the Applicants when it disclosed to a third party that it was collecting an outstanding debt from them. e. The FSP should compensate the Applicants for their non-financial loss arising from the FSP‟s breach of their privacy by paying each of them $250. f. The FSP is to pay the required compensation to the Applicants either by cheque, or into an account or accounts as they request, within 14 days of all parties‟ acceptance of this Recommendation.