Denial of storm damage claim for sub-floor embankment collapse; soil movement and landslip exclusions
Text of the determination
Case No: 288082 Determination Page 1 of 8
Case number: 288082
General Insurance – Domestic Insurance – Home Building Insurance – Storm
damage – Policy exclusions – earth movement; landslide
5 February 2013
Background
1. The Applicant insured his home building under a Home Building Insurance
Policy for replacement value against loss or damage caused by insured events.
The policy incepted on 12 November 2009 and was renewed annually to 12
November 2012.
2. The Applicant’s hom e is approximately four years old and was built on land
which slopes significantly from front (west elevation) to the rear (east elevation).
The land had been excavated to allow construction of the home.
3. On 26 December 2011, the Applicant reported that his home had suffered
damage as a result of severe storms on 25 December 2011.
4. Stormwater had overflowed from roadside drains, down his driveway and
entered the bottom storey of the house and the sub-floor area. The stormwater
resulted in an earth batter under the home collapsing causing two support
stumps to be exposed and subject to the risk of collapse.
5. The Applicant submitted a claim on the FSP for the cost of removing the
collapsed earth batter; determine whether or not the stumps have been
compromised, and building a retaining wall.
6. The FSP has denied liability on the grounds the loss or damage was caused by
soil movement and subsidence or landslide which are events that are excluded
from cover under the policy.
Summary of Applicant’s Position
7. The FSP has rejected his claim on the ground that the damage is to the sub
floor embankment soil and is not covered under the terms of the policy.
8. The soil movement has caused problems which are insured under the policy,
that is, structural damage to the home which is, either supported by the FSP’s
own engineer, ‘H’s’, report or, at the very least, stated as being undeterminable
without exploratory work.
Determination
Case No: 288082 Determination Page 2 of 8
9. The FSP has rejected his claim based on the engineer H’s opinion that it is
‘unlikely’ there is structural damage to the stumps. This opinion has been put
forward without addressing engineer H’s report that work is required to
determine this conclusively.
10. The FSP has never addressed the fact that as a result of the storm there is a
couple of cubic metres of wet clay resting against the back wall of the
downstairs room. The Applicant submits there are two problems with this:
(i) Both engineer H, and his appointed engineer, RB, have agreed that this
undoubtedly is causing structural damage to the wall; and
(ii) The lower area of the home gets flooded with each heavy rain because
the clay has covered the drainage and allows water to make its way
through the wall and into the room.
11. The FSP has agreed that the damage to the room caused by the water is an
insured event. The Applicant contends that the FSP admits that the storm
caused the water to enter the room. However, the FSP then separates ‘soil
movement’ as a part of the cause of the damage.
12. The FSP’s engineer has stated that the baffle wall was not constructed with a
fall of 45 degrees which resulted in the collapse of the soil. The Applicant
submits that if the FSP decided the fault and responsibility lay with the builder
and/or engineer, then he would expect that the FSP would take up discussions
with one or both of them as to liability for the collapse.
Summary of FSP’s Position
13. On 25 December 2011, stormwater inundated the Applicant’s home causing
damage. A basement room was damaged by stormwater for which the FSP has
accepted liability. The stormwater also caused a landslip in the sub-floor area of
the home. The FSP submits that there is no dispute as to the cause of the
landslip under the Applicant’s home. The FSP accepts that, on the balance of
probabilities, this was caused by the excessive amount of rain that occurred on
25 December 2011.
14. On the advice of its external loss adjuster, ‘C’, the FSP engaged a structural
engineer, ‘H’, to determine the cause and extent of the d amage caused by the
landslip.
15. H reported that the cause of the landslip was due to the site cut of the land at
construction was greater than 45 degrees and, therefore, without a retaining
wall, the slope was in greater danger of movement. H also determined there
was insufficient drainage at the site that contributed to the damage caused.
16. The terms and conditions of the policy of insurance exclude loss or damage
arising from or involving soil movement, subsidence or landslip, unless caused
by an earthquake.
Case No: 288082 Determination Page 3 of 8
17. The FSP submits that the movement of the land underneath the Applicant’s
home is a clear exclusion under the policy.
18. The Applicant submitted a report from structural engineer, ‘RB’, stating that due
to the landslide itself, it was difficult to determine what the angle of the slope
was before the movement of the land.
19. RB stated that while the angle at the west side of the home appeared to be
steeper than 45 degrees, due to the nature of the stiff clay at the property and
in conjunction with the protected nature of the clay cut being underneath the
home, a soil engineer may have approved a steeper cut.
20. The plans for the Applicant’s home, which is only three to four years old,
indicate a cut of 45 degrees was necessary for the construction of the home.
However, soil engineers appointed by the FSP’s engineer H reported that the
slope under the home was left at approximately 60 – 70 degrees.
21. The FSP submits that if it was to have its liability extended to include the
landslip at the Applicant’s home, that repair work would involve placing the
home in a better state than it was before the events occurred.
22. The FS P’s obligation pursuant to the terms and conditions of the policy would
be to restore the Applicant’s property to the condition it was in prior to the
storm.
23. The FSP submits that in accordance with the terms and conditions of the policy,
it has declined to cover the correction of the landslip at the Applicant’s home.
The FSP further submits the landslide itself is most likely caused by incorrectly
constructed slope of land for the excavation, and it is does not have the
responsibility to act as recoveries agent and solicitor to pursue the original
builders and/or their insurers on the Applicant’s behalf.
24. The FSP relies on the following policy/contract provisions:
‘What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular insured events.
Yes
You are covered for damage or loss to your home building occurring during the
period of cover and caused by the following events:
...
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy
fall of rain, snow or hail.
No
Case No: 288082 Determination Page 4 of 8
...
Damage or loss caused by water seeping into or otherwise entering your building due
to:
a defect or fault in the design, structure or construction of your building where you
could reasonably be expected to be aware of the defect or fault,
...
What we do not cover – general exclusions
Your are not covered under any section of this policy for damage, loss, cost or
liability caused by or arising from or involving:
...
erosion or washing away of soil, earth or gravel,
the washing away or movement of the surface of any path or driveway which has a
surface consisting of a loose material such as gravel, stone or dirt,
soil movement or settlement,
subsidence or landslide unless caused by the insured event of earthquake,
...
Precautions that you need to take
Precautions
You must at all times, and at your expense, take all reasonable precautions:
for the safety and protection of your building and the site,
to prevent bodily injury or damage to property,
to prevent damage to your building,
to ensure compliance with all statutory obligations, by-laws or regulations imposed by
any public authority, relating to the safety of persons or property.
If you do not, we may reduce or refuse to pay any claim you may make.’
Issues
25. Whether the damage to the Applicant’s property was caused by an insured
event of the policy.
26. Whether the FSP is entitled to rely upon a policy exclusion to deny liability to
the Applicant.
Reasons for Decision
27. Due to the nature of the dispute, FOS has considered it appropriate to expedite
the dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. Thus, this dispute has not been subject to a FOS Recommendation
and has proceeded directly to Determination. The parties have been previously
advised that a Determination will be issued in this case.
Case No: 288082 Determination Page 5 of 8
28. The onus of proof is on the Applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against. Once
the Applicant has established that the loss was prima facie caused by a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
29. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence, it is not necessary to go into all of this material other than when
relevant.
30. On 25 December 2011, the Applicant’s locality suffered severe thunderst orms
and stormwater. Rainfall at a Bureau of Meteorology recording station,
approximately eight kilometres away from the Applicant’s property, recorded
rainfall of 71mm between 0900 hours on 25 December and 0900 hours on 26
December 2011. The majority of the rainfall fell during the evening of 25
December 2011.
31. The stormwater runoff from stormwater drains and overflow from the guttering
of the Applicant’s home inundated the basement of the home and also escaped
into the sub-floor area causing the collapse of a clay batter.
32. Therefore, as the policy of insurance covers damage or loss caused by
stormwater, the Applicant, prima facie, has a claim that falls within the cover
provided by the policy.
33. As the FSP seeks to rely upon policy exclusions to deny liability to the
Applicant, the onus shifts to it to establish that, on the balance of probabilities,
the damage or loss was caused by an exclusion under the policy.
34. The Applicant’s home is cut into a steep embankment and on 25 December
2011 stormwater inundated the sub-floor area causing the batter to collapse
undermining concrete stumps of one area.
35. The external loss adjuster who inspected the damage was of the opinion that a
valid claim existed under the policy. The loss adjuster appointed an engineer to
inspect the concrete stumps which appeared to have been compromised by the
water flow.
36. Engineer H inspected the site on 11 January 2012 and reported:
the north site cut embankment collapsed along its entire length; the soil
collapsed against the lower level west wall and water tanks;
inspection of the stumps above the embankment revealed that the three
south stumps appear to be undermined;
the remainder of the stumps occur approximately 500mm west of the top
of the embankment but it was difficult to determine if they have been
undermined due to the extent of collapsed soil in place;
the collapse of the sub-floor cut embankment can occur as a result of a
combination of poor site drainage and inadequate construction;
Case No: 288082 Determination Page 6 of 8
it appears that the cut embankment was relatively steep, cut on an angle
greater than 45 degrees;
site cuts greater than 45 degrees require a retaining wall to prevent them
collapsing; engineer H is of the opinion that a retaining wall should have
been constructed;
water enters the sub-floor area due to poor drainage and wet
embankment;
in his opinion the collapse of the sub-floor site cut embankment is as a
result of a combination of poor site drainage and inadequate construction;
in his opinion the south three stumps at the top of the embankment have
been undermined by the soil collapse and it is likely that the remainder of
the stumps have been undermined;
this would need to be confirmed when the collapsed soil has been
removed.
37. The Applicant appointed a consulting structural engineer, RB, to inspect the site
and review the FSP’s engineer H report. In his report dated 24 February 2012,
RB stated, in part,:
H did not have a copy of the structural drawings, architectural drawings or
soil report and made some assumptions that are not correct;
the architectural drawings had shown in sections the 45 degree cut;
the angle on the west side appeared to be steeper than 45 degrees;
a soil engineer or building inspector may have approved a slightly steeper
angle in the stiff clay where protected from weather under the house and
perhaps 60 degrees or more in the lower part of the cut in rock;
a retaining wall was not required because it was achievable to cut at a
stable angle (45 degrees) and use of long span floor joists;
the stump footings were designed to be founded on weathered rock and
this is well below the 45 degree line of influence;
need to verify if 700mm into ground and founding on rock, otherwise need
to replace stump/pads;
with a design founding depth on rock at 1000 to1200 mm deep he does
not expect the stumps to be undermined;
RB is of the opinion that the collapse is the direct result of excess
stormwater runoff flowing over the top of the west cut from a single storm
event;
the amount of flow would have greatly exceeded the capacity of the
carport drainage and the gravel cut-off drain at the front of the property;
he was of the opinion that the drains worked adequately with previous
storms;
the house is located on the lower side of the bottom of a dip in the gravel
road and overflow from the road and road reserve and the open drain
Case No: 288082 Determination Page 7 of 8
opposite flows down the front of the property, which greatly adds to
normal design runoff;
RB recommended removal of the collapsed soil, clean out spoon drain to
get drainage working again, assess whether the slope can be further cut
to achieve a 45 degree slope; alternatively,
construct a retaining wall and back filled with granular backfill with 30
degrees maximum slope behind, the base of the wall should be located so
that it is still below 45 degrees line of influence to the stump footings.
38. Engineer H engaged a soil engineer, ‘CEL’, to investigate the stumps. In its
report dated 31 May 2012, CEL stated, in part:
‘Given this preliminary exposure, the depth to rock, the lack of any structural damage
to the building above the collapsed batter and the anecdotal evidence from the owner
(i.e. the stumps holes appeared to be very deep) it is highly likely that the
stumps/pads are in fact founder on the rock...’
Failure of batter in the sub-floor
39. On the evidence submitted, I find that the batter in the sub-floor area of the
Applicant’s home collapsed due to the insured event ‘storm and rainwater’.
40. The storm and rainwater was the proximate cause of the collapse of the batter,
therefore, the FSP is not entitled to rely upon the policy exclusions in respect
to:
erosion or washing away of soil, earth or gravel,
the washing away or movement of the surface of any path or driveway
which has a surface consisting of a loose material such as gravel, stone
or dirt,
soil movement or settlement,
subsidence or landslide unless caused by the insured event of
earthquake.
Policy exclusion defect or fault in design
41. The insured event ‘storm and rainwater’ excludes:
‘Damage or loss caused by water seeping into or otherwise entering your
building due to:
a defect or fault in the design, structure or construction of your building where
you could reasonably be expected to be aware of the defect or fault’.(my
emphasis)
42. The Applicant’s home was to be constructed according to an architect’s pla ns
which provided a batter under the house to be constructed at an angle of 45
degrees. For some unknown reason the batter was constructed at an angle of
greater than 45 degrees which probably contributed to the collapse.
Case No: 288082 Determination Page 8 of 8
43. The Applicant’s architect did not approve of the batter angle being altered to
greater than 45 degrees and the Applicant was unaware of the alteration. The
Applicant also could not be expected to be aware of the defect or fault in the
construction.
44. Therefore, I find that the FSP is not entitled to rely on the policy exclusion in
respect to ‘a defect or fault in design...’
45. The Applicant submits that the FSP should indemnify him for the cost of:
removing the collapsed earth from under his house;
determining whether or not the foundation stumps have been
compromised; and
construction of a retaining wall.
46. The Applicant ’s policy of insurance covers damage or loss to the home building
caused by insured events. Therefore, the FSP’s liability is limited to repairing or
replacing any damage caused by the storm event.
47. The policy does not extend to cover any new or remedial works that may be
necessary to prevent damage or loss in the future.
Determination
48. Therefore, I determine the FSP is liable for the costs of:
removing all of the collapsed earth from under the Applicant’s home;
clear and repair any drains damaged during the storm;
determining whether or not the foundation stumps have been
compromised; and if so
replace or rectify any damaged stumps.
49. However, I also determine that the FSP is not liable for the costs involved in the
design or implementation of any remedial works, including construction of a
retaining wall, to prevent the inundation of water to the sub-floor of the home.