Text of the determination
Case No: 287981 Determination Page 1 of 11
Case number: 287981
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
8 November 2013
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the background as set out in the
Recommendation is accurate and is as follows.
2. The Applicant‟s dwelling is insured under a Home and Contents insurance
policy held with the Financial Services Provider (FSP).
3. On 27 December 2011 the Applicant lodged a claim under the policy for
damage sustained to the building arising from a severe hail storm on 25
December 2011. The damage included roof tiles, whirly birds, roller shutters
and an air conditioning unit.
4. The FSP accepted liability for the claim and settled the whirly birds, roller
shutters and air conditioning unit claim by cash payment to the Applicant.
The FSP obtained a report on the condition of the roof tiles and based on the
report finding denied the claim in relation to the roof tiles. The denial was on
the ground the condition of the tiles was due to wear and tear and gradual
deterioration and was excluded from cover provided by the policy.
5. The Applicant subsequently submitted a report obtained by him in relation to
the roof tiles and two quotations in the sums of $21,480 and $24,090 for
rectifying that damage.
6. The FSP accepts that it is required to indemnify the Applicant for tiles which
were damaged. The FSP maintains the quotes provided by the Applicant are
not fair or reasonable or consistent with the extent of damage. As such, the
FSP requires access to the Applicant‟s property to allow its preferred
contractors with the opportunity to quote for the insured damage.
7. The Applicant did not agree with the FSP‟s decision, hence the dispute
which was the subject of a Recommendation. The Recommendation was in
favour of the FSP and was not accepted by the Applicant. The FSP accepted
the Recommendation. In the circumstances, the matter has been referred to
me for Determination.
Determination
Case No: 287981 Determination Page 2 of 11
Summ ary of Applicant’s p osition
8. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicant‟s position as set out in
the Recommendation is accurate and is as follows.
9. The Applicant argues that tiles on his roof are now chipped due to the
extensive hail storm. As a former builder he says that the ridge caps and
valleys on the roof withstood the hailstorm and no water came in.
10. Two quotations were submitted to the FSP to rectify the damage. However
the FSP wanted to obtain quotes from its preferred contractors. The
Applicant wanted a cash settlement as he “will not engage trades that have
no proven past history of works.”
11. The FSP‟s contractor first reported there was no storm damage and the
F SP‟s denial of his claim was based on that report. The FSP settled for
damage to the whirly bird, the air-conditioning unit and the lights.
12. Inspections took place on 20 March 2012 by PI, 5 April 2012 by BBS (at
which time the contractor reported 8 of every 10 tiles were chipped and have
to be replaced), 15 May 2012 by CH in relation to the air conditioning unit
and BBS again on 20 June 2012.
13. The Applicant obtained 3 quotes from roof tilers. They all stated that the tiles
are chipped but they would not confirm the cause is hail damage. He then
obtained a report from a consultant architect and quotations to argue
damage to his roof should be rectified according to that report‟s findings.
14. The Applicant rejected the Recommendation and provided further
photographs and emails in support of his position. He submits;
replacing some of the tiles cannot be done as stated as tile sizes have
changed (L x W) and replacement of new tiles would not suit the
existing batten spacing or layout.
the statement that chips were pre existing because of moss growth is
incorrect, the fact that we live in a high vegetation area and this claim
has taken two years is why moss is present on most chips, not that the
chip wasn't caused by hail.
many statements carry no relevance to this dispute , the comment that
the ridge caps are not chipped and that there are 50/100 tiles damaged
is bias, I can send you photo's to the contrary.
the new roof tiles are a different size , profile and colour.
On the west and south aspect most of the tiles have been impacted
severely by the hail, there are more than 1,500 tiles damaged.
the only tiles that would come close are secondhand, from tile yards
and due to the double handling are excessively chipped and
damaged.(as per photo)
Case No: 287981 Determination Page 3 of 11
new roof tiles cannot be randomly replaced ,which is why he has
obtained quotes to replace the entire roof.
Summary of FSP’ s position
15. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP‟s position as set out in the
Recommendation is accurate and is as follows.
16. The FSP initially relied on a report provided by a contractor commissioned
by it to argue there was no storm damage to the roof and deterioration to the
ridge cap and valley tiles was due to age, wear and tear.
17. The FSP submits that the report obtained by the Applicant recommends that
only the damaged tiles should be replaced. It does not include every tile on
the roof or battens and sarking as indicated in the Applicant‟s quotes.
18. The FSP refers to a further report obtained by it from roofing contractor
“SRS‟ to argue that although the there is evidence of damage that could be
related to the hail storm event, the report also confirmed there was damage
present which is unrelated to the hail storm.
19. The FSP states the report obtained by the Applicant does not comment on
this damage and questions the level of analysis by the author.
20. The FSP submits that although the Applicant‟s report has been of
assistance, due to the level of analysis and professional differences between
the two parties, the report provided by SRS should be preferred. It notes
SRS specialises in roofing.
21. The FSP accepts that it is required to indemnify the Applicant for tiles which
were hail damaged. However the quo tes submitted by the Applicant are not
fair and reasonable or consistent with the level of damage. It has attempted
to have qualified repairers quote on the damage based on its preferred
contractor‟s report. However the Applicant has refused to cooperate b y not
allowing the quotes to be obtained.
22. The FSP requests the Applicant allow it to obtain quotes from its preferred
contractor or alternatively, the Applicant provide evidence justifying his
position the entire roof, battens and sarking require replacement.
23. The FSP relies on the following policy terms:
“ EXCLUSIONS APPLICABLE TO YOUR POLICY
IN RESPECT OF ALL SECTIONS IN THE POLICY, WE WILL NOT COVER
YOU FOR DAMAGE, LOSS OR LIABILTY CAUSED BY, ARISING FROM OR
INCLUDING ANY OF THE FOLLOWING:
...
X Wear and tear, lack of maintenance or inherent defect, including
gradual deterioration.”
Case No: 287981 Determination Page 4 of 11
24. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position.
Issue
25. Whether the extent of hail damage to the roof of t he Applicant‟s dwelling
requires replacement of the entire roof.
Reasons for Decision
26. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
27. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
28. In reaching a decision, it is appropriate to consider the Terms of Reference
under which FOS operate. The Terms of Reference require that I consider
what is fair in all the circumstance having regard to the relevant legal
principles, the terms of the relevant policy and good industry practice.
Regard should also be had to prior Determinations, although such
Determinations are not binding or precedents.
The evidence and contentions of the parties
29. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the parties‟ positions as set out in the
Recommendation is accurate and is as follows. As the material has been
exchanged the reports will not be recited in full in this Determination except
where relevant.
PI building assessment report dated 29 March 2012.
30. The FSP arranged for this building assessment report. The assessment was
completed by PI on 29 March 2012. The assessor note the Applicant
claimed the hail had damaged 5 eave roller shutters to the rear and right
hand side of the property, the coil to the air conditioner and two exterior
lights to the garage. The assessor agreed. The Applicant said there was no
damage inside the house. The assessor estimated repair cost to be
$23,094.45.
31. The assessor noted the home was well maintained and concluded:
“Our inspection of the roof revealed there to be no storm damage, however
there is some deteriorated pointing to the ridge cap and valley tiles due to
age, wear and tear.
...
Case No: 287981 Determination Page 5 of 11
Our inspection revea ls no hail impact damage to the roof tiles”
The undated report of the Architect.
32. The Applicant engaged the architect to inspect the roof which he did on 10
March 2013.He notes the house was built in about 1987 and is in good
condition. He noted evidence of chipped roof tiles and window shutters also
damaged by hail. He found that;
“There is clear evidence the roof tiles have been damaged by hail. Tiles are
chipped at the edges, with the size of the chip varying. The chipping has
mainly occurred at the perimeter of the tile. The extent of chipping has taken
pieces of the tile off and broken the glazing of the terracotta.
...
CONCLUSION
The inspection indicates that there has been damage to the tiles, with the
pattern reflecting severe hail damage. Although no tiles were severely
damaged, I am of the opinion that the location of the chips on the tiles, and
the level of damage of the protective glazing shall reduce the integrity of the
tiles.
I recommend that any damaged tiles be replaced.”
SRS report (AS) dated 2 July 2013.
33. SRS was engaged by the FSP to inspect the roof which was done on 31
May 2013. I note the report is made by a roof tiler/slater and general roof
assessor. He concluded there was storm damage, impact damage and
maintenance, and that further permanent repairs are required. He also
concluded that a make safe was not required and there were no leaks,
construction fault, faulty workmanship or previous inadequate repairs. He
began the report by saying that he inspected the roof some 17 months after
the storm event and so, “it is difficult to determine the exact cause of
damage....”
34. SRS then reported to the FSP as follows:
“SRS noticed that chipping or flaking was evident on the majority of the roof
tiles. Several of these are noticeably more recent than others.
SRS cannot rule out the possibility that hail had caused or contributed to the
overall condition of several of these roof tiles.
SRS noted that moss had grown on several of the chipped or flaking roof tiles.
This is not necessarily the result of hail damage. These fully glazed roof tiles
are baked at high temperatures and are prone to chipping during storage,
cartage, installation and the aging of the roof tile.
SRS found some chipping on the top of the roof tiles (beneath the overlapping
roof tile) which could not have been the result of hail damage.
This supports our theory that some tiles may have been chipped during
installation.
Case No: 287981 Determination Page 6 of 11
Reading the independent architect‟s report provided (March 10, 2013) it is
noted that there w as „ no evidence of any water damage to the ceilings from
roof leaks.’
SRS can only assume that (A) any internal damage had been repaired or (B)
that internal damage had not occurred. In the above mentioned report, it also
states that „ no tiles were severely damaged...’ SRS assumes that internal
damage had not occurred. Leaks were not evident during our assessment.
Hail had not impacted or damaged the capping mortar. Moss is evident
throughout the mortar indicating that none of the capping mortar had been
replaced after the storm event.
SRS noted some chipping along the valley tiles. It is SRS‟s professional
opinion that these roof tiles were damaged during installation. A tile cutter
(and not an angle grinder) was used causing chipping to occur.
In summary, SRS do not believe that all chips and flaking are the result of hail
damage. SRS estimates that approximately 50 to 100 roof tiles may have
been further damaged by hail. The roof tiles used in this roof are of good
quality. SRS do not believe that the chips and flaking affect the integrity of the
roof tiles.
A quotation has been provided by others to replace all roof tiles, battens,
install sarking and re-point the entire roof. The associated costs are
reasonable for the work stated but SRS believe that not all roof tiles require
replacement. It is not necessary to replace the roof battens.”
Photographs
35. PI took no photographs of the roof but did take photos of the hail impact to
the air conditioning coil and the floodlights.
36. The architect took photographs of the tiles showing the typical chipping of
the tiles, the ridge capping tile and the glazing protection removed. He notes
the damaged flashing showing “hammering” from storm damage. He says
the valley flashing and pointing are in good condition
37. SRS also provided photographs of the roof tiles with annotations describing
what he had seen and set out in his report.
38. The Applicant provided further photographs after the Recommendation
which are not of the damaged roof but of the difference in the type of tile
available now as compared with the tile on the roof.
Invoices
39. BBS attended the property on 20 March 2012 and provided a quote to repair
4 electric shutters in the amount of $7,293.44. This was cash settled for
$4,707 due to matching issues.
40. BBS was also authorised to proceed to repair the exterior lights and the air-
conditioning unit in the amount of $12,454.20. This was also cash settled.
41. There is no objective independent evidence that BBS inspected the roof.
Certainly, BBS did not report on the roof.
Case No: 287981 Determination Page 7 of 11
42. The Applicant obtained a quote from ERT dated 22 April 2013 to remove
existing roof and replace 3,700 roof tiles and battens for $24,090.
43. The Applicant obtained a second quote from EWR dated 1 May 2013 to
remove damaged terracotta tiles and replace with new to match for $21,480.
44. The architect charged the Applicant $660 for his report. The FSP reimbursed
the Applicant for the cost of the report.
Analysis
45. It is an accepted principle of general insurance law that an insured bears the
onus to establish on the balance of probabilities that they have suffered a
loss caused by an event to which the policy responds. This is known as a
prima facie claim. Once so established, the onus shifts to the insurer to
prove on the balance of probabilities that an exclusion applies if it seeks to
deny or limit its liability for the loss.
46. Accordingly in this matter the Applicant must prove on the balance of
probabilities that the loss was caused by an insured event such as
accidental damage or a storm and if that is established, the onus shifts to the
FSP to prove on the balance of probabilities the loss was caused by an
exclusion such as wear and tear and gradual deterioration.
47. Initially the FSP contended there was no hail damage to the roof tiles
because of the report of the assessor who inspected the roof not long after
the storm event.
48. However the FSP then considered reports it obtained from the Applicant and
its own expert.
49. The dispute then revolved around not whether there had been storm
damage to the roof tiles but the extent of the damage and the cost to replace
the tiles. After the Recommendation, the Applicant said that more than 1,500
tiles have been damaged by the storm event and that new tiles cannot be
randomly replaced as the sizes of the tiles have changed. He says the
photographs he has sent to the Service after the Recommendation
demonstrate this. Therefore, he maintains his contention that the entire roof
needs to be replaced.
50. The FSP did not make any further submissions after the Recommendation.
51. The FSP submitted that it only has to indemnify the Applicant for the
damaged tiles. It contends its evidence is that some of the tiles are hail
damaged and some are not. It says that the quotes submitted by the
Applicant are not consistent with the level of the damage and that it should
be allowed to have a quote done based on its expert report. It also says the
Applicant has not allowed this to be done.
52. I have considered both reports from the architect and from SRS. I have
looked at photographs taken too.
Case No: 287981 Determination Page 8 of 11
53. SRS concedes there are some tiles damaged in the storm – about 50 to 100
tiles. He says the hail damage has not affected the integrity of the roof tiles.
He also says that other tiles have damage that predates the storm or that the
damaged tiles may have been chipped during installation. He also says that
the roof battens do not have to be replaced. The photographs he took
support and illustrates his submissions.
54. The architect inspected the roof a few weeks before SRS. He is of the view
that although no tiles were severely damaged that the integrity of the
chipped tiles has been affected. He says that the damaged tiles should be
replaced but he does not say how many damaged tiles there are. The
photographs he took show the pattern of chipping which he describes as
“severe hail damage.” I infer from this comment and the photographs that
there are more than 50 to 100 tiles damaged by the storm in his opinion but
he has not provided an actual estimate.
55. The reports are not dissimilar in their conclusion in that they both agree that
some tiles are damaged but differ as to whether the integrity of the tile is
such that they have to be replaced. Further the architect appears to assume
that all the damage he saw was caused by the storm whereas SRS says that
some damaged tiles were not damaged in the storm.
56. The Applicant has the onus of proof to establish on the balance of
probabilities that all the claimed damage to the tiles is related to the hail
damage in the storm. I am not satisfied that he has met the onus as his
expert report is not as detailed as the expert report from SRS. The architect
has not commented on or been asked to comment on the cause of damage
to all the tiles whereas SRS has made a more detailed report and
distinguishes the condition of the tiles from damage in the storm as
compared with earlier damage.
57. Further, I note that although the architect is certainly qualified to comment on
the tile damage, his expertise is not as specific as that of SRS who is a roof
tiler and roof assessor.
58. Neither expert has commented on the quantum of the claim or the issue of
the matching tiles. The architect simply says that “any damaged tiles are to
be replaced”. He has not comme nted on the quotes obtained by the
Applicant which were obtained after the architect inspected the roof.
59. SRS has reviewed the quotes but makes no actual assessment of the cost of
replacing the tiles. He simply says the “associated costs are reasonably for
the work stated” but that “not all the roof tiles require replacement”. And he
says: “it is not necessary to replace the roof battens.”
60. As he has reviewed the quotes and as I accept his report is more detailed
and provides a more detailed analysis of the state of the roof tiles, I accept
that the condition of all roof tiles was not entirely due to the impact by hail. I
also accept that the extent of damage to the tiles was not sufficient to
warrant replacement of the entire roof including the roof battens.
Case No: 287981 Determination Page 9 of 11
61. I do note that the SRS admits that it was difficult to determine the exact
cause of damage that had occurred because he had inspected the roof more
17 months after the storm. However, the architect is in the same position as
he only inspected the roof a few weeks earlier than SRS. Nonetheless SRS
still makes some detailed observations even if there was a lapse of time from
the storm to the inspection.
62. After the Recommendation the Applicant submitted that replacing some of
the tiles cannot be done as tile sizes, profile and colour have changed. He
says new ties would not suit the existing batten spacing or layout. He says
that 1,500 tiles have been damaged and the second hand tiles which would
fit are not suitable as they are already chipped and damaged. Accordingly he
claims that as the new roof tiles cannot be randomly replaced but that the
whole roof has to be replaced.
63. After the Recommendation, the Applicant also provided photographs in
support of his contention. The FSP made no further comment on this
information.
64. This issue leads me to consider some other policy terms and conditions.
They are as follows:
“ MAKING A CLAIM
The checklist below can help to ensure you have done all you need to do to
enable us to handle your claim quickly. If you do not meet your responsibilities
we may cancel your policy and reduce or refuse to pay your claim.
WHAT YOU MUST DO WHEN YOU MAKE A CLAIM
...
Allow us access . You may be required to let us enter your home to
investigate the cause of loss or damage following a claim.
HOW WE SETTLE YOUR CLAIM
HOW WE SETTLE A CLAIM FOR YOUR HOME, CONTENTS, ENTHUSIAST
ITEMS OR PERSONAL EFFECTS
We discuss with you what is necessary to make good the loss or damage,
and in respect of loss or damage to your home, contents, Enthusiast items or
personal effects, we decide whether we will:
Repair damage; or
Replace your home ...
Pay you what it would cost us to repair or replace your home...
If we agree to pay you the cost of repair or replacement, we will reduce the
amount we pay by an amount equal to any trade discount that we would have
obtained from a supplier, had we chosen to repair or replace your items.
If you decide not to repair or replace your home, or do not commence repair
or replacement within six months of the date the loss or damage occurred, we
will pay you what it would have cost us to repair or replace your home at the
date of loss or damage.
MATCHING BUILDING AND CONTENT MATERIALS
Case No: 287981 Determination Page 10 of 11
Where we repair your home, we will try to return your home to the same size
and standard as your current home by matching building materials as far as
we can.....
Where we cannot achieve an exact match, we will use materials that are
readily available in Australia and match the damaged or lost materials as near
as possible in our opinion.
....
We will not pay for materials to match undamaged parts of your home to
create a uniform effect.
.........”
65. The policy provides that the Applicant must allow the FSP to enter the home
to investigate the cause of loss or damage and if this does not occur then the
FSP may reduce or refuse to pay the claim. It is not unreasonable that the
FSP have the further opportunity to inspect the roof damage to assess the
amount of the damage and the cost to repair it and to assess the claim made
by the Applicant that the tiles cannot be randomly replaced.
66. However as the storm damage happened nearly two years ago, I do not
propose to delay matters further by delaying an outcome to allow for a
further inspection and assessment. Rather I will make a determination on the
material to hand and considering what is fair in all the circumstances.
67. The Applicant says that as the new roof tiles cannot be randomly replaced
the whole roof has to be replaced. The FSP has made no comment on this
assertion. The policy provides that the FSP has to try to match building
material as far as it can but that it does not have to achieve an exact match.
Rather, the FSP can use materials that are readily available in Australia and
match the damaged tiles as near as possible.
68. The Applicant has provided photographs of tiles that are a different colour
and a slightly different size and says this is the reason that the whole roof
has to be replaced. However, I do not find this sufficiently compelling
evidence to support the payment of over $20,000 to have all the tiles on the
roof replaced. On this material alone, I do not accept that there are no
materials at all readily available in Australia and that there are no tiles
available of sufficient size, colour and standard so that the roof cannot be
repaired adequately by replacing the damaged tiles with new tiles.
69. SRS says that only 50 to 100 tiles are to be replaced although he has some
reservations about the cause of the damage as he looked at the roof so long
after the storm. Because of this, I do not accept tha t estimate as an absolute
number but would allow a modest percentage more. The architect does not
say how many tiles are damaged by the storm. The Applicant asserts 1,500
tiles are hail damaged but without providing any independent objective
evidence of that assertion.
70. The quote from ERT to replace the roof for $24,090 includes in the cost
3,700 tiles. SRS says the quotes are not unreasonable if I were to accept
Case No: 287981 Determination Page 11 of 11
that all that work had to be done. For the reasons stated above, I do not
accept that all that work has to be done.
71. Taking into account the amount of this quote to replace 3,700 tiles, the
widely disparate estimates of the number of tiles damaged and the possible
difficulty of finding tiles of the same size and standard I am of the view that it
is fair in all the circumstances to allow an amount of $5,000 to the Applicant
to replace the hail damaged tiles on the roof.
Determination
72. On the basis of the available information and for the reasons stated, I
determine that the FSP is to indemnify the Applicant for the hail damage to
the roof by paying to the Applicant the amount of $5,000.
73. I will not award interest on $5,000 as there is no evidence that the Applicant
has spent money and had the roof repaired.