Claim denied for sub-floor water inundation and stump movement; long delay in decision
Text of the determination
Case No: 286971 Determination Page 1 of 9
Case number: 286971
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
9 April 2013
Background
1. On 18 January 2011, the sub floor of the Applicant‟s home in Pyramid Hill,
Victoria, was inundated with water following heavy rainfall and flooding in the
area.
2. On 16 March 2011, the Applicant lodged a claim under his Home Building
Insurance policy issued by the Financial Services Provider (FSP), for
structural damage to the building.
3. By letters dated 19 May 2012 and 2 July 2012, the FSP denied the claim on
the ground the distress observed to the building was not caused by the
isolated rainfall in January 2011, rather it occurred as a result of soil bearing
failure under the timber stumps in conjunction with the deteriorated condition
of the stumps, both of which are excluded by the terms of the policy.
Summary of Applicant’s position
4. The Applicant disputes the FSP‟s decision to deny the claim on the following
grounds:
Prior to 18 January 2011, heavy rain fell which contributed to the
inundation of his property with water from the channel and not from the
creek as stated by the FSP.
Contact with the FSP involved 17 different people in five different
States who did not have any knowledge of his claim.
Failure by the FSP to call back as promised.
The new concrete path which the assessor considered was replaced as
a result of pre-existing damage had been replaced when the sewer was
connected and not as a result of previous cracking.
The assessor had been informed the north wall was not part of the
claim.
The chimney had been pulled down prior to the water damage.
Determination
Case No: 286971 Determination Page 2 of 9
The time taken to finalise the claim (2 years) has allowed further
damage to occur as the property was not re-blocked.
A requirement for the grant from the Department of Human Services
(DHS) included the FSP‟s response to the claim. The FSP was made
aware of this when he sent a copy of the DHS letter to the FSP. That
grant was closed in March 2012 and due to the FSP‟s 14 month delay,
the grant time has elapsed.
Summary of FSP’s position
5. The FSP relies on reports obtained from two consultant engineers, which
show the Applicant‟s property damage was caused by a combination of flood
water, soil movement, wear and tear and subsidence.
6. The FSP submits any damage caused by water inundation to the sub-floor
and stumps would have been caused by flood water or a combination of
stormwater run-off and flood water.
7. In this case, it is entitled to deny the claim based on the definition of „flood‟
and the legal principle set out in the matter of Hams v CGU Insurance Ltd
(2002) 12 ANZ Cases 61-525) (the Wayne Tank principle).
8. The FSP submits there were pre-existing internal cracks, evidence of
patchwork and previous movement and old damage to the north wall.
9. The west wall of the lounge room had previous repairs to cracks which were
caused by soil movement. The kitchen and bathroom showed signs of pre -
existing movement due to the poor condition of the stumps and pre-existing
subsidence.
10. The FSP acknowledges the Appli cant‟s submission that he lost the
opportunity to apply for a government grant to cover the re-blocking of the
stumps due to the delay in the claims process.
11. The FSP refutes the Applicant‟s assertion he had been prejudiced due to the
delays in the claim process. The FSP submits the Applicant had the
opportunity to apply for the grant at any stage of the claims process.
12. The FSP argues that it would not be appropriate to provide a conclusion as
to whether the claim was for acceptance prior to assessment. The
successful lodgement of a claim is not indicative of an acceptance of liability.
13. The FSP relies on the following policy terms:
“ What we cover – Insured events
No
Damage or loss caused by flood. Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from; or
Case No: 286971 Determination Page 3 of 9
is prevented from entering because of other water has already
escaped or been released from it;
the normal confines of any watercourse or lake, including any that may
have been modified by human intervention, or reservoir, canal, dam or
stormwater channel.
Flood does not mean storm water run-off from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
...
What we do not cover
- general exclusions
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
...
wear and tear, rust, deterioration or corrosion.
...
flood,
...
soil movement or settlement,
subsidence or landslide unless caused by the inured event of earthquake,”
Issues
14. Whether the FSP was entitled to deny liability for the claim.
15. Whether the Applicant was prejudiced by the claims process.
Reasons for decision
16. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
17. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
18. Prior to arriving at a determination, the Panel has read and considered all
the material submitted by the parties to FOS.
19. When making a claim under an insurance policy, the responsibility rests with
the policyholder to establish on the balance of probabilities, that the cause
for the loss claimed falls within the cover provided by the policy.
Case No: 286971 Determination Page 4 of 9
20. When this has been established, an FSP relying on terms of the policy to
deny the claim has the burden of establishing on the balance of probability
that the terms of the relevant clauses apply to defeat the claim.
Cause of damage claimed
21. It is common ground between the parties that the water inundation of the
Applicant‟s property did not enter the dwelling but instead was contained
within the sub-floor of the building.
22. The FSP relies substantially on the engineers‟ reports commissioned by it, to
argue the water inundation of t he Applicant‟s property was flood water or a
combination of flood water and surface run-off. As there has been an
exchange of material between the parties, the Panel does not intend reciting
details of the reports in this Determination. The Panel will, however, refer to
sections of those reports, where relevant.
Source of the water which inundated the property
23. The Applicant‟s property is located about 400 metres from a creek. The
creek crosses Kelly Street about 400 metres from the Applicant‟s property. A
concrete drain is located just behind the eastern boundary of the property.
24. Engineer “FG” in its hydrology report dated 17 June 2011 found:
Local stormwater run-off could not have occurred on 18 January 2011,
due to the absence of rainfall on the day of the event and 3 days
preceding the event.
If damage to the dwelling was the result of soil movement because of
inundation by rainfall from 10 to 14 January 2011, then any damage
may have been a result of inundations which occurred on numerous
occasions in total.
The significant inundation of the property on 18 January 2011 was the
result of overflow from the creek.
25. In arriving at his findings, the engineer observed the hills located about 2
kilometres from the property were surrounded by Bullock Creek on all sides.
He stated it was not possible for stormwater run-off from the hills to reach
the property unless the creek was full.
26. The engineer further considered stormwater inundation of the property from
the rear was not possible, unless the drain at the rear of the property was full
and overflowed.
27. In addition, following inspection of the swale at the intersection with Kelly
Street, the engineer was of the opinion that due to debris in trees and fences
within and on the bank of the creek, that water backed up the creek and
overflowed into the property from both front and rear.
Case No: 286971 Determination Page 5 of 9
28. In relation to surface run-off of rainwater entering the site, the engineer
observed:
There was no rainfall on 18 January 2001 and the three preceding
days.
Significant rainfall from 10 to 14 January 2011 would have resulted in
some accumulation of rainwater on the property, on the day of the
rainfall. It was possible that some of this water would have flowed
under the house causing distortion to floors, doors and window frames.
However, if this occurred, then it would also have occurred during other
numerous occasions when there was significant rainfall.
29. Based on this information, the Panel accepts on balance that any water
which entered the Applicant‟s property from the direction of the hills or from
the front and rear of the property on 18 January 2011, would be overflow
from Bullock Creek and or the drain to the rear of the property.
30. The policy defines „flood‟ as water which escapes or overflows from a
watercourse, drain or stormwater channel or cannot enter those, because
they are full or overflowing. Loss or damage caused by flood is excluded
from cover provided by the policy.
31. The policy does provide an exception to the flood exclusion insofar as „water
escaping from a drain‟ may be the source of an initial inundation, prior to the
arrival of the all encompassing policy excluded flood waters. However, even
were the Panel to accept, on the balance of probabilities, that the drain at the
rear caused partial inundation of the building ‟s sub floor, prior to the arrival of
flood waters from Bullock Creek, the Panel determines this water was
present for only a short duration, prior to the arrival of the creek water. Once
the creek water mixed with the drain water, all the resulting inundation is
properly characterised as the policy excluded event of flood.
32. For reasons outlined below, the Panel also determines, the contributory
effect of the water (whatever its source) may not be sufficient to establish it
as the proximate cause of the damage to the subfloor of the house.
Cause of damage
33. Following a site inspection on 27 July 2011, the consultant civil and
structural engineer “BH”, provided a detailed and comprehensive analysis of
the cause for the damage to the Applicant‟s home.
34. BH concluded there has not been any significant damage caused to the
house by the water inundation apart from the probable further subsidence
movement throughout the east portion of the house, most probably due to
the poor condition of the existing stumps.
35. The engineer observed:
The house displays recent movement in various areas including
cracking in the east wall of the lounge room, the north wall of the
Case No: 286971 Determination Page 6 of 9
lounge room was moving away from the wall, there was cracking in the
front bedroom and laundry/bathroom area.
There was significant cracking to the rear veranda. However, the
cracking appeared to be pre-existing and there was some patching and
portions of concrete removed suggesting the paving was in poor
condition, prior to the flood in January 2011.
There was evidence of extensive older damage. The majority of the
chimney had been removed suggesting previous movement in the
house.
Soils in the area are highly to moderately reactive clays.
Unless flood water has been able to pond under the house to a
significant depth and for a significant time, then the soil is not saturated
to a depth sufficient to cause soil swelling that could affect the footing
system.
Recovery movement could have caused some or all of the recent
cracking and movement around the internal and external walls
particularly where new cracks have appeared over older previously
repaired cracks and where the floor levels show limited current
differential movement.
There is significant subsidence through the central portion of the
kitchen which suggests the stumps in this area have experienced
significant decay and subsided due to their condition rather than as a
result of the water inundation. The same circumstances apply to the
bathroom, toilet and laundry areas of the house.
They believe much of the movement in the house was pre-existing and
due to causes other than the water inundation.
The short period of water inundation would not have caused any
significant deterioration of the stumps.
36. The engineer reported:
“Based on the floor levels and the limited amount of internal cracking
compared to the amount of movement that has occurred, we believe that the
water inundation/flooding has likely caused some minor additional subsidence
movement to the stumps under the kitchen bathroom and laundry and toilet
area with this movement primarily due to the relatively poor condition and the
founding depth of the stumps in this portion of the house allowing this
movement to be mainly due to general rehydration of the soils following the
extended drought. Rehydration and subsequent swelling of the under laying
clays may continue for a number of years potentially causing further cracking
and movement.”
37. According to the evidence, the Applicant‟s home experienced movement
resulting in damage prior to the January 2011 water inundation. In addition,
the condition of the stumps was considered poor and for the most part
responsible for the movement and cracking evidenced following the January
event. The expert opinion was that causes other than the water inundation,
were responsible for the damage claimed.
Case No: 286971 Determination Page 7 of 9
38. While the Applicant advised damage to the north wall of the home including
the partially removed chimney did not form part of his claim, the evidence is
indicative that the other damage claimed was principally due to a
combination of the condition of the stumps, changing environmental
conditions impacting on the reactive clay soils and the effect of water on their
founding soils.
39. Although water may have been a limited factor in relation to the performance
of the stumps, engineer BH observed that soil bearing failure will occur
under the more heavily loaded stumps being around the internal walls that
carry the roof load.
40. BH went on to state, it is not common for the centre of the floor to an
individual room to show significant subsidence movement as a result of soil
bearing failure as the load on the underlying stumps is low compared to
those around the load bearing perimeter walls.
41. BH observed there was significant subsidence throughout the centre portion
of the kitchen which leads to the conclusion the stumps in that area were
experiencing significant decay and subsided due to their condition rather
than as result of the water inundation.
42. For these reasons, the Panel considers the water inundation had only a
marginal effect on the cause for the movement, with the dominant cause for
the damage being the pre-existing condition of the stumps. Damage or loss
arising from deterioration is excluded from cover provided by the policy.
43. In reaching this conclusion, the Panel notes that it has already determined
that to the extent drain water may have been present under the house, it was
only for a short time, prior to the arrival of the creek water and that time
would have been insufficient to cause any damage to the subfloor‟s foo tings.
Once the creek water arrived, this being policy excluded, then to the extent it
arguably contributed to the subfloor damage, it must be disregarded.
44. Accordingly, the Panel considers the cause for the damage does not fall
within the terms of cover provided by the contract and the FSP was entitled
to deny liability for the claim
Government grant
45. The Applicant lodged the claim on 16 March 2011. By letter dated 19 May
2012, the FSP denied the claim. The FSP‟s final decision was issued on 2
July 2012, being about two months after the initial denial was issued.
46. It follows that a period of about 15 months elapsed before the Applicant was
informed his claim was not accepted.
47. The Panel accepts that at the time of the loss the industry was under
considerable pressure as a result of serious widespread flooding in
Queensland and Victoria, resulting in a significant increase in claims made.
Case No: 286971 Determination Page 8 of 9
48. According to the Applicant, “DHS” had carried out a site inspection of his
home soon after the flooding in January 2011. He advised that by letter
dated 15 March 2011, DHS informed him he could apply for a grant to rectify
the stumps. Approval for the grant was subjected to a number of conditions
including but not limited to provision of his concession card, bank
statements, ra te notices and the insurance company‟s response to the claim.
49. The Applicant says the FSP was provided with a copy of that letter. The FSP
denies receiving notice of the Applicant‟s potential interaction with DHS (the
15 March 2011 letter) until the Applicant referred this matter to the Service.
50. The Applicant now advises that because of the time taken by the FSP to
deny the claim, the grant is no longer available to him.
51. The FSP‟s IDR response to the Applicant dated 2 July 2012, specifically
acknowled ges „the time taken for (name of Insurer) to inform you of its
decision in regards to your loss would have been lessened through more
effective management of your claim‟. The FSP in a subsequent submission
has apologised for this delay.
52. While the FSP asserts the Applicant was in a position to apply for the grant
at any time, the Applicant advised that he contacted DHS during the claims
process and was reminded of the criteria required to apply for the grant.
53. In the Panel‟s opinion, the Applicant suffered a s a result of the lengthy period
of time taken to inform him the claim was not accepted. In this regard, the
Panel does not agree with the FSP that the Applicant has not been the
subject of an unusual amount of time taken to resolve the Applicant‟s claim.
If this were so, why would the FSP acknowledge the Applicant‟s frustration
and extend a sincere apology for the experience, while also acknowledging
the delay was caused by its contractors, in the provision of reports.
54. Clause 9.3b) of the FOS Terms of Reference provide:
“Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the Financial
Services Provider, compensate the Applicant for non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy rights -injury has
occurred to the Applicant‟s feelings or humiliation has been suff ered by the
Applicant.
The maximum amount of compensation for non-financial loss will be $3,000 per
claim made in the dispute”.
55. The Panel regards the FSP‟s delay as excessive and that has interfered
significantly with the Applicant‟s expectation of peace of mind, particularly
given his anxiety in respect of the „time bound‟ nature of the grant for which
he may have been entitled.
Case No: 286971 Determination Page 9 of 9
56. Having regard to the material, the Panel intends to exercise its discretion
pursuant to 9.3b) of the FOS Terms of Reference and award the Applicant a
sum of compensation.
57. The Panel considers that a sum of $2,000 represents a fair amount in all the
circumstances.
Determination
58. On the basis of the available information the Panel determines that the FSP
was entitled to deny liability for the claim.
59. Pursuant to clause 9.3b) of the FOS Terms of Reference, the FSP is to pay
the Applicant the sum of $2,000 as compensation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.