Home / Financial Firm (Unknown - Insurer) / Determination 286790

Determination 286790

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners' pool was damaged when a creek flooded, and the FSP declined the claim as erosion. AFCA found flood caused the damage, that flood cover applied from 5 February 2012, and ordered the FSP to pay the pool damage with interest, with no figure stated.

The supplementary PDS added flood cover and the expert evidence attributed the damage to flood rather than erosion over time, so the erosion exclusion did not defeat the claim.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 286790 Determination Page 1 of 7 Case number: 286790 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 26 November 2012 Background 1. The Applicants hold a Home Building insurance policy with the Financial Services Provider (FSP). The policy commenced on 11 July 2002 and expires on 11 July 2012. The building is covered for complete replacement subject to a $500 excess. 2. On 7 March 2012 the Applicants‟ property was damage d as a result of heavy rains and an adjacent Creek overtopping its banks. The Applicants subsequently claimed for the damage to the residential dwelling , the pool, pool plumbing, equipment and its surrounds “the pool”. 3. The FSP accepted the claim for damage to the building but declined the damage to the pool. The basis for the declinature is the loss or damage arose from erosion which is an excluded cause of loss under the policy. 4. The Applicants dispute the declinature on the basis that it was flood which caused the damage and flood is covered by the policy. The Applicants have also raised their dissatisfaction with the claims handling which led to delay and resulted in further deterioration to the pool. Summary of Applicant’s position 5. The Applicants rely on the Supplementary Product Disclosure Statement (SPDS). I note the SPDS confirms that flood is added as a new insured event under the PDS 2006 or 2011 as of 5 February 2012. I note the following policy terms from this SPDS: “ Yes No Flood „Flood ‟ means the covering of normally dry land by water that has escaped or been released from the normal confines of: Any lake, or any river, creek or other natural watercourse, whether or .... Loss or d amage to retaining walls, garden borders and free standing outdoor walls; Resultant cracking to paths, driveways, any outdoor surfaces but we will cover them if they are washed away by the flood; ... Loss or damage to swimming pools or underground tanks ca used by water leaking down the sides, against the sides or getting underneath them; ... Loss or damage caused by erosion, vibration, subsidence, landslip, Determination Case No: 286790 Determination Page 2 of 7 not altered or modified; or Any reservoir, canal or dam. landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage to your building caused by a landslide or subsidence that occurs within 72 hours of, and directly because of, flood and not because of erosion over time, structural fault or design fault; ... On page 13 of the PDS, delete the 'flood' general exclusion. Also, delete the general exclusion 'subsidence or landslide unless caused by the insured event of earthquake' and replace with 'subsidence or landslide unless caused by the insured event of earthquake or unless specifically covered under insured event flood.” 6. The Applicants state that after a night of heavy rain a creek that runs along the rear of the property rose and caused damage to a corner of the swimming pool area at the bottom of the garden. At this time the damage was limited to a small amount of land being washed away in the area around the pool pump, causing the pool pump enclosure, pavers and boundary fence to sink several centimetres. Drainage pipes and plumbing/electrical wiring associated with the pool pump also shifted. 7. The Applicants were informed by the FSP that an assessor would be appointed to inspect the damage. The inspection did not take place until 19 April 2012, being 43 days later as the original assessor did not have instructions to inspect the pool. This later inspection also occurred after further flooding when a substantial part of the pool area collapsed exposing all the plumbing and live electricity. 8. The Applicants note that they made 12 telephone calls to the FSP between 8 March 2012 and 19 April 2012 informing its representatives of the urgency of the situation. The representatives reassured the Applicants not to worry as they were covered for flood damage. It was 58 days after claim lodgement (4 May 2012) before the FSP indicated a potential issue with the claim. During this period of time the claim altered from minor damage to a major collapse beneath the pool pump house whilst awaiting a FSP decision. This collapse also affected the pavers, concrete and drainage pipes being washed away. The filter, pump and associated plumbing were left hanging over the edge of the hole and live electricity was exposed. 9. The Applicants note the job number quoted on the report for the first assessor “R” does not match the job number for the photographs. The Applicants contend these photographs were not taken on the day implied by the report. 10. The Applicants contend the policy terms contained within the SPDS clearly covers the incident. The terms allow for cover of flood that washes outdoor surfaces away or causes landslide/subsidence within 72 hours of, and directly because of, flood. Summary of FSP’s position 11. The FSP relies on a PDS dated 26/12/2009 which contains the following policy terms and conditions: “What we do not cover – general exclusions (Page 14) Case No: 286790 Determination Page 3 of 7 You are not covered under any section of your policy for damage, loss, cost or legal liability caused by or arising from or involving: Erosion or washing away of soil, earth or gravel, The washing away or movement of the surface of any path or driveway which has a surface consisting of a loose material such as gravel, stone or dirt, Soil movement or settlement, Subsidence or landslide unless caused by the insured event of earthquake” 12. The FSP relies on claim file records from which I note the following:  On 9 March 2012 the Applicants contacted the FSP to notify it of the claim. The relevant portion states: “Also the inground pool meets the boundary for the creek at the back of our property. The neighbour at the back hasnt (sic) put sufficient retaining walls in and his soil has now gone into the creek. Ie the land has dropped away because of the flooding in the last couple of days. We had a structural engineer in a couple of months ago as the land was starting to drop away from his yard and he said more support is required in the neighbours yard. The neighbour has put a few sandbags in but it is not enough. The neighbour wont (sic) allow us to add any more as he says we would be trespassing. We have a proper retaining wall. My husband is getting another structural engineer to come and have a look at it”  On 9 March 2012 the female Applicant contacted the FSP to ascertain whether preventative works could be arranged as she had concerns of dislodgement due to torrential rain. The FSP “Advised the policy covers damaged caused by an insured event but doesn’t cover maintenance or preventative works. Advised she is covered for flood damage since 5.2.”  R is appointed as an assessor on 10 March 2012.  On 12 March 2012 the FSP contacts the female Applicant and notes the “...make safe attended – assessor to contact within 24-48hrs and rpt to hand in 10-15 days....the creek looks like it is going to flood into the back yard and the pool pump will dislodge if this happens – adv ms io that the assessor will be able to have a look at this”  On 26 March 2012 the FSP is informed that she has not heard from the builders about the pool. Further, water is getting under the pool and damaging tiles and pump on the side of the pool. The FSP then escalated the claim to arrange for the builder to attend for pool and pump.  On 13 April 2012 the female Applicant again contacted the FSP due to concerns regarding the state of the pool. The FSP informed the female Applicant that an engineer/builder should shortly be in contact.  On 19 April 20012 the female Applicant contacted the FSP and informed the damage was progressively getting worse.  On 2 May 2012 the Applicant contacted the FSP and it was discovered further damage had now occurred. The Applicant confirmed there were 2 events. After the first event there was minor flood damage, retaini ng wall was still in place and they had informed the FSP it was unsafe if Case No: 286790 Determination Page 4 of 7 not repaired. The second event then occurred which is when the retaining wall, soil surrounding the pool, pool pump and pavers had washed away. The FSP indicated the Applicant would need to lodge two claims.  On 4 May 2012 the Applicants received a verbal claim declinature.  On 8 May 2012 the Applicants clarified with the FSP that the damage to the interior and pool area was sustained in the same event. As a result of this discussion the matter was referred to Internal Dispute Resolution. 13. The FSP relies on the report dated 14 March 2012 from R. It is noted that the report makes no mention of the pool. The job number assigned to this report is „1981182‟. The photographs attached to the report include pictures of the pool however the job number assigned to these photographs is „2080800‟. 14. The FSP relies on a report dated 20 April 2012 from R which provides a job number of „2080800‟. R arranged for a roof tiler to attend the property and provided an excerpt from that report. Interestingly the report states: “I have inspected the roof to find: - Part of the soil in the back yard near the swimming pool pump has been washed away by the overflowing of the river nearby” There is no further comment regarding the swimming pool contained within this document. 15. The FSP relies on report dated 19 April 2012 from “PA” of company “Q”. Q states that: “Heavy rain caused the water course at the rear of the property to flood, washing the embankment & collapsing the pavers, undermining the pool pump and shed. ... Water staining to the carport ceiling, rear corner block near pool collapsed and water undermined the pool pump & pool shed exposing underground electrical cables & plumbing pipes. Pavers running parallel to the rear boundary fence have slumped due to the subsidence & wil (sic) need to be removed and replaced over additional sand bedding” 16. The FSP contends the property was assessed and it was confirmed the damage to the pool area had occurred due to the soil being washed away from the overflowing river at the rear of the property. 17. The policy clearly excludes cover for erosion or washing away of soil or earth. Accordingly, the damage to the pool area should be excluded as this is the cause of damage to same. 18. The FSP submits the Applicants were at no time informed that their claim for the pool would be covered. In fact, the FSP sent a specialist to determine coverage which would indicate to the Applicants that this area may not be covered under terms and conditions of the subject policy. Case No: 286790 Determination Page 5 of 7 19. The FSP acknowledges the submissions of the Applicants that the damage got progressively worse. In response the FSP states the insured policy covers loss and damage for the insured event and that the erosion of soil occurred over time and not from one event. Issues 20. Whether the FSP was entitled to decline the Applicants‟ claim for damage to the pool. 21. Whether the FSP has handled the claim appropriately. Reasons for Decision 22. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 23. I have read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 24. Due to the nature of the dispute, the FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 25. There are two issues (listed above) which I will deal with separately. Whether the FSP was entitled to decline the Applicants’ claim for damage to the pool 26. First, the expert evidence before me states that the Creek at the back of the property has overflowed and caused the damage to the pool. There is however inconsistent evidence regarding whether there was one or two events. Further, there is evidence that during the claims handling process the pool deteriorated due to ongoing rainfall. 27. The only expert opinion (other than a tiler who would not appear appropriately qualified) is that of Q who stated that there was flood which rose up to wash the embankment which collapsed the pavers and undermined the pool pump/shed. 28. I have reviewed the PDS and the SPDS. I consider that the SPDS forms part of the PDS and it was clearly the intention of the FSP that it form part of the policy terms as of 5 February 2012. The FSP was provided with the SPDS together with the Applicants‟ submissions by facsimile from FOS on 6 August 2012. The FSP has not responded to this documentation and does not appear to dispute the provision of the SPDS to the Applicants. I have further Case No: 286790 Determination Page 6 of 7 formed this view given t he FSP‟s claim records confirm an employee advised flood cover existed as of 5 February 2012 that this SPDS was in force at the time of the loss. 29. The SPDS alters the policy to provide cover for flood. More importantly it also alters the exclusion relied on by the FSP. The FSP‟s policy does not cover „subsidence or landslide ....unless specifically covered under insured event flood‟. The policy states under the flood event that it will not cover resulting cracking to outdoor surfaces unless washed away by flood. Further, the policy covers erosion, collapse and earth movement if it occurs within 72 hours of, and directly because of, flood and not because of erosion over time, structural fault or design fault. 30. The evidence before me suggests that the damage to the pool has arisen from flood. It is unclear how much damage occurred from the event subject of the original claim given the inconsistent information and lack of proper documentation of the damage in the first assessment report by R. 31. I note that Q has not provided any evidence delineating between the original claim event and the subsequent damage. There is some evidence that deterioration was occurring due to the original type of damage. 32. Given this, I have no basis to reduce the amount payable to the Applicants or require the charging of a second excess for a further event. 33. I also consider there has been a delay in the claims handling, which I will discuss below, which likely (if all loss does not arise from the original event) contributed to the extent of the loss. Given this, I have formed the opinion the FSP should pay for the entire damage to the pool and its surrounds. It does not appear that any retaining wall should rightly be paid for as it would always be excluded from the policy. Whether the FSP has handled this claim appropriately 34. I have no explanation why the FSP declined this claim given the expert evidence that flood caused the damage. On its own PDS and SPDS, of which the FSP is deemed to be aware, it covers flood and limited earth movement/washing away of outdoor surfaces due to flood. 35. The original claim to the FSP discussed the issue of the pool and the dropping of the land due to the flooding. Despite this, R apparently did not investigate the pool or report on same in the assessment report dated 14 March 2012. It is unknown what instructions were provided to R or why on review of the report the FSP has not queried this. 36. Despite numerous telephone calls alerting the FSP to the potential ongoing damage to the pool, no report is obtained on the pool until 19 April 2012. It then takes the FSP until 4 May 2012 to decline the claim. 37. Under the General Insurance Code of Practice the FSP ordinarily has 10 business days to inform an insured of whether an assessor is required and notify the Applicant within 5 days of appointing them. The FSP is also to Case No: 286790 Determination Page 7 of 7 make a decision within 10 business days of having all necessary information. The General Insurance Code of Practice does allow leeway for the FSP for catastrophe files, which includes this file. 38. On review of the evidence however I still hold concerns about the delay in appointing the second assessor to review the pool. The explanation provided by the FSP is somewhat unsatisfactory given R and Q are both from construction companies and likely to be similarly qualified. If they are not, then the FSP has not provided the qualifications of each party and why Q was more qualified to review the issue of the pool over R and/or why R was not appropriately qualified to review the pool. The simple fact of the matter is that the FSP failed to obtain information regarding the pool in the first instance and required the second assessment in order to review the claim for same. 39. The FSP has also not explained why the photographs attached to the original report from R have a different job number to the actual job number of the report. 40. The delay between the original claim for the pool and the provision of the report is approximately 5-6 weeks. This delay is unsatisfactory. 41. I will not order compensation for the claims handling on the basis that I have already made a decision the FSP shall pay for the entire pool damage due, in part, to the delay. Determination 42. On the basis of the available information I determine the FSP shall make payment for the Applicants‟ claim for damage to the pool. The FSP shall settle the claim for damage to the pool within 30 days of the Applicant‟s acceptance of this Determination. If the FSP decides to cash settle the Applicant it will make payment of the settlement amount plus interest on the settlement amount in accordance with the Insurance Contracts Act 1984 from 4 May 2012 (being the original claim denial) until the date of payment of the claim. 43. I note there are issues raised concerning the claims handling process. This is a matter for consideration by the Service‟s Code Compliance Manager.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.