Denial of flood water damage to homes, contents and farm property under flood exclusion
Text of the determination
Case No: 286756 Determination Page 1 of 10
Case number: 286756
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
11 September 2013
Background
1. The Applicant, WJ, and his wife, LJ (the Applicants) arranged an insurance
contract with the Financial Services Provider (FSP) to cover various rural
risks. This contract covered a particular site in Millmerran, Queensland, that
contained two homes as well as contents and farm property. The site is
surrounded by a levee bank.
2. On 29 December 2010, the Applicants informed the FSP that their property
sustained extensive water inundation damage. The date of loss was 27-28
December 2010.
3. The FSP, after engaging a loss adjuster and a hydrologist, declined liability
for a large portion of the claim, on the basis the damage was caused by
“Flood” as defined by the policy. However, as the cover in place for the two
homes provided a $20,000 additional benefit for “Flood”, it has paid $38,975
to the Applicants in furtherance of this benefit ($40,000 in total minus the
$1,025 excess).
4. The Applicants, through their solicitors, have disputed this decision as they
are seeking indemnity for their total loss. For the sake of convenience,
reference to the Applicants will include their solicitors.
5. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicants ’ position
6. The Applicants have submitted the following in disputing the FSP‟s decision:
The FSP‟s hydrologist's evidence should not be accepted as it has
relied on rainfall data that is unreliable, has made assumptions about
the structure of the levee bank whic h is beyond her expertise to make
and did not take into account the estimated time of inundation .
There is clear evidence of an insured event, namely storm.
Determination
Case No: 286756 Determination Page 2 of 10
7. Given this, the Applicants seek to be indemnified for the full extent of their
loss, including interest pursuant to section 57 of the Insurance Contracts Act
1984 (the Act).
Summary of FSP’s position
8. The FSP substantively relies on the hydrologist‟s evidence and the following
policy provisions to maintain its position:
“ General definitions ...
Flood means the escape or release of water from the normal confines of a
pond, lake, reservoir, canal, dam or uncovered watercourse.
...
Farm property damage policy
The events You are insured against ...
6. wind, rain, hail, snow or escape of liquid
but not for loss or damage:
directly caused by Flood
...
directly caused by rain, hail, snow or escape of liquid to Other
Property, unless the loss or damage:
- occurs when the Other Property is in a secure building,
structure or vehicle; ...
directly caused by rain, hail, snow or escape of liquid to a Farm
Vehicle unless the loss or damage:
- occurs when the Farm Vehicle is in a secure building or
structure ...
...
[C] home policy
What You are insured against
This policy insures You against accidental damage ...
What is not insured
This policy does not insure You against:
1. damage directly caused by:
...
Flood, except as described under the additional benefit „Flood
cover‟
...
Additional benefits ...
Flood cover
Case No: 286756 Determination Page 3 of 10
If „Building‟ is shown on the certificate of insurance, We pay up to $20,000 for
damage to Your Home directly caused by Flood during the Period of
Insurance arising out of one event.
If „Contents‟ is shown on the certificate of insurance, We pay up to $10, 000 for
damage to Contents in Your Home directly caused by Flood during the Period
of Insurance arising out of one event.
We pay up to $20,000 for all damage to Your Home and Contents at any one
location arising out of the one event.”
Issue
9. Whether the FSP is entitled to deny liability for the items in dispute pursuant
to “Flood”.
Reasons for decision
10. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
11. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
12. The onus is on the Applicants to establish, on the balance of probabilities,
that they suffered a loss caused by a risk insured agai nst on the face of the
facts (ie a prima facie claim). In this regard, the Panel notes there are two
distinct covers available under the rural policy issued by the FSP.
13. With respect to the cover for the two homes and contents, the policy insures
the Applicants against accidental loss or damage. There is no dispute such
an event has occurred. However, its application is subject to the flood
exclusion.
14. In regards to the farm property damage, the policy also insures the
Applicants for accidental damage but only if one of the defined events is not
triggered; the relevant defined event is: „wind, rain, hail, snow or escape of
liquid‟. This defined event is subject to a flood exclusion and the „Other
Property‟ must be in a „secure building, structure or vehicle‟ at the time it‟s
damaged by that defined event.
15. In the Panel‟s view, it cannot be disputed on the one hand that in insurance
terms, the damage was accidental, which means a prima facie claim is afoot
for the residential homes and contents therein, while in respect of the farm
property portion, that the damage was prima facie associated with rain or
Case No: 286756 Determination Page 4 of 10
escape of liquid. Accordingly, it‟s apparent that the central issue is whether
in either of the events, does the flood exclusion apply?
16. Accordingly, as the Applicants have established a prima facie claim under
both covers, the Panel accepts that the onus is on the FSP to establish, on
the balance of probabilities, that the damage caused to the Applicants‟
property was “Flood”.
The Evidence
17. The FSP has provided three reports from a hydrologist company, “ WM ” . Two
are authored by SMc and were dated 23 March 2011 and 14 April 2011.
SMc's second report revised the first one following her inspection of the
property. The second report reproduces the substance of the first with some
additional comments.
18. SMc‟s two reports contain the following of relevance:
Two houses and a number of sheds were identified on the property.
They were inundated to a depth between 1m and 1.5m above floor
level during the event. House 1 is a slab-on-ground building. The slab
is approximately 300mm above the adjacent ground level. House 2 is
on stumps which are also approximately 300mm above ground level.
The floor levels of the shed vary but WJ (the male Applicant), stated
they are relatively consistent with the floor level of the two houses.
Rainfall records were obtained from the three nearest Bureau of
Meteorology rainfall stations over a three day period ending at 09:00
hours on 28 December 2010. The highest daily rainfall of 97.0mm was
recorded in the 24 hours to 09:00 hours on 27 December at the station
located 10.9km south west of the property.
The Condamine River is located approximately 1.1km north-east of the
property. Back Creek, a tributary of the Condamine River, is located
approximately 1.3km south-west of the property. The area is
topographically very flat.
Recorded levels of the Condamine River were obtained from Centenary
Bridge, located approximately 3km upstream of the property. The
Condamine River water level at this station peaked at approximately
7.00am on 28 December 2010.
The house and sheds are located within a 1.5m high soil levee bank.
Any rain that falls within the confines of the levee bank would pool in
the area until absorbed by the ground, evaporated or pumped out by
the insured. There is no other stormwater catchment that drains to
houses and sheds.
The following information was provided by the male Applicant, WJ, as
recorded by SMc in her report dated 14 April 2011:
- On 26 December (Sunday), there was approximately 100mm of
rain. Water was lying around (approximately 100mm deep in
Case No: 286756 Determination Page 5 of 10
places) both inside and outside of the levee bank. Water had not
inundated the houses or the sheds above floor level at this time.
- It drizzled most of the night and at around 5.00am on 27
December (Monday), there was a storm that brought heavy rain
until around 10.00am.
- On Monday afternoon, they emptied the rain gauge. They had
received approximately 203mm since the previous afternoon.
- A tractor inside the levee bank was running a pump nearly all of
Monday to reduce the water level.
- Shortly after dark on Monday, it began to rain heavily again. The
heavy rain lasted until 11.00pm. The rain continued until the
water reached the peak.
- Around 10.00pm on Monday night, they noticed the water level
was close to the floor level of the houses and sheds. By
11.00pm, it had entered the houses and sheds above floor level.
The depth of inundation above floor level was between 200mm
and 300mm.
- Around 11.00pm, they decided to move the tractor that was
inside the levee. When they moved it, the depth of water inside
the levee was approximately halfway up the tractor tyres.
- At this time, the water level outside the levee bank was higher
than the water level inside the levee bank but had not
overtopped the bank.
- At approximately 4.00am on 28 December, the water from
outside began to overtop the levee bank from the north-west.
The water level in the houses was approximately 200mm deep
at this time.
- At approximately 5.00am, the water level reached the peak. The
water had only overtopped the levee bank by less than 100mm.
- He noted water may have seeped through the levee bank from
the outside as it is only dirt.
19. SMc then provided the following findi ngs based on the above:
Rainwater that fell inside the levee bank could not have inundated the
houses and sheds above floor level alone.
Photographs provided by WJ (reported to have been taken between
3.00pm and 4.00pm on 27 December 2010), show water ponding
inside the levee bank quite some time before the reported initial
inundation. From these photographs, it appears that the water level
inside the levee bank had to rise by a further 300mm to 500mm to
inundate the houses and sheds.
Rainfall records show that a maximum of 68.0mm was recorded to
9.00am on 28 December 2010. Even if all of this rainfall fe ll in the
afternoon on 27 December (considering the photographs provided by
Case No: 286756 Determination Page 6 of 10
WJ), the water level inside the levee from the ponded rainfall could not
have risen to a depth sufficient to inundate the houses and sheds
above floor level. Accordingly, rainfall alone would not have raised the
levels ponding within the levee.
It is likely they were initially inundated by a combination of rainwater
that fell inside the levee bank and floodwater from the Condamine River
and Back Creek seeping through the levee bank. As reported by WJ,
this water reached a depth of at least 200mm before the levee bank
was overtopped by floodwater.
The reported time that the levee bank surrounding the house and
sheds was overtopped is consistent with the recorded peak water level
in the Condamine River at Centenary Bridge.
20. WJ provided a statement signed by him on 15 January 2013 that the
Applicants are relying on. This states the following of relevance:
From August to December 2010, the whole region the property is
located in was subject to numerous storms, heavy rainfall events and
constant wet conditions.
From September to November 2010, he and his wife measured 231mm
of rainfall at the property.
The wet weather continued over the Christmas period and up until 26
December 2010, he and his wife recorded another 208.3mm of rainfall.
On 27 December 2010, they recorded a further 96mm of rainfall at
9.00am along with another 55.3mm of rainfall until 9.00am on 28
December 2010. For the 48 hours between 26 and 28 December 2010,
they recorded a total 151.3mm of rainfall.
For the month of December 2010, they recorded a total 367.9mm of
rainfall. The average annual rainfall is between 650 to 700mm.
The water from the Condamine River and Back Creek overtopped the
levee bank at approximately 4.00am on 28 December. Prior to this
time, the rainfall that fell within the levee bank had inundated the
houses and dairy sheds causing the damage claimed for.
He refutes the fact that he alleged floodwater may have seeped
through the walls of the levee bank. The levee bank is made up of clay
based soil gathered from the banks of the river. It is compacted and
well maintained and they regularly spray the levee bank to ensure it
remains free of vegetation.
The same material is used for their “ring tanks” which hold 200 to 1 ,500
mega litres of water. They have never experienced any seepage with
these “ring tanks”.
Neither he nor his neighbours consider the records retained by the
Bureau of Meteorology to be reliable. One of the reasons is the
distance these radars are located from their property.
Case No: 286756 Determination Page 7 of 10
He has since measured the levels of the sheds and workshop. He has
identified that the workshop is 100mm lower than the houses. The dairy
shed is approximately 180mm lower than the level of the houses.
21. A statement dated 10 January 2013 was also provided by SP, who lives
approximately 3km away. He provided the following information:
He has lived at the address for approximately 23 years and has
recorded the rainfall for the entire time he has lived at the address. He
can recall that 2010 was an exceptional year in terms of rainfall. He
recorded 337mm of rainfall in December 2010.
The constant rain and saturation of the soil in the month of December
2010, meant any additional rain was not absorbed by the ground.
He seldom relies on the Bureau of Meteorology‟s records due to their
distance and the fact their conditions can often vary to his own.
22. A statement was also provided by MP dated 25 November 2012, who has a
weather recording station on his property which records weather for the
Bureau of Meteorology and is submitted to the Bureau once a quarter. He
corroborated SP‟s evidence regarding the unreliability of weather stations. In
particular, he stated that the radar images from Marburg radar station, do not
reflect the actual rainfall experienced at their location possibly because of
interference created by mountains that exist between the Marburg radar and
their properties.
23. WM was asked to review the Applicants‟ submission dated 16 January 2013,
which included the three statements summarised above. SM, principal
engineer, did so and provided an additional report dated 8 February 2013
that contained the following of relevance:
The rainfall recorded by the Applicants and those retained by the
nearest rainfall station are consistent. Accordingly, it was appropriate to
factor the levels of rainfall recorded from this nearby station.
The report reiterated that given the photographs supplied by the
insured regarding the ponding of water in the levee bank between 3.00
and 4.00pm on 27 December, and the fact the rainfall recorded for that
day was not less than 55.3mm, it was simply not possible for this
rainfall alone to have caused the inundation.
This remains true even if it is accepted that all of this rain fell before
10.00pm, the ground was fully saturated and the continuous pumping
during the day did not reduce the water level within the levee bank.
Accordingly, the only plausible explanation for a water level rise of the
necessary magnitude observed by WJ, is seepage through the levee
wall.
With respect to the lower floor levels of the workshop and dairy sheds,
the report concluded the following:
“Based on information provided by t he insured, the above floor inundation of
the houses commenced sometime between 2200 hours and 2300 hours on 27
Case No: 286756 Determination Page 8 of 10
December. Therefore, the above floor inundation of the two sheds would have
commenced sometime before 2200 hours on 27 December. If rain continued
to fall throughout the night of 27 December and also in the morning of 28
December (as reported by the insured) only a portion of the 55.3mm rain that
fell in the 24 hours to 0900 hours on 28 December would have fallen within
the levee bank prior to the initial inundation of the sheds. For reasons given
earlier, it was not possible for less than 55.3mm of rain alone to have
inundated the shed above floor level prior to 2200 hours on 27 December.”
Consideration of the Evidence
24. The Panel acknowledges tha t one of the Applicants‟ principal arguments i n
relation to flood not causing the damage is refuting the FSP‟s contention that
floodwater seeped through the levee bank to combine with the rainfall inside
the levee bank that resulted in the inundation of the properties on the site. In
furtherance of their position, the Applicants have provided photographs of a
flood event in January 2013, showing the levee bank was not seeping
floodwater.
25. In addition, the Applicants have submitted that the issue of whether the levee
bank seeps or not is a matter beyond the expertise of the hydrologist. The
Panel accept this contention.
26. However, the Panel does not consider the hydrologist's evidence has no
probative weight in respect of this substantive issue.
27. In this regard, the Panel notes the hydrologist‟s report appeared to take into
account the following salient facts:
Photographs supplied by the Applicants, reported to have been taken
between 3.00 and 4.00pm on 27 December 2010, showing water
ponding inside the levee bank for quite some time before the reported
inundation. The Applicants have not disputed the hydrologist‟s
evidence in this regard or the photographs provided in support.
The Applicants recording 55.3mm of rainfall for the 24 hours leading to
9.00am on 28 December 2010.
A tractor inside the levee bank pumping water outside the levee.
The floor levels of the house being 300mm above the adjacent ground
level and the area being topographically flat.
Floodwater pooling outside the levee bank from the Condamine River
and/or Back Creek but not at a level sufficient enough to overtop the
bank.
The floor levels of the home being inundated to a depth of 200 to
300mm on or around 11.00pm on 27 December 2010.
The water outside the levee bank only reaching a level sufficient to
overtop its bank around 4.00am on 28 December 2010.
Case No: 286756 Determination Page 9 of 10
28. In light of this contention, the Panel Chair Ombudsman conducted a site
inspection on 26 August 2013. Present was the male Applicant and a
representative of the FSP.
29. The Panel Chair Ombudsman made the following observations:
At the end of the driveway is a large levee which the driveway runs
over. The first thing to note about the levee is that at the point of entry
over the driveway, it is at least 500mm lower than the higher points of
the levee.
Within the levee bank are two houses, a milking shed and a number of
other sheds and workshops and grain silos. The levee bank is not the
same height all the way around. In particular, at the milking shed near
the second smaller house, the levee bank is q uite a bit lower and the
area on the outside of the levee bank where the cows go after they
have been milked is of a similar height to the levee bank but perhaps a
little lower. There are two houses within the levee bank and the main
house is on a concrete slab about 300mm above the ground and the
second smaller house is raised on stumps about 700mm high.
The area within the levee bank looks flat to the naked eye but the male
Applicant says that it actually slopes in both directions towards two
pump points at either end of the area within the levee bank and water is
pumped from those two pump points. Either side of the levee bank is a
drain which does not extend all the way around. In particular, it is to be
noted there is no drain either side of the levee bank in the area of the
milking shed.
The male Applicant says that they have not done a full scale upgrade of
the levee bank but every year they do maintenance of it and they do
this in about September or October. The maintenance involves digging
the black soil and the clay out from the drains and piling it on top of the
levee bank. They do this at that time of the year as they generally get a
few storms after that, which usually smoothes down the bank because
they want to be able to drive on top of the ba nk if possible. The male
Applicant says that some properties have a single pump point, but he
says that is not enough which is why they have two pump points.
The levees appear solid and are made up of clay and black soil but the
rain lines can be seen running through them where rain has occurred
and run off the banks and it makes small crevices. The male Applicant
says that the levee does not work unless the drains are kept clear and
there were a number of drains full of water which the male Applicant
said was from rains about three weeks ago.
30. If the Panel was to accept the Applicants‟ contention that the levee bank was
impervious to seepage, then the Panel would also be required to accept that
the 55.3mm rainfall which fell inside the levee bank was sufficient enough to
Case No: 286756 Determination Page 10 of 10
raise the level of the water which ponded inside the levee bank to inundate
the property to a level of 200 to 300mm above floor level by 11 .00pm on 27
December 2010.
31. The Panel, assisted by the site report of the Panel Chair Ombudsman
determines, on the balance of probabilities, that the levee is not susceptible
to seepage; it is a substantial feature and the soil used in its construction, a
mixture of clay and black soil, is known to compact very tightly. The
Applicants are obviously diligent in their maintenance of the levee and have
considerable experience and confidence in their ability to maintain its
integrity and imperviousness.
32. As previously noted, the FSP bears the onus of proof demonstrating the
damage caused by water inundation prior to 4.00am on 28 December 2010
(when it is agreed the river overtopped the levee) was also caused by the
policy excluded event of flood. The Panel determines it has not, on the
balance of probabilities, discharged that onus.
33. Accordingly, using the ground level at the point of the main residence as the
benchmark and noting the floor level of that residence at an estimated
300mm above ground level, the FSP is to indemnify the Applicants for water
damage to a total height of 500mm (the main residence 300mm above
ground plus another 200mm inside) throughout the affected areas.
34. On acceptance of this Determination by the Applicants, the FSP is to
arrange for an assessor to attend the property and agree on an assessment
of the damage caused by such a level of inundation.
35. In the event the parties cannot concur on the scope of damage, they can
request of the Panel, a subsequent Determination in that regard.
Determination
36. On the basis of the available information, the Panel determines the FSP is to
indemnify the Applicants for water damage up to a level of 500mm above
ground level throughout the affected areas.
37. To the extent the FSP elects to cash settle the claim, interest is to accrue at
the statutory rate from 21 April 2011, being the date of initial declinature.