Home / Financial Firm (Unknown - Insurer) / Determination 286661
Determination 286661
Denial of claim
Summary
The applicants' Yeronga home and contents were water-damaged in January 2011 and the FSP declined the claim as flood, which the policy excludes. AFCA's Panel found the home was inundated after the 24-hour flash flood window, so the loss was flood and the FSP was entitled to decline.
Flash flood cover requires sudden flooding within 24 hours of the heavy rain that caused it, and the hydrology evidence showed inundation occurred later, so the flood exclusion applied.
Issues
- Claim denial primary · not upheld
“The Panel determines that the FSP is entitled to decline liability in response to the claim.”
- Inadequate claim investigation secondary · not upheld
“Whilst the Panel accepts the hydrology may not always be accurate there is nothing in this dispute to question the findings.”
- Product terms interpretation secondary · not upheld
“The Panel accepts that the inundation occurred outside the 24 hour period, so it falls within flood, which the policy does not cover.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 286661 Determination Page 1 of 8
Case number: 286661
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
29 November 2012
Background
1. The Applicants‟ home (located in Yeronga, Queensland) and contents were
insured with the Financial Services Provider (FSP) under a home building
and contents insurance policy.
2. Their property was damaged as a result of water inundation in January 2011
following severe weather events.
3. A claim was lodged with the FSP who declined liability on the basis the
damage was caused by flood which the policy excluded.
4. The Applicants maintain they are entitled to indemnity because:
The Applicants may not have been provided with a PDS and absent
proof of same, the FSP has not complied with its Section 35 of the Act
obligations as mandated by the Insurance Contracts Act 1984.
The policy terms with respect to coverage for flood, stormwater run-off
and flash flood were unclear; and
The loss was caused by events covered by the policy in any event.
Summary of Applicant s’ position
5. The Applicants are represented. For convenience, the expression
“Applicants” will jointly refer to them and their representative.
6. Their home and contents were damaged by stormwater runoff and/or flash
flood because:
The Bureau of Meteorology (BOM) had issued warnings of heavy rains
and flash flooding shortly before 9.00am on 11 January 2011.
Their home was inundated within 24 hours of rainfall that occurred on
the morning of 11 January 2011.
The rains that fell over the Wivenhoe Dam on the morning of 11
January 2011 led the dam operators to adopt a W4 release strategy,
which was ultimately the main cause of the flooding downstream.
Determination
Case No: 286661 Determination Page 2 of 8
7. The evidence of the FSP‟s hydrologist is unreliable because:
The hydrologist was likely to have based his opinion on a “desk top
review” instead of an inspection of the property.
A number of his conclusions are unsupported.
The hydrologist failed to assess/analyse if the home was first inundated
by stormwater run-off and/or flash flood.
8. Their evidence as to the events that occurred is as follows:
Their home is situated close to a number of stormwater drains which
can overflow during significant rain or storms.
Significant rains in the Yeronga area commenced on 9 January 2011
and the rains progressed into storms (with thunder and lightning) on 10
January 2011.
It was raining on the night of 10 January 2011, and it got progressively
worse.
It was “torrential” all day on 11 January 2011.
They evacuated at about 7.00pm on 11 January 2011 and at that time,
“water was slowly rising on the street”.
Neighbours who did not evacuate at the same time as them observed
that the stormwater drains were “blocked up and could not accept any
more water”.
The water was mixing with a “significant amount” of rainwat er in the
area and moving closer towards nearby properties.
Three neighbours witnessed the initial inundation of the area.
According to them:
i. The initial inundation was caused by water from the stormwater
drains.
ii. The section of the Brisbane River near the Applicants‟ home never
broke its banks.
They believe the initial inundation would have occurred “shortly after”
they evacuated on 11 January 2011.
Summary of FSP’s position
9. The Applicants‟ property was not damaged by flash flood or stormwater run -
off, but by flood (as defined in the policy) because:
Its hydrological evidence shows that the proximate cause of their loss
was the rains which fell in the Wivenhoe Dam catchment from 9
January 2011 or earlier. Releases from the dam caused the Brisbane
and Bremer river levels to rise and subsequently inundate the
Applicants ‟ residence. The Applicants ‟ property was therefore damaged
by rain which fell more than 24 hours earlier.
Case No: 286661 Determination Page 3 of 8
The terrain around the Applicants‟ home does not indicate that it was
particularly vulnerable to stormwater run-off.
Rainfall at around the time the home was first inundated was
insufficient to cause stormwater inundation.
The timing of the rise of the Brisbane River is consistent with the male
Applicant‟s second statement that his property was first inundated prior
to 3.00pm on 12 January 2011.
The Applicants‟ first statement – that his property was inundated late on
the evening of 11 January 2011 – is incorrect because:
i. there was no rainfall late on the evening of 11 January 2011; and
ii. the Brisbane River level at that time was insufficient to cause an
inundation.
The Applicant has not made any allegation of stormwater flooding.
10. Even if the proximate cause was flash flood (which it denies) a proximate
cause was also the rain that fell from 9 January 2011, which is excluded. As
such, the whole loss is excluded on the basis of the Wayne Tank principle.
11. The FSP relies on the following policy provisions contained in its PDS:
“ Words / terms with special meanings
Word / term Meaning
…
Flood Rising water which enters your home as a result of it running off
or overflowing from any origin or cause.
This policy does not cover flood unless we have agreed and it
is shown on your certificate of insurance
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
…
Storm A violent disturbance of the atmosphere associated with strong
winds including a cyclone, lightning, heavy rain, hail or snow
but not con tinuous bad weather by itself.
…
Insured events you are covered for
Damage caused by the weather ….
What is covered What is not covered
Storm …
…
Case No: 286661 Determination Page 4 of 8
Flash flood and
stormwater run - off
A sudden flood caused by
heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…
…
Your home
…
The most we will pay for home claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
Your contents
…
The most we will pay for contents claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
contents sum insured or
$25,000, whichever is higher. ”
Issue
12. Whether the Applicants received a PDS; if so, whether the definitions of
„flood‟ and „stormwater run - off and flash flood‟ are confusing, such that the
FSP is not entitled to rely upon them.
13. Whether the Applicants‟ loss was caused by stormwater run-off, flash flood
and/or flood (as defined in the policy).
Case No: 286661 Determination Page 5 of 8
Reasons for decision
Preliminaries
14. Due to the nature and complexity of the dispute, it has been directly referred
to the Panel for Determination in accordance with the Operational Guidelines
to the Financial Ombudsman Service‟s (FOS) Terms of Reference.
15. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
16. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
17. The Panel notes that whilst the Applicants when requesting the FSP review
its initial decision stated they could not recall receiving the PDS from the
FSP they have pursued this argument within the dispute notice. The FSP
had responded to the Applicants‟ comments by letter dated 11 October 2011
and maintained the PDS had been sent to the Applicants. As this issue has
not been pursued further by the Applicants, the Panel accepts for the
purpose of this dispute that most likely the Applicants had received a copy of
the relevant PDS prior to the claim.
Proximate cause of damage
Initial inundation: storm/rain water and/or flood water?
18. The Applicants did not personally witness the initial inundation of their home
but believe that it occurred shortly after they evacuated at about 7.00pm on
11 January 2011. The Applicants maintain:
Three neighbours remained with their homes and observed properties
in the area being inundated by water from the stormwater drains.
The Applicants observed water rising from the stormwater drains near
the property as they left the property at about 7.00pm 11 January 2011
The FSP hydrologist originally indicated the property would be
inundated at approximately 4.00am 12 January 2011
19. The Applicants have provided a statement from a neighbour (VC) who
essentially says that the Applicants‟ home was inundated at about 7.00am
on 12 January 2011.
20. The Panel notes the following from the mate rial exchanged:
The Applicants‟ property is elevated between 5.7m AHD (Australian
Height Datum) and 6.5m AHD.
According to hydrologist DC (see his 13 July 2012 statement):
Case No: 286661 Determination Page 6 of 8
i. Rainfall activity at the East Brisbane Alert Gauge (4.2km from the
Applicants‟ home) is likely to be representative of rainfall activity in
the Applicants‟ area.
ii. Rainfall records at the relevant alert gauge shows that some
74mm, 42mm, and 44mm of rains fell on 9, 10 and 11 January
2011 respectively.
iii. The Bureau of Meteorology (BOM) apparently reported that the
alert gauge was not transmitting data during between 11.30am
and 4.00pm, but had instead recorded rainfall during this period
as a cumulative total at 4.00pm on 11 January 2011; thereby
appearing to suggest there was a “spike” in rainfall at 4.00pm.
iv. Some 2mm of rain fell between 4.10pm and 7.27pm on 11
January 2011. In a later paragraph, the hydrologist suggests that
some 2mm of rain fell after 4.07pm.
v. There were no rains after 7.27pm on 11 January 2011 and on 12
January 2011.
vi. There are stormwater infrastructures on the streets around the
Applicants‟ home.
vii. The Applicants‟ home is constructed on a ground slab and the
“level of the ground beneath the house” is estimated to be at 6.2m
AHD (“the minimum living area of the home”).
viii. After interpolating Brisbane River levels at the Oxley Creek Mouth
and Brisbane City gauges, the Brisbane River was estimated to
have reached:
1. The minimum level of the Applicants‟ property (i.e. 5.7m
AHD) at about 3.19am on 12 January 2011.
2. The minimum living area of the home (i.e. 6.2m AHD) at
about 7.01am on 12 January 2011.
ix. The Applicants‟ property was unlikely to have been inundated by
localised run-off although their property is located within a local
catchment.
DC has not explained why the relevant alert gauge was not transmitting
any data between 11.30am and 4.00pm on 11 January 2011(when it
appears to have been functioning well before 11.30am and after
4.00pm on 11 January 2011). There is no explanation from BOM on the
issue in the material exchanged.
It is unclear how DC was able to determine river levels and rainfall
activities at such precise times as 4.07pm, 4.10pm, and 7.27pm on 11
January 2011, and 3.19am and 7.01am on 12 January 2011;
particularly when his exhibits “DCC05” and “DCC06” appear to chart
rainfall activity and river levels at 3 and 4 hourly intervals respectively.
Exhibit “DCC05” appears to suggests that there were two periods of
intense rainfall on 11 January 2011:
Case No: 286661 Determination Page 7 of 8
i. The first period appears to have occurred to between 11.00am and
12.00pm on 11 January 2011.
ii. The second period appears to have occurred between 5.00pm and
6.00pm on 11 January 2011.
According to hydrologist SC (see his 7 June 2012 report and
accompanying “Key Conclusions” statement and exhibits):
i. The “benchmark level” of the Applicants‟ home is 6.2m AHD.
ii. The “benchmark level” appears to be the level of the on ground slab
of the home.
iii. The Brisbane River was estimated to be at 5.8m AHD at 4.00am on
12 January 2011. 5.8mAHD is 0.4m below the “benchmark level”.
Timing of inundat ion for “flash flood”
21. In order for the Applicants to be entitled to this limited cover, the following
elements must be established:
there was a sudden flood;
there was a heavy rain that occurred within 24 hours prior to that flood;
the sudden flood was caused by that heavy rain.
22. FOS has determined in other disputes, following consideration of material
exchanged, that the heavy rainfall commencing around 4.00am on 11
January 2011(in the upper catchment of the Brisbane River) was a
proximate or effective cause of the adoption of the W4 release strategy.
23. The Panel has previously determined that this combined with the heavy rain
over the Brisbane River from about 4.00am that day and the heavy rain that
commenced falling over the Bremer River was the proximate cause of
inundation of many properties downstream of the Wivenhoe Dam.
24. Given the wording of the FSP‟s policy in respect to flash flood, the Panel has
determined that the inundation in these earlier Determinations is properly
categorised as flash flood providing the inundation occurs within 24 hours of
the commencement of the heavy rainfall.
25. The Panel accepts based on the material exchanged in this dispute that for
the Applicants ‟ claim to succeed and fall within the definition of “flash flood”
within the terms of the policy, it is necessary for the Applicants to establish
the property was inundated within 24 hours of this heavy rainfall. As the
Panel accepts the heavy rainfall commenced at approximately 4.00am on 11
January 2011 the inundation would have to occur prior to 4.00am on 12
January 2011.
26. The hydrology evidence from SC and DC indicates that whilst the property
may have been inundated prior to 4.00am 12 January 2011 the home was
not inundated until later at 7.01am 12 January 2011.
Case No: 286661 Determination Page 8 of 8
27. SC‟s site specific hydrology approximates the relevant benchmark level as
6.2m AHD and further approximates that at 4.00am on 12 January 2011, the
Brisbane River, would only have reached 5.8m AHD, some 0.4 metres below
the height necessary to commence inundation of the house.
28. Whilst the Panel accepts the hydrology may not always be accurate there is
nothing in this dispute to question the findings. In the circumstances the
Panel accepts the findings as reliable. The evidence before the Panel is that
the Applicants ‟ property was not likely to have been inundated until
sometime on/after 7.00am on 12 January 2011. This is outside the relevant
24 hour period to fall within the flash flood definition of the policy and is
properly classified as flood.
29. Accordingly the Panel is satisfied the policy does not extend to cover the
loss.
Determination
30. The Panel determines that the FSP is entitled to decline liability in response
to the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.