Home / Financial Firm (Unknown - Insurer) / Determination 286217
Determination 286217
Flood claim for bamboo flooring denied as excluded flood; stormwater run-off not accepted
Summary
The applicant's rented home in Fernvale was inundated in January 2011. The FSP accepted only limited stormwater damage and excluded the rest as flood, offering $1,500. AFCA found the FSP had not shown the bamboo flooring damage was caused solely by flood and ordered indemnity for the floor, with statutory interest from 26 February 2011.
Once accidental damage is established, the insurer bears the onus of proving an exclusion applies, and the FSP's hydrology evidence did not meet the balance of probabilities for the flooring.
Issues
- Claim denial primary · upheld
“the FSP has failed to meet its onus to show that the damage to the bamboo flooring was caused solely by flood, it is required to indemnify the Applicant”
- Claim amount dispute secondary · upheld
“Such indemnity is not limited to the area immediately adjacent to the front door.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 286217 Determination Page 1 of 6
Case number: 286217
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of Claim - Inundation - Flood or Stormwater Run-off
27 February 2013
Background
1. The Applicant held a landlord insurance policy for her rented home with the
Financial Services Provider (FSP). The property was tenanted and the policy
provided building cover only, subject to an excess of $200.
2. On or about 11 January 2011, the Applicant‟s property in Fernvale was
inundated as a result of the significant weather events which affected much
of Queensland at the time.
3. The FSP agreed to provide partial cover for limited damage it considered
may have been due to stormwater run-off. The FSP otherwise formed the
opinion that the proximate cause of the damage was the flooding of the
Brisbane River and excluded this damage as flood was not covered under
the policy.
4. The Applicant disagrees with this decision and seeks indemnity for at least
the cost of replacing her bamboo flooring, estimated at around $12,165.50.
Summary of Applicant ’ s position
5. The Applicant says that her property was inundated by stormwater run-off
and that the FSP has failed to establish that any such damage should be
limited in the way that it has suggested.
Summary of FSP’s position
6. The FSP says that the cause of the loss was the flooding of the Brisbane
River and this is not an event that the policy provides cover for.
7. There is no direct evidence that the home was inundated by stormwater run-
off, although the possibility of minor inundation was considered by the FSP‟s
hydrologist. In consideration of this, an offer for limited cover was made.
Determination
Case No: 286217 Determination Page 2 of 6
8. The FSP relies on the following policy provisions:
Page 8 of the Product Disclosure Statement (PDS)
“ DEFINITIONS
...
“Flood” means the inundation of normally dry land by water escaping or
being released from the normal confines of any natural water course, lake,
reservoir, canal or dam.”
Pages 20-22 of the PDS
“ SECTION 7. GENERAL EXCLUSIONS
These General Exclusions apply to the whole of your Policy unless otherwise
stated. Your Policy does not cover:
...
7.17. Flood damage except as provided in Section 2. Contents Cover under
Additional Benefits “Flood damage to Contents”.”
Issue
9. Whether the Applicant‟s loss is covered under the FSP‟s poli cy.
Reasons for decision
10. The Panel is satisfied that a full exchange of information has taken place
between the respective parties and that each party has had the opportunity
of addressing any issues raised.
11. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the issues to be considered. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
12. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative appointed by the Financial Ombudsman
Service Board, and a consumer representative appointed by the Financial
Ombudsman Service Board.
13. There is an onus on an insured to establish on the balance of probabilities
that a claim arises from an event for which the policy provides cover. This is
known as a prima facie claim. Should this onus be discharged, it is then the
responsibility of the insurer to establish the application of any exclusion on
which it relies to deny the claim.
14. As the policy provides general cover for accidental damage and it is not in
dispute that the Applicant‟s property was inundated with water, which in this
Case No: 286217 Determination Page 3 of 6
instance is properly characterised as „accidental‟; the Panel therefore
accepts that the threshold for accidental damage cover has been met.
15. The onus of proof therefore transfers to the FSP to establish that the cause
of the loss was not covered within the ambit of the policy. In this instance,
the FSP states that the policy does not cover building damage that arises as
a result of flooding.
16. The provision of the policy and the exclusion itself are not issues in dispute
and the consideration of the matter will be based on whether the FSP has
discharged its onus to show that the damage was caused by a flooding
event.
17. After the loss was reported, the FSP retained a loss adjuster, CR. CR
provided a report dated 5 April 2011, after a visit to the site. This report
noted that:
the insured home was a low set timber frame house constructed on a
concrete slab in or about 2008/2009;
the nearest water body is the Brisbane River, with the home located
about 2km south of one stretch of it and about 2km west of another
section;
separating the property from the western area of the river, is a ridge set
about 80m higher than the Applicant‟s property;
about 900m north of the property is a quarry;
flash flooding from stormwater run-off had not affected the property by
the time that the heavy rain finished (about 1.00pm 11 January 2011);
water began to rise in the area from about 5.45pm (11 January 2011);
witnesses suggested that the rise in water was due to a collapse of the
berm, built to reduce the noise from the quarry. Residents believed that
a build up of water behind this berm was ultimately responsible for the
inundation of homes;
the insured home is situated at about 45m above sea level;
it was “unlikely” that water from the Brisbane River affected the home;
the water may have originated from the quarry, emerging to affect the
homes after collapsing the berm;
water reached a level of about 1.1m throughout the home;
the total amount of estimated damage was around $70,000;
retention of a hydrologist “may be necessary” to more closely
investigate the matter.
18. Whilst the report is comprehensive, the Panel notes that CR is not a
hydrologist and appears not to have had the expertise to draw the
conclusions that he has. The Panel particularly notes that the conclusion
drawn by CR (that the origin of the water that inundated the property was
Case No: 286217 Determination Page 4 of 6
unlikely to have been from the Brisbane River) has not been adopted by the
FSP.
19. CR subsequently retained a hydrologist, WT, at the instruction of the FSP.
WT also attended the site and provided a report dated 7 September 2011.
WT found that:
the tenant at the time of the loss had left the property but the current
tenant had been a resident next door and was present for some of the
events at the time of the flooding;
both the Applicant and the current tenant were spoken to;
the Applicant recalled the prior tenant suggesting that there was “heavy
rain” on the morning of the loss, with water first emerging in the area to
the rear of the property, from where a farm is situated just to the west.
This water subsequently receded and rose again about three hours
later, inundating the property. Peak water levels were about waist deep;
the current tenant said that there was “heavy rain” throughout the
evening of 10 January 2011 and into the next day. The water was
observed to be “knee deep” at the farm area. Her home was not
inundated at this time but the water did reach the rear boundary. Water
was running off the driveway and pooling out the front and nearly
“entered the property through the front door”. The rain stopped a t about
10.00am and water was noticed in the farm area from about 2.00-
3.00pm. It rose quickly and tenants were evacuated by the SES;
the ground elevation at the site was estimated to be about 42.6-42.7m
AHD (Australian Height Datum). The concrete slab is about 100-
150mm off the ground, making the floor level about 42.7-42.85m AHD;
based on the graphs regarding rainfall from Savages Crossing Rainfall
Alert, rain was recorded in the local area into the late afternoon. The
peak period pushed 100mm/hr in the mid morning period of 11 January
2011. There appears to have been no significant rainfall after about
3.00pm;
WT considered that “extreme rainfall” fell between 5.00am and 2.00pm
on 11 January 2011. Some “ponding” occurred in flat areas of Fernvale
of depth s likely no greater than 100mm. Some of this “may have
inundated buildings”. In steeper areas, this would have resulted in
overland flow. Whilst the neighbour‟s home was not inundated by the
“ponding” water, it is possible that this could have happened at the
Applicant‟s property through the front entry and garage. This water
drained away by 12.00pm that day and the rain had ceased by mid-
afternoon. A second event was noticed from about 4.30pm which
originated from the Brisbane River. The river level peaked at 42.67m at
Savages Crossing at 1.40am on 12 January 2011;
Case No: 286217 Determination Page 5 of 6
based on an interpolation of water levels, WT estimated a total peak of
43.8m AHD;
there was a clear flow path for water from the Brisbane River to the
site;
inundation in the home was to an estimated height of 0.95m-1.1m;
whilst there was possible minor stormwater inundation, WT considered
that the majority of damage was caused by the flooding of the Brisbane
River.
20. The FSP relied upon the conclusions of WT to suggest that the maximum
level of inundation of the insured property was to no more than part of the
garage and part of the front entrance (if there was any at all). It estimated
this damage at possibly $200 but later increased this by way of a formal offer
for $1,500.
21. The Applicant considers that the inundation ruined her bamboo flooring,
which requires replacement. She seeks $12,165.50 in relation to this.
22. A later report from WT concluded that such an event may have occurred
(that is, stormwater runoff may have entered the home, but only to a minor
degree) but not that it was definite.
23. The FSP considers that the Applicant cannot prove the inundation and that
its settlement was generous in the circumstances.
24. The Panel disagrees with the FSP‟s position. As the policy provides cover for
accidental damage and such damage has been established, the onus is with
the FSP to establish that this damage was caused by the excluded event
(flood). WT could not rule out that at least some of the damage was due to
stormwater run-off and in fact concedes that it may have entered the home.
25. The FSP must therefore provide indemnity under the policy for stormwater
runoff and can only limit indemnity to the extent that it demonstrates the
exclusion applies.
26. The Applicant accepts that the property was ultimately inundated by
floodwater, however, it is accepted that there was likely some initial
“ponding” in areas around the home at the time of the heavy rain which was
clearly due to stormwater. This water later dissipated and a second event
occurred which was the water direct from the Brisbane River.
27. The Applicant has claimed that the initial stormwater inundation had
damaged her bamboo flooring and the FSP has accepted liability for that,
although to a very limited extent. The FSP limited its offer on the basis that
WT suggested that the flow of stormwater may be limited to (for example)
carpets, rather than the whole floor area. In the Panel‟s view, that is not
persuasive evidence and does not meet the standard of „balance of
probabilities‟.
Case No: 286217 Determination Page 6 of 6
28. In the Panel‟s view, as the FSP has failed to meet its onus to show that the
damage to the bamboo flooring was caused solely by flood, it is required to
indemnify the Applicant for her loss.
Determination
29. On the basis of the available information, the Panel determines that the FSP
must indemnify the Applicant for the damage to her bamboo floor. Such
indemnity is not limited to the area immediately adjacent to the front door.
30. To the extent that the FSP elects to cash settle the claim for this damage, it
is also required to pay interest at the statutory rate from 26 February 2011
until the date of payment.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.