Home / Financial Firm (Unknown - Insurer) / Determination 286217

Determination 286217

Flood claim for bamboo flooring denied as excluded flood; stormwater run-off not accepted

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-20
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$12,166
SourceAFCA PDF

Summary

The applicant's rented home in Fernvale was inundated in January 2011. The FSP accepted only limited stormwater damage and excluded the rest as flood, offering $1,500. AFCA found the FSP had not shown the bamboo flooring damage was caused solely by flood and ordered indemnity for the floor, with statutory interest from 26 February 2011.

Once accidental damage is established, the insurer bears the onus of proving an exclusion applies, and the FSP's hydrology evidence did not meet the balance of probabilities for the flooring.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 286217 Determination Page 1 of 6 Case number: 286217 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of Claim - Inundation - Flood or Stormwater Run-off 27 February 2013 Background 1. The Applicant held a landlord insurance policy for her rented home with the Financial Services Provider (FSP). The property was tenanted and the policy provided building cover only, subject to an excess of $200. 2. On or about 11 January 2011, the Applicant‟s property in Fernvale was inundated as a result of the significant weather events which affected much of Queensland at the time. 3. The FSP agreed to provide partial cover for limited damage it considered may have been due to stormwater run-off. The FSP otherwise formed the opinion that the proximate cause of the damage was the flooding of the Brisbane River and excluded this damage as flood was not covered under the policy. 4. The Applicant disagrees with this decision and seeks indemnity for at least the cost of replacing her bamboo flooring, estimated at around $12,165.50. Summary of Applicant ’ s position 5. The Applicant says that her property was inundated by stormwater run-off and that the FSP has failed to establish that any such damage should be limited in the way that it has suggested. Summary of FSP’s position 6. The FSP says that the cause of the loss was the flooding of the Brisbane River and this is not an event that the policy provides cover for. 7. There is no direct evidence that the home was inundated by stormwater run- off, although the possibility of minor inundation was considered by the FSP‟s hydrologist. In consideration of this, an offer for limited cover was made. Determination Case No: 286217 Determination Page 2 of 6 8. The FSP relies on the following policy provisions: Page 8 of the Product Disclosure Statement (PDS) “ DEFINITIONS ... “Flood” means the inundation of normally dry land by water escaping or being released from the normal confines of any natural water course, lake, reservoir, canal or dam.” Pages 20-22 of the PDS “ SECTION 7. GENERAL EXCLUSIONS These General Exclusions apply to the whole of your Policy unless otherwise stated. Your Policy does not cover: ... 7.17. Flood damage except as provided in Section 2. Contents Cover under Additional Benefits “Flood damage to Contents”.” Issue 9. Whether the Applicant‟s loss is covered under the FSP‟s poli cy. Reasons for decision 10. The Panel is satisfied that a full exchange of information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 11. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 12. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative appointed by the Financial Ombudsman Service Board, and a consumer representative appointed by the Financial Ombudsman Service Board. 13. There is an onus on an insured to establish on the balance of probabilities that a claim arises from an event for which the policy provides cover. This is known as a prima facie claim. Should this onus be discharged, it is then the responsibility of the insurer to establish the application of any exclusion on which it relies to deny the claim. 14. As the policy provides general cover for accidental damage and it is not in dispute that the Applicant‟s property was inundated with water, which in this Case No: 286217 Determination Page 3 of 6 instance is properly characterised as „accidental‟; the Panel therefore accepts that the threshold for accidental damage cover has been met. 15. The onus of proof therefore transfers to the FSP to establish that the cause of the loss was not covered within the ambit of the policy. In this instance, the FSP states that the policy does not cover building damage that arises as a result of flooding. 16. The provision of the policy and the exclusion itself are not issues in dispute and the consideration of the matter will be based on whether the FSP has discharged its onus to show that the damage was caused by a flooding event. 17. After the loss was reported, the FSP retained a loss adjuster, CR. CR provided a report dated 5 April 2011, after a visit to the site. This report noted that:  the insured home was a low set timber frame house constructed on a concrete slab in or about 2008/2009;  the nearest water body is the Brisbane River, with the home located about 2km south of one stretch of it and about 2km west of another section;  separating the property from the western area of the river, is a ridge set about 80m higher than the Applicant‟s property;  about 900m north of the property is a quarry;  flash flooding from stormwater run-off had not affected the property by the time that the heavy rain finished (about 1.00pm 11 January 2011);  water began to rise in the area from about 5.45pm (11 January 2011);  witnesses suggested that the rise in water was due to a collapse of the berm, built to reduce the noise from the quarry. Residents believed that a build up of water behind this berm was ultimately responsible for the inundation of homes;  the insured home is situated at about 45m above sea level;  it was “unlikely” that water from the Brisbane River affected the home;  the water may have originated from the quarry, emerging to affect the homes after collapsing the berm;  water reached a level of about 1.1m throughout the home;  the total amount of estimated damage was around $70,000;  retention of a hydrologist “may be necessary” to more closely investigate the matter. 18. Whilst the report is comprehensive, the Panel notes that CR is not a hydrologist and appears not to have had the expertise to draw the conclusions that he has. The Panel particularly notes that the conclusion drawn by CR (that the origin of the water that inundated the property was Case No: 286217 Determination Page 4 of 6 unlikely to have been from the Brisbane River) has not been adopted by the FSP. 19. CR subsequently retained a hydrologist, WT, at the instruction of the FSP. WT also attended the site and provided a report dated 7 September 2011. WT found that:  the tenant at the time of the loss had left the property but the current tenant had been a resident next door and was present for some of the events at the time of the flooding;  both the Applicant and the current tenant were spoken to;  the Applicant recalled the prior tenant suggesting that there was “heavy rain” on the morning of the loss, with water first emerging in the area to the rear of the property, from where a farm is situated just to the west. This water subsequently receded and rose again about three hours later, inundating the property. Peak water levels were about waist deep;  the current tenant said that there was “heavy rain” throughout the evening of 10 January 2011 and into the next day. The water was observed to be “knee deep” at the farm area. Her home was not inundated at this time but the water did reach the rear boundary. Water was running off the driveway and pooling out the front and nearly “entered the property through the front door”. The rain stopped a t about 10.00am and water was noticed in the farm area from about 2.00- 3.00pm. It rose quickly and tenants were evacuated by the SES;  the ground elevation at the site was estimated to be about 42.6-42.7m AHD (Australian Height Datum). The concrete slab is about 100- 150mm off the ground, making the floor level about 42.7-42.85m AHD;  based on the graphs regarding rainfall from Savages Crossing Rainfall Alert, rain was recorded in the local area into the late afternoon. The peak period pushed 100mm/hr in the mid morning period of 11 January 2011. There appears to have been no significant rainfall after about 3.00pm;  WT considered that “extreme rainfall” fell between 5.00am and 2.00pm on 11 January 2011. Some “ponding” occurred in flat areas of Fernvale of depth s likely no greater than 100mm. Some of this “may have inundated buildings”. In steeper areas, this would have resulted in overland flow. Whilst the neighbour‟s home was not inundated by the “ponding” water, it is possible that this could have happened at the Applicant‟s property through the front entry and garage. This water drained away by 12.00pm that day and the rain had ceased by mid- afternoon. A second event was noticed from about 4.30pm which originated from the Brisbane River. The river level peaked at 42.67m at Savages Crossing at 1.40am on 12 January 2011; Case No: 286217 Determination Page 5 of 6  based on an interpolation of water levels, WT estimated a total peak of 43.8m AHD;  there was a clear flow path for water from the Brisbane River to the site;  inundation in the home was to an estimated height of 0.95m-1.1m;  whilst there was possible minor stormwater inundation, WT considered that the majority of damage was caused by the flooding of the Brisbane River. 20. The FSP relied upon the conclusions of WT to suggest that the maximum level of inundation of the insured property was to no more than part of the garage and part of the front entrance (if there was any at all). It estimated this damage at possibly $200 but later increased this by way of a formal offer for $1,500. 21. The Applicant considers that the inundation ruined her bamboo flooring, which requires replacement. She seeks $12,165.50 in relation to this. 22. A later report from WT concluded that such an event may have occurred (that is, stormwater runoff may have entered the home, but only to a minor degree) but not that it was definite. 23. The FSP considers that the Applicant cannot prove the inundation and that its settlement was generous in the circumstances. 24. The Panel disagrees with the FSP‟s position. As the policy provides cover for accidental damage and such damage has been established, the onus is with the FSP to establish that this damage was caused by the excluded event (flood). WT could not rule out that at least some of the damage was due to stormwater run-off and in fact concedes that it may have entered the home. 25. The FSP must therefore provide indemnity under the policy for stormwater runoff and can only limit indemnity to the extent that it demonstrates the exclusion applies. 26. The Applicant accepts that the property was ultimately inundated by floodwater, however, it is accepted that there was likely some initial “ponding” in areas around the home at the time of the heavy rain which was clearly due to stormwater. This water later dissipated and a second event occurred which was the water direct from the Brisbane River. 27. The Applicant has claimed that the initial stormwater inundation had damaged her bamboo flooring and the FSP has accepted liability for that, although to a very limited extent. The FSP limited its offer on the basis that WT suggested that the flow of stormwater may be limited to (for example) carpets, rather than the whole floor area. In the Panel‟s view, that is not persuasive evidence and does not meet the standard of „balance of probabilities‟. Case No: 286217 Determination Page 6 of 6 28. In the Panel‟s view, as the FSP has failed to meet its onus to show that the damage to the bamboo flooring was caused solely by flood, it is required to indemnify the Applicant for her loss. Determination 29. On the basis of the available information, the Panel determines that the FSP must indemnify the Applicant for the damage to her bamboo floor. Such indemnity is not limited to the area immediately adjacent to the front door. 30. To the extent that the FSP elects to cash settle the claim for this damage, it is also required to pay interest at the statutory rate from 26 February 2011 until the date of payment.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.