Text of the determination
Case No: 286154 Determination Page 1 of 9
Case number: 286154
General Insurance - Domestic Insurance - Home Building and Contents - Storm
- FSP Decision - Claim Amount - Pre-existing Condition - Service - Delay in
Claim Handling
20 June 2013
Background
1. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP), which was in force at the time of the loss.
The policy covered against listed insured events.
2. On 30 December 2011, the Applicants lodged a claim for damage to the
home building following a storm, which occurred on 25 December 2011.
3. The FSP partially denied the claim on the basis that the damage to the
stumping was an ongoing issue, unrelated to the storm. The Applicants
disagree with this decision and want the FSP to pay their claim in full.
Summary of Applicants ’ position
4. On 25 December 2011, a hail and rainstorm flooded their backyard and
damaged the skylights, causing water to enter the house along the edges of
the ceiling. The following morning, upon noticing misaligned doors, they
suspected the flood could also have affected the stumping.
5. When they purchased the house, they appointed a building inspector, who
said that re-stumping was required. The vendor organised this in April 2011,
prior to them purchasing the house on 1 July 2011. When they moved in, the
house was balanced and all doors could open and close perfectly.
6. The fact that the FSP’s engineer (IP), inspected the site 2.5 months after the
incident, has disadvantaged them. At the time, IP accepted that to some
degree they would be disadvantaged because it was quite difficult for him to
decide what took place.
7. Further, when they obtained insurance, the FSP’s agent (bank) failed to
highlight important facts that could have affected their decision to take out
the policy. They argue if the bank was informed of the need for re-stumping,
why did it not bring this to their attention as an exclusion for claims.
Determination
Case No: 286154 Determination Page 2 of 9
8. They seek a written explanation or apology for the FSP’s delay in attending
to their claim and for the FSP to accept their claim in full.
Summary of FSP’s position
9. Following the recommendation by its loss assessor (CC), it appointed
building experts (TSB), to inspect the site. TSB said there was genuine
plaster and painting damage from a skylight, but recommended an engineer
to be appointed to comment on the plasterboard cracking and stumping
issues.
10. Upon review of the report by structural engineer IP, the FSP concluded that
the cracking damage and misaligned doors were not the result of a single
water inundation event, but the result of long-term and ongoing movement of
the soil supporting the house’s footings.
11. The pre-purchase report also indicated that there were pre-existing issues
within the home, which had been caused by movement within the
foundations and footings.
12. Based on this information, the FSP accepted the claim for resultant damage
related to the skylights, but declined the claim for cracked plasterboard lining
and misalignment of doors, as that damage was not caused by a storm
event, but by pre-existing issues predating the policy.
13. The widespread damage caused by the 25 December 2011, storm event,
created a heavy demand for the service of qualified building assessors and
thus not all homes were promptly inspected. Given the circumstances, any
delay in providing assessment services would not have been unreasonable.
14. It disagrees that IP would have stated to the Applicants that they were
disadvantaged by the delay in his attendance to the site.
15. It maintains its denial of a portion of the claim, on the basis that the type of
damage sustained, is excluded under the policy.
16. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement (PDS):
“ General exclusions
We will not pay for any loss or damage, or liability caused directly by or arising
from:
any event that does not occur within your period of insurance
...
Buildings and contents cover exclusions
We will not pay for any loss or damage which is caused directly or indirectly
by:
settling, shrinkage or any movement of earth
Case No: 286154 Determination Page 3 of 9
settling, shrinkage or expansion in buildings, foundations, walls or
pavements
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear ” .
Issues
17. Whether there were unreasonable delays by the FSP that could have
disadvantaged t he Applicants’ entitlement for cover.
18. Whether the FSP is entitled to deny the claim for the re-stumping and cracks
in plasterboard under the terms and conditions of the policy.
Reasons for decision
19. As advised to the parties, due to the nature of the dispute and the amount
claimed, the Financial Ombudsman Service (FOS) has considered it
appropriate to expedite the dispute to a Determination by an Ombudsman in
accordance with the Operational Guidelines to the FOS Terms of Reference.
20. I have reviewed the partie s’ submissions and note there is no dispute that
the property was damaged during the storm of 25 December 2011. I will now
address each issue in dispute.
Were there unreasonable delays by the FSP that could have disadvantaged the
Applicants’ entitlement for cover
21. The Applicants say that the FSP has taken too long to handle the claim,
appoint an assessor, appoint experts, review the claim and provide an
internal dispute resolution (IDR) response.
22. The Applicants argue that IP confirmed verbally to them, that visiting the site
two and a half months after the event, would have disadvantaged them.
23. The FSP alleges that due to the magnitude of damage caused by the storm
of 25 December 2011, there was a heavy demand for the services of
qualified building assessors and not all homes were promptly inspected.
Given this, it considers any delay would not have been unreasonable.
24. The FSP considers that, despite IP’s late a ppointment, attending the
property two months after the event, did not put anyone at a disadvantage.
25. On this point, I refer to IP’s clarification email of 30 May 2012, which says:
“To be honest I do not recall having had a conversation with the insureds
stating that they would have been disadvantage by the timing of my visit. Due
to the nature of the event and the issues that it was reported to have caused
to the home, I would not have made such a comment as I do not believe that
attending the property 2 months after the event puts anyone at a
disadvantage in this instance.
Case No: 286154 Determination Page 4 of 9
Yes, with some jobs it helps to get a property as soon as possible after an
event to assist with the investigations, but that does not pertain in this case”
[sic].
26. In early communications between the parties, in particular an email dated 29
February 2012, the male Applicant says:
“According to the engineer [IP], ideally he should be requested to come right
after the incident to check on things. Now that it is three months after, it can
be hard to write a report for that but he will try and take note of the time factor.
This is exactly why we were concerned. We asked him if we will be
disadvantaged by the long delays. He did not answer that question directly but
we have a feeling that we mi ght be!”
27. I note that there are some contradictions between this email (which it seems
was sent on the same day of IP’s inspection) and what the Applicants have
submitted to FOS.
28. In particular, within the email the male Applicant says that IP confirmed it
would be hard to report on the cause due to the time factor, but it does not
say that IP confirmed this was a disadvantage for the Applicants.
29. The Applicants’ position is based on IP’s alleged statement that it would
have been quite difficult to identify what took place, which does not mean it
was impossible, or that, in effect, it prejudiced them.
30. In the absence of further evidence or explanation, I am not satisfied the
Applicants have established on the balance of probabilities that they suffered
a disadvantage or prejudice by the delay in assessing the property.
31. Further, I accept the FSP’s explanation, that due to the large number of
claims arising from this storm event, a short delay in attending some
properties was unavoidable.
Whether the FSP is entitled to deny the claim for the re-stumping and cracks in
plasterboard under the terms and conditions of the policy
32. It is recognised insurance law that the insured has the onus to establish, on
the balance of probabilities, that the claim falls within the definition of an
insured event; this is known as a prima facie claim. If this is established, the
onus shifts to the insurer to establish the application of any provision on
which it relies to deny or limit the claim.
33. There is n o dispute between the parties that a “storm” event took place on
25 December 2011, or that “storm” is an insured event under the policy and
that this event caused at least part of the claimed damage to the property.
34. The Applicants contend that issues with stumping and cracks in plasterboard
are a result of the storm event and the flood that occurred in their backyard
as a result of the storm.
Case No: 286154 Determination Page 5 of 9
35. To support their position, the Applicants say that the damage could not have
been due to pre-existing conditions, because the stumping issue was
identified and repaired earlier in the year.
36. The Applicants rely on a pre-purchase building report of 7 April 2011 and an
invoice for the repair of the stumping. The pre-purchase building report
relevantly says:
The report is not to be taken as a guarantee for the future performance
of the building, materials and or workmanship.
Some past movement was evident as shown by patched brickwork,
gaps at a window frame and eaves lining and trim to the dwelling’s
brickwork. Patched cracks do not appear to have moved further since
the patching was done.
It is very dry under the house. Soil shrinkage and soil cracking has
severely affected the proper performance of the stumping.
Numerous concrete stumps have settled due to subfloor soil cracking.
Many stumps are supported incorrectly by the foundation soil and have
large gaps between the soil and the stump concrete footing.
This is a “Major Structural Fault” and needs to be rectif ied as it results
in uneven floor levels, settlement of the internal house framework and
misalignment of doors and plaster fractures.
This will have a significant cost to rectify due to the very low subfloor
clearance and may require installation of additional stumps and/or
packing of existing ones.
There are random irregular floor surfaces evident with some creaking at
“bedroom 1’s” entry.
The dining door needs the slider stop adjusted, all bedroom doors need
adjusting. Improving subfloor and restoring support will improve door
performance.
37. A tax invoice from a reblocking specialist, dated 18 April 2011, says
“Description of Services ... Level and pack house no guarantee that further
movement will not occur” [sic].
38. The Applicants have also provided (to the FSP) screen captures of a video in
which it is easily observed that part of a house (allegedly the backyard) was
inundated during a hailstorm (hail is also observed).
39. The FSP contends that the damage is ongoing and has been occurring for a
number of months. It says its cause is pre-existing issues that would have
originated before the policy started.
40. To support its position, the FSP has presented several reports from CC, a
report from builder T and a report and clarification email from IP. CC’s
Case No: 286154 Determination Page 6 of 9
reports in summary suggest that the claim should be partially denied based
on the information from T and IP.
41. T’s building report of 17 January 2012 relevantly says:
There is debris in the soaker tray of the skylight that the owner will have
to clean out. This is likely to be the cause of resultant water damage to
the entrance and lounge directly below, which requires minor patching.
There is no storm damage to the roof. Paint is peeling off the concrete
roof tiles due to wear and tear.
There is cracking to various walls and plaster junctions and doors
misaligned to areas of the front of the house.
There is some genuine plaster and painting damage from the skylight
but T recommends appointing an engineer to comment on the cracking.
42. IP’s report is very detailed as to th e damage room-by-room. In summary, it
contains the following relevant information:
The dwelling is a single-storey brick veneer building with a pitched
concrete tile roof sitting on a stump and bearer floor frame. It was
inspected on 29 February 2012.
The female Applicant stated that:
i. Prior to the storm event of 25 December 2011, there was no
fracturing to the plasterboard wall linings, cornices or woodwork in
the home and no doors were binding on their doorjambs.
ii. On 26 December 2011, the double robe doors in “bedroom 2”
became misaligned and the door to the north side was no longer
closing. That same day, fractures to the plasterboards developed.
iii. Additional cracking to plasterboard lining appeared in “bedroom 1”
and “bedroom 3” within a week fro m the storm event.
iv. Prior to settlement on the purchase of the property in July 2011, the
previous owner took care of packing works in the subfloor of the
home (beneath “bedroom 4”) to assist in re -levelling the flooring.
There is cracking damage throughout the interior of the building, which
in IP’s view is due to long -term and ongoing soil movement within the
foundations and footings of the house.
There is also cracking damage and popped nails that have previously
been repaired (presumably prior to purchase of the house), which
suggest that the movement has been ongoing.
The walls of the bathroom, laundry, meals area and WC room have
cracks that are consistent with the age of the building.
Case No: 286154 Determination Page 7 of 9
There are misaligned room and robe doors throughout the dwelling.
Signs of wear on striker plates on some of these doors suggest the
doors have been in that position for an extended period of time.
Other doors, although showing wear on striker and wear on the head of
door jambs, seemed not to have been in that position for very long.
Although there may have been new movement, IP considers this is part
of continuing long-term soil settlement.
The floor is uneven on “bedroom 1” and “bedroom 3”.
The ground soil under the home is very dry and has no evidence of
water inundation. There are large cracks in the soil, which have opened
due to lack of moisture, leading to contraction of the surface soils. This
indicates that the majority of the home has subsided due to shrinking of
founding soils.
Long-term ongoing ground movement would have been exacerbated
within the last 18 –24 months due to the return to “normal” rainfall,
following 10 years of drought conditions.
The evidence supports that the subfloor was packed and re-levelled.
There are plastic packing strips inserted between the concrete stumps
and the hardwood bearers along two rows of bearers in the centre of
the home (from east to west). There is no packing to external bearers.
The packing in the subfloor may have exacerbated some of the
plasterboard cracking and doors misalignment by creating a “hump” in
the centre of the flooring, particularly at the front of the house.
The pre-purchase report mentions pre-existing issues caused by
movement in the foundations and footings, consistent with the issues IP
saw. This suggests the issues are pre-existing.
The soaker tray to the entry skylight and the proofing sealant to the
solar tube over the kitchen require regular maintenance.
The damage to the window in “bedroom 2”, to the plasterboard ceiling
lining in the entry, passageway and the staining to the ceiling in
“bedroom 4” may be consistent with the claimed storm event.
43. IP’s report contains several photographs of most internal areas, under the
house and on the roof, which in my view corroborate IP’s observations.
44. In r eference to his report, IP’s clarification email of 30 May 2012 , says:
When inspecting the subfloor region, he saw no evidence of water
inundation to the western part of the house (low side of the property),
occurring as part of the 25 December 2011 storm.
There was no erosion or water track marks to the surface of the ground
under the house. The soil was extremely dry and cracked. The pre-
purchase building report also notes the same.
Case No: 286154 Determination Page 8 of 9
The interior showed multiple points of evidence in the form of previous
crack repairs, suggesting that the movement and cracking has been a
long-term issue and predates the purchase of the home.
There is also evidence of minor subsidence to the stump and bearer
subfloor, which occurred some time ago as per the rate of wear on the
striker plate to door of “bedroom 1”.
There is no evidence to support the notion that the issues found were
caused by a single storm related event. However, there is evidence of
issues predating the purchase of the home and relating to long -term
and ong oing movement within the house’s foundations and footings.
45. FOS asked the Applicants if they wished to provide any expert evidence to
support their position. Within an email of 13 May 2013, the Applicants stated
that they could not supply other reports.
46. In my view, the previous attempts to repair old cracks on walls and popped
nails on the ceiling, indicate that there was a pre-existing issue. Repairs
were carried out to the stumping and bearers of the house prior to the
Applicants purchasing the property, to resolve an issue with soil movement.
47. The reblocking specialist who carried out the repair said in its invoice that the
repair is no guarantee that there would no longer be any soil movement .
48. The material to hand suggests that the issue of long-term and ongoing soil
movement at the foundations of the house, remained unresolved. This,
combined with varying weather conditions over a long period, has resulted in
further cracking of plasterboard lining and misalignment of doors.
49. Accordingly, I am satisfied that the FSP has established, on the balance of
probabilities, that the loss has been caused by ongoing soil movement,
which is excluded under “settling, shrinkage or any movement of earth” and
“settling, shrinkage or expansion in buildings, foundations”. The refore, the
FSP is entitled to deny the claim.
50. Even if I were to consider that the storm event of 25 December 2011,
contributed to the damage, it is my view that in such case the Wayne Tank
principle would apply to defeat the claim.
51. Under this principle, where a loss has two or more concurrent proximate
causes and at least one of them is excluded from cover, the insurer is not
required to indemnify.
52. As such, if the loss were considered to have been caused by the storm event
(covered) and the ongoing soil mo vement (excluded), then the Wayne Tank
principle would apply to defeat the claim.
Case No: 286154 Determination Page 9 of 9
Other issues
53. The Applicants have alleged that the bank did not highlight important facts or
bring to their attention the fact that issues with re -stumping could be an
exclusion for claims.
54. In brief, I note that at law, it is an obligation of insureds to familiarise
themselves with the terms and conditions of the policy so as to ensure that it
meets their needs or to seek cover elsewhere. Further, it is not an obligation
of an insurer or its agents to provide personal advice on a particular product
that they are offering.
55. Accordingly, it was the Applicants ’ responsibility to ensure they understood
the contents of the policy and not the FSP’s (or the bank’s) obligation to
specifically bring their attention to potential exclusions.
56. As to the damage that IP identified as likely to have been caused by the
storm event, it is my understanding that the parties are in the process of
achieving a settlement and therefore, I will not address those issues in this
decision.
Determination
57. On the basis of the available information, I determine that there were no
delays that prejudiced the Applicants.
58. Further, I determine that the FSP is entitled to deny the claim for the re-
stumping and cracks i n plasterboard under the terms and conditions of the
policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.