Determination 285896
Quality and scope of bathroom tile and vanity repairs; claim delays
Summary
The Applicants' accepted water damage claim was disputed over the scope of tile repairs and the quality of replacement vanity benchtops, and the FSP took over two and a half years to resolve it. AFCA required the benchtops to be replaced, accepted the FSP's tile repair offer, and awarded $500 for delay.
Repairs must restore the property as near as possible to its former condition, and unexplained delays of this length justified non-financial loss compensation under the Terms of Reference.
Issues
- Repairs or contractors primary · upheld
“I am not satisfied that the benchtops provided to the vanity cabinets were of appropriate quality; FSP to replace the benchtops.”
- Delay secondary · upheld
“The delay in responding to the Applicants' claim by the FSP is unexplained, and in my view, unacceptable.”
Subjects and remedies
home or building damagepay interestpay non financial lossrepair or rectify
Text of the determination
Case No: 285896 Determination Page 1 of 7
Case number: 285896
General Insurance - Domestic Insurance - Home Building - Service - Service
quality
6 June 2013
Background
1. This Determination follows the rejection for Recommendation issued by the
Service on 15 April 2013.
2. The Applicants’ hold a home building contents and personal valuable policy
with the Financial Services Provider (FSP) insuring the Applicants ’ building
for $250,000, contents for $50,000 and personal valuables for $2,000.
3. On 10 April 2010, the Applicants lodged two claims for water damage
sustained to vanity cupboards in two bathrooms namely the ensuite
bathroom and the second bathroom of the property which the Applicants
believe was caused by a leaking pipe.
4. According to the FSP, following an initial investigation of the claim, no
leaking pipes were found and the cause of damage was believed to have
been a large gap between the basin and bench top. The back panel of the
vanity cupboard was also found to have been eaten away by termite activity.
Following the appointment of an internal assessor, the assessor confirmed
sighting water damage to both vanity cupboard units and the claims were
accepted. During the repair process, damage occurred to some of the tiles in
the second bathroom and to one tile in the ensuite bathroom. The FSP’s
repairer was unable to locate matching tiles and the FSP proposed to repair
the area of the second bathroom by replacing a complete row of small tiles
with feature/border type tiles above the vanity bench top and by replacing a
complete row of tiles above the vanity bench top in the bathroom suite.
5. The Applicants have rejected the proposed repair methods and believes that
both bathrooms should be retiled completely. The Applicants also believe the
FSP has used inferior products when replacing the vanity cupboards in both
bathrooms.
Summary of Applicants’ p osition
6. The Applicants maintain the contractor employed by the FSP to replace the
vanities and tiles used inferior quality tops that are porous and stained which
the Applicants maintain is unacceptable. The Applicants further maintain that
Determination
Case No: 285896 Determination Page 2 of 7
the contractor broke the tiles above both vanities when carrying out this
work.
7. In rejecting the Recommendation, the Applicants note they are not prepared
to accept the patch up job as suggested by the FSP and maintain the tiles
and vanities in their home were of first class quality and the resolution
offered by the FSP will not restore the bathrooms to their original state.
Summary of FSP’ s position
8. The FSP maintains the material used in the supply and manufacture of the
replacement vanity tops being made with the correct type of materials as fit
for the purpose.
9. With respect to the damage to the ensuite bathroom tiles, the FSP maintains
as only one tile to the side of the ensuite vanity top was damaged, the offer
to replace a complete row of splashback tiles as per the Applicants’ selection
is fair and reasonable. With respect to the second bathroom, the FSP
maintains the replacement of these small tile pieces to the second bathroom
is consistent with the Applicants original agreement for the supply and
installation of the small border type tiles strip.
10. The FSP relies upon information provided by GBI and a laminex products
factsheet to support its claim that the benchtops of the vanity units had been
replaced with a product recommended to be supplied to both kitchen and
bathroom benchtops, that the product is of a similar quality and design as
the existing benchtops and in accordance with the relevant building codes
and specifications as determined by the manufacturer.
Issues
11. Whether the Applicants are entitled to the replacement and complete retiling
of both bathrooms.
12. Whether the Applicants are entitled to the replacement of the vanity
benchtops which are now stained.
Reasons for Decision
13. The parties have had the opportunity of negotiating a resolution of this
dispute and have had the matter considered and a Recommendation issued.
14. The parties have also had the opportunity of submitting more information to
the Service and the opportunity of providing information to address the
issues that are in dispute, prior to the making of this determination.
Case No: 285896 Determination Page 3 of 7
15. I note that despite the Applicants having rejected the Recommendation, they
have offered no further evidence with respect to either the cause of the
damage to the benchtops or any evidence that the tiles offered as part of the
replacement were of an inferior quality.
16. I am satisfied in the circumstances that each party has had the opportunity of
addressing the issues and that, I am therefore in a position to make a
Determination in this matter.
17. There is no dispute that the Applicants had received the Product Disclosure
Statement (PDS) and policy wording from the FSP. The PDS and policy
wording is relevantly indexed and provides cover for a variety of insured
events. Although the FSP may have initially indicated an intention to decline
the claim, there is no dispute that the damage sustained to the bathrooms is
due to the insured event of the escape of liquid from any fixed apparatus,
fixed tanks or fixed pipes, and therefore falls within the terms of the policy.
18. In this respect, I note in the Notice of Response (NOR) the suggestion made
by the FSP that the tiles above both vanity unit tops appear to be gummy. I
do not believe that is a relevant fact in consideration of this dispute. It is
apparent that the damage to the tiles sustained in this matter was caused by
the action of the builders employed by the FSP in replacing the vanity tops.
There is no suggestion that the tiles had suffered or were suffering from pre-
existing damage.
19. I also note there appears to be considerable delay in this matter from when
the Applicants initially lodged the claim. According to the FS P’s summary of
facts, the Applicants initially contacted the FSP on 10 April 2010. It appears
that the repairer ‘MG’ did not report on the damage until 3 December 2010
approximately eight months later. Such a delay is unacceptable. It would
then appear that it was not until the Applicants contacted the FSP on 2
February 2011, that the Applicants were informed that the claim was to be
declined. This occurring two months after having received the report and
nearly 10 months after the lodgement of the claim is also unacceptable. It
appears that the FSP then took approximately four months to arrange an
internal assessor to attend at which time the assessor sighted the water
damage to both vanity cupboard units and considered the claim should be
covered. Again, it is unacceptable that it would take nearly four months for
an assessor to attend.
20. It is unclear from the information exchanged exactly when the vanity units
were replaced. However, it is clear that the FSP’s assessor did not re -attend
the site to discuss with the Applicants the relevant options of repairing the
damage sustained to the tiles until 31 January 2012 with the option being
confirmed via email on 2 March 2012. Again, it is unclear what has caused
such significant delays for what appears to be a relatively straight forward
complaint. At some later stage, the FSP has notified the Applicants of the
response from GBI and of the information sheet with respect to the laminex.
The copy of the GBI letter is dated 11 July 2012. According to the NOR at
tha t time, the FSP advised that `RBD’, the builder, would contact the
Applicants with respect to the replacement tiles. It is not until 22 October
Case No: 285896 Determination Page 4 of 7
2012, that the FSP has completed its IDR and maintained the original
decision. At that time the FSP notes that RBD had sourced tiles that were
not a correct match.
21. It is understandable that the Applicants have been concerned by the delays
and by the conduct of the FSP in this matter, as it appears, based on the
information exchanged that it took over two and half years from the
notification of the claim until the FSP’s IDR decision had been reached and
even at that stage the tiles had not been matched.
22. In the absence of any explanation, such delays are unacceptable.
23. The FSP’s policy under the definition of reinstatem ent provides that
reinstatement shall be by way of repair or restoration to as near as possible
to its former condition, but not better or more extensive than when new,
whilst replacement is defined as being replacement by equivalent property in
new condition.
24. Under the home building claims provisions of the policy, where a claim is
accepted, the FSP has the option:
To repair the home to a condition as near as possible to its former
condition at the date it was damaged...
25. In circumstances as in the current dispute, where exact replacement tiles are
not available, that is the replacement tiles for both, the ensuite bathroom and
second bathroom, then it is not unreasonable for the FSP to seek to replace
the tiles with tiles that are as near as possible a match for the broken tiles.
26. I have not been provided with a detailed description of the proposed
replacement tiles. I note the FSP has acknowledged that the tiles sourced by
RBD were not the correct match which was an oversight. Whether they have
in fact been able to match the tiles is unclear from their IDR letter.
27. In my view, the offer of the FSP to replace a complete row of splashback
tiles as per the Applicants selection in the ensuite, is fair and reasonable and
the offer to replace the small tile pieces in the second bathroom and supply
and install a small border tile strip, would also be fair and reasonable,
providing the replacement tiles are as near a possible match for the broken
tiles. Given the location of the damaged tiles, in my view, it would be
unreasonable to require the FSP to completely retile both bathrooms.
28. If the Applicants are not willing to accept this offer as being fair and
reasonable in the circumstances, then the FSP would be entitled to cash
settle the Applicants for the cost of the replacement and installation of the
tiles in both the bathrooms.
29. Insofar as the dispute with respect to the replacement of the vanity
benchtops is concerned, I note the FSP maintains that the material used is
the correct type of material and fit for purpose.
Case No: 285896 Determination Page 5 of 7
30. They have provided a statement dated 11 July 2012 from GBI. The
statement, however, is from the Account Manager. Whether the Account
Manager has any knowledge as to the appropriate products to be utilised is
unclear. The comment with respect to the Account Manager’s dealings with
RBD is in my view irrelevant given that RBD had broken the tiles in the first
place and then sourced incorrect tiles as replacement tiles.
31. The FSP has referred to a laminex factsheet as confirmation that the
benchtops were suitable for the intended purpose.
32. Again I note from the GBI correspondence, that in fact Formica Indian Sage
and Formica Black were the products used in the bathrooms. These are
different products to the products in the laminex information sheet, although
similar. Whether the Formica products supplied were adequate and suitable
for the purpose, is unclear. I note from having looked at the Formica website
that the Formica products include a warranty. Whether the damage claimed
is covered under the warranty, has not been discussed.
33. The photographs identified damage to the replacement vanity benchtops in
the form of a staining ring in the ensuite and a similar ring in the second
bathroom.
34. It seems most unusual that a product if fit for purpose would be stained in
such a manner. I am not satisfied based on the information as provided by
the FSP, that the benchtops provided to the vanity cabinets were in fact of
appropriate quality or as near as possible to the condition of the former
benchtops. I am not satisfied that the information as exchanged establishes
that the damage or staining of the benchtops was due to actions by the
Applicants or a failure of the Applicants to properly maintain the benchtops.
35. In the circumstances, I am of the view that it is fair and reasonable that the
FSP replace the benchtops to the vanity cabinets in the ensuite bathroom
and in the second bathroom.
Compensation
36. As indicated earlier in this Determination, the delay in responding to the
Applicants’ claim by the FSP , is unexplained, and in my view, unacceptable.
37. Under paragraph 9.3 of the Terms of Reference, compensation can be
awarded up to a maximum of $3,000 for non-financial loss where there is an
unusual degree or extent of physical inconvenience or time taken to resolve
the situation or interference with the Applicants expectation of enjoyment of
peace of mind.
38. The FOS Terms of Reference and operational guidelines, whilst noting that
FOS will take a conservative approach to compensation for non-financial
loss notes that there must be an unusual amount of inconvenience or time
taken.
Case No: 285896 Determination Page 6 of 7
39. As indicated earlier in this Determination, based on the information supplied,
the Applicants’ claim was originally lodged with the FSP on 10 April 2010. It
appears it took eight months for the FSP to appoint a repairer to report on
the damage and that repairer got it wrong. It took a further two months and
took the Applicants to follow up the claim before the Applicants were
informed of this decision and then a further four months b efore the FSP’s
assessor attended and confirmed the claim was one for acceptance. There
then appears to be continual delays in the repairs with damage sustained
during the course of the repairs. In fact these delays continued through to
the IDR letter of 22 October 2012 in which the FSP acknowledges the
builder RBD had sourced tiles that were not a suitable correct match to the
existing tiles.
40. In my view, such a delay and the difficulties faced by the Applicants are
sufficient to establish an unusual amount of inconvenience and time taken to
resolve the situation. It is not acceptable in my view that these matters
should have taken over two and half years to resolve.
41. In the circumstances, having regard to the delay and the nature of the claim,
I propose determining that payment of compensation pursuant to paragraph
9.3 of the Terms of Reference in the sum of $500 is appropriate.
Determination
42. Accordingly, I determine that the FSP is entitled in accordance with the
terms and conditions of the policy to complete the reinstatement of the
ensuite and second bathroom and that the FSP’s offer to replace a complete
row of splashback tiles as per the Applicants selection in the ensuite is fair
and reasonable and the FSP’s offer to replace the small tile pieces in the
second bathroom with the installation of a small border type tiles strip is fair
and reasonable in the circumstances. Should the Applicants not be prepared
to accept the builder appointed by the FSP to conduct the repairs, then I
determine the FSP is entitled to cash settle this aspect of the dispute based
on a costed scope of works provided by the repairer.
43. Further I determine that the FSP is to arrange for the replacement of the
vanity benchtops with benchtops that are suitable for the purpose. I
determine that the FSP is entitled in accordance with the terms of the policy
to cash settle the Applicants the amount that would cost to replace the
benchtops with suitable matching benchtops.
44. Insofar as the parties agree to a cash settlement of this dispute, I determine
that the FSP is to pay interest in accordance with Section 57 of the
Insurance Contracts Act from 2 June 2010 being two months after the
lodgement of the original claim by the Applicants until date of payment of the
claim.
Case No: 285896 Determination Page 7 of 7
45. I further determine, pursuant to paragraph 9.3 b) of the Terms of Reference,
that the FSP shall pay the Applicants compensation for non-financial loss in
the sum of $500.