Text of the determination
Case No: 285308 Determination Page 1 of 14
Case number: 285308
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
12 November 2012
Background
1. The Applicant holds a Home Insurance Policy with the Financial Services
Provider (FSP). The policy commenced on 21 November 2011 and expires
on 21 November 2012. The policy covers the building for complete
replacement subject to an excess of $1,100.
2. On 25 January 2012, the Applicant contacted the FSP to lodge a claim for
storm damage to the pool. The FSP and the Applicant both arranged for
expert reports during the course of the claims process.
3. The FSP declined the claim on the basis its policy excludes damage for
movement of a pool, wear and tear and soil movement.
4. The Applicant disputes the declinature on the basis the pool did not move
but hydrostatic pressure caused the pool wall to buckle and as hydrostatic
pressure is not excluded the claim should be covered. The Applicant is
further dissatisfied by the FSP‟s claims handling process.
Summar y of Applicant’s position
5. The Applicant states that on 25 January 2012, he arrived home from work at
5.30pm, at this time it was raining heavily. The Applicant drained a small
amount of water from the pool to prevent overflow and then proceeded back
inside at approximately 5.45pm. At the time of going inside the Applicant
heard loud metallic „banging‟ noises and describes this as similar to the
sound of a cricket ball hitting a Colorbond fence. He heard approximately 9-
10 „bangs‟ within the space of five minutes but did not realise this was
related to the pool. When the Applicant checked on the pool at 7.30pm he
discovered the damage.
6. The original assessor admitted to the Applicant that he was not particularly
knowledgeable about pool structure or damage. He recommended an
engineer assess the damage.
Determination
Case No: 285308 Determination Page 2 of 14
7. The Applicant obtained a report dated 8 February 2012, from the company
he utilises to maintain the pool “S”. This report cost $120. The following is
noted from this report by two senior service technicians from S:
The pool is an in-ground fibreglass pool that is in very good condition
with no signs of long term staining evidence.
The pool has been pushed in by external water causing the fibreglass
shell to lift from its normal position.
S is of the opinion that the damage sustained is a direct result of this
storm on 25 January 2012.
This lifting has caused the pool to buckle and crack at both ends which
has then caused the normal backfill of soil to dissipate, lifting the pool
coping and surrounding pavers.
The pool requires replacement, as it cannot be repaired.
8. The Applicant also received an email dated 12 March 2012 from S. The
email provides the following information:
S finds it difficult to believe the hydrostatic valve failed given the pool
colour was green and brown after the storm. The colour suggests the
valve did release water into the pool.
The analysis of the rainfall in the area suggests that the excessive
rainfall has caused the damage to the pool.
9. The Applicant relies on a further report dated 14 March 2012 from S. The
report provides the following information:
S notes its previous statement of „lifting pool‟ in the initial report was a
generic term and did not refer to the entire pool.
S has since been informed that the pool shell has always been 30mm
above the coping in one area. As a result it is obvious that this is not a
consequence of the storm.
Damage to the pool was caused by water pressure pushing on the
pool‟s southern wall causing it to buckle and collapse. S‟s discussions
with the Applicant revealed he heard the cracking/damage during the
storm on 25 January 2012.
The external water pressure has caused the pool wall to buckle in the
middle and crack at both ends, which has then caused the normal
backfill of soil to dissipate.
10. The Applicant says S regularly checked the pool. He say S “even had one of
their scuba divers recently check underwater and in particular the hydrostatic
valve and found it to be in good working condition.” He points out that K did
not dive and inspect the valve.
11. The Applicant contends that the damage arises from Storm and Rainwater,
which is an insured event. Further, that no excluded event is applicable to
the circumstances of this claim. The hydrostatic pressure operating on the
Case No: 285308 Determination Page 3 of 14
pool is a direct consequence of the heavy rainstorm. The pool has not
moved, it is still in position and only the south wall has buckled. The terms of
Case No: 285308 Determination Page 4 of 14
bend or warp are not synonymous with the term „move‟. For similar reasons
the Applicant disputes the application of soil movement.
12. The FSP has altered the basis of its declinature during the claims process
from moving, shifting or dislodging, to wear and tear and deterioration and
soil movement or settlement. In particular the Applicant notes the following:
The wear and tear deterioration exclusion was only raised on 21 May
2012. The Applicant disputes the applicability of this exclusion given
the pool was regularly maintained by S.
The soil movement or settlement exclusion refers to the shrinking and
swelling of expansive soils. The Applicant disputes the applicability of
this exclusion noting it has nothing to do with the reported dissipation of
backfill. Again, this exclusion was only brought up on 21 May 2012.
When the Applicant produced evidence the pool had not lifted, the
moving, shifting or dislodgment exclusion was dismissed by the FSP
and hydrostatic issues were raised as a reason to deny. The Applicant
states again that the exclusion is not applicable given that the pool as a
hole has not moved but rather only its wall has buckled due to the
pressure caused by the heavy rain.
13. The Applicant disagrees with K‟s report given the hydrostatic valve was
checked by S and found to be in working order both before and after the
storm. Further, the water went a muddy colour after the storm, which
indicated the hydrostatic valve was functioning. As this section of the pool
has always been 30mm above the surrounding paving, K‟s findings do not
support the exclusion relied on. In addition K‟s comments that the pool was
“probably” at the end of the serviceable life are in contrast to S‟s comments
that the pool was in very good condition.
14. By email dated the 26 October 2012 to the Service, the Applicant provides
some more photographs and says:
“Attached are photographs of my pool taken last week, approx imately one
week after I drained the entire mass of water in mid October 2012. It is
evident that damage as a result of storm is restricted to the upper section of
the south wall and that the entire floor and other three sides are unmoved and
firmly in place. I maintain that the wording and the common interpretation of
the said exclusion must not apply or used to deny this claim as the pool did
not move, shift or dislodge.
Furthermore, I make a point that the photographs were taken soon after a
heavy storm took place. Please take note of the murky muddy water on the
eastern side of the pool. These are the remains of water that had seeped into
the pool from beneath the floor through the Hydrostatic Valve. This is firm
evidence that this valve is still operating normally and not faulty as
suggested.”
15. The FSP has not responded to this further information.
16. The Applicant notes the FSP has since altered its PDS to exclude seepage
of water, which causes damage to pools. While this PDS and exclusion are
Case No: 285308 Determination Page 5 of 14
not applicable to this contract of insurance, the Applicant submits that the
FSP has altered the policy to clarify the meaning of the exclusion and the
items to which it applies.
17. The Applicant notes that he has anonymously rung the FSP and has been
informed by its employees that the pool would be covered as long as it is a
direct result of storm.
18. The Applicant seeks replacement of the in-ground fibreglass swimming pool
and associated works.
19. The Applicant is dissatisfied with the customer service received from the
FSP. The FSP did not maintain communication and contact him in line with
the time frames provided. The Applicant has provided a timeline of events
indicating the communication attempts, advice of when communication
should be received and necessary follow-up with the FSP when
communication did not occur. The Applicant has noted times he „vented
frustration‟ at being unable to speak with relevant claims managers. There
was further an instance of a call cutting out after the Applicant had been on
hold for 10 minutes. The FSP (excepting the IDR department) did not
provide the written report that would have assisted with his discussions with
the IDR department.
20. The Applicant says the IDR department is not independent, as his
arguments were not taken into consideration.
21. The Applicant further notes that the assessor stated an engineer should be
engaged by the FSP overruled this. He was not informed of the reason for
same.
22. The Applicant contends that he had to take days off work, prepare
correspondence, chase reports and seek answers in order to properly
respond to the FSP. The time taken on this dispute has taken time away
from assisting his wife with two young autistic children. The Applicant did not
raise the issue of compensation however and indicates surprise that the FSP
should state he was not entitled to compensation when he had not raised it.
Summary of FSP’s position
23. The FSP relies on the following policy terms and conditions from its PDS,
which it refers to in its Notice of Response as dated 31 July 2006, but the
PDS provided by the FSP is dated 26 December 2009. The policy wordings
relied on are the same in both documents. They are:
“What we cover – insured events
...
Yes
Case No: 285308 Determination Page 6 of 14
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
Storm means violent wind (including a cyclone or tornado) thunderstorm or a
heavy fall of rain, snow or hail.
...
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
...
Wear and tear, rust, deterioration or corrosion,
...
Soil movement or settlement,
...
The moving, shifting or dislodging of any swimming pool or spa and their
covers and liners, or any septic tank or other inground structure unless
caused by the insured events of earthquake or impact”
24. The FSP relies on an assessor report dated 1 February 2012, which said re
cause of damage:” build up of rain water runoff” and the resultant damage
was “ fibreglass swimming pool had buckled at the top and cracked, pavers
had sunk.”
25. The assessor completed a Building Assessment with a total building
estimate of $25,000.
26. He said an engineering report should be obtained to report on the cause of
damage and after the IDR team reviewed the claim, an engineer was
engaged.
27. The FSP relies on the following expert report dated 28 February 2012 from
an engineer “K”. K also spoke t o S. I note the following from this report and
photographs taken by K:
On 20 February 2012, K observed the damaged pool with the south
wall pushed in a maximum of approximately 400mm. The pool has
been uplifted by approximately 30mm at the ends of the south side.
(This reference to uplifting is later deleted by K after he saw
photographs taken of the pool before the storm event). The coping has
cracked at both ends of the wall. The pool at the southeast corner has
moved away from the paving. Brick pavers along the south side of the
pool are dislodged.
The water level in the pool is approximately 140mm below the top of
the coping.
There are some brick pavers on the south side, which have been
dislodged into the water, and the loss of the backfill, which appears to
be clay, and the 150mm sand bedding for the pavers which have
Case No: 285308 Determination Page 7 of 14
probably been pushed under the uplifted pool floor. There does not
appear to be a dedicated drainage system in the backfill behind the
pool walls.
K believes‟ S‟s opinion was generally in agreement with his own
observations. K spoke with S who informed him the pool has a
hydrostatic relief valve, which S believed was working.
A review of the recorded rainfall indicates that heavy rain occurred on
25 January 2012.
The inwards movement and fracturing of the south wall of the pool,
which is in the flow path of sub-surface water from the rain, indicates
the wall has been subjected to a net force acting inwards. This force is
the difference between the sum of the forces of the earth pressure and
the hydrostatic pressure of the build up of water on the backfill side,
both acting inwards, and the force of the hydrostatic pressure of the
water in the pool acting outwards.
This is consistent with the observation that there is no damage to the
north wall of the pool.
There does not appear to be a dedicated drainage system in the
backfill behind the pool to disperse the water and prevent the build up
of hydrostatic pressure on the walls.
The hydrostatic relief valve at the bottom of the pool may be jammed at
the spring mechanism or the O-ring seals worn out. The purpose of the
valve is to act as a one-way valve allowing water into the pool but not
out of the pool. It opens when there is an excessive build -up of water
pressure under the pool. The valve should be replaced every 5 years.
K formed the view that the pool had probably reached the end of its
serviceable life. It did not have the capacity to safely resist the earth
and hydrostatic pressures acting on it particularly if the hydrostatic
valve is faulty.
K agreed with S that the pool could not be repaired.
28. The FSP has also relied on a further report from K by email of an unknown
date. K has now looked at photographs provided by the Applicant, which
show that the ends of the southern wall of the pool projected above the
surround paving before the storm event. K notes this and says:
K stands by his view that earth and hydrostatic pressures acting on it
damaged the pool. Any uplifting of the pool would have been
consequent on the damage to the south wall.
Any reference to uplifting is to be deleted from his earlier report
K‟s discussions with S are now superseded by S‟s later report.
29. The FSP submits that the policy covers storm and there is a prime facie
claim for this event by the Applicant. However, the policy is also subject to
exclusions.
Case No: 285308 Determination Page 8 of 14
30. The FSP contends its assessment of cause of the damage was that the
stormwater runoff had washed away the soil supporting the sides of the pool,
causing the pool to move. The FSP declined the claim on the basis that
losses of this nature were excluded by the policy.
31. The FSP acknowledges the Applicant‟s contention that the whole pool has
not moved. In response the FSP states the exclusion does not require the
whole pool to move in order to apply.
32. The wear and tear exclusion has been applied due to the age of the pool and
K‟s belief that the hydrostatic valve did not function correctly causing the
pressure to build up around the pool.
33. The soil movement exclusion was applied due to the engineer reporting the
dissipating of supporting backfill material had moved due to the uplifting of
the pool; however this does not apply as both the engineer and the pool
repairer have since advised the pool had not uplifted due to this event.
34. The FSP acknowledges the Applicant did not receive the level of service he
expected but does not agree the level of inconvenience was such to justify a
payment of compensation.
35. The engineer‟s report was not originally obtained because the claims officer
was of the view the claim was clearly one for declinature. However, as a
result of the IDR review the engineer‟s opinion was obtained prior to making
a final claims decision.
36. The Applicant was fully aware of the claims decision and was issued 3 final
decision letters from IDR outlining the reason for the declinature. The
exclusion relating to movement has applied to all of these decision letters.
Further, the Applicant was sent the engineer‟s report and did not advise of
non-receipt.
37. The FSP altered its PDS together with numerous other changes to the policy
terms and conditions and that it is not unusual for insurance companies to
continually improve their products and update the wording/layout of a PDS.
This does not derogate from its contention that its policy wording in the
policy the subject of this dispute is clear and unambiguous.
Issues
38. Whether the FSP was entitled to decline the Applicant‟s claim for damage to
the pool.
39. Whether the FSP‟s claims handling was appropriate.
Case No: 285308 Determination Page 9 of 14
Reasons for decision
40. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
41. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
42. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
43. Insurance law states that the onus rests with the Applicant to prove on the
balance of probabilities that he has sustained a loss insured under the
policy. Once established, the onus shifts to the FSP to establish the facts so
that the claim falls within an exclusion from cover.
44. There are two discrete issues and I will deal with each separately.
Whether the FSP was entitled to decline the Applicant’s claim for damage to the pool
45. The parties do not dispute the following:
The Applicant had a valid policy of insurance, which covered the
property at the time of the storm event on 25 January 2012.
There was heavy rain on that day.
The pool damage includes a buckled south wall and associated
damage including damage to the coping.
46. Both K and S originally believed the pool had lifted by 30mm, however they
revised their opinion on receiving photographs from the Applicant that this
was the position of the pool before the storm.
47. In its Notice of Response the FSP accepts that damage to the pool was
caused by storm however relies on three exclusions. In the NOR, the FSP
also says it no longer relies on the soil movement exclusion - „however this
does not apply as both engineer and the pool repairer have advised the pool
has not uplifted due to this event.”
48. Accordingly I will only address the other two exclusions relied on in this
Determination.
49. I note that S had pre and post damage inspections of the pool. S confirmed
that the pool was in „very good condition‟ and does not suggest that the
pool‟s age was a factor in the damage. S believed the hydrostatic pressure
valve was working because he saw the colour of the water in the pool after
the storm.
Case No: 285308 Determination Page 10 of 14
50. In contrast, K indicates the pool had probably reached the end of its
serviceable life and that the hydrostatic valve may have jammed. On the
other hand, S has indicated the colour of the pool water indicated the valve
was working correctly as it had let in some of the water causing hydrostatic
pressure i nto the pool. Given S‟s greater familiarity with the pool due to
maintenance, pre-damage inspections and post-damage inspections, I prefer
S‟s opinion as to the general state of the pool.
51. Further, I am of the view that K does not express his view with sufficient
certainty to rebut the positive assertion of S that the pool was in good
condition and that the valve was working. K says that the pool had probably
reached the end of it life and the hydrostatic valve may have jammed.
Whereas S makes positive assertions about the relevant evidence. A
corollary of this view of the evidence from S and K is that I do not accept that
FSP has satisfied the burden of proof it has and I find that on the balance of
probabilities that the cause of the loss was not caused or contributed to by
wear and tear. Accordingly, in my view this exclusion does not apply.
52. It was S‟s opinion that the external water had pushed in the southern pool
wall causing the fibreglass shell to buckle in the middle and crack at both
ends, which has then caused the normal backfill of soil to dissipate. This
opinion of S generally agrees with K‟s opinion that the damage to the
southern wall of the pool arose from hydrostatic and earth pressure.
53. The parties have both provided submissions regarding whether this damage
to the southern pool wall can be considered „moving, shifting or dislodgment‟
of the swimming pool. The policy does not provide a definition of these terms
and accordingly the plain English meaning will be applied. The Macquarie
Dictionary provides the following relevant definitions for move (of which
moving is a verb), shifting and dislodgment as follows:
“move”
verb ( moved , moving )
– verb ( i ) 1. to change place or position; pass from one place or situation to
another. ...
3. to advance, p rogress, or make progress…
– verb ( t ) 11. to change the place or position of; take from one place, posture, or
situation to another.
12. to set or keep in motion; stir or shake.
“shift”
verb ( i ) 1. to move from one place, position, etc., to another.
...
“dislodge”
verb (dislodged, dislodging)
– verb (t) 1. to remove or drive from a place of rest or lodgement; drive from a
position occupied.
– verb ( i ) 2. to go from a place of lodgement”
Case No: 285308 Determination Page 11 of 14
54. S and K have confirmed there was no uplift but the pool wall only had been
pushed in or buckled causing the damage. Given the damage description, I
consider it appropriate to also review the plain English definition of „buckle‟
and “push” which are as follows:
“buckle”
...
4. a bend, bulge, or kink, as in a saw blade.
– verb ( buckled , buckling )
...
6. to bend and shrivel, by applying heat or pressure; warp; curl.
– verb ( i ) 7. to bend, warp, or give way suddenly, as with heat or pressure.
“ push ”
verb ( t ) 1. to exert force upon or against (a thing) in order to move it away.
2. to move ( away , off , etc.) by exerting force thus; shove; thrust; drive.
...
– verb ( i ) 10. to exert a thrusting force upon something.
11. to use steady force in moving a thing away; shove.
55. In my view on the plain meaning of these words, and from the evidence of K
and S, the facts are that the southern pool wall has been pushed in or
buckled, not that the swimming pool itself has moved, shifted or dislodged
from its usual position in the ground at the insured property. The southern
wall has either buckled or has been „pushed in‟. The term buckle does not
contain any definition that is synonymous with the terms moved, shifted or
dislodged. I have also considered the term „push‟ although I note the full
term provided was „pushed in‟ which is indicative of a force and a direction of
force on the pool shell‟s southern wall not the swimming pool itself.
56. I have reviewed the wording of the exclusion clause and note that the clause
refers to the moving, shifting or dislodging of any swimming pool or its
covers/lin ers….or other inground structure. The clause suggests to me the
whole of the item must move, shift or dislodge rather than a part of it as in
this case whilst the rest of the pool remains intact and in its original position.
57. The circumstances before me indicate the swimming pool itself has not
moved, shifted or dislodged but the pool‟s southern wall has buckled or been
pushed in. I do not consider that the exclusion has been made out on the
plain meaning of the words. Further, I consider that if the FSP wished to
extend the exclusion to a part of the pool whilst the rest remained in position
then it could have stated otherwise by stating in the exclusion the swimming
pool or a portion/part of the swimming pool.
58. I further note that the exclusions do not operate for damage caused by
hydrostatic pressure. The evidence before me is that the heavy rain and
stormwater run-off caused hydrostatic pressure resulting in damage to the
Case No: 285308 Determination Page 12 of 14
southern pool wall, which in turn caused damage to the southern pool wall
surrounds. Accordingly, in my view the damage arises from an insured event
to which the exclusions relied on do not apply.
59. For the above reasons, I find that the FSP is liable to indemnify the Applicant
for the damage to the pool and the surrounds as caused by the storm on 25
January 2012.
60. The evidence from S and from K is that the pool cannot be repaired and has
to be replaced. The FSP‟s assessor assessed the damage at $25,000.
61. S said he had “made contact with 3 indepen dent pool builders and put them
on notice that written quotations for like for like pool replacement will be
required” but I have not seen any quotations from S.
62. In his report, K made recommendations for rectification of the damage but
has not quantified the damage caused by the storm event.
63. Therefore, the FSP will need to properly assess and adjust the claim
pursuant to the terms of the policy.
Claims processing
64. The Applicant says there have been issues with communication between the
Applicant and the FSP . It is of some concern that the FSP‟s records include
notations of „overdue‟ activity and the matter is still not resolved until
sometime later.
65. It is further noted that the advice of the assessor who inspected the property
was not followed in relation to obtaining an engineer‟s report. In my view, the
assessor made no firm findings as to the cause of the loss other than to
state “Cause of Damage Build up of rain water run off” and that the
“fibreglass swimming pool had buckled at the top and cracked, pave rs had
sunk”. It is surprising to me in such circumstances that a claims decision
could be made on the strength of such information. The FSP‟s IDR
department has clearly considered this an issue and on 21 February the
FSP‟s file notes show it correctly ord ered an engineer to attend and report
on the cause of damage. The report was then done and dated 28 February
2012. In all the circumstances however I do not think there was an unusual
degree of time taken to resolve the situation and make a claims decision.
66. The Applicant also complained that he did not received the expert report
relied upon by the FSP in the original claims decision. However, the FSP did
not have the report at that time. Its file notes show it was sent on 2 March
2012, which was very close to the time it was received by the FSP, and that
then the Applicant was also told then the reasons why the claim was denied.
67. If there was then a delay in the processing of the claim and the dispute, it
was because not all the relevant information had been taken into account in
the claim determinations as both the Applicant‟s expert and the FSP‟s expert
erred in their reports by stating the pool had been uplifted up by 30mm.
Case No: 285308 Determination Page 13 of 14
68. The Applicant corrected this on 27 March 2012 and obtained a further report,
which in turn required the FSP to seek an additional opinion from its own
expert, all of which is reasonable claims handling in my view. Its file notes
show the further report from K was received on or about 27 April 2012 and
the Applicant was advised of it on or about 1 May.
69. However the Applicant is also concerned that the FSP has not been
consistent in the reasons why it denied his claim. I note the first two
decisions made 22 February and 20 March 2012 denied the claim using the
“moving, shifting, and dislodging exclusion”. However, they don‟t have the
new information from the Applicant about the state of the pool before the
storm event. The next decision 4 April notes the new information and doesn‟t
make a decision as it needs more information. The final IDR decision letter
dated 21 May relies on that same exclusion and some others. This is not
unusual and I don‟t agree there is sufficient evidence before me that
indicates the IDR decisions weren‟t made properly and independently.
70. The Applicant attempted to resolve the dispute by obtaining a report from S.
I note there was a charge of $120 for obtaining this report. I consider that the
report was useful and K has also relied on advices/reports provided by S.
Given the S‟s report was considered in the claims deci sion and this
Determination I consider the report fee should be reimbursed for the reasons
stated and as is allowed pursuant to Terms of Reference 9.4.
Determination
71. On the basis of the available information and for the reasons stated, I
determine the FSP was not entitled to decline the Applicant‟s claim pursuant
to the terms and conditions of the policy.
72. Within 14 days of the Applicant‟s acceptance of this Determination, the FSP
shall assess the claim and make a decision as to whether it will replace the
pool and replace the damage to its surrounds or pay the costs of same.
73. If the FSP decides to cash settle, and providing the Applicant agrees the
amount, within 7 days of making that decision and agreement with the
Applicant, the FSP will make payment of the settlement amount less the
policy excess plus interest on the settlement amount in accordance with the
Insurance Contracts Act 1984 from 21 May 2012 (being the date of its final
IDR decision) until the date of payment of the claim.
74. I find there were some unsatisfactory issues raised in the claims handling
process and some delays but I also determine there was not an unusual
degree of time taken to make a final decision about the claim in all the
circumstances.
Case No: 285308 Determination Page 14 of 14
75. Finally, I determine the FSP shall make payme nt of $120 to the Applicant for
S‟s report within 7 days of the Applicant providing a tax invoice evidencing
payment to S for the report.