Home / Financial Firm (Unknown - Insurer) / Determination 284783

Determination 284783

Claim denial - flood exclusion (backflow from Brisbane River)

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's basement coolrooms at a New Farm fruit store were inundated in January 2011 and the FSP declined the claim as flood. The Panel accepted expert evidence that Brisbane River flood water backed up the stormwater drains and found the loss fell within the flood exclusion, so the FSP was entitled to decline.

Water escaping from drains surcharged by rising river levels falls within the policy definition of flood and the common law definition, which excludes the loss.

Issues

Subjects and remedies

business interruptionnatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 284783 Determination Page 1 of 10 Case number: 284783 General Insurance - Domestic Insurance - Home Building and Contents - FSP Decision - Denial of claim – flood – stormwater run-off 6 March 2013 Background 1. The Applicant holds a Business Insurance policy with the Financial Services Provider (FSP). The policy provides cover to the business property, contents and machinery. 2. On or about 12- 13 January 2011 the Applicant‟s property situated on “Merthyr Road” New Farm Queensland was damaged by water inundation. 3. The FSP declined the claim on the basis the damage arose from flood which is an excluded cause of loss under the Applicant‟s policy. 4. The Applicant disputes the declinature on the basis the water inundation arose from stormwater inundation. Summary of Applicant’s position 5. The Panel notes the Applicant was represented by an agent; accordingly references to the Applicant throughout this Determination are taken to include both those parties. 6. The Applicant has enclosed a Statement from “MW” who is a qualified engineer with 50 years experience. MW was requested to provide a statement to the Queensland Floods Commission of Inquiry. The Panel notes the following from the documentary extracts provided:  MW was asked to prepare a „Prefeasibility Study‟ in response to a recommendation by the BCC Flood Response Review Board that backflow prevention devices be installed.  Stormwater runoff from the catchment north of Merthyr Road is captured by „James Street‟ stormwater drainage system, which then drains to stormwater pipes under Merthyr Road before discharging through outfalls to the Brisbane River. Determination Case No: 284783 Determination Page 2 of 10  During the 2011 floods, rising river levels caused river flood waters to back up the stormwater drainage network resulting in flood waters reaching the south-eastern side of Merthyr Road.  The profile through the New Farm Park indicates the area inundated during the January 2011 flood has the potential to be frequently inundated by local or flash floods but not to the depths experienced in January 2011.  The estimated 1974 flood level in the river at this location is 3.2m AHD, whilst the current levee height is considered likely to be higher than 5m AHD.  The 3000mm x 2100mm box culvert at Merthyr Road drains an area which is quite sensitive to local storm inundation and which would be quite sensitive to the head loss through a backflow protection device. It is because of this sensitivity, it is suggested that it be fitted with a flap gate if a device is to be fitted.  Overland flows from Tenerife areas to the north and west of Merthyr Road a re captured by “James Street” stormwater system and then drain to Merthyr Road and then out to the river via the stormwater pipes under Merthyr Road.  A relief drainage study carried out for Council for the New Farm Teneriffe drainage catchments showed that local inundation from overland flows and surcharging would inundate areas below 3.29m during a 50 year ARI storm event.  The area inundated during the January 2011 flood has the potential to be inundated by local or flash floods more frequently than backflows from a major river flood event.  Several pipes discharge to the Brisbane River from the main New Farm system but those that are directly connected to the J Street drainage system are the two which run along Merthyr Road.  The area would be quite sensitive to the extent to which additional resistance from backflow protection devices fitted to the stormwater system outfalls could worsen local flooding during major storm events in the local catchment. 7. The Applicant has enclosed a Queensland Floods 2011 Stormwater Backflow report from which the Panel notes the following:  The flooding caused by backflow through the municipal stormwater drainage network has been identified as a significant cause of inundation experienced in some Brisbane suburbs such as New Farm.  Backflow from the Brisbane River was the initial source of flooding impacts in many cases, particularly in the inner urban areas. However, in the majority of instances, higher flood levels were later caused by surface inundation when the river actually broke its banks.  Effectively, backflow flooding occurs only in those situations where there is a stormwater or other pipe connections between a source of Case No: 284783 Determination Page 3 of 10 flooding and an area of land which is lower than the bank level of the watercourse. It can also occur with suburban creek flood in Brisbane – although it is noted that this was not a cause of flooding in January 2011, because the local creek systems were not in flood at that time.  Current drainage design practices do not include making allowance for backflow prevention. 8. The Applicant has enclosed a property report which indicates that the ground level at the property is 0.9-3.6m AHD. The property is in both an overland flow path and on a large allotment. Overland flow is the excess run-off during high rainfall events that travels overland following low-lying natural drainage paths. Such flooding commonly occurs when underground drainage exceeds capacity. 9. The Applicant has enclosed a number of proof of loss documents in support of her claim for loss and damage. 10. The Applicant submits that the MW report explains the property was in fact inundated by stormwater. The Applicant, by e -mail to the Service dated 5 June 2012, stated that she consulted with MW and explained the history of this matter to him. MW provided an opinion that this would indeed be the result of stormwater and supplied a copy of his report to her. 11. The Applicant acknowledges the FSP‟s submissions and responds as follows:  The Applicant states that “TM” of the hydrology company “W” was performing hi s first field assessment when reviewing the Applicant‟s property. He further advised his training had been in Environmental Development. The Applicant does not accept him as an expert in floods or field assessments.  The field study provided by TM of W confirms that the loss was caused due to inundation of water which built up in the drainage system and caused the property damage.  All water which resulted in this loss was due to water coming up through the drains. Summary of FSP’s position 12. The FSP relies on the following policy terms and conditions: “Words with special meaning ... Flood the inundation of normally dry land by water escaping or released from the normal confines of any natural watercourse or lakes (whether or not they have been altered or modified) or from any dam, reservoir or canal ... Defined events cover Case No: 284783 Determination Page 4 of 10 We cover You for loss or damage at the Business premises caused by the following defined events: ... 7. Storm, tempest, rainwater, snow sleet, wind, hail but not: (a) by water from or action of the sea, tidal wave, storm surge, high water or Flood. ... What you are not covered for under Accidental damage cover ... 1. Loss or damage caused by any defined events cover in this section. 2. Loss or damage caused by events or to the items listed under general exclusions. ... Additional benefits – business property cover ... What you are not covered for under this section 1. We will not pay for loss or damage under the Business Property cover section caused by: ... ... ... (h) Flood ... Machinery cover section ... What you are not covered for under this section ... 6. Loss or damage caused by or arising from: ... (h) storm, tempest, Flood, windstorm or cyclone.” 13. The FSP has enclosed a copy of the claim form completed by the Applicant from which the Panel notes the following description: “Rainwater build up and failure of pumps caused damage to a cold rooms (sic) located in basement carpark. Subsequently the damage was compounded by flooding in the area which led to failure of power supply which conti nued until Sunday 16 January 2011 at 5pm.” The Panel further notes the date of the loss is given as approximately 10.00am on 12 January 2011. Case No: 284783 Determination Page 5 of 10 14. The FSP has enclosed an assessor‟s report dated 10 February 2011 from which the Panel notes the following:  The Applicant had been trading on Monday and Tuesday 10/11 January 2011. The insured was notified that the power authority was to cut the power to the city electrical grid. The cut was due to the fact that floods were expected and as a safety measure the cutting of the power would protect the power grid and substations from damage by water when powered up and also then protect subsequent commercial and residential premises from sustaining short circuiting of power supply.  The insured moved their stock from the coolrooms in the underground car park area into the retail shop and into their truck where stock was not perishable.  The power supply was cut for a single period of time, approximately midday Wednesday 12 January 2011 and remained off until approximately 5pm Sunday 16 January 2011.  In the interim, the underground car park area where the two coolrooms are located went underwater on Wednesday 12 January 2011. The peak of the rise was at 4.00am 13 January 2011.  The assessor recommended a gross reserve of $45,000 on contents and $40,000 on business interruption. There was a further suggestion that $30,000 may be required to repair the coolrooms. 15. The FSP relies on the hydrology report from W dated 21 March 2011 from which the Panel notes the following:  The insured property is located on a floodplain of the Brisbane River which is located approximately 560m to the northeast. The Flood Flag Map for New Farm shows the eastern half of the property lies within the „ Creek, River or Tidal Flooding ’ extent.  The property contains a single story commercial shopping centre, a double storey storage and loading dock area and a surface and underground basement level car park. The claimant operates a fruit store located in the shopping centre which uses cold storage rooms in the basement level of the car park.  Terrain elevation contour mapping available from the Brisbane City council shows that the site lies within a local depression, which has an area of approximately 148 Hectares. The elevation of the property varies between 3.5m and 1m and slopes downward from north-west to south- west towards the centre of the local terrain depression.  W reviewed river level information from the Brisbane City gauge located 5.3km upstream from the site and Breakfast Creek gauge which is located 2.5km downstream of the property. The river gauge data indicates that levels in the Brisbane River rose steeply from 6.00am on Tuesday 11 January 2011. The river peaked at about 4.5m at 3.00am-4.00am on Thursday 13 January 2011. The ordinary gauge levels are 0m AHD. Case No: 284783 Determination Page 6 of 10  W obtained the following information from the Applicant‟s employee: i. Water inundated the cold storage rooms located in the basement car park level of the property. ii. The water that inundated the property started entering the car park on the morning of Wednesday 12 January 2011. iii. Water entered the basement level of the car park through the ramp leading to the surface located near the north-east property boundary and the drains located on the floor of the car park basement level. iv. By 4.00am on Thursday 13 January 2011 the water level had reached upstairs from the basement level of the car park. v. At the peak of the flood, the whole basement was flooded. vi. Pumps located in the car park cut out because there was too much water.  Evidence of flooding in the form of flood marks was observed at the ground level of the car park and within one of the cold storage rooms located in the basement level of the car park. The approximate heights of the observed flood marks were 0.8 -2.5m from the ground surface level of the car park and the floor level of the cold storage room respectively.  W concluded that due to the limited size of the local stormwater catchment that drains towards the site and the relatively low rainfall intensity (2-5 year ARI); it is unlikely that there was sufficient local stormwater runoff for this to be a contributing factor to the inundation that occurred on the property. Further, the reported timing of the inundation coincides with the rising water levels in the Brisbane River.  The peak of the Brisbane River is roughly consistent with the observed height of the flood mark on the surface level of the car park.  This peak level would have caused flood waters from the Brisbane River to surcharge up the subsurface drainage pipes in the area and spill out into areas within the local depression including the property. This is corroborated by the employee‟s recollection of water entering the property from drains. The peak level is not high enough to overtop the ridge of the local depression and inundate the property directly. 16. The FSP relies on a report dated 21 March 2012 from W. The Panel notes the following from this report:  W notes that the inspections were carried out by two member teams.  Reports were then written by the team members and, in this case, reviewed by “DM” who has 40 years experience. DM has 15 years experience with flood claim inspections.  The previous report from W indicates peak intensity of local rainfall was 2-5 year ARI intensity. Stormwater infrastructure is generally designed Case No: 284783 Determination Page 7 of 10 to accommodate 2-10 year ARI events. It is therefore unlikely that the drain surcharged purely from local catchment runoff.  As a ridge of high ground runs between the site and the Brisbane River, the site would not have been inundated directly by flows escaping the Brisbane River. However, as the water in the Brisbane River began to rise on 11 January 2011, water backed up the local subsurface drainage system and spilled out into the property. This concurs with MW‟s report. 17. The FSP contends that there is:  No cover for loss of refrigerated stock under the business insurance section as the policy excludes damage caused by variation in temperature and flood.  No cover exists for the loss of coolrooms as “ Contents ” under the business insurance section as the policy exc ludes damage caused by flood.  In addition there is no cover for the damage to the coolrooms under the machinery section, as it does not cover flood and water escaping from any source which is external to the plant and machinery.  There is further no cover for loss of refrigerated stock under the machinery section as the Applicant has not opted to insure under “ Deterioration of Stock ” cover.  Further, the turning off of power to the coolrooms and subsequent loss of stock due to deterioration is not covered as an insured peril or under the Accidental Damage component of the policy as „variations in temperature‟ is an exclusion. 18. The evidence obtained by the FSP demonstrates New Farm was flooded by water escaping from the confines of the Brisbane River channel. As the water level in the Brisbane River began to rise on 11 January 2011, water backed up the local sub surface drainage system and spilled out into the property. The time of inundation was on 12-13 January 2011. This was after the rainfall had eased, confirmed through Bureau of Meteorology records. 19. Accordingly, the Applicant‟s loss arises from the action of flood based on the policy definition, common law definitions and the hydrology reports. 20. The FSP further notes that if stormwater and floodwater mixed together that this is deemed floodwater and would be excluded. Issue 21. Whether the FSP was entitled to decline the Applicant‟s claim. Case No: 284783 Determination Page 8 of 10 Reasons for decision 22. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 23. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 24. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 25. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 26. First, the Panel notes that the policy wording excludes cover for flood under the defined events section. The Accidental Damage cover excludes loss or damage covered by any of the policy‟s other defined events or to the items listed under the general exclusions. This effectively excludes both storm and flood from the ambit of the Accidental Damage cover of the policy. The machinery benefit also excludes storm and flood from cover. 27. The Panel notes the Applicant has not disputed that she did not elect the optional extension of flood cover. 28. The loss of refrigerated produce caused by its removal from the coolrooms in anticipation of the power being cut off, would normally attract indemnification under the policy event of ‘Deterioration of Stock’ ; however the Applicant elected not to include that option from the policy menu. Accordingly, as the Accidental Damage (AD) provision only operates in areas not covered by one of the policy‟s defined events, this AD provision cannot now assist the Applicant. The Panel has reviewed the Applicant‟s concerns rega rding the hydrology report and W‟s response to same. The Panel considers tha t due to the process employed by W to ensure the accuracy of its reports and the similar evidence of MW‟s that the reports can be relied upon. 29. Accordingly, the essential question before the Panel is whether the cause of inundation is properly defined as stormwater inundation or flood. Clearly if the inundation is caused by storm then the Applicant is entitled to indemnity for a number of business property and machinery losses. However, if the loss arises from flood then the loss is excluded from cover. 30. The Panel has reviewed the evidence of MW and W. The evidence is largely consistent, that is, that the inundation was caused by water surcharging through the drainage system. 31. The Panel has noted the Applicant‟s submissions that MW indicated the damage arose from stormwater inundation. The Applicant however has provided nothing in writing from MW to confirm this was his opinion. Given this, the Panel cannot rely on the Applicant‟s assertion in this regard, Case No: 284783 Determination Page 9 of 10 particularly as it contrasts to the written report provided by MW, in that the inundation did not arise from surface water run-off but rather backing up of stormwater drains. 32. MW states that during the 2011 floods, the rising river levels caused river flood waters to back up the stormwater drainage network res ulting in flood waters reaching the south-eastern side of Merthyr Road. New Farm Park was also inundated due to backflows in Merthyr Road . The evidence by MW is corroborated by W who states that the cause of inundation was due to surcharging of river water up the subsurface drainage pipes in the area which spilled out into areas within the local depression including the insured property. W notes the rainfall was insufficient in and of itself to inundate the property. 33. The Panel accepts the evidence of each e xpert that the stormwater drainage systems surcharged due to the rising levels of the Brisbane River, causing water to escape from the drainage system and inundate the insured property. In reaching this conclusion, the Panel accepts that the height of the New Farm „ridge‟ precluded overland flow from the Brisbane River inundating the risk address. 34. The policy definition states that flood is: “Flood the inundation of normally dry land by water escaping or released from the normal confines of any natural watercourse or lake (whether or not they have been altered or modified) or from any dam, reservoir or canal ” (Panel‟s emphasis added) 35. Kirby J in the case of Provincial Insurance Australia v Consolidated Wood Products (1991) 25 NSWLR 541 considered the meaning of canal and storm water channel and preferred the Macquarie Dictionary definition for canal and stormwater channel which were: “Canal An artificial waterway for navigation draining, irrigation, etc A channel or watercourse Stormwater Channel An artificial passage from stormwater and floodwater; floodway. Also, stormwater canal, stormwater drain.” 36. The Panel further notes the case of Sika Plastics v Cornhill Insurance in which the Court held that: “...a watercourse is said to overflow its normal banks when a ll the water that would otherwise drain or fall into it cannot be contained in it because it is full. All the surplus water is then overflow, no matter whether or not some of it has at one time been within the banks and then forced out” 37. The evidence is that the water in question surcharged from the stormwater drains because the river levels had risen. This falls within the definition of water that has escaped from a canal. This also falls within the common law Case No: 284783 Determination Page 10 of 10 definition of flood which encapsulates the surplus water being forced out of the river due to raised levels. 38. Accordingly, the Panel determines, having carefully considered all the hydrological evidence and the terms of the policy that, on the balance of probabilities, the water observed surcharging from the drains and caused the damage, subject of this claim, falls within the definition of flood under the terms of the policy. Determination 39. On the basis of the available information the Panel determines the FSP was entitled to decline the Applicant‟s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.