Home / Financial Firm (Unknown - Insurer) / Determination 284759
Determination 284759
Denial of claim
Summary
The applicants' retaining walls collapsed after heavy rain in February 2012 and the FSP declined the claim under exclusions for faulty design and workmanship and gradual deterioration. AFCA found the lower walls failed due to faulty design and construction, so the FSP need not indemnify, and left open the upper wall and 2008 repair question.
The general exclusion for loss caused by a defect, structural defect, faulty workmanship or design applies where the engineering evidence shows the collapse resulted from original construction.
Issues
- Claim denial primary · not upheld
“The FSP is not required to indemnify the Applicants for the loss resulting from damage to the two lower retaining walls.”
- Repairs or contractors secondary · unclear
“If those repairs were completed by a builder appointed by the FSP, then any further rectification to the upper wall may be the responsibility of the FSP.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 284759 Determination Page 1 of 5
Case number: 284759
General Insurance - Domestic Insurance – Home Building - FSP Decision -
Denial of claim
30 November 2012
Background
1. The Applicants hold a Home Building insurance policy underwritten by the
Financial Services Provider (FSP). The policy provides cover against defined
events.
2. The Applicant‟s property includes three retaining walls which have been built
roughly parallel to each other below the level of the house. The walls were
initially built by the Applicants with the help of friends.
3. In 2008 the upper wall collapsed following inundation by rain. The FSP
accepted this claim and the damaged wall was rebuilt.
4. During early February 2012 the property was again inundated with heavy
rain and parts of the two lower retaining walls collapsed. The FSP has
denied this claim on the basis of policy exclusions in relation to:
- Settling, shrinkage or any movement of the earth
- Gradual deterioration, wear and tear
- Roots from trees, plants, shrubs or grass
- A defect in an item, structural defects or faulty workmanship or design
- Flood
5. The Applicants believe that the upper wall has also been affected by the
collapse of the lower walls.
Summary of Applicant’s position
6. The Applicants have not presented any evidence or argument to support
their contention that the claim should be paid.
Determination
Case No: 284759 Determination Page 2 of 5
Summary of FSP’s position
7. The FSP has submitted reports from a loss adjuster and a structural
engineer to support its argument that the loss has been caused by the
gradual deterioration of the retaining walls which in turn results from faulty
design and building practices.
8. The FSP relies on the following policy exclusions contained within the
defined event of Storm, Rainwater or Wind:
“ Storm rainwater or wind
We will cover your buildings or contents for loss or damage as a result of
storm, rainwater or wind.
We will not cover
- Water entering your buildings
- Through an opening made for any building, renovation, renovation or
repair work
- Because of a structural defect, faulty design or faulty workmanship
when your buildings were constructed
- Free- standing gates, fences or walls that are made of timber and are
more than 15 years old. ”
9. The FSP also relies upon the following general exclusions:
“We will not cover any loss or damage as a result of or ca used by:
o Settling shrinkage or any movement of earth
o Erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
o Roots from trees, plants, shrubs or grass
o A defect in an item, structural defects or faulty workmanship or design
o Flood ”
10. The FSP further advises that acceptance in whole or in part of the previous
claims has not set a precedent as the cause of this failure is gradual
deterioration which is not an insured event and that the current claim is not in
relation to a wall which had been previously replaced by the FSP‟s preferred
builders.
Issues
11. Whether the Applicants have been able to prove a loss under the policy.
12. Whether the FSP has been able to prove the operation of a policy exclusion.
13. Whether the acceptance of the previous claim in 2008 has any bearing on
the current claim
Case No: 284759 Determination Page 3 of 5
Reasons for decision
14. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
is due to the quantum and complexity of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
15. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
16. The Applicants‟ policy covers their home building. The retaining walls are
brought under this cover by virtue of the policy definition of ”Building” which
includes:
“anything permanently built, constructed or installed on your propert y for
domestic purposes”
17. The FSP has addressed this claim as falling under the listed event of “Storm,
Rainwater or Wind” but it may also fall under the listed event of “Landslide or
Subsidence” which reads:
Landslide or Subsidence
We will cover your buildings or contents for loss or damage as a result of a
landslide or subsidence.
We will only do this if the loss or damage occurs within 72 hours of
o An earthquake or explosion
o A storm including rainwater or wind, or
o Liquid escaping from a fixed pipe, or an object attached to a pipe, fixed
gutter, fixed tank or drain
18. The Applicants‟ property was inundated by rainwater during the period
immediately prior to loss. This would appear to satisfy the conditions
required to prove a loss under the listed event of “La ndslide or Subsidence”.
The FSP‟s loss adjuster confirms the weather conditions at the time of the
loss and further states:
“We have no concerns with the validity of the Insured‟s version of events and
believe the event occurred on the stated date of loss, being 12 February
2012”
19. The listed event of Landslide or Subsidence contains no exclusion in relation
to timber walls more than 15 years old.
20. The report from the FSP‟s engineer dated 22 February 2012 makes it clear
that the timbers in the retaining wall had deteriorated, that the stability of the
walls had been adversely affected because the uprights had been
constructed in filled material and that the walls do not comply with the
relevant Building Act due to the lack of engineering certification.
Case No: 284759 Determination Page 4 of 5
21. The report also discusses the build up of ground water following the
rainstorms and the likely impact on the retaining walls. The following
statements are contained within the report:
“No specific surface water drainage provisions were evident along the lengths
o f the lower two retaining walls.”
“The recent rains have likely increased the loadings on the retaining walls,
due to increases in the moisture content in the retained soils, however such
rainfall events are a predictable event (sic) which should have been taken into
consideration in the design and construction of the walls.”
“The surface water drainage provisions of the walls do not appear to be
adequate and have likely resulted in the saturation of the backfill materials,
causing increased loadings on the retaining walls. The probable lack of sub-
soil drainage has also likely exacerbated the saturation of the backfill
materials.”
22. Based on the engineer‟s observations, it appears that the collapse of the
retaining walls was caused as a result of the pressure exerted when
rainwater saturated the backfilled soil behind the retaining walls. However
the engineer also makes the point that these rainwater events are
predictable events that should have been taken into consideration during the
design and construction of the walls. He goes on to say that the saturation of
the backfill is a likely result of the lack of drainage.
23. I am therefore satisfied that the collapse of the retaining walls is as a direct
result of faulty design and/or workmanship in the original construction of the
walls and that the FSP is entitled to rely on the general policy exclusion in
relation to faulty design/workmanship.
24. The FSP has expressed the view that the upper wall is not part of this claim,
however the Applicants have stated (as reported by the FSP‟s engineer) that
they believe that the upper wall has also suffered some movement.
25. The information from the Applicants and from the FSP is unclear in relation
to the 2008 repairs to the upper wall. If those repairs were completed by a
builder appointed by the Applicants, then the FSP has no further liability. If
however the repairs were completed by a builder appointed by the FSP, then
any further rectification to the upper wall, resulting from the events of
February 2012, may be the responsibility of the FSP.
26. The report from the FSP‟s engineer makes it clear that the rectification work
completed in 2008 also fails to comply with the relevant Building Act. The
report states:
“The replacement uppermost retaining wall was constructed withou t any
engineering design or certification.”
“On the basis of the advice from (the builder), the depth of embedment of the
uprights of the uppermost wall may be inadequate to support the loads from
the wall due to the likelihood that they have been placed in at least some
depth of filled ground. Furthermore, the uprights appear to be constructed, at
least partially, in the backfill material between the middle and uppermost
walls, and therefore rely on the stability of the lower walls. A retaining wall of
Case No: 284759 Determination Page 5 of 5
this size (i.e. over 1m in height) should have been constructed with
appropriate design and certification to comply with the requirements of the
Building Act.”
27. Having made the point that the inadequate construction of the upper wall
results in its relying on the stability of the lower walls, the engineer goes on
to say:
“The partial collapse of the middle wall has further destabilised the upper
wall.”
28. The FSP has already accepted the 2008 claim. The Applicants‟ cover
includes a Replacement Benefit, so the settlement in 2008 will have been
subject to the following policy condition:
“If we decide to repair or rebuild your buildings and your current schedule
shows „including replacement benefit‟
We will repair or rebuild the part of your building that suffered the loss or
damage to a condition as close as possible to when new, but not better.
If we rebuild your buildings we will also pay the amounts that you need to pay
to ensure your buildings comply with government legislation and local
authority bylaws, unless
o You were required to pay these amounts before the loss or damage
occurred, and you did not do so
29. I am satisfied that the damage that occurred to the two lower retaining walls
on 12 February 2012 was as a direct result of faulty design and construction
and that the FSP has proven that the loss is subject to a policy exclusion.
30. If there is any damage to or instability in the upper retaining wall as a result
of the partial collapse of the lower walls then the cost of rectifying the upper
wall may, subject to certain conditions, be the responsibility of the FSP.
Determination
31. On the basis of the available information I determine that the FSP is not
required to indemnify the Applicants for the loss resulting from damage to
the two lower retaining walls.
32. I also note that, in the event that the 2008 repairs were completed by a
repairer appointed by the FSP, the Applicants may have the right to dispute
the adequacy of that claim settlement, in total, independently of this dispute.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.