Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' retaining walls collapsed after heavy rain in February 2012 and the FSP declined the claim under exclusions for faulty design and workmanship and gradual deterioration. AFCA found the lower walls failed due to faulty design and construction, so the FSP need not indemnify, and left open the upper wall and 2008 repair question.

The general exclusion for loss caused by a defect, structural defect, faulty workmanship or design applies where the engineering evidence shows the collapse resulted from original construction.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 284759 Determination Page 1 of 5 Case number: 284759 General Insurance - Domestic Insurance – Home Building - FSP Decision - Denial of claim 30 November 2012 Background 1. The Applicants hold a Home Building insurance policy underwritten by the Financial Services Provider (FSP). The policy provides cover against defined events. 2. The Applicant‟s property includes three retaining walls which have been built roughly parallel to each other below the level of the house. The walls were initially built by the Applicants with the help of friends. 3. In 2008 the upper wall collapsed following inundation by rain. The FSP accepted this claim and the damaged wall was rebuilt. 4. During early February 2012 the property was again inundated with heavy rain and parts of the two lower retaining walls collapsed. The FSP has denied this claim on the basis of policy exclusions in relation to: - Settling, shrinkage or any movement of the earth - Gradual deterioration, wear and tear - Roots from trees, plants, shrubs or grass - A defect in an item, structural defects or faulty workmanship or design - Flood 5. The Applicants believe that the upper wall has also been affected by the collapse of the lower walls. Summary of Applicant’s position 6. The Applicants have not presented any evidence or argument to support their contention that the claim should be paid. Determination Case No: 284759 Determination Page 2 of 5 Summary of FSP’s position 7. The FSP has submitted reports from a loss adjuster and a structural engineer to support its argument that the loss has been caused by the gradual deterioration of the retaining walls which in turn results from faulty design and building practices. 8. The FSP relies on the following policy exclusions contained within the defined event of Storm, Rainwater or Wind: “ Storm rainwater or wind We will cover your buildings or contents for loss or damage as a result of storm, rainwater or wind. We will not cover - Water entering your buildings - Through an opening made for any building, renovation, renovation or repair work - Because of a structural defect, faulty design or faulty workmanship when your buildings were constructed - Free- standing gates, fences or walls that are made of timber and are more than 15 years old. ” 9. The FSP also relies upon the following general exclusions: “We will not cover any loss or damage as a result of or ca used by: o Settling shrinkage or any movement of earth o Erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear o Roots from trees, plants, shrubs or grass o A defect in an item, structural defects or faulty workmanship or design o Flood ” 10. The FSP further advises that acceptance in whole or in part of the previous claims has not set a precedent as the cause of this failure is gradual deterioration which is not an insured event and that the current claim is not in relation to a wall which had been previously replaced by the FSP‟s preferred builders. Issues 11. Whether the Applicants have been able to prove a loss under the policy. 12. Whether the FSP has been able to prove the operation of a policy exclusion. 13. Whether the acceptance of the previous claim in 2008 has any bearing on the current claim Case No: 284759 Determination Page 3 of 5 Reasons for decision 14. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is due to the quantum and complexity of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 15. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 16. The Applicants‟ policy covers their home building. The retaining walls are brought under this cover by virtue of the policy definition of ”Building” which includes: “anything permanently built, constructed or installed on your propert y for domestic purposes” 17. The FSP has addressed this claim as falling under the listed event of “Storm, Rainwater or Wind” but it may also fall under the listed event of “Landslide or Subsidence” which reads: Landslide or Subsidence We will cover your buildings or contents for loss or damage as a result of a landslide or subsidence. We will only do this if the loss or damage occurs within 72 hours of o An earthquake or explosion o A storm including rainwater or wind, or o Liquid escaping from a fixed pipe, or an object attached to a pipe, fixed gutter, fixed tank or drain 18. The Applicants‟ property was inundated by rainwater during the period immediately prior to loss. This would appear to satisfy the conditions required to prove a loss under the listed event of “La ndslide or Subsidence”. The FSP‟s loss adjuster confirms the weather conditions at the time of the loss and further states: “We have no concerns with the validity of the Insured‟s version of events and believe the event occurred on the stated date of loss, being 12 February 2012” 19. The listed event of Landslide or Subsidence contains no exclusion in relation to timber walls more than 15 years old. 20. The report from the FSP‟s engineer dated 22 February 2012 makes it clear that the timbers in the retaining wall had deteriorated, that the stability of the walls had been adversely affected because the uprights had been constructed in filled material and that the walls do not comply with the relevant Building Act due to the lack of engineering certification. Case No: 284759 Determination Page 4 of 5 21. The report also discusses the build up of ground water following the rainstorms and the likely impact on the retaining walls. The following statements are contained within the report: “No specific surface water drainage provisions were evident along the lengths o f the lower two retaining walls.” “The recent rains have likely increased the loadings on the retaining walls, due to increases in the moisture content in the retained soils, however such rainfall events are a predictable event (sic) which should have been taken into consideration in the design and construction of the walls.” “The surface water drainage provisions of the walls do not appear to be adequate and have likely resulted in the saturation of the backfill materials, causing increased loadings on the retaining walls. The probable lack of sub- soil drainage has also likely exacerbated the saturation of the backfill materials.” 22. Based on the engineer‟s observations, it appears that the collapse of the retaining walls was caused as a result of the pressure exerted when rainwater saturated the backfilled soil behind the retaining walls. However the engineer also makes the point that these rainwater events are predictable events that should have been taken into consideration during the design and construction of the walls. He goes on to say that the saturation of the backfill is a likely result of the lack of drainage. 23. I am therefore satisfied that the collapse of the retaining walls is as a direct result of faulty design and/or workmanship in the original construction of the walls and that the FSP is entitled to rely on the general policy exclusion in relation to faulty design/workmanship. 24. The FSP has expressed the view that the upper wall is not part of this claim, however the Applicants have stated (as reported by the FSP‟s engineer) that they believe that the upper wall has also suffered some movement. 25. The information from the Applicants and from the FSP is unclear in relation to the 2008 repairs to the upper wall. If those repairs were completed by a builder appointed by the Applicants, then the FSP has no further liability. If however the repairs were completed by a builder appointed by the FSP, then any further rectification to the upper wall, resulting from the events of February 2012, may be the responsibility of the FSP. 26. The report from the FSP‟s engineer makes it clear that the rectification work completed in 2008 also fails to comply with the relevant Building Act. The report states: “The replacement uppermost retaining wall was constructed withou t any engineering design or certification.” “On the basis of the advice from (the builder), the depth of embedment of the uprights of the uppermost wall may be inadequate to support the loads from the wall due to the likelihood that they have been placed in at least some depth of filled ground. Furthermore, the uprights appear to be constructed, at least partially, in the backfill material between the middle and uppermost walls, and therefore rely on the stability of the lower walls. A retaining wall of Case No: 284759 Determination Page 5 of 5 this size (i.e. over 1m in height) should have been constructed with appropriate design and certification to comply with the requirements of the Building Act.” 27. Having made the point that the inadequate construction of the upper wall results in its relying on the stability of the lower walls, the engineer goes on to say: “The partial collapse of the middle wall has further destabilised the upper wall.” 28. The FSP has already accepted the 2008 claim. The Applicants‟ cover includes a Replacement Benefit, so the settlement in 2008 will have been subject to the following policy condition: “If we decide to repair or rebuild your buildings and your current schedule shows „including replacement benefit‟ We will repair or rebuild the part of your building that suffered the loss or damage to a condition as close as possible to when new, but not better. If we rebuild your buildings we will also pay the amounts that you need to pay to ensure your buildings comply with government legislation and local authority bylaws, unless o You were required to pay these amounts before the loss or damage occurred, and you did not do so 29. I am satisfied that the damage that occurred to the two lower retaining walls on 12 February 2012 was as a direct result of faulty design and construction and that the FSP has proven that the loss is subject to a policy exclusion. 30. If there is any damage to or instability in the upper retaining wall as a result of the partial collapse of the lower walls then the cost of rectifying the upper wall may, subject to certain conditions, be the responsibility of the FSP. Determination 31. On the basis of the available information I determine that the FSP is not required to indemnify the Applicants for the loss resulting from damage to the two lower retaining walls. 32. I also note that, in the event that the 2008 repairs were completed by a repairer appointed by the FSP, the Applicants may have the right to dispute the adequacy of that claim settlement, in total, independently of this dispute.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.