Home / Financial Firm (Unknown - Insurer) / Determination 284355

Determination 284355

Cyclone Yasi building claim: insurer's scope of works and declined items disputed, with poor quality builder repairs and claim handling complaints

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Owners disputed the insurer's scope of works for cyclone damage to their home and sought further repairs and costs. AFCA rejected most items but ordered the FSP to replace some tiles and weatherboards, clean areas, reimburse louvre repairs and criticised its claim handling.

The insurer is entitled to rely on expert reports, but items lacking cyclone causation evidence or excluded as rust or ageing were not payable, while items with covered damage must be rectified.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 284355 Determination Page 1 of 11 Case number: 284355 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 19 January 2013 Background 1. The Applicants incepted a home building and contents insurance policy with the Financial Services Provider (FSP) on 9 November 2010. The building was insured for the sum of $300,000 and contents for $75,000 2. A claim was lodged under the policy as a result of damage caused to insured property resulting from Cyclone Yasi on or about 2 and 3 February 2011. 3. The FSP appointed a loss adjuster to attend the property to report on the damage. Following which a building report and scope of works (SOW) were provided. Quotes to repair damage based on the SOW were also obtained. 4. Based on the most competitive quote the FSP deemed the building was repairable and authorised its repair. 5. A dispute has arisen as the Applicants dispute the SOW believing not all cyclone damage had been identified which included roof repairs. In addition the Applicants complained of poor workmanship and customer service provided by the FSP’s appointed builder. 6. The FSP accepted there was a deteriorated relationship between the Applicants and builder. 7. A building consultant (M) was appointed to attend the property and report on the concerns raised by the Applicants. It was conceded that poor quality repairs had been undertaken that needed to be addressed. Other damage was also identified that needed to be addressed. The FSP accepted the roof had been compromised because of the cyclone and arranged for its replacement. However, the FSP did not accept all damage claimed by the Applicants was attributed to cyclone damage. 8. The FSP paid the contents sum insured as the loss of contents exceeded the sum insured. Determination Case No: 284355 Determination Page 2 of 11 Summary of Applicants ’ position 9. The Applicants formally lodged a dispute with the Service on16 May 2012 when a dispute form was submitted along with substantial documentation. 10. The Applicants were also, at that time, waiting for a report from the Queensland Building Services Association (QBSA) in support of their position. 11. Nevertheless, they say the scope of works was minimised from the beginning. They say the FSP’s claims process has failed them as the costs have increased from approximately $175,000 to nearly $300,000. It may have been possible that a correct assessment may have enabled them to a cash payout with them organising and managing the repair of the property. 12. The Applicants say the FSP and its representatives failed in their duties towards them in regards to the claim. 13. The Applicants raised issues during the claims process in regard to:  The roof - they asked for it to be properly inspected prior to the FSP’s preferred builder commencing cyclone damage repairs.  Wall cladding - they asked for re-assessment of this. They say this was overlooked in the M report as it only addresses the overlap issue of the cedar weatherboards and not the damage.  Bedroom one feature wall – they have identified pressure cracks in the wall.  Air conditioner, air cooling system and fans – they have not been included in the scope of works. Whereas they say a neighbour who is also insured with the FSP had replacement of fans and air conditioner included in their scope of works. They would like an electrical report and guarantee that they will not have any future problems.  Toilet cistern and seats – exposure to of salt water from the cyclone entering the home has caused a reaction to the plastic causing staining. This is not an aging or deterioration problem. They say they are aware other homes have had this type of damage accepted as cyclone damage.  Painting of cladding – the product to be used is “Sikkens’ and they need to pick the correct colour as it darkens with age. They want the correct process followed when painting with this product.  Window seals – they want their concerns noted for this if there is a problem in the future with leaking windows.  Smoke alarm – although they only had a battery operated alarm, State relegations require a wired alarm be installed if a major reconstruction takes place.  The roof has leaked during the wet season causing damage to newly replaced lights and walls. Case No: 284355 Determination Page 3 of 11  Floating floor was damaged from rain as windows had not been replaced.  External louvered window blinds are the wrong length.  The cost of reconstruction is no longer transparent. They would like to be provided with the actual cost incurred by the FSP in the reconstruction of the property. 14. On 28 November 2012 the Applicants submitted correspondence which they say outlines their concerns more comprehensively. They acknowledge the FSP has arranged for the cladding to be painted to a more reasonable colour. 15. The Applicants listed the following items not accepted by the FSP as relating to additional cyclone damage:  More damage to external cladding – weatherboards,  Toilet cistern discolouration,  Patio and garage slate tiles  Upstairs bedroom 1 wall painted blue,  Balcony hand railing  Air cooling system including (soffit) grille off bedroom 1 balcony,  Flyscreens  Concrete in front of house 16. The Applicants listed the following items h aving not being replaced “like for like”:  External louvered blinds,  Clothes line  Driveway paving not done as per sample supplied and more damage. 17. The Applicants again raised issue with the damage to the floating floor. 18. The Applicants also listed other items under “More concerns” (summarised):  more damage in garage,  scope of works not completed and garage not cleaned,  backyard paving not cleaned,  home was not desalinated as per scope of works and rusting is visible on bolts of framework,  doorbell removed by builder and not replaced,  small section of ceiling not repaired properly. It was painted but still shows damage, Case No: 284355 Determination Page 4 of 11  lights in main toilet, toilet off laundry and laundry replaced with fluorescent lights. They were not fluorescent lights previously.  they are concerned as so what is happening in the wall cavities between the gyprock and wall cladding as the cavities were not cleaned,  they think the replacement air conditioner is less powerful than their previous one,  exposed ceiling beams in the lounge/kitchen have not been painted and there is also poor quality of painting done,  the stairs have been repaired poorly and painted badly,  areas of bad plastering in the home and that plastering should have been done to the full wall height,  laundry tub has been replaced with a lesser quality one. 19. The Applicants again raised issues with the FSP’s appointed builder as well as raising issues regarding the loss adjuster’s and FSP’s handling of the claim. 20. The Applicants raised concern with the costs to finalise the buildings repairs as it will exceed the sum insured of $300,000. 21. The Applicants believe the FSP has paid too much for the reconstruction of the building and had the building been correctly assessed originally for which they believe they would have received pa yment, they would have been responsible for the repair. Summary of FSP’s position 22. In its submission to the Service dated 22 June 2012 the FSP concluded: “[FSP] has relied on the provisions of the Applicant’s policy and Insurance Contracts Act 1984 to assess its potential liability for the disputed claim. Based on the information provided by our loss assessors, and contained in our files, [FSP] submits that it has fairly and accurately assessed the Applicants’ claim. [FSP] has engaged a qualified expert in this field and considers that the disputed damage has been caused over time by events outside the cover provided in the Policy Booklet/Products Disclosure Statement. [FSP] considers that it has upheld its obligation under the Duty of Utmost Good Faith in its presentation that the claim was outside the cover by gathering all the facts to ensure the decision to decline the items in dispute was based on all the facts available. [FSP] considers that the Applicants has submitted a claim to receive indemnity for some items to which they weather the damage claimed has been caused by the cyclone not entitled. Based on the provision of its clear and unambiguous policy wording, [FSP] submits that it is entitled to deny indemnity to the Applicants for these items.” Case No: 284355 Determination Page 5 of 11 23. The FSP relies on the following policy provisions: “ Listed Events cover We will cover your buildings or contents for loss or damage as a result of the incidents listed on the following pages. ... Any cover we provide is subject to exclusions. Exclusions to your cover Any cover we provide is subject to the following exclusions We will not cover any loss or damage as a result of, or caused by   erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear ... How we settle a buildings claim  We will decide how we will settle your claim If your building suffers loss or damage, we will decide whether to  repair  rebuild, or  pay the cost to repair or rebuild that part of your buildings that suffered loss or damage If we do, we will  pay you up to the buildings sum insured, as listed on your schedule  only repair, rebuild or pay you for the part or parts of the building that actually sustained loss or damage, including damaged portions pf fixed coverings to walls, floors and ceilings only in the room, hall or passage where the damage occurred.  try to match any material used to repair your buildings with the original materials or nearest equivalent available to the original materials  .... When we settle your claim, the law that will apply is the law of the State or Territory where the loss, damage or liability occurred.” Issues 24. Whether the disputed damage has been caused by the cyclone. 25. Alternatively, whether the disputed damage falls within the terms and conditions provided by the policy. Case No: 284355 Determination Page 6 of 11 Reasons for decision 26. FOS has considered it is appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is because of the issues in dispute and quantum. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination by an Ombudsman. 27. There has been an exchange of material between the parties. There is a great deal of information submitted by the Applicants. It is not intended to recite information in this Determination except where considered relevant. 28. It is not disputed that an insured event occurred which is covered by the policy. The Applicants have referred a dispute to the Service as they believe all damage they have identified has been caused by or can be attributed to Cyclone Yasi. 29. I have mentioned the voluminous material submitted by the Applicants and note their issues and concerns regarding the claim. Particularly, the handling of the claim by the FSP and its authorised representatives, including the appointed builder. 30. The FSP submitted that the quality of repairs was not in dispute, but I disagree with the FSP. The Applicants say some repairs undertaken have not been done satisfactorily hence they sought assistance for QBSA. 31. Nonetheless, I am surprised by the FSP’s handling of the c laim. It does not dispute there was a breakdown in the relationship between the Applicants and the builder. There does not appear to be steps taken by the FSP to take over or more closely the management of the claim and has left the management of the claims in the hands of an external loss assessor. This was a complex and substantial claim and it required careful oversight. 32. The Applicants did not agree with the scope of works relied upon by the FSP as it did not include the roof and wanted it reassessed. However, I accept the FSP is entitled to rely on reports obtained by appropriate experts in support of its position. 33. The initial loss assessor who attended the property reported that a building consultant would be required to firmly detail the necessary repairs to the home and to also check the roof space to ensure that the roof framing had not been twisted or deflected. 34. I reviewed the report, dated 7 March 2011, by the appointed building consultant (HBS) and his scope of works. HBS reported there were no visible signs of damage to the flat ceiling roof frame or roof battens. HBS considered the overall damage to be relatively minor with no structural damage to the property. 35. It was not until July 2011 when the roof structure of the building was inspected by a consulting engineer (AM) that it was reported that 26 ridge Case No: 284355 Determination Page 7 of 11 panels of the roof cladding (Kip Loc type system) were damaged. Also several battens were observed to be cracked. AM recommended the whole roof sheeting be replaced. The FSP arranged for the replacement of the roof and there are outstanding issues with the roof. 36. The Applicants have indicated that there are outstanding issues which includes cyclone related damage and quality of repairs. They have listed the items that have not been resolved to their satisfaction. The Applicants referred the builder’s workmanship/quality of repairs to the QBSA and other matters which QBSA considered were contractual issues with the FSP. 37. The Applicants provided the QBSA reports and the FSP provided a response addressing the items. I note the Applicants were not happy with QBSA as it did not agree with all workmanship/quality repairs issues raised by the Applicants. 38. The Applicants’ submission received by the Service 28 November 2012, which is described as being more comprehensive, was exchanged with the FSP. The FSP did not provide any additional response and relies on it previously submitted material. 39. The Applicants continued to make submissions covering matters that had previously been raised and these were exchanged with the FSP to which it provided response. 40. The Applicants also raised issue regarding the costs incurred by the FSP as indicating it had paid for work that was not done or it was invoiced twice. The FSP was internally dealing with this. The FSP advised that because it had authorised repairs it was incurring the costs even if it went beyond the sum insured of $300,000. 41. For the benefit of this determination I believe it is warranted to address some items individually that are noted in the summary of the App licants’ position. I have taken into consideration the material submitted particularly taking note the reports reli ed upon by the FSP and the QBSA’s report which were primarily to report on the builder’s workmanship/quality of repairs. Wall cladding 42. The Applicants say they were never happy with the HBS report but it did outline damage to the weatherboards. They say the MCS report mainly deals with the overlap issue of the weatherboards and fails to report on damage to the remaining cladding. 43. The Applicants, in particular, have raised issue with one of the northern walls. They say it suffered damage sand and water damage during the cyclone. The FSP says the damaged weatherboards have been replaced. 44. The Applicants submitted a quote to replace the northern wall to the driveway. The quote gives no basis as to why the wall should be replaced. There is no independent report to say the wall requires replacement. Case No: 284355 Determination Page 8 of 11 45. I am not satisfied there is evidence that establishes that there is cyclone damaged cladding which has not been addressed. 46. Although there were concerns with issue with installation of replacement weatherboards due to overlapping it is my understanding this has been resolved. 47. Some weatherboards were used as a colour palette in the attempt of matching the existing cladding cover. Photographs provided by the Applicants show the colour variance in the weatherboard. I am satisfied the Applicants are entitled to have these weatherboards replaced. Toilet cistern discolouration 48. The Applicants have provided photos of toilets which show evidence of discolouration to cistern and seats. The Applicants say this was caused by the cyclone. 49. The Applicants says that a neighbour who had the same discolouration problem had the toilet replaced by his insurer. According to a note from the neighbour it would seem that his insurer did not consider it worth disputing over. 50. I can only consider the terms and conditions of the Applicants’ policy that are applicable to the circumstances. The FSP says the discolouration is a sign of aging and not consistent with cyclone damage. 51. There is no satisfactory independent evidence before me to support a finding that the discolouration is cyclone damage. I accept the FSP was entitled to deny this aspect of the claim. Garage slate tiles/garage cleaning/paving cleaning 52. The Applicants are seeking the replacement of two broken tiles. I do not have the benefit of photographs of the damaged garage tiles. The FSP says that two individual tiles had lifted that are not consistent with cyclone damage. However, no report establishes this. 53. Bearing in mind the intensity of cyclone Yasi and for the sake of reasonableness the FSP is to replace the two garage tiles. 54. The FSP says the garage has been cleaned by the builder and that any sand in there now is an ongoing situation. The FSP says the builder also cleaned the rear paving and that any problem with it is a maintenance issue. The Applicants dispute the builder cleaned the garage and paving. 55. In the interest of fairness and reasonableness, I urge the FSP to arrange for the cleaning of the garage and rear paving. Case No: 284355 Determination Page 9 of 11 Bedroom 1 wall 56. The wall in dispute was painted blue following cyclone Yasi, it was previously brown. The Applicants say the wall has sustained inward pressure damage from the cyclone. The FSP says it is not cyclone related damage based on MCS’ s report. 57. The painting of the wall was accepted under the scope of works as cyclone damage. M in his report says the defective plastering should have been addressed prior to the repainting as pre-existing damage. 58. QBSA reported imperfections could only be identified under reflective lighting. 59. Nevertheless, I am satisfied that no cyclone damage was sustained to the wall and that painting of the wall in the colour blue was at the Applicants request which apparently has highlighted the imperfections to the wall. Bedroom 1 balcony hand railing 60. The Applicants have complained about the sandblasting to the railing and poor effort in repairing it. 61. It is noted the hand railing has sustained sandblasting effects from the cyclone which M described as not having cyclone damage other than an exacerbation of the already aging paint finish to the timberwork. M also reported the timber used for the hand railing was inappropriate material. 62. There is no indication that repair to the hand railing is deficient and I satisfied the FSP has no further obligation to the railing. Air Cooling system 63. The FSP says the system has been checked and found to be noisy. However, it says there is no evidence of cyclone damage to it. 64. The Applicants obtain ed an electrician’s report which indicates the louvre assembly is sluggish and does not open properly with etch corrosion on most of the louvres. The electrician reported the corrosion is consistent with exposure salt water immersion which is alleged to ha ve happened during the cyclone. 65. The FSP has not disputed this. Accordingly, I accept that the louvres and operation of the louvres have been damaged by an event covered by the policy. If the louvres have been repaired the FSP is to reimburse the Applicants for the cost on presentation of an invoice. Otherwise, the FSP is to arrange for the repair of the louvres. The same applies for the cost of the control switch. 66. The Applicants also seek the cost in replacing a front balcony air vented grille. M reported the rust on it was a pre-existing problem. The Applicants Case No: 284355 Determination Page 10 of 11 acknowledge that there was rusting to the grille before the cyclone but it is far worse now because of the cyclone. 67. Nevertheless, rust is an ongoing process and this was evident to the grille prior to the claimed event. 68. The policy excludes loss or damage caused by or resulting from rust. I am satisfied the FSP was entitled to exclude this item from the claim. Replaced items 69. The terms and conditions of the policy allow the FSP under buildings settlement to  try to match any material used to repair your buildings with the original materials or nearest equivalent available to the original materials. 70. The Applicants state tha t some items have not been replaced “like for like”. Although the FSP has not responded to this, the Applicants have not satisfied me, the items have not been replaced in accordance with the policy terms. Lights 71. The Applicants raised issue with lights having been replaced with florescent light bulbs. A photograph was provided showing one of the lights. It is noted the bulb is an energy saving bulb. 72. I am satisfied energy saving bulbs are an acceptable replacement under the terms and conditions of the policy. Flooring 73. I am not satisfied the Applicants have established new flooring has been damaged which would require replacement. Smoke alarm 74. The Applicants seek replacement of the current battery operated smoke alarm with a wired alarm based on State regulations. 75. However, the requirement is only when a building has undergone a major renovation. I am not satisfied the property has undergone a major renovation. 76. Accordingly, I am satisfied the Applicants are not entitled under the policy to a wired smoke alarm. Driveway paving 77. The Applicants have indicated they are not satisfied with the driveway paving as they were not given details of the options available to them. The FSP has argued that the Applicants agreed to the replacement paving. Case No: 284355 Determination Page 11 of 11 78. I am satisfied the FSP has fulfilled its obligation for the replacement paving. Flyscreens 79. The Applicants seek replacement of damaged flyscreens. However, I am not satisfied it has been satisfactorily established that the fly screens have been damaged by the claimed event. The FSP was entitled to deny this aspect of the claim. 80. After analysing the material, I am not satisfied the Applicants have established that all the damage claimed has been caused by the cyclone event. Determination 81. On the basis of the available information I determine the FSP’s liability is to  Replace two paving tiles.  Clean the garage and rear paving.  Reimburse the Applicants for the cost of repairs to louvres.  Replacement of the weather boards in accordance with paragraph 47.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.