Denial of claim - wear, tear and deterioration exclusion
Summary
The applicant's investment property roof was damaged in a February 2010 storm and the FSP denied the claim as maintenance and wear-related. AFCA found the roof's deterioration was a factor, apportioned the loss, and ordered the FSP to pay 25% of the $16,237.60 repair quote, $3,918.96, plus interest.
Where the wear-and-deterioration exclusion and a covered storm were consecutive rather than concurrent causes, the Wayne Tank principle did not apply and the loss was apportioned under clause 8.2 of the Terms of Reference.
Issues
- Claim denial primary · upheld
“I am satisfied the FSP has established that it should not be fully responsible for the claim... the FSP is to pay 25% of the claim.”
- Claim amount dispute secondary · unclear
“the Case Manager's apportionment of 25% of the total damage in the sum of $16,237.60 is fair in all the circumstances.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 284315 Determination Page 1 of 7
Case number 284315
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
18 December 2012
Background
1. This is a review of a Recommendation by the Service’s Case Manager dated
23 October 2012. The Applicant has rejected the Recommendation and in
accordance with the Terms of Reference, the matter has been referred to me
for Determination.
2. The relevant Background, Summaries of the parties ’ position and Issue to be
determined as set out in paragraphs 1 to 13 of the Recommendation, and in
the interest of clarity and completeness I will restate same:
1. “The Applicant’s investment property was insured under a Commercial
Combined Insurance Policy issued by the Financial Services Provider
(FSP) for $1,700,000.
2. The Applicant claims that on 6 February 2010 the roof of the premises
suffered damage during storms in the area at about that time. and lodged
a claim under the policy.
3. The claim was denied by the FSP on the grounds reports obtained by it
during assessment of the loss indicated the roof had pre-existing
damage, rust, wear and tear and ongoing maintenance issues.
Summary of Applicant’s position
4. The FSP confirmed that on 6 February 2010 the Bureau of Meteorology
(BoM) confirmed there were very strong winds in excess of 90km/h and
74mm of rain which affected many properties in the area.
5. The FSP further neglected to report that prior to 6 February there were
very strong winds on 18, 19, 23, 26 of January and 2 and 3 February.
These winds were in excess of 60km/h. The winds that occurred on 18
and 19 January damaged sections of the roof panels.
6. Quotations were then sought for the repairs. The winds then occurred on
the other dates and continued to rattle and weakened the roof panels and
screws.
7. When the extreme storm occurred on 6 February the roof panels and
screws were not stable enough so most of the roof panels started to lift
and crack under the pressure.
Determination
Case No: 284315 Determination Page 2 of 7
8. It is also common knowledge that the Richmond area is prone to very
high winds and storm activity which had damaged the roof. This has been
documented. The FSP looked for loose screws, cracked panels and
leaves in the gutters which were found after the storm occurred.
Summary of FSP’s position
9. The FSP relies on reports obtained by the loss adjuster and other experts
in denying the claim.
10. The FSP considers based on the reports that the damage to the property
resulted from ongoing maintenance issues and not as a result of any
insured event. From the information obtained the Applicant knew or
should have known about the damage and chose not to address the
matter.
11. The FSP further considers the damage occurred prior to inception of the
policy.
12. The FSP relies on the following terms of the policy:
“ What you are not covered for under this section
1 We will not pay for loss or damage under the Business Property
cover section caused by:
…
b. wear and tear
…
vi. wear, tear, fading or gradual deterioration.”
Issue
13. Whether the FSP was entitled to deny liability for the claim. ”
Reasons for Decision
3. There has been a full exchange of information and each party has had the
opportunity to address the issues that have been raised. I have perused all
o f the exchanged material and I have considered the parties’ submissions
including the Applicant’s further submission under cover of email dated 4
November 2012.
4. In making his Recommendation, the Service’s Case Manager set out his
reasons in paragraphs 15 to 35 and I will restate same:
15. “ The FSP seeks to rely on a clause in the policy to deny the claim and
therefore has the burden of establishing on the balance of probabilities
that the relevant clause applies to defeat the claim.
16. The loss adjuster provided a number of reports during the management
of the claim. The following is relevant information contained in those
reports.
Case No: 284315 Determination Page 3 of 7
17. Loss adjuster’s r eport dated 15 March 2010.
On 6 February 2010 Sydney and surrounding areas were affected
by torrential storms and high winds. The BoM confirmed winds in
excess of 90kmh and 74 mm of rain affected many residential and
commercial properties. The damage was widespread.
Box gutters and drainage pipes on the Applicant’s premises
overflowed and ingressed under the roof sheets cascading down
wall linings within the arcade area.
Minimal damage could be seen to the internal eave linings of the
retail arcade shops.
It was obvious very little maintenance had been undertaken with
areas of imperfections and inadequate roof design contributing to
the ingress of water on occasions of torrential rain. The amount of
debris on the roof and gutters clearly affected the flow of water
runoff which contributed to backflow damaging the property below.
18. The roof was inspected by a roofing contractor who identified the
following:
Polycarbonate roofs were installed under 1 degree pitch.
Debris of foliage in gutter.
Surface rust evident in various areas.
Cappings not secured adequately in various areas .
The contractor concluded:
“All the water ingress areas in the insured’s property is a direct
result of maintenance related issues other than the recently
installed polycarbonate roofing over the arcade area, which is
installed at 1 degree and is under the manufacturer’s warranty for
this product. All roof penetrations should be trayed as to allow the
water not to dam up behind penetrations. The box gutters need to
be regularly m aintained of debris and foliage.”
19. A number of photographs of the roof accompany the report.
20. The loss adjuster considered the quotes submitted by the Applicant
related to structural repairs which were not damaged by storm. However
following a site inspection accompanied by the Applicant the adjuster
reported damage caused from lifting by wind and hail damage could be
seen. The hail indentation on the polycarbonate sheets was new and he
was aware there had been hail damage in the vicinity of Richmond during
May having assessed similar damage for other insurers.
21. The adjuster advised that he had been informed by the Applicant’s broker
that at the time of an inspection conducted in 2009 there was no obvious
damage to the building.
22. The adjuster recommended the claim be accepted.
23. In his report of 25 October 2010 the adjuster reported information
obtained from the Applicant’s manag ing agent indicated an ongoing
history of damage to the roof since 2002. The adjuster commented:
“Although we have obtained previous reports indic ating the damage
of the roof and additional damage by hail, it is now obvious that the
Case No: 284315 Determination Page 4 of 7
damage is accurate but the dates of the occurrence do not appear
to be relating to the claim that has been lodged by the insured in
February 2010.
In our opinion the damage occasioned to the insured’s roof is pre -
existing damage and therefore has either been paid previously by
insures and has not undertaken the repairs or has neglected to
maintain the integrity of the building.”
24. The incidents reported by the managing agent included:
“06.02.2002 Storm damage to Perspex sheeting on skylight.
23.09.2002 Tenant reported two skylight sheets flapping loose after
high winds.
10.07.2003 Perspex panels screwed back down.
11.08.2008 Roofer made temporary repairs to Perspex sheeting
after a storm.
20.11.2008 Roofer made temporary repairs to loose Perspex
sheeting.
19.01.2010 Tenant reported loose Perspex sheeting flapping in the
breeze. Roofer contacted to secure. He reported that
the sheeting is very brittle and screws are puling
through the Perspex.
There have been numerous occasions over the last few years where
temporary repairs have been made.
You will note on the photos taken on 26.11.2009 battens that have been
screwed over the top of the Perspex sheets to tr y and secure them.”
25. A number of photographs accompany the report.
26. The Applicant’s managing agent in a report dated 20 J anuary 2010 to the
Applicant provided the following information:
The roofer attended the premises as one of the sheets above shops
5 and 6 was loose and flapping in the wind.
He screwed it down temporarily but it was split and will leak. A lot of
the screws were ready to pull through the sheeting as the sheets
had become brittle.
The roofer has quoted for heavy industrial grade fibreglass as the
sheeting in now to thin and had had continual repairs carried out
over the years because of the strong winds in the area. All the
battens holding down the sheeting are rotten and not holding down
much at all.
27. Photographs have been provided which show several screws to the roof
sheeting with the screws having no purchase on the sheeting due to wear
around the screw.
28. By letter dated 19 January 2011 the A pplicant’s managing agent provided
the following information:
He has lived in the area for over 25 years and has experienced the
same weather conditions as experienced by the Applicant’s
property over this time.
Case No: 284315 Determination Page 5 of 7
During severe storms roof sheets have been torn off the roof
structure or broken by hail and the whole sheeting system has been
compromised over the years from these storms.
The Applicant addressed each incident and repaired it where
necessary at his cost. However the continual damage cannot be
safely rectified as a piece meal approach.
It is most urgent that clear roof sheeting be replaced.
Summary
29. In arriving at my decision I consider the following information is relevant.
a. The policy provides cover for loss or damage to the building caused
by storm, rainwater, wind and hail.
b. According to the adjuster, storm with winds of up to 90kmh and 74
mm of rain were experienced in the area on about 6 February 2010
causing widespread damage.
c. The adjuster observed new hail damage to the polycarbonate roof
and evidence of the roof sheets having been lifted in the February
2010 storms. The adjuster confirmed hail damage had occurred to
other properties in the area.
d. The roof displayed rust and was installed under 1 degree of pitch
which was under the manufacturer’s warranty.
e. The roofing contractor found the ingress of water to the premises
following the February 2010 claim was due to maintenance issues
and incorrect pitch of the roof.
f. The roof sheets were brittle with screws puling through the Perspex.
Battens holding the roof were rotten.
g. The roof had sustained damage on a number of occasions since
2002 with the roofer making only temporary repairs on two
occasions.
30. The evidence therefore leads to the conclusion that the roof had suffered
significant deterioration to the extent that screws were ineffective and
provided little or no resistance to wind, battens holding down the sheeting
were rotten and the sheets were brittle.
31. I am persuaded by the evidence that the roof had deteriorated over time
and its condition at the time of the February 2010 storm was a factor in
causing the damage claimed. I am also satisfied the roof sustained storm
and hail damage
32. In circumstances where more than one concurrent cause has been
established as responsible for damage and one concurrent cause is
covered by the policy and the other is excluded, it is established law that
the clause excluding the cover is dominant and the claim fails. However
in the circumstances of this case the deterioration of the roof occurred
prior to the February storm which means that one proximate cause was
followed by another so that they were consecutive.
Case No: 284315 Determination Page 6 of 7
33. While the policy provides cover for damage caused by storm, the policy
also contains a clause which excludes cover when the loss or damage is
caused by wear or gradual deterioration. Because one proximate cause
of the damage was the deteriorated condition of the roof which made it
vulnerable to storm damage, I am satisfied the FSP has established that
it should not be fully responsible for the claim.
34. In this case I propose to exercise the discretion available to me under
clause 8.2 of the Service’s Terms of Reference and to do what I consider
as fair in all the circumstances. In this regard I consider that the FSP is to
pay 25% of the claim.
35. Two quotations for rectifying the damage have been submitted in the
sums of $15,700 and $16,237.60. The FSP is entitled to accept the lower
of the quotations. The Applicant is claiming the sum of $15,675.85 which
he says has been paid to the contractor. Accordingly I find that the FSP is
to pay $3,918.96 being 25% of $16,237.60. ”
5. The Case Manager’s reasons are given comprehensively and I agree with
his reasoning and with his recommended outcome. I add the following
further comments.
6. I note that the insurer’s loss adjustor had recommended the claim be
accepted and that he had been informed by the Applicant’s broker that
following the previous inspection in 2009, there was no obvious damage to
the building. However, the managing agent of the premises provided details
of incidents causing damage to the Perspex sheetings on five occasions
from 2002 until 2008 that is prior to the subject incident that occurred on 19
January 2010.
7. As noted by the Case Manager, the subject roof was installed under 1
degree of pitch which was below the manufacturer’s warranty.
8. Having viewed the photographs and considered the reports, I agree with the
Case Manager’s conclusion that the roof had suffered deterioration and
screws were ineffective and provided inadequate resistance to high winds.
Battens holding down the sheeting were rotten and the sheets were brittle.
9. The Case Manager, in paragraph 32 of his Recommendation set out above,
referred to what is known as the Wayne Tank Principle where damage is
caused by more than one concurrent cause, one of which is covered under
the policy and the other excluded. The Case Manager correctly noted that in
this case, the proximate causes were not concurrent and therefore the
application of that principle, which would have denied the Applicant
entitlement to recover under the policy, was not appropriate.
10. Whilst I note the cost of replacement of the polycarbonate roof was
approximately $16,000, the Applicant is not entitled to be indemnified for that
amount where a combination of consecutive causes is a result of the
damage.
Case No: 284315 Determination Page 7 of 7
11. The question at issue for me to determine is whether the Case Manager’s
apportionment of damages (25%) is being attributed to the damage caused
by the subject storm.
12. Having regard to the deteriorated state of the roof, its replacement involves a
substantial amount of betterment to the Applicant if the damage is not
apportioned fairly and reasonably.
13. In my view, the Case Manager’s apportionment of 25% of the total damage
in the sum of $16,237.60 is fair in all the circumstances. Thus, applying
clause 8.2 of the Service’s Terms of Reference, it is fair that the FSP pay
25% of that amount.
Determination
14. The FSP is to pay the Applicant the sum of $3,918.96 in settlement of the
claim.
15. The Applicant is entitled to interest under the Insurance Contracts Act from
24 August 2011 to the date of payment. The appropriate rate of interest is
7.25%.