Home / Financial Firm (Unknown - Insurer) / Determination 284315

Determination 284315

Denial of claim - wear, tear and deterioration exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-15
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$3,919
Non-financial loss—
Amount claimed$15,676
SourceAFCA PDF

Summary

The applicant's investment property roof was damaged in a February 2010 storm and the FSP denied the claim as maintenance and wear-related. AFCA found the roof's deterioration was a factor, apportioned the loss, and ordered the FSP to pay 25% of the $16,237.60 repair quote, $3,918.96, plus interest.

Where the wear-and-deterioration exclusion and a covered storm were consecutive rather than concurrent causes, the Wayne Tank principle did not apply and the loss was apportioned under clause 8.2 of the Terms of Reference.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 284315 Determination Page 1 of 7 Case number 284315 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of claim 18 December 2012 Background 1. This is a review of a Recommendation by the Service’s Case Manager dated 23 October 2012. The Applicant has rejected the Recommendation and in accordance with the Terms of Reference, the matter has been referred to me for Determination. 2. The relevant Background, Summaries of the parties ’ position and Issue to be determined as set out in paragraphs 1 to 13 of the Recommendation, and in the interest of clarity and completeness I will restate same: 1. “The Applicant’s investment property was insured under a Commercial Combined Insurance Policy issued by the Financial Services Provider (FSP) for $1,700,000. 2. The Applicant claims that on 6 February 2010 the roof of the premises suffered damage during storms in the area at about that time. and lodged a claim under the policy. 3. The claim was denied by the FSP on the grounds reports obtained by it during assessment of the loss indicated the roof had pre-existing damage, rust, wear and tear and ongoing maintenance issues. Summary of Applicant’s position 4. The FSP confirmed that on 6 February 2010 the Bureau of Meteorology (BoM) confirmed there were very strong winds in excess of 90km/h and 74mm of rain which affected many properties in the area. 5. The FSP further neglected to report that prior to 6 February there were very strong winds on 18, 19, 23, 26 of January and 2 and 3 February. These winds were in excess of 60km/h. The winds that occurred on 18 and 19 January damaged sections of the roof panels. 6. Quotations were then sought for the repairs. The winds then occurred on the other dates and continued to rattle and weakened the roof panels and screws. 7. When the extreme storm occurred on 6 February the roof panels and screws were not stable enough so most of the roof panels started to lift and crack under the pressure. Determination Case No: 284315 Determination Page 2 of 7 8. It is also common knowledge that the Richmond area is prone to very high winds and storm activity which had damaged the roof. This has been documented. The FSP looked for loose screws, cracked panels and leaves in the gutters which were found after the storm occurred. Summary of FSP’s position 9. The FSP relies on reports obtained by the loss adjuster and other experts in denying the claim. 10. The FSP considers based on the reports that the damage to the property resulted from ongoing maintenance issues and not as a result of any insured event. From the information obtained the Applicant knew or should have known about the damage and chose not to address the matter. 11. The FSP further considers the damage occurred prior to inception of the policy. 12. The FSP relies on the following terms of the policy: “ What you are not covered for under this section 1 We will not pay for loss or damage under the Business Property cover section caused by: … b. wear and tear … vi. wear, tear, fading or gradual deterioration.” Issue 13. Whether the FSP was entitled to deny liability for the claim. ” Reasons for Decision 3. There has been a full exchange of information and each party has had the opportunity to address the issues that have been raised. I have perused all o f the exchanged material and I have considered the parties’ submissions including the Applicant’s further submission under cover of email dated 4 November 2012. 4. In making his Recommendation, the Service’s Case Manager set out his reasons in paragraphs 15 to 35 and I will restate same: 15. “ The FSP seeks to rely on a clause in the policy to deny the claim and therefore has the burden of establishing on the balance of probabilities that the relevant clause applies to defeat the claim. 16. The loss adjuster provided a number of reports during the management of the claim. The following is relevant information contained in those reports. Case No: 284315 Determination Page 3 of 7 17. Loss adjuster’s r eport dated 15 March 2010.  On 6 February 2010 Sydney and surrounding areas were affected by torrential storms and high winds. The BoM confirmed winds in excess of 90kmh and 74 mm of rain affected many residential and commercial properties. The damage was widespread.  Box gutters and drainage pipes on the Applicant’s premises overflowed and ingressed under the roof sheets cascading down wall linings within the arcade area.  Minimal damage could be seen to the internal eave linings of the retail arcade shops.  It was obvious very little maintenance had been undertaken with areas of imperfections and inadequate roof design contributing to the ingress of water on occasions of torrential rain. The amount of debris on the roof and gutters clearly affected the flow of water runoff which contributed to backflow damaging the property below. 18. The roof was inspected by a roofing contractor who identified the following:  Polycarbonate roofs were installed under 1 degree pitch.  Debris of foliage in gutter.  Surface rust evident in various areas.  Cappings not secured adequately in various areas . The contractor concluded: “All the water ingress areas in the insured’s property is a direct result of maintenance related issues other than the recently installed polycarbonate roofing over the arcade area, which is installed at 1 degree and is under the manufacturer’s warranty for this product. All roof penetrations should be trayed as to allow the water not to dam up behind penetrations. The box gutters need to be regularly m aintained of debris and foliage.” 19. A number of photographs of the roof accompany the report. 20. The loss adjuster considered the quotes submitted by the Applicant related to structural repairs which were not damaged by storm. However following a site inspection accompanied by the Applicant the adjuster reported damage caused from lifting by wind and hail damage could be seen. The hail indentation on the polycarbonate sheets was new and he was aware there had been hail damage in the vicinity of Richmond during May having assessed similar damage for other insurers. 21. The adjuster advised that he had been informed by the Applicant’s broker that at the time of an inspection conducted in 2009 there was no obvious damage to the building. 22. The adjuster recommended the claim be accepted. 23. In his report of 25 October 2010 the adjuster reported information obtained from the Applicant’s manag ing agent indicated an ongoing history of damage to the roof since 2002. The adjuster commented: “Although we have obtained previous reports indic ating the damage of the roof and additional damage by hail, it is now obvious that the Case No: 284315 Determination Page 4 of 7 damage is accurate but the dates of the occurrence do not appear to be relating to the claim that has been lodged by the insured in February 2010. In our opinion the damage occasioned to the insured’s roof is pre - existing damage and therefore has either been paid previously by insures and has not undertaken the repairs or has neglected to maintain the integrity of the building.” 24. The incidents reported by the managing agent included: “06.02.2002 Storm damage to Perspex sheeting on skylight. 23.09.2002 Tenant reported two skylight sheets flapping loose after high winds. 10.07.2003 Perspex panels screwed back down. 11.08.2008 Roofer made temporary repairs to Perspex sheeting after a storm. 20.11.2008 Roofer made temporary repairs to loose Perspex sheeting. 19.01.2010 Tenant reported loose Perspex sheeting flapping in the breeze. Roofer contacted to secure. He reported that the sheeting is very brittle and screws are puling through the Perspex. There have been numerous occasions over the last few years where temporary repairs have been made. You will note on the photos taken on 26.11.2009 battens that have been screwed over the top of the Perspex sheets to tr y and secure them.” 25. A number of photographs accompany the report. 26. The Applicant’s managing agent in a report dated 20 J anuary 2010 to the Applicant provided the following information:  The roofer attended the premises as one of the sheets above shops 5 and 6 was loose and flapping in the wind.  He screwed it down temporarily but it was split and will leak. A lot of the screws were ready to pull through the sheeting as the sheets had become brittle.  The roofer has quoted for heavy industrial grade fibreglass as the sheeting in now to thin and had had continual repairs carried out over the years because of the strong winds in the area. All the battens holding down the sheeting are rotten and not holding down much at all. 27. Photographs have been provided which show several screws to the roof sheeting with the screws having no purchase on the sheeting due to wear around the screw. 28. By letter dated 19 January 2011 the A pplicant’s managing agent provided the following information:  He has lived in the area for over 25 years and has experienced the same weather conditions as experienced by the Applicant’s property over this time. Case No: 284315 Determination Page 5 of 7  During severe storms roof sheets have been torn off the roof structure or broken by hail and the whole sheeting system has been compromised over the years from these storms.  The Applicant addressed each incident and repaired it where necessary at his cost. However the continual damage cannot be safely rectified as a piece meal approach.  It is most urgent that clear roof sheeting be replaced. Summary 29. In arriving at my decision I consider the following information is relevant. a. The policy provides cover for loss or damage to the building caused by storm, rainwater, wind and hail. b. According to the adjuster, storm with winds of up to 90kmh and 74 mm of rain were experienced in the area on about 6 February 2010 causing widespread damage. c. The adjuster observed new hail damage to the polycarbonate roof and evidence of the roof sheets having been lifted in the February 2010 storms. The adjuster confirmed hail damage had occurred to other properties in the area. d. The roof displayed rust and was installed under 1 degree of pitch which was under the manufacturer’s warranty. e. The roofing contractor found the ingress of water to the premises following the February 2010 claim was due to maintenance issues and incorrect pitch of the roof. f. The roof sheets were brittle with screws puling through the Perspex. Battens holding the roof were rotten. g. The roof had sustained damage on a number of occasions since 2002 with the roofer making only temporary repairs on two occasions. 30. The evidence therefore leads to the conclusion that the roof had suffered significant deterioration to the extent that screws were ineffective and provided little or no resistance to wind, battens holding down the sheeting were rotten and the sheets were brittle. 31. I am persuaded by the evidence that the roof had deteriorated over time and its condition at the time of the February 2010 storm was a factor in causing the damage claimed. I am also satisfied the roof sustained storm and hail damage 32. In circumstances where more than one concurrent cause has been established as responsible for damage and one concurrent cause is covered by the policy and the other is excluded, it is established law that the clause excluding the cover is dominant and the claim fails. However in the circumstances of this case the deterioration of the roof occurred prior to the February storm which means that one proximate cause was followed by another so that they were consecutive. Case No: 284315 Determination Page 6 of 7 33. While the policy provides cover for damage caused by storm, the policy also contains a clause which excludes cover when the loss or damage is caused by wear or gradual deterioration. Because one proximate cause of the damage was the deteriorated condition of the roof which made it vulnerable to storm damage, I am satisfied the FSP has established that it should not be fully responsible for the claim. 34. In this case I propose to exercise the discretion available to me under clause 8.2 of the Service’s Terms of Reference and to do what I consider as fair in all the circumstances. In this regard I consider that the FSP is to pay 25% of the claim. 35. Two quotations for rectifying the damage have been submitted in the sums of $15,700 and $16,237.60. The FSP is entitled to accept the lower of the quotations. The Applicant is claiming the sum of $15,675.85 which he says has been paid to the contractor. Accordingly I find that the FSP is to pay $3,918.96 being 25% of $16,237.60. ” 5. The Case Manager’s reasons are given comprehensively and I agree with his reasoning and with his recommended outcome. I add the following further comments. 6. I note that the insurer’s loss adjustor had recommended the claim be accepted and that he had been informed by the Applicant’s broker that following the previous inspection in 2009, there was no obvious damage to the building. However, the managing agent of the premises provided details of incidents causing damage to the Perspex sheetings on five occasions from 2002 until 2008 that is prior to the subject incident that occurred on 19 January 2010. 7. As noted by the Case Manager, the subject roof was installed under 1 degree of pitch which was below the manufacturer’s warranty. 8. Having viewed the photographs and considered the reports, I agree with the Case Manager’s conclusion that the roof had suffered deterioration and screws were ineffective and provided inadequate resistance to high winds. Battens holding down the sheeting were rotten and the sheets were brittle. 9. The Case Manager, in paragraph 32 of his Recommendation set out above, referred to what is known as the Wayne Tank Principle where damage is caused by more than one concurrent cause, one of which is covered under the policy and the other excluded. The Case Manager correctly noted that in this case, the proximate causes were not concurrent and therefore the application of that principle, which would have denied the Applicant entitlement to recover under the policy, was not appropriate. 10. Whilst I note the cost of replacement of the polycarbonate roof was approximately $16,000, the Applicant is not entitled to be indemnified for that amount where a combination of consecutive causes is a result of the damage. Case No: 284315 Determination Page 7 of 7 11. The question at issue for me to determine is whether the Case Manager’s apportionment of damages (25%) is being attributed to the damage caused by the subject storm. 12. Having regard to the deteriorated state of the roof, its replacement involves a substantial amount of betterment to the Applicant if the damage is not apportioned fairly and reasonably. 13. In my view, the Case Manager’s apportionment of 25% of the total damage in the sum of $16,237.60 is fair in all the circumstances. Thus, applying clause 8.2 of the Service’s Terms of Reference, it is fair that the FSP pay 25% of that amount. Determination 14. The FSP is to pay the Applicant the sum of $3,918.96 in settlement of the claim. 15. The Applicant is entitled to interest under the Insurance Contracts Act from 24 August 2011 to the date of payment. The appropriate rate of interest is 7.25%.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.