Claim declined for timber floor damage under defective design and workmanship exclusion
Text of the determination
Case No: 284240 Determination Page 1 of 9
Case number: 284240
General Insurance – Domestic Insurance – Residential Bed & Breakfast
Insurance – Water damage – burst water pipe – Policy exclusions- wear & tear,
gradual deterioration, defective design, rust, corrosion, settlement, shrinkage
– S46 Insurance Contracts Act 1984.
26 March 2013
Background
1. The Applicant insured his bed and breakfast and function centre under a
Residential Bed & Breakfast Insura nce Policy against accidental loss or
damage covering building number 1 for $3,000,000, building number 2
$134,162 and building number 3 for $134,162. The property was purchased by
the Applicant in 1995.
2. The policy of insurance incepted on 20 March 2010 and had been renewed
annually to 20 March 2012.
3. On 2 August 2011, the Applicant lodged a claim in relation to timber floor
boards that had lifted, cupped and distorted.
4. A loss adjuster’s report dated 17 August 2011, recorded that the Applicant had
advised that over recent months he had noticed a dramatic escalation in the
property’s water consumption.
5. On 27 July 2011, the Applicant and his staff had noticed a deterioration of the
timber hardwood flooring in a large area of a building known as, The Pavilion.
The deterioration was causing the timber hardwood floors to lift, cup and distort,
particularly at the front half of the hall.
6. The Applicant engaged a plumber to carry out an inspection in order to identify
the cause of the increased water consumption. On or about 27 July 2011, the
plumber detected a leaking water pipe, being the main water supply to the
mansion, which crosses the driveway between the main building, building
number 1 and The Pavilion.
7. The plumber repaired the damaged water supply pipe and water consumption
returned to normal levels.
8. The Applicant submits that the burst water pipe caused water to escape into the
sub-floor and nearby foundations of The Pavilion, resulting in the deterioration
and damage to the timber floorboards. The cost of repairs is estimated to be
$41,680.
Determination
Case No: 284240 Determination Page 2 of 9
9. The Financial Services Provider (FSP) engaged a builder, ‘TD’, to determine
the cause of the damage to the flooring. TD reported that the damage had been
caused by a combination of design and construction errors, on-going since the
construction of the building.
10. The FSP contends that the damage to the flooring had been caused by the
policy exclusions in respect to construction and drainage defects which pre-
existed the leaking water pipe.
Summary of Applicant’ s Position
11. The Applicant noticed an increase in water consumption when receiving water
bills in mid to late 2010 and early 2011. A plumber engaged to investigate the
cause of the increased consumption, found that a water supply pipe had been
leaking. The plumber repaired the water pipe and consumption returned to
normal levels.
12. In early 2011, the Applicant noticed damage to the timber floorboards in the
building known as, The Pavilion. He submits that the damage to the floorboards
was caused by water escaping from the leaking water pipe which then flowed
under the floor of the building.
13. The building subject to the claim was built in approximately 1968 and
purchased by the Applicant in 1995. When he purchased the property there
was no evidence of any defects in the floo ring. He was also unaware of any
construction or drainage defects.
14. The FSP asserts that the damage to the flooring was as a result of defective
design, workmanship or defective material from the time of construction.
However, the FSP has not submitted any evidence in support of its opinion.
15. The FSP has stated that any person would have noticed nail heads staining the
floorboards. The Applicant submits that he is not a building expert or
experienced in building matters so as to have noted that nail head changes
were indicative of problems with the floor at the time of purchase.
16. The FSP’s builder TD incorrectly inferred that flooring replacement had
occurred before and after the Applicant had purchased the property. Any
flooring replacement had taken place after the water presence in the sub-floor
area. The floor damage occurred during 2011 and not prior to 1995. Therefore,
contrary to what TD opined, no-one or someone, had made a connection
between the sub-floor water and the floor damage. (sic)
17. The FSP contends that the Applicant was aware of the defect in the floor or that
a reasonable person in the circumstances would have been aware. The
Applicant submits that this statement is untrue and offensive.
18. The FSP’s building consultant also stated:
Case No: 284240 Determination Page 3 of 9
the Applicant had clearly replaced sections of the floorboards that were
damaged by water to the east end of The Pavilion since the purchase of
the property and he must have realised the build-up of water could only
be a result of construction and drainage defects;
the Applicant had upgraded the external drainage system in The Pavilion
by opening the downpipe bases into the stormwater system which
clearly shows the Applicant was aware of the drainage defect issue;
therefore, the Applicant was aware of the pre-existing defects at the time
of entering into the current insurance policy and therefore section 46 of
the Insurance Contracts Act 1984 (the Act) will not prevent the FSP from
denying the claim.
19. The Applicant strenuously denies the building consultant’s allegations a nd
contends they are untrue and offensive.
Summary of FSP’s Position
20. The FSP contends that the Applicant’s policy covers accidental loss or damage
caused by external and visible means. However, it also contends that if the loss
or damage has been caused by defective design, workmanship or defective
materials, the FSP is not liable.
21. The FSP engaged building consultants ‘TD’ to determine the cause of the
damage to the flooring. TD found that the damage has been caused by a
combination of design and construction errors on-going since the construction
of the building.
22. In its report dated 13 September 2011, TD stated that the likely cause of the
building problems were:
The Pavilion building is a large solid brick public hall type of building and
is approximately 60 years old and has been constructed on a slightly
sloping site which slopes from the north-west corner then diagonally
across the building to the south-east;
the building has little or no surface drainage around the perimeter to
direct water away from the building;
the open earth drains against the building to the north and east walls are
lower than the surrounding ground and any surface runoff collects
against the building and either soaks into the adjacent ground, into the
subfloor area or evaporates away;
the concrete spoon drain to the western side allows surface drainage to
run through the vents directly into the wall spaces and under the
building;
Case No: 284240 Determination Page 4 of 9
the method of floor construction has severely restricted ‘cross flow’
ventilation in the subfloor area preventing the evapotranspiration (sic) of
the moisture from the enclosed foundation material;
the silty foundation material allows surface water to soak through same,
down to the clay layer at approximately 600mm deep, then slowly move
laterally away, downhill, as part of normal gravity effect of the
groundwater. The footing system, bearing on this clay layer impedes the
flow of the groundwater causing damping in various areas.
the subfloor ventilation has always been severely restricted, mainly by
the internal cross walls at the edge of the main hall along the north and
south sides and the nib wall construction;
the ventilation is severely restricted by internal walls and poor vent
placement;
the ground level below the building is lower than the corresponding
ground levels around the external lawns/gardens with
runoff/groundwater finding the lowest point – being under the floor;
extremely wet weather conditions following a long period of drought
causing a rise in the level of the water table.
23. In his report dated 3 October 2011, the FSP’s loss adjuster, after having viewed
the building consultant’s report, stated:
‘It appears that the resultant damage to the timber has primarily resulted due to the
foregoing construction and drainage defects, which have pre-existed the leaking
water pipe.
There are no indications that the recently detected leaking pipe has had any
significant contribution to this damage’.
24. The FSP submits that the Applicant has not provided any evidence to the
contrary. The FSP is of the opinion that the design and construction errors are
the proximate cause of the loss and not the leaking pipe.
25. The FSP has considered whether section 46 of the Insurance Contracts Act
1984 (the Act) would assist the Applicant in this instance.
Section 46 Insurance Contracts Act 1984
26. Section 46 of the Insurance Contracts Act 1984 provides that if a claim is made
in respect of a loss that occurred in whole or in part as a result of a defect or
imperfection in a thing and the insured was not aware of the defec t or a
reasonable person in the circumstances could not be expected to have been
aware of the defect or imperfection the insurer may not rely on an exclusion
clause that refers to the condition of the thing before the contract was entered
into.
Case No: 284240 Determination Page 5 of 9
27. The Applicant has stated that he was completely unaware of the construction
and draining defects in The Pavilion. Furthermore, the Applicant has stated that
he was completely unaware of the connection between the distorted
floorboards and the construction and draining defects in the building.
28. However, in building consultant TD’s report dated 21 December 2011, it is
stated:
‘It is my opinion, that the various patches of flooring replacement to the east end of
the hall date over the last 20 to 25 years with some being obvious at the time of
purchase and most likely some carried out during the current ownership. Therefore,
someone has made the connection between subfloor water and floor damage.’
29. The FSP contends that despite the Applicant’s statements that he was
completely unaware of the construction and draining defects in The Pavilion,
the FSP holds the view that in fact he was aware of the defects or that a
reasonable person in the circumstances would have been aware.
30. In view of the building consultant’s report, the FS P believes the Applicant was
aware of the pre-existing defects at the time of entering into the current
insurance policy and therefore, section 46 of the Act will not prevent the FSP
from denying the claim.
31. The FSP relies on the following policy/contract provisions:
‘WHAT’S NOT COVERED
...
4. Loss or Damage to Your property which is caused by:
a) wear and tear or gradual deterioration
...
c) defective design, workmanship or defective materials
d) rot, mildew, rust, corrosion, insects, woodworm, termites, vermin
...
f) settlement, shrinkage, expansion, warping or condensation
Issues
32. Whether the Applicant’s property suffered damage which falls within the cover
provided by the policy of insurance.
33. Whether the FSP is entitled to rely on any policy exclusions to deny liability.
Reasons for Decision
34. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the FOS
Terms of Reference. Thus, this dispute has not been subject of a FOS
Case No: 284240 Determination Page 6 of 9
Recommendation and has proceeded directly to Determination. The parties
have been previously advised that a Determination will be issued in this case.
35. The onus of proof is on the Applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against. Once
the Applicant has established that the loss was prima facie caused by a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
36. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material other tha n when
relevant.
37. The flooring in a building known as The Pavilion suffered damage as a result of
water escaping into the subfloor of the building. Therefore, due to the policy of
insurance covering accidental loss or damage the Applicant, prima facie, has a
claim that falls within the cover provided by the policy.
38. Therefore, the onus shifts to the FSP to establish that, on the balance of
probabilities, the damage was caused by an exclusion from the cover provided
by the policy.
39. The building subject to this claim dispute was built in approximately 1968 and
the Applicant purchased the property in 1995.
40. In late 2010 and early 2011, the Applicant noticed that his water bills indicated
there had been a substantial increase in water consumption. The Applicant
engaged a plumber to investigate the cause of the increased consumption and
in July 2011, he discovered the main supply water pipe was leaking.
41. After the leaking pipe had been repaired water consumption dropped back to
normal usage levels.
42. The Applicant contends that in early 2011, the floor of the building began to lift,
cup and distort at the front of the building. He contends that the cause of the
damage was water leaking from the damaged pipe, escaping into the subfloor
of the building.
43. The FSP engaged a building consultant, TD, to inspect the damaged flooring,
advice on the extent of the damage and provide an opinion as to whether the
damage was associated with the leaking water pipe discovered in close
proximity to the building.
44. TD reported that, in its opinion, the damage to the flooring had been occurring
over a long period of time and was the res ult of surface water and groundwater
finding its way under the building, the poor drainage and ventilation in the
subfloor creating ideal moist/wet conditions for fungal decay and high moisture
content, causing the timber flooring to both decay and/or swell.
Case No: 284240 Determination Page 7 of 9
45. TD also stated that the failure of the water pipe was located approximately 14
metres south west of the south west corner of the building and approximately
300mm lower than the surface levels of the corner of the damaged building.
46. TD was also of the opinion that although the leaking water pipe would have
added to the saturation of the ground, the damage under the building was due
to a combination of problems detailed in its report.
47. The FSP denied liability on the grounds the damage to the flooring was caused
by defective design, workmanship or defective materials, which are events
excluded from the cover provided by the policy.
Is the Applicant entitled to be indemnified for the damage to the flooring?
48. In a letter dated 18 April 2012, the Applicant stated:
Some floor boards had been replaced prior to him purchasing the
property.
He did not have any problems with water prior to early 2011.
Other than general maintenance to clean drains etc. the drainage
system to the Pavilion has not been upgraded.
The building was constructed in approximately 1968 and there were no
signs of deterioration in the floor until July 2011, despite weather
variability over 50 years.
There were no signs of floor defects caused by design and construction
errors since construction in about 1968.
There is no evidence of defects in design, workmanship or defective
materials from the time of construction.
The Applicant was completely unaware of any construction or drainage
defects at the time of purchase (if indeed there were any present in
1995).
The Applicant is not a building expert or experienced in building matters
so as to have noted nail head changes as indicative of problems with the
floor at the time of purchase.
The leaking water pipes were repaired by the plumber after floor boards
were lifted and collected water was discovered in the sub-floor.
The FSP’s builder TD is incorrect when he offers the opinion that
patches of flooring replacement to the east end of the hall date over the
last 20 to 25 years. The Applicant submits that the flooring replacement
took place generally since the water presence and flooring damage was
noted in 2011 and not prior to purchase.
Case No: 284240 Determination Page 8 of 9
No-one had made a connection between sub-floor water and floor
damage.
49. In its first report dated 17 August 2011, the loss adjuster stated:
‘At this stage following our inspection of the damaged floor and it’s (sic) location in
proximity of the defective water pipe, we consider that the damage, which appears
fresh and of recent occurrence, may well in fact be associated with the described
accumulation of water beneath the sub-floor of the building caused by discharge from
the subject water pipe.’
50. This statement was made subject to further verification.
51. In the loss adjuster’s second report dated 3 October 2011, he referred to
builder TD’s repo rt and reversed his opinion that the leaking water pipe
contributed to the damage to the building’s floor.
52. The loss adjuster noted that:
‘It appears that the resultant damage to the timber has primarily resulted due to the
foregoing construction and drainage defects, which have pre-existed the leaking
water pipe.’
53. Builder TD reported that the sub-floor ground surface is up to 200mm lower
than the adjacent external ground surface, that is, the sub-floor area is a sump.
54. The FSP is denying the Applicant’s cla im on the following bases:
The damage is not linked to the leaking pipe
The damage to the floor is cellar (wet) rot
The cause is poor original design and/or construction and poor sub-floor
ventilation.
55. The Applicant submits that when he purchased the property in 1995 he was not
aware of, and there was no evidence of, defective design, workmanship or
defective materials in the construction of the building.
56. Therefore, I must consider whether or not section 46 of the Insurance Contracts
Act 1984 (the Act), provides any relief to the Applicant.
57. Section 46 of the Act provides that if a claim is made in respect of a loss that
occurred in whole or in part as a result of a defect or imperfection in a thing and
the insured was not aware of the defect or a reasonable person in the
circumstances could not be expected to have been aware of the defect or
imperfection the insurer may not rely on an exclusion clause that refers to the
condition of the thing before the contract was entered into.
58. For section 46 to have application, the FSP is required to rely on a provision in
the contract that has the effect of limiting or excluding the insurer’s liability
Case No: 284240 Determination Page 9 of 9
under the contract by reference to the condition, at a time before the contract
was entered into, of the thing.
59. In this case, the FSP is not relying on any such provision. It is simply stating the
loss is not covered due to the exclusion defective design, workmanship or
defective materials.
60. In these circumstances, I note section 46 of the Act has no application to the
circumstances of this dispute as the exclusion does not refer to the condition of
the thing before the contract was entered into. Nelson v The Hollard Insurance
Company Pty Ltd [2010] NSWSC 199.
61. In other words, section 46 of the Act does not provide any relief to the
Applicant.
62. Based upon the opinions of TD and the evidence submitted by the FSP, I find
that, on the balance of probabilities, the damage to the Applicant’s property was
caused by defective design, workmanship or defective materials in respect to
poor drainage, poor original design/construction and poor sub-floor ventilation.
Determination
63. Accordingly, I determine that the FSP is entitled to rely upon the policy
exclusion in respect to loss or damage caused by defective design,
workmanship or defective materials, to deny liability for the Applicant’s claim.