Denial of flood damage claim under river flood exclusion
Summary
The applicant's home contents were damaged by water during the January 2011 Ipswich and Bremer River flooding and the FSP declined the claim as river flood, an excluded event. AFCA found the policy clearly informed him of the exclusion and that the inundation was floodwater from the Bremer River, so the FSP was entitled to deny the claim.
The PDS wording on river flood and the hydrology evidence showing backwater flooding after rainfall ceased established that the loss fell within the exclusion, and s 35 of the Insurance Contracts Act was satisfied.
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 284183 Determination Page 1 of 9
Case number: 284183
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim-Exclusion/ condition – Flood – Ss 13 and 35 Insurance
Contracts Act 1984
16 January 2013
Background
1. The Applicant held a Home Contents Insurance Policy (the policy) with the
Financial Services Provider (FSP).
2. The insured property in North Booval, Queensland suffered water damage
arising from the significant weather events experienced in the area during
January 2011.
3. The FSP having concluded its assessment of the loss declined the claim on
the basis the damage was due to the event „River flood‟, which is specifically
excluded from cover under the policy.
4. The Applicant remains dissatisfied with the FSP‟s decision to decline th e
claim and is seeking complete indemnity under the policy.
Summary of Applicant‟s position
5. In disputing the FSP‟s declinature of his claim the Applicant has sought the
assistance of legal representatives “L”. In the interest of easy understanding
and brevity, both the Applicant and L will be referred to as “the Applicant” for
the purpose of this determination.
6. The issues raised by the Applicant in his submission to the Service are:
The FSP‟s failure to discharge its obligations under Section 35 of the
Insurance Contracts Act 1984 (the Act);
The FSP did not adequately investigate the claim and is relying on a
generic hydrology report;
The Applicant‟s home was affected by multiple events, namely
stormwater and rain, before any river flooding occurred.
The Applicant maintains that he relied on the FSP‟s expertise to en sure
that he had adequate cover and by providing him with a product that
Determination
Case No: 284183 Determination Page 2 of 9
was totally unsuitable for his needs, noting the area where the insured
contents were to be based, the FSP has breached its duty of utmost
good faith.
The Applicant believes the policy is confusing with respect to the
definitions for river flood, storm and rain. In addition, the definition for
flash flood is so restrictive that no real benefit is offered. As a result, the
FSP has not fulfilled its obligations under the Act to clearly inform him
of the exclusion of flood from cover and should not be able to rely on
this exclusion.
He says that there is evidence that a storm occurred on the morning of
Tuesday 11 January 2011, which caused flash flooding in the local
area.
The Applicant evacuated his home between 10.00pm-10.30pm on 11
January 2011 after being warned to evacuate by the police at around
9.30pm that night. At the time he evacuated his home, water was yet to
affect the lip of the culvert behind his property.
The catchment area behind the property accommodates one
stormwater drain and two street run-off diversions. There were three
torrential storms that day (11 January) and the catchment had difficulty
handling the amount of stormwater run-off from the three sources
mentioned above.
The Applicant believes water that normally runs to Bundamba Creek
was unable to do so because the creek level was rising due to the
storms and its catchment.
The Applicant rejects the hydrology evidence relied upon by the FSP as
being accurate, on the basis it includes a disclaimer.
He maintains that in the alternative, the claim should be paid under the
insured ev ent of „Water and Other liquid‟ and notes that the exclusions
which apply to this insured event do not include „river flood‟.
Summary of FSP‟s position
7. The FSP rejec ts that Applicant‟s allegation that it breached its duty of utmost
good faith, saying that its duty does not extend to assessing whether the
Applicant lived in a flood prone area, or providing personal financial product
advice on the suitability of a particular policy to the risks faced by the
Applicant.
8. It maintains the policy wording is clear and unambiguous regarding the
exclusion of river flood and that it clearly informed the Applicant of the
exclusion of river flood from cover through the provision of a Product
Disclosure Statement (PDS). The onus rests with the Applicant to read the
relevant policy documentation and ensure that the cover available under the
policy was suitable to his requirements.
Case No: 284183 Determination Page 3 of 9
9. The FSP notes it is not in dispute that the Applicant received the relevant
policy documentation including the PDS in January 2009. Therefore he had
a period of two years prior to the loss in which to read the provisions and
determine whether it met his needs.
10. Further, the transcripts of the telephone conversations between the parties in
November 2010 and December 2010 clearly show that the Applicant was
informed that the change of address did not change the policy in any way i.e.
the PDS provided in 2009 remained in effect.
11. The hydrological evidence available shows that the inundation of the
Applicant‟s home was caused by the rising of the Bremer River water levels
backing up Bundamba Creek and subsequently inundating the insured
home. So, this clearly falls within the policy exclusion for river flood and the
FSP was entitled to deny liability for the damage resulting from this
inundation.
12. The FSP relies on the following policy provisions:
“ FSP relies on the following policy provisions:
“Page 5 What you are not covered for
There are certain times when this insurance may not provide cover.
Some events we may not cover include:
Damage caused by seas or river flood (see Section 1.12).
…
Page 16- 20 Definitions‟
“flash flood” means what occurs when there are heavy, intense bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your home.
But does not include when rainwater on the site:
Cannot runoff into a water catchment system, because it is overflowing
in flood, and
Mixes with flood water coming from the water catchment system and
then flows into your home.
…
“river flood” means when water that is normally conta ined in a water
catchment system increases because of rainfall or snow melt (whether in the
immediate region or elsewhere) or is deliberately released by an authority,
and the water overflows onto land that is not normally covered by water into
your home.
…
Page 29-30 Storm, Rain or Flash Flood
…
We will not pay for damage caused by:
Case No: 284183 Determination Page 4 of 9
…
river flood ”
Issues
13. Whether damage to the Applicant‟s property was caused by floodwater as
excluded under the policy.
14. Whether the FSP was entitled to decline indemnity to the Applicant in line
with the policy.
Relevant Law
Section 13 of the Insurance Contracts Act 1984 provides that a contract of
insurance is a contract based on the utmost good faith, and there is implied in each
contract, a provision requiring each party to act towards the other party, in respect
of any matter arising under or in relation to it, with the utmost good faith.
Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation to the
contract, an insurer may not refuse to pay an amount equal to the minimum amount
of cover set out in the regulations made pursuant to the Act unless it can prove that
before the contract was entered into, the insurer clearly informed the insured in
writing of the relevant provisions of the contract, or that the insured knew or a
reasonable person in the circumstances could be expected to have known of such
provision.
Reasons for decision
15. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
16. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
17. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
18. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
Case No: 284183 Determination Page 5 of 9
19. The Panel notes that the parties do not dispute the following:
The Applicant held an active home contents insurance policy with the
FSP at the time of loss.
The FSP provided and the Applicant received the relevant policy
documentation i.e. PDS and Certificates of Insurance (COI).
The Applicant evacuated the property at around 10.00pm on 11
January 2011 at which stage the property had not been inundated with
water.
The property is situated in close proximity to Bundamba Creek and the
Bremer River.
The insured property was inundated by water that came from the rear
above habitable floor level up to a peak level of approximately 2m.
20. The Panel has considered the Applicant‟s submissions to the Service and
notes that a number of concerns raised are identical to issues previously
determined by the Service. Accordingly, in the interest of brevity and having
previously considered these concerns the Panel will only briefly reiterate its
position in respect to these matters. The issues referred to are:
Clearly Inform
Provision of the PDS
It is not in dispute the FSP provided and the Applicant received the
relevant policy documentation/terms prior to the loss. Accordingly the
Panel is satisfied the FSP has fulfilled its obligations under Section 35 of
the Act in this regard.
Clear and unambiguous provisions
The Applicant has raised concerns in relation to the wording of the policy
and maintains that the relevant wording and definitions would not be
considered sufficient to inform a consumer of the policy limitations.
The Panel has considered the wording of the policy in respect to the terms
„flash flood, river flood‟ and the insured events of “ Water Or Other Liquid ”
and “ Storm, Rain Or Flash Flood ”. The Panel is satisfied that the wording
of the policy is both clear and unambiguous in its meaning and
application.
Further, in respect to the Applicant acknowledging having read the
relevant policy terms and not understanding the mea ning, the policy was
purchased around two years prior to the date of loss. The relevant terms
of the policy (the exclusion of flood cover) remained constant over this
time allowing a more than reasonable period of time for the Applicant to
read and understand the scope and limitations of the policy.
The Panel acknowledges the Applicant‟s reference to only receiving the
updated policy documentation four days prior to the date of loss and
therefore only for four days of the allowed 21 days cooling off period.
However, as noted above, the Panel notes the policy was actually
Case No: 284183 Determination Page 6 of 9
incepted a few years prior to the date of loss, with the updated policy
documentation only reflecting the change of address and not a n alteration
to the policy provisions which remained the same over the relevant period.
Section 13 “Utmost Good Faith”
The Panel has also considered the Applicant‟s position in respect to the
FSP‟s alleged breach of its responsibility of acting with the u tmost good
faith in respect to its failure to draw his attention to the policy limitations
especially during telephone conversations held between the parties in
November 2010 and December 2010. Further, that by failing to bring the
inadequacy of the cover available under the policy to the Applicant‟s
attention the FSP has failed to fulfil its obligations under Section 13 of the
Act.
Whilst the Panel can understand the Applicant‟s concern with respect to
this, it is well established law that the onus is on the Applicant to identify
the cover that he seeks and to identify to an FSP the type of cover
requested. In these circumstances, the Panel is satisfied there has been
no breach of the duty of utmost good faith on the part of the FSP.
Proximate Cause for the loss
21. The Panel has been provided with multiple hydrology reports, including a site
specific report commissioned by the FSP. The FSP has also referred to the
relevant Insurance Council of Australia (ICA) hydrology reports. As there has
been an exchange of material between the parties and both have had the
opportunity to comment, information from the various reports relied on will
only be reiterated, where considered relevant.
ICA hydrologist report “Volume 3 Flooding in Ipswich City LGA”
There were four distinct rainfall periods across Ipswich City LGA during
the period from 9 January to 13 January 2011 (p1) . These occurred at:
around 1000 hours and 1200 hours on 9 January
around 1500 hours to 2100 hours on 9 January
around 0700 to 1100 hours on 10 January
around 0600 hours to 1500 hours on 11 January.
Over the 5 days from 9-13 January, moderate to heavy rain fell over
Ipswich City LGA (7.2.2).
Rainfall in the 24 hours to 0900 on 9 January was not significant (less
than 25mm).
Over the next 24 hours to 0900 on 10 January was moderate (40 -80mm).
Rainfall in the 24 hours to 0900 on 11 January was significant (25-
200mm). Rainfall was heaviest in the north-western area of the LGA
around Tallegalla.
Case No: 284183 Determination Page 7 of 9
Large releases were made from Wivenhoe Dam over the period from
0600 hours and possibly as early as 0300 hours on 11 January until
around 0300 hours on 12 January. (9.3)
It was concluded that the dam release flood was the immediate cause of
flooding along the reaches of the Brisbane River downstream of the dam,
and along tributaries through the Ipswich City LGA. (9.3)
At about 0900 hours on 11 January water levels at One Mile Bridge Alert
and Ipswich Alert began to rise rapidly due to Brisbane River water
flowing back up along the Bremer River. The peak water level at these
stations occurred on 12 January and was caused by backwater from the
Brisbane River and Bremer River flood attempting to flow downstream.
„M‟s‟ Site Report dated 7 February 2011
A site inspection was undertaken by an assessor appointed by the FSP
on 4 February 2011.
The Applicant was not present at the time of inundation and had
evacuated the property at around 10.00pm on 11 January.
The water rose quickly and came from the culvert and Bundamba Creek.
The property is located one kilometre from the creek.
The inundation peaked at around 2m within the insured property which is
built on a slab with an approximate 150mm difference between
surrounding ground levels and floor level.
M recommended the appointment of a hydrologist to the claim.
W‟s S ite Specific Inundation Assessment (Hydrology) dated 31 May 2012
An inspection was undertaken at the insured property by consultant „T‟ on
27 April 2012.
It was noted to be a one storey dwelling on a concrete slab approximately
150mm above ground level.
The recorded rainfall data at the Bundamba Creek (Hanlon Street) Alert
rainfall station located approximately 800m north east of the property
shows a total of 123mm of rain fell between 0000hrs on 9 January to
1800hrs on 11 January in the vicinity of the insured property.
No significant rainfall was recorded after about 2.00pm on 11 January.
Peak hourly rainfall intensity of 16.3mm/hr was recorded in the hour to
2.00pm on 11 January. For durations up to 24 hours the recorded rainfalls
had an ARI of less than one year which means higher intensity rainfalls
are experienced in the area on a regular basis.
The property is located 260m from the Bundamba Creek and 1.3km
upstream of the Bremer River. The catchment area draining to the subject
property is minimal.
The estimated ground levels at the property were between 16.6m AHD to
17.7m AHD, with peak flood levels of Bundamba Creek reaching 19.39m
Case No: 284183 Determination Page 8 of 9
GH corresponding with the estimated inundation level at the property i.e.
up to 2m.
The urban drainage in the area is well defined and includes underground
pipe networks and street drains to direct stormwater run-off away from the
properties in the area.
T concluded that flooding of the subject property was caused by overland
flow from the Bremer River floodwater which backed up Bundamba Creek,
both initial and subsequent peak levels of inundation were caused by
floodwaters.
22. The Panel as noted above has considered the Applicant‟s contention in
respect to the cause of the inundation of the property. The timing of the
inundation is crucial to the consideration of whether the loss was due to flash
flood or alternatively due to river flood inundation.
23. The Panel has considered similar matters and is satisfied that the
inundation from surface run-off rainwater (flash flood) is generally associated
with intense rainfalls of short duration and within a short time period after the
occurrence of the intense rainfall occurring.
24. The Panel notes that the Applicant was not present at the property at the
time of inundation and had evacuated the property at or after around
10.00pm on 11 January 2011. The available expert consultants‟ evidence
put the initial inundation of the insured dwelling above floor level at around
4.00am on 12 January 2011.
25. The Panel is satisfied that there was no rainfall of significance in the area
after around 3.00pm on 11 January. Any inundation in the area, on the
balance of probabilities, which occurred after a significant period of time, in
this case over 12 hours after the rainfall in the area ceased, would have
been due to backwater flooding from the Bremer River.
26. Also of note was that there were four significant rainfall events in the area
between 9 January 2011 and 11 January 2011; it is also reasonable to
conclude that had surface run-off rainwater entered the home, it would have
done so contemporaneously to those distinct rainfall periods experienced
over the previous days. There is no evidence this occurred.
27. The Panel notes that the information available in the relevant ICA Hydrology
report supports the findings and position taken by W in its report submitted to
the FSP in respect to the weather conditions and circumstances leading up
to the flooding of the area in question during January 2011.
28. On the basis of the available information, having dealt with similar matters in
the North Booval area and in the absence of any evidence to the contrary,
the Panel is satisfied that, on the balance of probabilities, the water which
inundated the Applicant‟s home was floodwater from the Bremer River
having back- flowed up Bundamba Creek which is in close proximity to the
insured property.
Case No: 284183 Determination Page 9 of 9
29. The policy does not cover loss or damage caused by river flood. It follows
that the Applicant‟s claim does not succeed on the basis of the Applicant‟s
contention that the damage was the result of stormwater. For the sake of
completeness the Panel also determines this removes any potential cover
under the policy defined event of „Water and Other Liquid‟.
30. The Panel notes that the Applicant‟s policy of insurance also covers
accidental loss or damage to insured property. However, accidental damage
cover is subject to the policy limitation whereby it excludes from cover under
this additional benefit, loss or damage which has been excluded under
sections 1, 2, 3, 6, 7, 8 of the policy.
31. The Panel has considered the relevant provisions and notes that section 1 of
the policy relates to the „Insured Events‟ section and it has been previously
established, loss or damage arising from river flood is excluded under the
insured event „Storm, rain or Flash Flood‟. This establishes that the damage
subject to the claim is excluded under section 1 of the policy and therefore is
also excluded from cover under the accidental damage benefit.
32. Accordingly, as indemnity available under the accidental damage cover is
also subject to the above noted river flood exclusion, this additional cover
selected by the Applicant does not come to his assistance on this occasion.
Determination
33. On the basis of the available information and the above reasons, the Panel
determines that:
the Applicant was clearly informed of the policy exclusion of river
flood;
the damage to the Applicant‟s property was caused by floodwater;
the FSP is entitled to deny the Applicant‟s claim.