Denial of swimming pool damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-10-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant claimed that a February 2011 storm lifted her partially installed swimming pool. AFCA found the damage was not caused by an insured event and upheld the FSP's denial.

The insured must prove on the balance of probabilities that the loss resulted from an insured event, and the engineer's evidence showed the damage stemmed from incomplete installation.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 284137 Determination Page 1 of 3 DETERMINATION INCORPORATING A RECOMMENDATION Case number: 284137 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 09 October 2013 Background 1. This dispute arises from a claim under the Applicant’s Home Building Insurance Policy with the FSP, for damage sustained to her swimming pool in or about February 2011 when the pool, following a heavy downpour, started to lift. 2. The Applicant lodged the claim on 21 September 2011. Following an assessment of the claim by the FSP, the FSP denied the claim on the grounds that the damage did not arise from an insured event as required under the terms of the policy and that th e Applicant’s claim does not fall within the terms and conditions of the policy. Conclusions in Recommendation 3. The Case Manager provided the parties with a Recommendation on the issues in dispute. The Case Manger determined the Dispute in favour of the FSP finding that the evidence as presented did not establish an insured event in accordance with the terms of the policy and recommending that the FSP is not obliged to indemnify the Applicant for the damage sustained. 4. A copy of the Recommendation is attached to this Determination. Further submissions 5. After the Recommendation was rejected by the Applicant the Applicant provided a Statutory Declaration from a friend and a certificate from “RR” dated 27 May 2013 with respect to the condition of the pool. 6. According to the Statutory Declaration from “JD”, JD was visiting the Applicant on 4 February 2011 when it started to thunder and rain. Within approximately 15 minutes the downpipes to the house could not cope and the area started filling with water. By the time the rain eased, the veranda and backyard were flooded. There was also flo oding to the Applicant’s Determination Case No: 284137 Determination Page 2 of 3 garage and damage to carpet in a bedroom and a leaky down light in the laundry. 7. RR certified that at the time of the final inspection approval carried out on 9 February 2009 for the installation of the swimming pool, the pool was installed in accordance with the approved documentation and appeared level at the time of inspection. 8. The FSP submits in relation to the additional information provided by the Applicant that: a) The Statutory Declaration does not confirm the cause of damage to the pool, in fact there is no mention of pool. b) The report from RR does not offer a cause of damage to the pool and simply confirms that the pool was level at the time of inspection, some two years prior to the claim being lodged. Ombudsman’s consideratio n 9. I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. 10. I have carefully considered the Case Manager ’s Recommendation, together with the pa rties’ further submissions. 11. I am satisfied that the Case M anager’s Recommendation contains an accurate summary of the background to this dispute, the parties’ positions, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 12. Although it is unclear exactly when the Applicant ’ s property was impacted by a storm, be it November 2010 or February 2011, photographs attached to the report from “ JM ” and date stamped 31 October 2011, suggests that the Applicant ’s pool had never been completely installed. The photographs identify quite wide gaps at the side of the pool that would need to be filled. 13. The Applicant does not dispute this. According to the report from UBS, the Applicant advised that since the completion of the house, whilst a pool company had completed the pool installation including installation of the pipe work to the roof mounted solar heater, they had not been able to complete the installation due to a combination of the pool contractor being too busy and the Applicant not having the required funds. 14. In September 2011 the pool contractor attended and found that the Applicant’s pool had moved out of level. He emptied the pool , evacuated Case No: 284137 Determination Page 3 of 3 around the pool shell and found the ground under the pool was saturated causing the pool to lift further out of level. 15. The additional evidence presented by the Applicant does not, in my view, go to the actual issue of whether the pool had shifted due to an insured event. The correspondence from RR simply confirms that the pool was level following completion of installation in May 2009. That is not in dispute in the current matter. 16. The Statutory Declaration from the Applicant’s friend simply confirms that there was torrential rain in February 2011. Whilst there is some question as to when the main event occurred, I accept for the purpose of this Determination that the rain event did occur in February 2011. That however is not the issue in dispute. 17. The onus is on the Applicant to establish on the balance of probability that the damage was sustained as the result of an insured event. Although the Applicant has claimed the heavy rainfall was the cause of damage (which would be consistent with an insured event of flash flooding or sto rm), there is evidence the cause of the damage was as a result of the pool having only been partially installed and remaining that way for a period of four years. 18. Whilst “CP” has reported that flooding around the pool has caused the levels to change, that is not in my view, sufficient to establish the damage was due to an insured event. 19. I find the report of JM persuasive. He has identified the fact that the pool was partially installed, he has explained the need for the pools to be carefully installed. He has clearly explained his conclusion that the damage was due to having left the pool partially installed. 20. I have considered the further information. Although RR confirms the pool was level, it does not say the pool had been fully installed. It does not change my view that the Case M anager’s Recommendation was correc t. Determination 21. Accordingly I determine that FSP is not liable to meet the Applicant’s claim in accordance with the terms of the policy. Case No: 284137 Recommendation Page 1 of 6 Case number: 284137 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 27 March 2013 Background 1. The Applicant holds a Home Building insurance policy with the Financial Services Provider (FSP) for a sum insured of $424,000 and an excess of $300. 2. On 21 September 2011 the Applicant lodged a claim in relation to her swimming pool, stating that a heavy downpour in late February 2011 had resulted in water getting under the pool and had caused it to lift. 3. The FSP denied the claim on the grounds the damage to the swimming pool did not result from a storm, an insured event, but occurred because the pool installation process was incomplete. Summary of Applicant’s p osition 4. Her claim relates to her swimming pool which was damaged due to excessive rainfall getting underneath the pool and causing it to lift. There was very heavy rainfall in February 2011 which resulted in flooding to her backyard. The damage is therefore due to an insured event. 5. The Applicant arranged for a company to properly install the pool. This company carried out the task and a certificate of final inspection was obtained. Summary of FSP’ s position 6. The FSP was not convinced there had been a storm around the time of loss, which was said to have occurred in February 2012. The FSP also said there had been a suggestion the pool was damaged in November 2010. 7. The FSP also contends the pool had not been completely installed and therefore, since it was still in its incomplete state, damage to the pool was likely to have occurred over the past four years. Recommendation Case No: 284137 Determination Page 2 of 6 8. The FSP has referred to policy exclusions such as wear, tear and lack of maintenance, gradual loss or damage and hydrostatic pressure. 9. The swimming pool had been incomplete for the past four years and the Applicant was aware of this which she acknowledged during the telephone call to the FSP when lodging the claim. Since the swimming pool was incomplete, any damage to it did not fall within the policy cover. 10. The reports obtained by the FSP support its decision to deny the claim. 11. The FSP relies on the following policy provisions: “ General exclusions – apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability caused by: … Wear and tear and lack of maintenance …; Gradual loss or damage of any kind; … Hydrostatic pressure; …” Issues 12. Whether the Applicant is entitled to indemnity under the policy for damage to her swimming pool. Reasons for Recommendation 13. I am satisfied there has been a full exchange of information between the parties and that each party has had the opportunity to respond to the other’s submissions. Background to claim 14. The Applicant lodged a claim under her policy on 21 September 2011 stating that water had gotten under her in-ground swimming pool and had caused it to lift, thereby resulting in damage to the pool. She indicated the likely date when this occurred was around 26 February 2011. 15. The Applicant obtained quotes from two separate companies for the repair works needed for her swimming pool. These quotes were $7,14 0 from “CP” and $9,800 from “OP”. Case No: 284137 Determination Page 3 of 6 FSP obtains report from “UBS” 16. The FSP asked UBS to make an assessment of the damage to the swimming pool. UBS attended the Applicant’s property on 19 October 2011 and compiled a report which included an outline of a discussion the assessor had with the Applicant. 17. The assessor said CP installed the fibreglass pool in the ground in 2007 and filled it with water before the Applicant’s house was built on that property. The house was completed in 2008 and the Applicant contacted CP to arrange completion of the pool installation including installation of pipe-work to the roof mounted solar heater. 18. During the following three years there were difficulties experienced in finalising the installation of the pool, including CP not being available as they were too busy and the Applicant not having the necessary funds when CP was available to carry out the work. UBS stated the installation of the pool was never completed. 19. I note that “WBS” provided a certificate of final inspection dated 11 February 2009 with respect to the installation of the fibreglass swimming pool. However, I further note the certificate contains a qualifier which states the certificate “is not evidence that the building or building work concerned complies with the Bui lding Act or the Building Regulations”. 20. UBS indicated CP attended the property in September 2011 and found that the pool had moved out of level. CP emptied the pool and excavated around the pool shell and found the ground under the pool was saturated, causing the pool to lift further out of level. 21. The report stated: “The underlying cause of the damage appears to have been a combination of the extended time between the pool installed into the ground, a lack of appropriate drainage and faulty workmanship, however the damage may have been contributed to by the storm.” 22. The report stated that it would be prudent to appoint an engineer to determine the cause of the damage and the extent of the liability, since the February 2011 storm may have contributed to the damage. Engineer’s report 23. An engineer (“JM”) inspected the property on 31 October 2011 in the presence of the Applicant’s former husband (“TZ”) who had indicated to JM the pool partially floated under heavy rain conditions in November 2010. TZ had also indicated the pool shell had never been fully installed due to limited funds. TZ advised JM the pool was partially installed and had remained in that condition since 2007. Case No: 284137 Determination Page 4 of 6 24. JM stated the pool is thin shelled and therefore required a careful installation to ensure a balance between the water pressure forces acting on the walls and floor of the pool on one side and carefully installed backfill on the other. JM also stated: “Impervious paving around the pool and associated surface drainage to protect the pool excavation from excessive rainwater entry should be an integral part of this process but was never carried out in this case.” 25. JM also indicated that agricultural drainage pipes around the base of the excavation were necessary. This would deal with any excessive water and prevent a build up. JM stated that no such drains were installed. 26. JM stated these types of pools should be installed in one process. It should not have occurred over time as had happened in this case. JM explained the process which should have been deployed by the installer. JM said: “…Unfortunately, in this case, no surface drainage was installed and consequently the pool excavation has been continually subjected to surface rainwater seeping down beside the pool potentially destabilising not only the cement stabilised backfill around the periphery of the pool shell but also potentially flooding the excavation with a propensity to cause the pool shell to be unstable even if full of water. It should be noted that the pool shell has been in this condition for approximately four years and during that time has always had a propensity to be damaged by instability.” 27. JM stated that it would have been more prudent to have left the excavation open and the pool shell left unconnected to any pipe work until such time as the Applicant had sufficient funds for complete installation. JM stated: “…Had proper surface drainage by means of correctly graded paving been installed around the periphery of the pool, this failure would not have occurred.” 28. JM also added: “It follows from the above that an excessive rain event has not been the issue with respect to the damage to the pool plumbing and the damage associated with the pool shell floating. It has been left in a partially installed situation for approx. four y ears and many storms and heavy rain events during that time.” (sic) CP’s report 29. The Applicant obtained a report dated 15 February 2013 from CP. This report was exchanged with the FSP which did not provide comment. 30. CP indicated that when he attended the property on 13 September 2011 he noticed the pool was not level. He also noticed the pool water was stagnant and mentioned this to TZ. CP asked him if he knew how this had occurred. CP said: “…He informed me the only time he could remember was when flooding had occurred some time back. He said the whole back yard was under water the street out front the next door neighbours and the house behind. The storm Case No: 284137 Determination Page 5 of 6 pipes in both streets could not cope with the deluge. Major flooding was all over Werribee.” (sic) 31. CP drained the pool and checked the base for damage. CP found an: “unsightly bulge in the floor area where soil and backfill had gathered under the pool. The result of the pool lifting because of the flood of water that had entered the back yard … I believe thi s would not have happened if the excessive water from the storm had not occurred,” (sic) 32. However, the information provided in CP’s report is limited and mostly deals with the background to the claim. It does not deal with the matters covered in JM’s report. As a result, I find CP’s report of no evidential worth in this dispute. Insured event 33. The policy is an insured events policy which means the Applicant needs to establish the pool damage resulted from one of the listed events. Given the nature of the damage to the swimming pool, the two most likely insured events could potentially be flash flooding or storm. 34. The lodging of the claim occurred on 21 September 2011 with the Applicant indicating the likely cause of damage was the heavy rainfall in February 20 11, seven months previously. The Applicant’s husband had also indicated to JM that the pool partially floated under heavy rain conditions in November 2010. 35. However, there is no evidence before the Service which corroborates the Applicant’s contention that damage to the pool resulted from a single event such as heavy rainfall in February 2011. 36. I find that JM’s comprehensive report is highly persuasive with respect to the likely cause of damage to the swimming pool. As such, I accept the likely cause of damage resulted from the pool having only been partially installed and had remained that way during the four years prior to the lodging of the claim. 37. The report from CP did not provide any evidence to counter the comments contained in JM’s report. 38. Therefore, there was no single event which caused the damage to the pool. Instead, the damage resulted because the pool had only been partially installed. This meant the pool was exposed to a number of contributing factors to the damage which resulted, of which the vagaries of the weather was but one. Case No: 284137 Determination Page 6 of 6 Recommendation 39. On the basis of the available information I recommend that the FSP is not obligated to indemnify the Applicant for the damage to and rectification of her swimming pool.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.