Denial of storm damage claim to creek crossing structure under bridge exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$50,000
SourceAFCA PDF

Summary

The insurer declined storm damage to a concrete creek crossing as an excluded bridge. AFCA found the structure was a causeway, not excluded, and ordered the insurer to indemnify the loss with statutory interest.

Undefined policy terms take their ordinary meaning, and a causeway is distinguishable from a bridge and is not within the bridge exclusion.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 284120 Determination Page 1 of 5 Case number: 284120 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion - Definition of Structure (Bridge/Causeway) 31 October 2012 Background 1. The Applicant held a home and contents insurance policy with the Financial Services Provider (FSP) from 27 December 2001. 2. On or about 25 January 2012, the Applicant suffered damage to a concrete linking structure built across a creek for access to their home (the structure) as a result of heavy storms and local flooding. She lodged a claim. 3. The FSP denied the claim on the basis that it considered the structure to be a “bridge” and the policy specifically excluded damage caused to bridges. 4. The Applicant contends that the structure is a causeway (or alternately a culvert or a driveway) and suggests that it should be covered. She seeks indemnity for up to $50,000 for the replacement of the structure. Summary of Applicant’s position 5. The Applicant says that the Department of Natural Resources classified the structure as a “causeway” and such a structure is not excluded from cover. 6. In the alternative, the structure worked as a “driveway” into the property and whilst the gravel section would not be covered, the concrete section should be. It might also b e interpreted as a “culvert”. Summary of FSP’s position 7. The FSP says that the structure is a bridge, being a construction built to facilitate the movement of traffic across a creek or small stream on the Applicant’s property. 8. The policy excludes cover for bridges, which is included with pontoons and jetties as items that are built or sit over water. As water is a common denominator for the three items, the FSP suggests that the commercial intent of the policy was clearly to exclude any such structure from cover. Determination Case No: 284120 Determination Page 2 of 5 9. The policy also nominates the term “bridge” to avoid the confusion associated with naming each possible structure that serves the same or similar purpose but might be interpreted differently. 10. The FSP relies on the following policy provisions: Page 23 of the Product Disclosure Statement (PDS) “ Is loss or damage is caused by a storm. ... Not covered under Buildings Insurance  loss or damage to: - ... - pontoons, jetties or bridges - gravel driveways... ” Issues 11. Whether the structure is properly defined as a “bridge”, a “causeway” and/or something else. 12. Whether the loss is covered under the FSP’s policy. Reasons for decision 13. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 14. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 15. The Applicant has suffered damage to the structure which leads into her property, over a local stream or creek bed. The structure requires extensive work to repair it and the damage has been estimated at anything between $22,992 (including $4,000 worth of work already done) and $50,000. 16. It is not in dispute that the circumstances of the Applicant’s loss were covered as an insured event under the policy (storm). The FSP suggests that the loss is excluded as the structure is most appropriately defined as a “bridge” and losses attributed to storm damage exclude damage to such structures. 17. The FSP contends that the use of the te rm “bridge” is meant in a broad sense for any similar structure, particularly as it may relate to providing Case No: 284120 Determination Page 3 of 5 passage over water. The purpose is that the proximity of a structure to water increases the level of risk under the policy and the FSP seeks to exclude such risks as a matter of prudence and generalises the language so that it may be interpreted as broadly as possible. 18. The FSP has also referred to the Victorian Supreme Court of Appeal matter, CIC Insurance Ltd – v- Bar won Region Water Authority [1998] VSCA 77 (the Water Authority matter). 19. Ormiston JA considered what he defined to be a bridge as against the Macquarie Dictionary definition and in the context of the structures involved in the proceeding, being pipeline structures for the local water authority: “ In truth what physically characterises a bridge is that which enables it to be identified as such, not what passes over a bridge from time to time. As long as the structure has been built to cross over a river, a ravine, a road or a railway, etc. then it is of little consequence whether people, vehicles, water or commodities are afforded passage by the bridge; it is sufficient that the structure itself crosses from one side of a river etc. to the other.” 20. Whilst this definition would arguably incorp orate the Applicant’s structure, it is also rendered in the context of a claim for generic, large scale infrastructure items and is relevant to this consideration in Victoria as distinct from rural New South Wales where the Applicant resides. One of the issues in dispute was the relevance of traffic to the definition of bridge and its interpretation under that policy. 21. Therefore, the considerations for the Water Authority matter were arguably set in amongst larger corporate and/or Local Government considerations, as against a structure for an individual’s home. 22. It is also appropriate that local legislation and/or regulations be considered in the context of any distinction(s) to be drawn between bridges and causeways. 23. The Applicant has primarily suggested tha t the structure is a causeway, but alternatively referred to it as a driveway or a culvert. 24. None of the relevant terms are defined in the FSP’s policy and I am therefore dependent on their ordinary everyday interpretations. 25. Photographs have been provided of the structure which confirms it serves as an extension of the roadway across the creek. The surface is concrete, with rocks and filler compacted underneath with at least three large drainage pipes to facilitate the flow of creek water from one side to the other. The height of the structure is perhaps one metre from the base of the creek bed, which would likely be dry at certain periods. 26. I consider that the structure itself is not a driveway (notwithstanding that it likely served this purpose for the Applicant). I similarly believe it is not a culvert as this more correctly defines the drainage pipes situated Case No: 284120 Determination Page 4 of 5 underneath. The culvert arguably forms part of the structure but not the structure itself. 27. Therefore, the main issue for me to consider is whether the structure as a whole is more correctly considered a bridge or a causeway. 28. The respective terms are defined in the Macquarie Dictionary as: “ bridge A structure spanning a river, chasm, road, or the like and affording passage... ... causeway a raised road o r path, as across low or wet ground.” 29. In effect, I consider that either definition may be applied to the Applicant’s situation. This is not to say that the terms should be interchangeable or that the excluded term (bridge) should be relied upon to the Appl icant’s detriment. 30. In a real sense, a bridge is often seen as a structure that passes over something (be it a road or water body or something else). It allows for clear passage for forms of traffic underneath. I consider a causeway to generally be a structure which is low built and does not readily permit travel underneath. I accept that there are exceptions to these considerations. 31. The Applicant suggests that the state Government defined the structure as a causeway and this is reflected in a notice she received in 2005, requiring that it be widened. 32. The Applicant supplied a excerpt from the Plantations and Reafforestation (Code) Regulation 2001 (the Regulations) which relevantly states: “ causeway means a natural or constructed crossing (other than a bridge) that enables vehicles to cross a drainage feature. ... In general, bridges and arch structures promote natural, unimpeded stream flow, allowing the free movement of fish underneath the structure during a wide range of hydrological conditions... Low-level crossings such as causeways are generally constructed at or near bed-level and are designed to convey water across the road surface as sheet flow.” 33. Interestingly, the above definition for causeway suggests that it is not abnormal for water flow to go above the surface/road level. It also describes it as a structure that “enables vehicles to cross a drainage feature”. Neither characteristic is typical of what might define a bridge 34. In reviewing the relevant regulations, I note that it distinguishes between causeways, culverts and bridges. As such, each may be defined and interpreted differently. Case No: 284120 Determination Page 5 of 5 35. Whilst I do not consider the usage of the relevant terms in the Regulations to be definitive, it sets a template upon which a causeway may be distinguished from a bridge, even if both serve a common purpose. 36. Ultimately, I am of the view that the terms bridge and causeway can be distinguished both technically (with consideration of the Regulations) and practically (given the purpose that each serves and the narrow applicability for a causeway). 37. In this context , I consider that the structure at the Applicant’s property is more suitably defined as a “causeway”. I am satisfied that such a structure can be distinguished from a “bridge”. I am influenced by the photographs. Save for earth and culvert type drainage, water pipes there is no free standing bridge structure. The paved roadway atop the earth pipes affords passage, but that in itself does not constitute a bridge. As noted above I accept that the structure is a causeway with a culvert beneath to allow the flow of water. If the FSP intended the exclusion of a causeway it could have been so stated in clear and unambiguous terms. 38. Accordingly, I consider that the FSP’s policy does not exclude causeways from cover and am satisfied that it must respond to the Applic ant’s claim. Determination 39. On the basis of the available information, I determine that the FSP must indemnify the Applicant for her loss. This includes any costs incurred by the Applicant for temporary work undertaken whilst the claim has been in dispute. 40. Insofar as any payment is to be made, the FSP must include interest calculated at the statutory rate from 21 February 2012 until the date of payment.