Home / Financial Firm (Unknown - Insurer) / Determination 284120
Determination 284120
Denial of storm damage claim to creek crossing structure under bridge exclusion
Summary
The insurer declined storm damage to a concrete creek crossing as an excluded bridge. AFCA found the structure was a causeway, not excluded, and ordered the insurer to indemnify the loss with statutory interest.
Undefined policy terms take their ordinary meaning, and a causeway is distinguishable from a bridge and is not within the bridge exclusion.
Issues
- Claim denial primary · upheld“I consider that the FSP's policy does not exclude causeways from cover and am satisfied that it must respond to the Applicant's claim”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 284120 Determination Page 1 of 5
Case number: 284120
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion - Definition of Structure (Bridge/Causeway)
31 October 2012
Background
1. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP) from 27 December 2001.
2. On or about 25 January 2012, the Applicant suffered damage to a concrete
linking structure built across a creek for access to their home (the structure)
as a result of heavy storms and local flooding. She lodged a claim.
3. The FSP denied the claim on the basis that it considered the structure to be
a “bridge” and the policy specifically excluded damage caused to bridges.
4. The Applicant contends that the structure is a causeway (or alternately a
culvert or a driveway) and suggests that it should be covered. She seeks
indemnity for up to $50,000 for the replacement of the structure.
Summary of Applicant’s position
5. The Applicant says that the Department of Natural Resources classified the
structure as a “causeway” and such a structure is not excluded from cover.
6. In the alternative, the structure worked as a “driveway” into the property and
whilst the gravel section would not be covered, the concrete section should
be. It might also b e interpreted as a “culvert”.
Summary of FSP’s position
7. The FSP says that the structure is a bridge, being a construction built to
facilitate the movement of traffic across a creek or small stream on the
Applicant’s property.
8. The policy excludes cover for bridges, which is included with pontoons and
jetties as items that are built or sit over water. As water is a common
denominator for the three items, the FSP suggests that the commercial
intent of the policy was clearly to exclude any such structure from cover.
Determination
Case No: 284120 Determination Page 2 of 5
9. The policy also nominates the term “bridge” to avoid the confusion
associated with naming each possible structure that serves the same or
similar purpose but might be interpreted differently.
10. The FSP relies on the following policy provisions:
Page 23 of the Product Disclosure Statement (PDS)
“ Is loss or damage is caused by a storm.
...
Not covered under Buildings Insurance
loss or damage to:
- ...
- pontoons, jetties or bridges
- gravel driveways... ”
Issues
11. Whether the structure is properly defined as a “bridge”, a “causeway” and/or
something else.
12. Whether the loss is covered under the FSP’s policy.
Reasons for decision
13. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
14. I am satisfied that a full exchange of the relevant information has taken place
between the respective parties and that each party has had the opportunity
of addressing any issues raised.
15. The Applicant has suffered damage to the structure which leads into her
property, over a local stream or creek bed. The structure requires extensive
work to repair it and the damage has been estimated at anything between
$22,992 (including $4,000 worth of work already done) and $50,000.
16. It is not in dispute that the circumstances of the Applicant’s loss were
covered as an insured event under the policy (storm). The FSP suggests
that the loss is excluded as the structure is most appropriately defined as a
“bridge” and losses attributed to storm damage exclude damage to such
structures.
17. The FSP contends that the use of the te rm “bridge” is meant in a broad
sense for any similar structure, particularly as it may relate to providing
Case No: 284120 Determination Page 3 of 5
passage over water. The purpose is that the proximity of a structure to water
increases the level of risk under the policy and the FSP seeks to exclude
such risks as a matter of prudence and generalises the language so that it
may be interpreted as broadly as possible.
18. The FSP has also referred to the Victorian Supreme Court of Appeal matter,
CIC Insurance Ltd – v- Bar won Region Water Authority [1998] VSCA 77 (the
Water Authority matter).
19. Ormiston JA considered what he defined to be a bridge as against the
Macquarie Dictionary definition and in the context of the structures involved
in the proceeding, being pipeline structures for the local water authority:
“ In truth what physically characterises a bridge is that which enables it to be
identified as such, not what passes over a bridge from time to time. As long as
the structure has been built to cross over a river, a ravine, a road or a railway,
etc. then it is of little consequence whether people, vehicles, water or
commodities are afforded passage by the bridge; it is sufficient that the
structure itself crosses from one side of a river etc. to the other.”
20. Whilst this definition would arguably incorp orate the Applicant’s structure, it
is also rendered in the context of a claim for generic, large scale
infrastructure items and is relevant to this consideration in Victoria as distinct
from rural New South Wales where the Applicant resides. One of the issues
in dispute was the relevance of traffic to the definition of bridge and its
interpretation under that policy.
21. Therefore, the considerations for the Water Authority matter were arguably
set in amongst larger corporate and/or Local Government considerations, as
against a structure for an individual’s home.
22. It is also appropriate that local legislation and/or regulations be considered in
the context of any distinction(s) to be drawn between bridges and
causeways.
23. The Applicant has primarily suggested tha t the structure is a causeway, but
alternatively referred to it as a driveway or a culvert.
24. None of the relevant terms are defined in the FSP’s policy and I am therefore
dependent on their ordinary everyday interpretations.
25. Photographs have been provided of the structure which confirms it serves as
an extension of the roadway across the creek. The surface is concrete, with
rocks and filler compacted underneath with at least three large drainage
pipes to facilitate the flow of creek water from one side to the other. The
height of the structure is perhaps one metre from the base of the creek bed,
which would likely be dry at certain periods.
26. I consider that the structure itself is not a driveway (notwithstanding that it
likely served this purpose for the Applicant). I similarly believe it is not a
culvert as this more correctly defines the drainage pipes situated
Case No: 284120 Determination Page 4 of 5
underneath. The culvert arguably forms part of the structure but not the
structure itself.
27. Therefore, the main issue for me to consider is whether the structure as a
whole is more correctly considered a bridge or a causeway.
28. The respective terms are defined in the Macquarie Dictionary as:
“ bridge
A structure spanning a river, chasm, road, or the like and affording passage...
...
causeway
a raised road o r path, as across low or wet ground.”
29. In effect, I consider that either definition may be applied to the Applicant’s
situation. This is not to say that the terms should be interchangeable or that
the excluded term (bridge) should be relied upon to the Appl icant’s
detriment.
30. In a real sense, a bridge is often seen as a structure that passes over
something (be it a road or water body or something else). It allows for clear
passage for forms of traffic underneath. I consider a causeway to generally
be a structure which is low built and does not readily permit travel
underneath. I accept that there are exceptions to these considerations.
31. The Applicant suggests that the state Government defined the structure as a
causeway and this is reflected in a notice she received in 2005, requiring
that it be widened.
32. The Applicant supplied a excerpt from the Plantations and Reafforestation
(Code) Regulation 2001 (the Regulations) which relevantly states:
“ causeway means a natural or constructed crossing (other than a bridge) that
enables vehicles to cross a drainage feature.
...
In general, bridges and arch structures promote natural, unimpeded stream
flow, allowing the free movement of fish underneath the structure during a
wide range of hydrological conditions...
Low-level crossings such as causeways are generally constructed at or near
bed-level and are designed to convey water across the road surface as sheet
flow.”
33. Interestingly, the above definition for causeway suggests that it is not
abnormal for water flow to go above the surface/road level. It also describes
it as a structure that “enables vehicles to cross a drainage feature”. Neither
characteristic is typical of what might define a bridge
34. In reviewing the relevant regulations, I note that it distinguishes between
causeways, culverts and bridges. As such, each may be defined and
interpreted differently.
Case No: 284120 Determination Page 5 of 5
35. Whilst I do not consider the usage of the relevant terms in the Regulations to
be definitive, it sets a template upon which a causeway may be distinguished
from a bridge, even if both serve a common purpose.
36. Ultimately, I am of the view that the terms bridge and causeway can be
distinguished both technically (with consideration of the Regulations) and
practically (given the purpose that each serves and the narrow applicability
for a causeway).
37. In this context , I consider that the structure at the Applicant’s property is
more suitably defined as a “causeway”. I am satisfied that such a structure
can be distinguished from a “bridge”. I am influenced by the photographs.
Save for earth and culvert type drainage, water pipes there is no free
standing bridge structure. The paved roadway atop the earth pipes affords
passage, but that in itself does not constitute a bridge. As noted above I
accept that the structure is a causeway with a culvert beneath to allow the
flow of water. If the FSP intended the exclusion of a causeway it could have
been so stated in clear and unambiguous terms.
38. Accordingly, I consider that the FSP’s policy does not exclude causeways
from cover and am satisfied that it must respond to the Applic ant’s claim.
Determination
39. On the basis of the available information, I determine that the FSP must
indemnify the Applicant for her loss. This includes any costs incurred by the
Applicant for temporary work undertaken whilst the claim has been in
dispute.
40. Insofar as any payment is to be made, the FSP must include interest
calculated at the statutory rate from 21 February 2012 until the date of
payment.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.