Text of the determination
Case No: 284019 Determination Page 1 of 11
Case number: 284019
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
4 January 2013
Background
1. The Applicants‟ home and contents in Charlton Victoria were insured under a
personal insurance policy issued by the Financial Services Provider (FSP).
2. On 14 January 2011, following extensive rainfall in the area, water inundated
the home causing extensive damage.
3. A claim under the policy was denied by the FSP on the grounds the house
was inundated sometime in the afternoon by overflow from the Avoca River
and Yeungroon systems and as such was excluded from cover provided by
the policy.
Summary of Applicants ’ position
4. The Applicants have appointed a legal firm to represent them. References to
the Applicants in this determination will include their representative.
5. The Applicants submit that stormwater runoff associated with heavy rain fell
between 10 and 14 January 2011and inundated their home causing damage
to the lower part of the house as well as to numerous items in the shed. The
initial inundation occurred in advance of the arrival of floodwater from the
Avoca River.
6. The Applicants rely substantially on hydrological reports commissioned by
their representative.
7. The Applicants do not dispute the Avoca River burst its banks. However,
they submit that any inundation before 5.30pm on 14 January 2011 was
caused by stormwater and local runoff and as concluded in the M reports
was responsible for damage to the foundations of the house and items in the
shed.
8. The Applicants are claiming for damage below the floor level to the house
foundations, internal cracking and other damage consequent upon the
foundation damage for which the dispute was brought.
Determination
Case No: 284019 Determination Page 2 of 11
9. They accept the inundation of the interior of their neighbo ur‟s house
occurred at about 7.00pm on 14 January and that the interior of their home
was likely inundated by floodwater at the same time.
10. The hydrological site specific report provided by M stipulates that shortly
before 5.00pm stormwater had reached the concrete slab foundation of the
house being two hours before floodwater inundated the home.
11. The rejection of the claim is therefore unreasonable and it should be paid.
Summary of FSP’s position
12. The FSP submits:
a. The cause for the inundation was overflow from the Avoca River.
b. This comes within the policy definition of „flood‟ and is therefore excluded
from cover.
c. It has complied with Section 35 of the Insurance Contract Act 1984 (the
Act)
Cause of inundation
13. The FSP relies substantially on a hydrological report of WT commissioned
by it. WT established the home of a neighbour of the Applicants was
inundated at about 7.00pm and based on this information concludes the
Applicants‟ home was initially inundated in the evening of 14 Ja nuary 2011.
14. The FSP considers it is clear from the conclusion of the WT report, the
location of the property to the east of Armstrong Street and the timing of the
event, that any water which entered the risk address on the evening of 14
January 2011 must have been overflow from the Avoca River.
15. The FSP relies on the following terms of the policy:
“Words with special meaning
“Flood” means the inundation of normally dry land by water escaping, or
being released from, the normal confines of a reservoir, natural watercourse
or lake, (whether or not they have been altered or modified). Flood also
includes water discharged from any sewerage or waste water systems due to
pressure induced by flood water.
...
Accidental Damage Cover
We will pay for Accidental Loss or Damage to your Buildings or Contents at
the Address other than Occurrences or items referred to in “What you are not
insured for.”
...
What you are not insured for
Case No: 284019 Determination Page 3 of 11
...
2 Loss or damage to your property caused by:
a. Flood. ...”
Issues
16. Whether the FSP was entitled to deny liability for damage to the foundations
and related damage to the Applicants‟ home and to items in the outbuildings.
Reasons for decision
17. Due to the complex nature of this dispute, FOS has considered it appropriate
to elevate the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. The dispute has not been the subject of a FOS
Recommendation and has proceeded direct to Determination.
18. The decision had been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
19. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
20. Prior to arriving at a determination, the Panel has read and considered all
the material submitted by the parties to FOS. Representatives of FOS have
also visited Charlton and spoken to residents. In this matter a site inspection
was conducted by the Panel Chair Ombudsman, assisted by another
member of the Panel on 11 December 2012. Also present was the female
Applicant and a representative of the FSP.
Prescribed contract
21. By letter dated 21 June 2011 to the FSP, the Applicants state that the FSP
failed to provide them with a policy document for the renewal period in which
the loss occurred. They argue that as such, they are entitled to the benefits
available according to the „standard cover‟ prescribed by the Insurance
Contract Regulations (IC R).
22. The FSP responded to the issue in its letter to the Applicants dated 18 July
2011. The Applicants‟ submission to the Service does not, however, again
raise this matter.
23. The issue will therefore not be determined by the Panel.
24. However, for the sake of good order the Panel concurs largely with the
arguments put forward by the FSP in its notice of response. In particular that
the Applicants were provided with the policy document in 2007 and having
provided the PDS, the FSP has complied with the legislation.
Case No: 284019 Determination Page 4 of 11
25. The FSP asserts the terms of the policy have not changed in the period
since then, to the time of renewal of the policy commencing on 25 August
2010.
26. Section 35 of the Act is relevant. Section 35 of the Act provides that, where a
claim is made under a prescribed contract and the event giving rise to the
claim is a prescribed event in relation to the contract, an insurer may not
refuse to pay an amount equal to the minimum amount of cover set out in
the regulations made pursuant to the Act unless it can prove that before the
contract was entered into, the insurer clearly informed the insured in writing
of the relevant provisions of the contract, or that the insured knew or a
reasonable person in the circumstances could be expected to have known of
such provision.
27. Section 35 of the Act does not impose on an FSP a duty to provide a policy
document to the policyholder on each renewal of the policy. Until such time
as the terms of the contract are altered, the FSP is deemed to have clearly
informed the policyholder of the policy terms by provision of the policy at
inception of the contract. Sections 11(9)(b) and sections 11(10)(a) and (c) of
the Act pertain in this regard.
28. Accordingly, the FSP is entitled to rely on the terms of the policy issued to
the Applicants in 2007, subject to the policy terms being clear and
unambiguous.
29. After examination of the policy the Panel is satisfied that the relevant terms
of the policy satisfy that criteria. For these reasons, the Panel accepts the
FSP is entitled to rely on the relevant terms of the policy in so far as they
apply to this dispute.
Water inundation of the Applicants’ property
30. The Panel has been provided with copies of various hydrological reports
obtained by the FSP and the Applicants. As these documents have been
exchanged it is not intended to recite the details in full in this determination.
The Panel will, however, summarise the reports in relation to the information
relevant to the issues disputed in this matter.
Hydrologist WT report dated 19 April 2011
Historically the town floods on both sides east and west with an area
remaining flood free through the centre of town along the St Arnaud-
Charlton Road.
Heavy rain fell in the area between 10 and 14 January. The largest fall
was recorded at 9am on Friday 14 of January 2011.
The most intense rainfall fell on the morning of 11 th and early morning
on the 13 th as shown on the charts (figure 7.4).
The peak flood level of 8.05m was reached early morning on 15 th
January being at least 2 days after the most intense rainfall.
Case No: 284019 Determination Page 5 of 11
The volume of water suggests either the Yeungroon Creek transferred
flows across the flood plain upstream of Charlton or the Avoca River
pushed more water into the floodplain upstream of the town.
Given the timing of flooding on the eastern edge of town was similar to
the gauged readings, this suggests the Yeungroon Creek and Avoca
River flows merged to become one system.
Flow depths in Yeungroon Creek were not expected to impact
anywhere west of Kaye Street.
Waters from Yeungroon Creek east of Kaye Street would have been up
to 150mm deep on the east side of Kaye Street and between 0.5m and
1m deep further to the east between there and Back St and Arnaud Rd.
After this, flows in Yeungroon Creek began to subside and the Avoca
River increased.
From around 5pm on 14 January local reports say the river began to
rise rapidly.
From around 6pm houses in the town were inundated with the river
peaking in the early hours of 15 January.
The Avoca River peaked at 8.05m resulting in widespread flooding of
the town and inundation of multiple properties. A large portion of the
town flooded about 12 hours after the last significant rainfall.
Any flooding after lunchtime can be directly attributed to the Avoca
River flooding as Yeungroon Creek had peaked earlier in the morning.
Hydrological report “M dated 3 November 2011 commissioned by the
Applicants
Rainfall
The highest rainfall was 15mm per hour from 1700 to 0800 on 13
January 2011. Rainfall rates were persistently high from 2300 hours on
13 January to 0600 on 14 January. No rain fell after 0800 on 14
January 2011.
The radar data for Charlton indicates the rainfall was highly
concentrated in short duration bursts. The rainfall which produced the
15mm/hour actually occurred over a period of about 12 minutes.
This situation is similar for the rainfall over night on 13-14 January.
The rainfall intensities in these bursts are much bigger than the
recorded hourly rates.
Overflow from local drainage systems
Given the intensity of rainfall which was much more than hourly rainfall
rates, overflow from local drainage systems and culverts was highly
likely. Especially given that the drainage system was already close to
capacity from earlier rainfall bursts.
Case No: 284019 Determination Page 6 of 11
The timing of overflow would correspond closely to the timing of the
rainfall.
The first possible incident of stormwater drainage overflow would have
occurred around 0700 on 13 January 2011. Any of the intense rainfall
periods recorded between 13 and 14 January could have been
responsible for overflow of stormwater drainage systems. The greater
probability being from midnight to 4 .00am on 14 January.
Direct overflow is less likely after this time.
Without augmentation from other sources stormwater drainage
overflow would be short lived.
Runoff from surrounding areas
There were two possible sources of runoff. Runoff was possible from
Charlton which does not enter the drainage systems and runoff from
surrounding rural areas.
During periods of heavy rainfall bursts, water would have overflowed
and contributed to surface runoff. Without augmentation from other
sources stormwater drainage overflow would have been short-lived.
It is highly likely that rainfall which fell on 13 and 14 January 2011 was
saturation overland flow and would have led to inundation of Charlton
on 13 and 14 January before floodwater from the Avoca River entered
the town.
Rain water falling south and east of Armstrong and High Streets will
tend to move east; with water to the west and north tending to move to
the river.
Water runoff as overland flow would concentrate water in the eastern
part of Charlton.
The combination of surface runoff from the surrounding area being
directed toward east Charlton combined with periodic overflow from
drainage systems in other parts of the town would lead to inundation by
stormwater and locally derived surface water on the morning of 14
January.
That inundation from locally derived stormwater run-off occurred, rather
than Avoca River water, is further supported by the changing sediment
loads of water seen in C harlton.
Clear water
When the Avoca River overtopped its banks and Charlton was
inundated by floodwater the source of that water can be clearly seen
because of its high sediment load.
Case No: 284019 Determination Page 7 of 11
Flooding from Avoca River
Minor flood level was reached at 0400 on 13 January. Moderate flood
levels were reached at 2045 on 13 January 2011. Major flood level was
reached at 1715 on 14 January 2011.
Significant inundation of Charlton from the Avoca River did not begin
until late afternoon on 14 January and became more severe through
the evening and night. Some outlying parts of Charlton would have
been inundated mid-afternoon.
Summary
Depending on the exact location of properties, they will have begun to
be inundated from the Avoca River overflow sometime in the afternoon
and early evening of 14 January 2011.
Any property inundation from runoff before this time, particularly
corresponding to those times when periods of heavy rainfall occurred
on 13 and early morning on 14 January 2011, could not have been
caused by inundation from the Avoca River.
It is possible that inundation could have been caused by
stormwater/intense rainfall runoff on 13 and early on 14 January 2011.
Inundation from stormwater accumulating in eastern and southern
Charlton is probable on the night of 13/14 January 2011 and early
morning/early afternoon of 14 January 2011.
Hydrological report M dated March 2012
Major flood level
Major flood level in Charlton was reached at 5.15pm on 14 January
2011 and is the point at which water begins to overtop the bank and
spill into town. Water has to rise above this level for widespread
inundation from the river to occur. There is also a time lag between
water overtopping the bank at this location and rising flood water
moving across town.
This indicates significant inundation from flood water probably occurred
after 5.15pm on 14 January 2011.
Eye witness reports in the east of town describe a rapid rise in water
levels and a change from clear to sediment laden water at about 6pm
on 14 January.
This is a reasonable estimate of the time delay between the river
reaching major flood level and the flood wave moving across town.
S ite report at Applicants’ property
The configuration of the road junction (Learmonth Street and High
Street) means that if the stormwater drain is blocked or full, water
Case No: 284019 Determination Page 8 of 11
ponds above and beyond the drain increasing depths further up
Learmonth Street.
Inform ation provided by the Applicants‟ neighbour indicates the open
gutter drain in front of the property was overflowing at 4.30pm on 14
January but had not covered the footpath. Shortly before 5pm water
levels rose, reaching the concrete slab forming part of the foundations
of the Applicants‟ house.
Given the lawn was inundated and water was surrounding the
foundations of the house by 5.00pm it is likely that the first phase of
inundation was from locally sourced stormwater.
By 7.00pm on 14 January water was shin deep in the neighbour‟s
property.
Any damage to the lower part of the house (the slab foundation) can
therefore be ascribed to stormwater.
Summary
31. The FSP seeks to rely on a clause in the policy to deny the claim and given
the policy provides „Accidental Damage‟ coverage, it therefore has the
burden of establishing, on the balance of probabilities that the terms of the
relevant clause apply to defeat the claim.
32. The timing of the initial inundation to the interior of the Applicants‟ home
estimated to be at about 7.00pm on 14 January is not in dispute. According
to the M report, water was shin deep in the neighbour‟s home at 7.00pm on
14 January, thus indicating water entered the Applicants‟ home before
7.00pm on that day.
33. The Panel is satisfied that ul timately the Applicants‟ property was flooded by
water from the Avoca River. Given the terms of the policy, the Panel accepts
that water from the Avoca River is properly categorised as flood water and
excluded from cover provided by the policy.
34. The Applicants claim the initial inundation of their site including over the
foundations of the home and into the shed was surface runoff rainwater and
responsible for the damage claimed. The central issue for determination is,
therefore, the time of first inundation of the site to the extent that water
saturated the foundations and entered the shed.
35. The evidence in relation to the source of the water which first inundated the
Applicants‟ property is divided. The Panel accepts the authors of the reports
were highly competent professionals and well qualified to assess and report
on the likely source of water which inundated the Applicants‟ property.
36. After careful analysis of the material the Panel considers the reports by M
are persuasive and may be relied on for the p urpose of this dispute. The M
reports focussed on the influence of surface runoff rainwater on flooding
mechanisms in the town. Additionally, the findings in the M report of March
2012 were based on a site inspection of the Applicants‟ property.
Case No: 284019 Determination Page 9 of 11
37. The M report confirmed stormwater would have played a major role in the
flooding in the town. Stormwater from the east and south east of the town
would have inundated many properties before the river overtopped
sometime after 5.15pm on 14 January 2011.
38. M report further observed a gradual rise in clear local water occurred up to
about 5.30pm on 14 January 2011. Sometime after 6.00pm a rapid rise
associated with inundation from the river began.
39. The evidence gathered from this site visit is consistent with evidence
considered in respect of many other matters following the January 2011
floods in Charlton. Particularly, some expert evidence has concluded that the
inundations occurring from the morning of 14 January 2011 was in fact water
overflowing from a watercourse and therefore, flood. Conversely, other
expert evidence has concluded that the early inundations, at least up to
5.00pm on that day, are more properly characterised as stormwater.
40. Having reviewed all of the available expert evidence and having carried out
many site visits in the town, the Panel has determined in a number of
previous disputes before it that water flow from the south and east of
Charlton on 14 January 2011 can be properly characterised as stormwater
runoff (refer disputes numbers 238492 and 279236) at least until about
5.15pm on 14 January 2011, following which the Avoca River reached its
major flood level and floodwater from the river started to inundate properties
in the town.
41. The extent to which individual properties would have been inundated i nitially
by stormwater and then by floodwater would depend on each property‟s
location, the topography of the immediate area and timing.
42. The Panel is satisfied that M‟s conclusions are supported by the information
obtained at the site visit on 11 December 2012.
43. The Panel established that the maximum height of water inundation was
approximately 800mm, which would equate to approximately 250-300mm
inside the house, which is estimated to be approximately 500mm above
ground; there are numerous tanks (with motors at ground level), sheds and a
garage at the back of the property all of which are approximately at ground
level. Along the side of the house are air conditioners/refrigerators and water
tanks, similarly at approximate ground level.
44. Discussion with the female Applicant revealed the Applicants accept that
damage from water inundation to the interior of the home and the contents
therein arose from the policy excluded event of flood; however, it is the
Applicants‟ contention that the initial stormwater run -off caused substantial
damage to the ground level foundations of the home and by implication
everything outside the home as described above, which also reside at the
same level as the house foundations.
45. The site inspection further revealed the Federation home, albeit built in about
1910, was very well maintained and in very good condition. According to the
Case No: 284019 Determination Page 10 of 11
female Applicant the interior walls of the home used to be straight, level and
flat, but since the stormwater allegedly affected the foundations, the interior
walls have cracked significantly, with doors unable to close as they are out of
square. The site inspection confirmed significant cracking and bulging in
some interior walls and the inability to close doors.
46. The Panel notes the property is in close proximity to Armstrong Street. From
the many site visits conducted by the Panel to Charlton, it is aware the area
was particularly susceptible to stormwater run-off and accordingly it
determines the ground level around the house was, on the balance of
probabilities, affected by approximately 200mm of stormwater run-off prior to
the arrival of flood water from the Avoca River. Furthermore, the female
Applicant indicated at the site inspection that her husband left the property at
approximately 10.00am on 14 January 2011, at which time water was
already pooling in the property‟s grounds.
47. It has been the Panel‟s practice, when contention exists between
hydrologists as to levels and timing of inundation, to place probative weight
upon credible eyewitness accounts, as being determinative of the issues in
play. In this instance, the site inspection established to the Panel‟s
satisfaction the female Applicant‟s account of her husband‟s timing of
departure and water inundation as credible and accordingly it determines, on
the balance of probabilities, that stormwater run-off, sufficient in time and
quantity pooled around the house for long enough (probably at least 8 hours)
to soak the underlying soils thereby leading to instability in the founding soils
and ultimately causing significant damage to the foundations of the house,
which in turn caused the damage to the home‟s interior walls and doors.
48. As stated above, the policy provides cover for accidental loss or damage.
Damage caused by stormwater is not excluded from the cover. In this case
the Panel accepts that the policy will respond to any damage to the home‟s
interior that is attributable to the foundations‟ shifting as a result of prolonged
exposure to the initial stormwater; albeit, the Panel also acknowledges, as
there was a subsequent flood inundation, not all of the damage to the house
interior and foundations can be attributed to the initial stormwater. In these
circumstances, the Panel, pursuant to its mandate of doing what is „fair in all
the circumstances‟, determines the FSP is to contribute 30% of the cost of
rectifying the damage to the home‟s foundations and the resultant damage to
the interior walls and doors.
49. It follows, therefore that in respect of damage to the numerous tanks (with
motors at ground level), sheds and a garage (and contents therein) at the
back of the property all of which are approximately at ground level and air
conditioners/refrigerators and water tanks at the side of the house, similarly
at approximate ground level, the determined level of 200mm of stormwater
run-off would have caused very substantial damage and the policy
accordingly will respond, albeit the quantum in respect of that damage will be
the totality of the assessed loss arising from 200mm inundation and not the
restricted 30% as determined for the house foundations and interior.
Case No: 284019 Determination Page 11 of 11
50. As no Scope of Works has been carried out for either matters referred to in
paragraphs 48 and 49 above, the FSP is directed to task an appropriate
expert in relation to an assessment and costing in respect of paragraph 48.
In respect of paragraph 49, it should engage with its usual loss assessment
process. The parties are asked to work cooperatively to settle this part of the
dispute. In the event they are unable to agree within 30 days of acceptance
of the Determination, the Panel will determine the amount.
Determination
51. On the basis of the available information the Panel determines:
a. The FSP is liable for 30% of the damage to the foundations and
structural damage within the home‟s interior. The FSP will engage an
appropriate expert capable of identifying and costing this damage.
b. The FSP is liable for damage pursuant to paragraph 49 abo ve,
although not limited to a 30% contribution.
c. In the event a dispute arises in relation to quantum, the matter may be
referred back to the Panel for determination.
d. Should the FSP settle any part of the claim by cash payment, interest is
payable in accordance with section 57 of the Act from 1 March 2011
being the date on which the claim was denied until payment is made.