Home / Financial Firm (Unknown - Insurer) / Determination 283920

Determination 283920

Denial of January 2011 flood inundation claim; flood exclusion and adequacy of PDS disclosure

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's Corinda home was inundated in January 2011 and the FSP denied the claim as flood. AFCA found the PDS and renewal schedules clearly informed him flood was excluded, and that the inundation was flood water rather than run-off.

Section 35 of the Insurance Contracts Act was satisfied by clear exclusion wording in the PDS and schedules, and the timing of inundation after the last rainfall showed flood water.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 283920 Determination Page 1 of 9 Case number: 283920 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 28 February 2013 Background 1. On 20 September 2006 the Applicant arranged insurance cover on his home in Corinda Queensland via an agent acting on behalf of the Financial Services Provider (FSP). The policy was renewed annually and current to 20 September 2012. 2. On 12 January 2011 the Applicant‟s home was inundated with water following heavy rainfall in the area which caused widespread flooding. 3. A claim under the Applicant‟s policy was denied on the ground the damage was caused by flood which was excluded from cover provided by the policy. Summary of Applicant’s position 4. The Applicant is legally represented. Any reference to the Applicant in this Determination will include his representative. 5. According to the hydrologist's report the property was inundated due to water backing up along a small open drain. The Applicant argues that it is difficult to understand how this drain could be classified as a “natural watercourse, lake or lagoon” when it passes beneath a road and appears to be purpose built for the collection of storm water. Therefore his property was initially inundated as result of „Storm, rainwater or Run - off‟. Accordingly, the FSP has failed to establish that the loss was due to an excluded event. 6. The FSP‟s definition of „flood‟ is too broad and does not meet the obligation to clearly communicate the exclusion. 7. The problem arises with the definition not being just for flood but floodwater combined with run-off and/ or rainwater that is excluded from cover. 8. The definitions of flood, storm, rainwater and run-off appear to be contradictory and confusing. 9. A consumer looking through the policy in order to determine whether or not flood is excluded is unlikely to look under defined events that are covered Determination Case No: 283920 Determination Page 2 of 9 when searching for what is an excluded cover. It is less likely they would look for flood exclusion under the storm cover. 10. In these circumstances, the FSP should not rely on the exclusion and instead pay out the claim as it has not met its disclosure obligations under Section 35 of the Insurance Contracts Act 1984 (the Act). 11. The exclusion clause relied on by the FSP is substantially similar to a definition discussed by FOS in Determination 41709. In that case the Panel found the definition of flood was artificially defined. The Panel went on to determine that without adequate cross referencing “such a practice in policy drafting does not comply with the provisions of Section 35 of the Insurance Contracts Act.” 12. In Determination 40607 FOS considered the identical flood exclusion to the FSP wording. In that matter the Panel determined that the insurer had not complied with its obligations to clearly inform in relation to Section 35 of the Act. 13. The FSP‟s policy is ambiguous, broad and confusing in relation to the „flood‟ exclusion and as such providing a policy does not clearly inform the insured of what it contains. 14. The PDS provides cover for loss or damage which results from the bursting leaking, discharging or overflowing of fixed pipes. 15. Water from an open drain inundated a portion of his street about 100 metres from his property. 16. He submits that a storm water drain is a fixed pipe which takes stormwater, rainwater or run-off away from the area where his property was located. 17. Consequently, the policy responds to the loss. Summary of FSP’s position 18. The FSP relies on an assessor‟s report and the report of a hydrologist commissioned t o determine the cause of water inundation to the Applicant‟s home. 19. Based on those reports it maintains the loss did not fall within the terms of the policy as it was determined as being flood. 20. The FSP states that at inception of the policy a new business pack was sent to the Applicant which included a schedule and PDS. 21. The FSP submits there is a clear definition of flood in the PDS and a statement that flood is not covered together with the flood exclusion at pages 29, 30, 58 and 59 of the PDS. In addition, the schedule at inception and at each renewal states flood is not covered by the policy. Case No: 283920 Determination Page 3 of 9 22. Accordingly, it has complied with Section 35 of the Act. 23. The Applicant was clearly informed that flood was an excluded peril. Additionally, the policy schedules make it clear the policyholder must read the schedule along with the PDS to ensure the cover is suitable for his needs. 24. The policy is clear and unambiguous with respect to damage caused by flood and it therefore has complied with Section 35 of the Act. 25. The FSP relies on the following terms of the policy. “Words with special meanings ... “flood” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. Note: This policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents. ... Insured events we will pay ... 9. Storm, rainwater or run-off ... We will pay for loss or damage caused by storm, rainwater or run-off. ” storm ” means violent wind including (cyclone and tornadoes), thunderstorms and hall which may be accompanied by rain or snow. “rainwater” means rain falling naturally from the sky onto the buildings and/or ground. “ run- off” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: a caused by:  flood , or  flood water combined with run-off rainwater. flood” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. ... When we will not pay a claim under your policy ... 2. Unless we state differently in your policy, we will not pay for: Case No: 283920 Determination Page 4 of 9 a flood as defined on page 12:” Issues 26. Whether the FSP provided the Applicant with a PDS, and in the event it did, whether its provision was sufficient to discharge its Section 35 of the Act obligations? 27. Whether the FSP was entitled to deny liability for the claim? Reasons for decision 28. This matter has been determined by a Panel consisting of an Ombudsman and Panel members with extensive experience in insurance industry and consumer claims. 29. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to respond. 30. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties. Provision of a policy to the Applicant 31. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 32. The Applicant‟s representative submits that it was unclear whether the Applicant received a PDS when he originally purchased the insurance but acknowledged that he has only received his PDS on an irregular basis since that time. 33. The FSP states that at inception of the policy, a new business pack was sent to the Applicant which included a PDS and schedule. 34. The following is an extract from a copy of the covering letter sent to the Applicant at inception of the policy. “To ensure al l the details on your cover are correct, we have attached the following documents – your policy Schedule and you Policy Document (Product Disclosure Statement).” Case No: 283920 Determination Page 5 of 9 35. The new business schedule vesting in the Applicant‟s name for the period commencing 20 September 2006 states: “Your new cover is set out in the Schedule and the attached Policy Document (Product Disclosure Statement). ... ... Please refer to the Policy Document (PDS). If you don‟t have a Policy Document (PDS) please call us. ... SITUATION ONE ... P lease Note: Flood is not covered by this policy.” 36. Each renewal schedule for the years 2007, 2008, 2009 and 2010 contain the following: “If you have any questions, require another Policy Document (PDS) or would like to make any changes to your policy, please contact us at .... ... ... This Schedule and the current Policy Document (Product Disclosure Statement) (PDS) if any of the information is incorrect or you require a copy of the PDS please contact us at [name and phone number]. ... Policy Type : [FSP] Classic Home Insurance Please Note: Flood is not covered by this policy.” 37. Most likely at inception of the policy the PDS was sent to the Applicant amongst other documents. The documentation advised the Applicant to contact the FSP if he did not have a policy document. 38. Additionally, at each renewal of the policy from 2007 to 2010 the Applicant was informed that the schedule and PDS set out the cover and that if a copy of the PDS is required to contact the FSP. 39. Further to this, the Applicant acknowledged that he received a PDS at irregular intervals since insuring his property with the FSP. 40. The Panel therefore accepts that the Applicant was provided with a PDS containing the terms of cover prior to the water damage to his property in January 2011. Policy terms 41. The Applicant argues that the terms of the policy relevant to flood are ambiguous, broad and confusing and as such, the provision of the PDS do not discharge the FSP‟s obligations under Section 35 of the Act. In particular, the Applicant refers to the terms of cover expressed under the insured event “Storm, rainwater or run - off” stating: Case No: 283920 Determination Page 6 of 9 “We will pay for loss or damage caused by storm, rainwater or run -off ... We will not pay for loss or damage: a caused by:  flood, or  flood water combined with run-off rainwater” 42. The Applicant reasons that a problem arises as on the one hand clients are given the impression they will be covered for rainwater run-off in the first sentence at point 9 of defined events but at the same time under subsection „a‟ of the same p oint, they are told runoff of any kind and rainwater that combines with flood is not covered. In addition, the definitions of flood and run-off overlap. The definitions of flood, storm, rainwater and run-off appear to be contradictory and confusing. 43. The in sured event “Storm, rainwater or run - off” defines each of these events as set out in paragraph 28 of this Determination. The definitions are clear and unambiguous. As such in the event an insured property is inundated by rainwater which has fallen on to the ground or rainwater which has flowed across normally dry land, the policy will respond. 44. However, when run-off rainwater combines with water defined as flood water that is water which has escaped or been released from any watercourse, reservoir or dam, then the policy will not respond. 45. The Panel has had considerable exposure to disputes arising from water inundation to insured properties. In many cases it has been established that the initial inundation of the property was from surface run-off rainwater before the run-off later merged with flood water to inundate the property. 46. When damage from stormwater run-off occurs independently of flood water or a combination of run-off and flood water occurs, it has been determined the policy will respond to the damage caused by the initial surface run-off inundation but not for damage arising from the combined run-off and flood water. 47. Thus, inundation may arise from two distinct and unique causes. The Panel does not accept that in the event a combination of run-off rainwater and flood water distinguishes the cover when the initial inundation is from run-off rainwater before the arrival of flood water. 48. Further, it has been established through legal precedent ( Sika Plastics v Cornhill Insurance (1982) 2NZLR 50 CA) that in instances where stormwater run-off, unable to drain away into the main watercourse, mixes with arriving (rising levels or backflow) floodwaters, the combination of such waters is considered to be flood water. 49. Hence, the terms of the clause referred to by the Applicant are consistent with legal precedent. Case No: 283920 Determination Page 7 of 9 50. The policy states that flood is not covered in several sections of the contract. These are found immediately following the definition of flood, within the insured event “Storm, rainwater or run -off ” and again within the exclusions expressed under “When we will not pay a claim under our policy”. 51. In addition, the new business schedule issued in 2006 and each subsequent renewal notice prior to the January 2011 loss, informed the Applicant that flood is not covered by the policy. 52. While the Applicant referred to previous determinations issued by FOS or precedent organisations, in deciding a dispute the Panel will have regard to legal principles, applicable industry codes or guidance as to practice, good industry practice and previous determinations. However, FOS will not be bound by these. 53. The Panel has considered the issues raised by the Applicant. It is well established that in order to satisfy Section 35 of the Act any relevant limitation or exclusion must be in clear and unambiguous language such that a person of average understanding and intelligence would have little difficulty in finding and understanding if they read the policy. In this dispute the FSP has clearly notified the Applicant of the flood exclusion on numerous occasions when forwarding the renewal documents. The PDS itself is indexed with clear reference to the relevant exclusion throughout the PDS. 54. After analysis of the material and having regard to the terms of the policy and legal precedent the Panel is satisfied that if the Applicant had read the policy they would have had little difficulty in finding and understanding the relevant flood exclusion. The Panel is satisfied the FSP clearly informed the Applicant that loss or damage caused by flood was not covered by his policy and as such complied with Section 35 of the Act. Circumstances of the loss 55. The Applicant provided the hydrologist, commissioned by the FSP with the following information.  It rained heavily on Monday 10 January 2011 a nd on Tuesday morning 11 January.  On Wednesday morning (12 January) the intersection of Penaton and Edmondson Streets had became inundated. This intersection was about 130 metres south east of his property.  At about 1100 hours on 12 January, the lowest section of his yard started to became inundated.  Between 1500 hours and 1600 hours water had inundated the downstairs rooms of the house  The water level inside the house peaked sometime in the morning of 13 January. 56. The hydrologist in his report of 4 August 2011 made the following findings: Case No: 283920 Determination Page 8 of 9  The peak 1 hour rainfall intensity of 14.8mm/hr occurred at 1100 hours on 11 January.  Peak stormwater runoff would have occurred within 10 to 30 minutes after the peak rainfall.  Virtually no rainfall was recorded at the Corinda High Alert rainfall station after 1700 hours on 11 January.  The recorded local rainfalls in the vicinity of the Applicant‟s property were not particularly severe for short durations (less than 1 year average recurrence interval for all durations).  The property is located about 90 metres from Oxley Creek. An open stormwater drain which crosses below Neata Street before flowing into Oxley Creek is located 100m south west of the property.  Based on the observed depth of inundation, the property would have been inundated above floor level at about 1500 hours on 12 January. This is consistent with the time of inundation observed by the Applicant.  The property is within the extent of backwater flooding from the Brisbane River. 57. The hydrologist concluded:  “Given the low intensity rainfall recorded at the subject property and the fact that the house was inundated above floor level on Tuesday afternoon, the subject property could not have been inundated by stormwater runoff.  Inundation of approximately 1.0m above floor level was caused by floodwaters backing up from the Brisbane River along Oxley Creek and the open stormwater drain.” 58. A chart depicting recorded rainfall levels at the Corinda High Alert rainfall station shows significant rainfall recorded on 11 January to about 1700 hours. No further rainfall was recorded on 11 January. Low levels of rainfall were recorded prior to 1800 hours on 12 January. 59. The Applicant argues the open stormwater drain referred to by the hydrologist should not be considered a watercourse as it passes beneath a road and appears to be purpose built for the collection of stormwater. 60. It has been judicially determined ( Gartner v Kidman [1962] HCA 27:108 CLR 12 (30 May 1962) that to constitute a watercourse there must be a course marked on earth by visible signs along which water usually flows. 61. The hydrologist described the drain as an open stormwater drain. The drain therefore is purpose built and designed to carry water between banks. It is not necessary that water will be flowing constantly. As such, the Panel accepts the drain is a watercourse. It follows from this that the Panel is not persuaded that the defined event, of loss or damage which results from the bursting leaking, discharging or overflowing of fixed pipes, as argued in the alternative by the Applicant, is applicable to the circumstances of the loss. Case No: 283920 Determination Page 9 of 9 62. In deciding whether the initial inundation of property was from surface run-off rainwater, the time of the initial inundation relative to the last rainfall or the overtopping of a watercourse and location of that watercourse are essential factors. 63. Given the initial inundation observed by the Applicant was at about 1500 to 1600 hours on 12 January 2011 and the time of the last recorded heavy rainfall was at about 1700 hours on 11 January 2011, the Panel is persuaded that the initial inundation of the home above floor level was not from surface run-off rainwater but on the balance of probabilities, flood water as defined by the policy. 64. Accordingly, the Panel considers the FSP had discharged the onus that rests with it to show the claim does not fall within the terms of cover provided by the policy. Determination 65. The Panel determines the Applicant was provided with a PDS and its provision was sufficient to discharge its Section 35 of the Act obligations. 66. The Panel determines all of the damage to the Applicant‟s home was attributable to flood and accordingly the FSP is entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.