Denial of flood-related home and contents damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,520
Non-financial loss—
Amount claimed$30,000
SourceAFCA PDF

Summary

The insurer denied a claim for water inundation at the applicant's home, relying on the flood exclusion. AFCA found the initial water was stormwater runoff, so it ordered payment of the repair scope and shed contents to 150mm, while rejecting structural damage and the balance of the claim.

The policy's flood definition covers only water escaping from a reservoir, natural watercourse or lake, so the earlier stormwater runoff was not excluded flood water.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 283705 Determination Page 1 of 15 Case number: 283705 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 13 February 2013 Background 1. The Applicant‟s home and contents in Charlton are insured under a Personal Insurance Policy issued by the Financial Services Provider (FSP). 2. On 14 January 2011 the home was inundated by water following intense rainfall in the area over several days. 3. A claim under the policy for damage caused by the inundation was denied by the FSP on the ground the damage was due to flood water and excluded from cover provided by the policy. 4. The FSP accepted a claim for spoilt food on the ground that the relevant authority had cut power to the Applicant‟s home in the interest of public health and safety. 5. The Applicant contends the damage to her home was caused by local stormwater run-off and that her claim should succeed. Summary of Applicant’s p osition 6. The Applicant is represented by a law firm. Any reference to the Applicant in this determination will include th e Applicant‟s representative. 7. The Applicant submits that it was storm and rainwater run-off associated with heavy rainfall between 10 and 14 January 2011 which inundated her home causing damage to the building and contents. 8. The Applicant relies substantially on reports (2) provided by hydrologist PM. PM concludes it is likely that rainwater which fell in the paddocks to the south and south-east of Charlton would have accumulated and run-off along natural drainage lines into the town because the soils in the south and south- east would have been saturated due to days of heavy rain. 9. She was at home on 14 January 2011 and observed water first entering her yard at around 5.00pm. Water first entered her home at about 5.30pm. The water was clear. Determination Case No: 283705 Determination Page 2 of 15 10. The first water that entered her home was through the rear room which is lower than the rest of her home. Soon after, in advance of 6.00pm, water seeped up through the floor boards and entered the front rooms of the house. 11. The Applicant says given the timing and colour of the water, it is clear the inundation was by storm and rain water. 12. PM noted the home is just 125m from the drain running through the east of Charlton and concluded that the inundation was likely to have been caused by local stormwater runoff. He concluded that this early stormwater would have caused inundation to the back room of the home and the initial inundation through the floor boards in the rest of the house. Summary of FSP’ s position 13. The FSP submits:  The cause of the inundation was overflow from the Avoca River.  This comes within the scope of the policy definition of “flood” and therefore is excluded from cover.  The cause for distress to the Applicant‟s building was the flood water. 14. The FSP relies substantially on a hydrological report provided by WT. It also relies on reports from its engineers and geo-technical testers. 15. The FSP argues that it is clear from the conclusion drawn by WT the location of the risk address to the east of Armstrong Street and timing of the event, that any water which entered the home on the evening of 14 January 2011 must have been overflow from the Avoca River. 16. Payment for the spoilt food was made on the understanding that the power was not out as a result of the flood but in order to protect public safety. Even if the cause for the power shortage was inundation of the power box by flood water then the loss is not covered and the Applicant has been reimbursed in excess of her entitlement under the policy. This is not a basis for accepting the remainder of the claim. Cause of distress to the building 17. The FSP contends the stormwater runoff could not possibly have penetrated the soil resulting in shifting of the building‟s foundations. Instead, the damage is most likely pre-existing and as a result of gradual wear of the foundation stumps. 18. The FSP refers to „FG‟ engineering and „GS‟ geotechnical reports in this regard. Case No: 283705 Determination Page 3 of 15 19. The FSP relies on the following policy terms: “Words with special meaning ... “Flood” means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). ...” ... SECTION A – HOME COVER ... Defined Events Cover We will pay for loss or damage caused by the following Defined Events: ... 8 Storm or rainwater, but we will not pay for loss or damage; … ... Additional Benefits ... Frozen food When your Contents are insured by the Policy, we will pay up to $1,000 for spoilage of frozen food in domestic freezers caused by: 1. ... 2. The failure of the electricity supply; 3. ... .;.. What you are not insured for Under Section A – Home Cover we will not pay for: ... 2 Loss or damage to your property caused by: 1. Flood, ...” Issue 20. Whether the FSP was entitled to deny liability for damage to the A pplicant‟s home and contents arising from the inundation on 14 January 2011. Reasons for Determination 21. Due to the complex nature of this dispute, FOS has considered it appropriate to refer the dispute to a Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. The dispute has not been the subject of a FOS Recommendation and has proceeded direct to Determination. Case No: 283705 Determination Page 4 of 15 22. The decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the ins urance industry and a representative with extensive experience in consumer claims. 23. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to respond. 24. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties. 25. There has been an exchange of material between the parties. Accordingly the Panel will refer only to relevant information contained within the expert reports. 26. WT report dated 21 August 2012 – commissioned by the FSP.  The flooding of the Applicant‟s property and dwelling was caused by overflows from the Calder Highway tributary. At the time of inundation, water from the tributary would have consisted of a combination of breakout flows from the Yeungroon Creek and Avoca River further upstream. Inundation of the dwelling would have occurred at about 6pm on 14 January. The depth of inundation would have increased when the area was later flooded directly by water from the Avoca River. Flooding from breakouts and transferred flows from the St Arnaud-Charlton tributary, Yeungroon Creek and Avoca River  Given the size of the catchment, the Charlton-St Arnaud Road tributary would have contributed flows prior to flows from the Yeungroon Creek and the Avoca River. Observations by residents indicate that in 1997 the Charlton-St Arnaud Road was changed so that the tributary culvert passing under the road was altered. The resulting culvert was considered insufficient to convey flows, causing flows to back up behind this road.  Modelling suggests that the Avoca River and Yeungroon Creek transferred flows across the flood plain upstream of town which occurred from about 5am on 14 January. Site inspection  The Applicant advised:  Water initially flowed from the rear corner of the property and rose quickly from between 5-6pm on 14 January 2011. Prior to that there had been little water on the property.  She left the property at about 6pm on that day at which time water had started entering the house. Her sons stayed at the house throughout the event.  The initial inundation occurred from 5pm on that day and began entering the dwelling from around 6pm. Case No: 283705 Determination Page 5 of 15  There had been some shallow water in the streets and gutters through the day prior to the inundatio n of her property.  The water which inundated her property was clear. It initially rose to a level of about 6- 8” above the floor level and then from about 9pm it rose a further 10”.  The floor level of the dwelling above ground level was 350mm. Flooding mech anism at the Applicant’s property  Water would have firstly flowed towards the property from the Calder Highway tributary of the Avoca River from east to west. The waterway referred to as „Calder highway tributary‟ is not part of the VicMap 1:250,000 topographical River and Stream layer as defined by DSE. Instead, the area of the channel is covered by a drainage easement from Watson Street to Calder Highway.  Given the response times of the catchment of the tributary upstream of the Calder Highway is 2 hours, the peak discharge associated with the rainfall would have been expected to have occurred close to the time the rainfall ceased.  Any significant continuing flows in the tributary after about 8am would have been caused by overland flows resulting from breakouts from Yeungroon Creek, the Charlton St Arnaud Road tributary and later from the Avoca River further upstream.  Given the size of the catchments, flooding from this tributary after about 8am would have been principally by overland flows resulting from breakouts from Yeungroon Creek and later, from the Avoca River further upstream.  As the inundation of the Applicant‟s property occurred at about 5pm flooding at this location was due to flood water originating from Yeungroon Creek and breakouts from the A voca River further upstream.  Later in the evening it is likely that flooding occurred directly from the Avoca River.  Clear water is not necessarily an indicator of stormwater. It is more an indicator of where the water has come from, in this case the vegetated catchment with little opportunity to pick up sediment, rather than a bare river channel. 27. PM report dated 3 November 2011 - commissioned by the Applicant Rainfall  The radar data for Charlton indicates the rainfall was highly concentrated in short duration bursts. The rainfall which produced the 15mm/hour actually occurred over a period of about 12 minutes. Case No: 283705 Determination Page 6 of 15  This situation is similar for the rainfall over night on 13-14 January 2011.  The rainfall intensities in these bursts are much bigger than the recorded hourly rates. Overflow from local drainage systems  Given the intensity of rainfall which was much more than hourly rainfall rates, overflow from local drainage systems and culverts was highly likely. Especially given that the drainage system was already close to capacity from earlier rainfall bursts.  The timing of overflow would correspond closely to the timing of the rainfall.  The first possible incident of stormwater drainage overflow would have occurred around 0700 on 13 January 2011. Any of the intense rainfall periods recorded between 13 and 14 January 2011 could have been responsible for overflow of stormwater drainage systems. The greater probability being from midnight to 0400 on 14 January.  Direct overflow is less likely after this time.  Without augmentation from other sources stormwater drainage overflow would be short lived. Runoff from surrounding areas  Runoff was possible from Charlton which does not e nter the drainage systems and runoff from rural areas.  During periods of heavy rainfall bursts, water would have overflowed and contributed to surface runoff. Without augmentation from other sources stormwater drainage overflow would have been short-lived.  It is highly likely that rainfall which fell on 13 and 14 January was saturation overland flow and would have led to inundation of Charlton on 13 and 14 January before floodwater from Avoca entered the town.  Water falling south and east of Armstrong and High Streets will tend to move east with water to the west and north tending to move to the river.  Water runoff as overland flow would concentrate water in the eastern part of Charlton.  The combination of surface runoff from the surrounding area being directed toward east Charlton combined with periodic overflow from drainage systems in other parts of the town would lead to inundation by stormwater and locally derived surface water on the morning of 14 January.  That inundation from locally derived water rather than Avoca River water is further supported by the changing sediment loads of water seen in Charlton. Case No: 283705 Determination Page 7 of 15 Yeungroon Creek  Yeungroon Creek is a former branch of the Avoca River which has been abandoned and filled in with flood deposits over many years. Much of its length has been in-filled in the extent that there is no longer a well-defined channel. It acts as a natural drainage line.  The course of the creek is marked by a series of linear depressions which breakout from the Avoca River channel north of Wychitella Channel junction. Half way along its length it became defined by a line of vegetation. South of Charlton its course is marked by a linear depression and vegetation. East of Charlton it is marked by a more clearly defined channel. Direction of storm water and floodwaters  The combination of surface water from surrounding areas directed to east Charlton thus overloading the storm water drainage system in this part of town combined with periodic addition of overflow from stormwater drainage system in other parts of town would lead to tendency for the parts of Charlton in and adjacent to the depressions (see fig 1) to be inundated by stormwater and locally derived surface water on the morning of 14 January.  That inundation was from locally derived water rather than Avoca River water is further supported by the changing sediment loads in the water seen in Charlton. Clear water  When the Avoca River overtopped its banks and Charlton was inundated by floodwater the source of that water can be clearly see n because of its high sediment load. Flooding from Avoca River  Minor flood level was reached at 0400 on 13 January 2011. Moderate flood levels were reached at 2045 on 13 January. Major flood level was reached at 1715 on 14 January.  Significant inundation of Charlton from the Avoca River did not begin until late afternoon on 14 January 2011 and became more severe through the evening and night. Some outlying parts of Charlton would have been inundated mid-afternoon. 28. In a second report dated March 2012 PM stated: Storm water drainage  The stormwater drainage system empties directly into the Avoca close to Calder Highway bridge. As the river rose the stormwater outlet would have been inundated by the river water and the drainage system would have back filled to capacity preventing stormwater from draining away. Case No: 283705 Determination Page 8 of 15  From the morning of 13 January (2011) onwards the stormwater drainage system would have been at full capacity and runoff rainwater would not be able to drain away. Stormwater accumulation therefore is a factor from mid morning on 13 January (2011) onwards. Clear water  The first accounts of sediment laden water occurred at about 6.00pm (14 January 2011) associated with a rapid rise in water level.  Mixing of clear and muddy water was a gradual process and likely took some time for water sourced from the river to flow across the town and mix with locally sourced stormwater. Major flood level  Major flood level is 7.5m. This level was reached at 5.15pm on 14 January (2011). Water has to rise above this level for widespread inundation from the river to occur.  This indicates that significant inundation for flood water probably occurred after 5.15pm (14 January 2011). It is possible other lower points of the river allowed water to leave the river and inundate parts o f the town earlier than this. Summary of to wn wide findings  The site visit confirmed that stormwater would have played a major role in the town flooding. The stormwater drainage system would have been inundated by rising water from the river long before the river rose over its banks.  The topography of the town reinforces the significance of the depression in the east of the town as a collection point for stormwater draining over the surface.  Modelling indicates this part of the town was inundated independently of the river long before the western part of town was inundated directly from the river.  Flooding across the town began in the east and progressed westward. A gradual rise from the clearly local water occurred up to about 5.30pm (14 January 2011) and sometime around 6pm (same day) a rapid rise associated with inundation from the river began. Site inspection of Applicant’s property  The back of the house is 35cm above ground level with a 5cm rise between the back room and the front of the house. Due to the slope of the ground, the front of the house is 45cm above the ground.  The property would have been affected by local water overflowing from the drain relatively early and to relatively high depths given that it is closer to the drain. Case No: 283705 Determination Page 9 of 15  By comparison to accounts by nearby properties, the timing of the transition from local flooding to river flooding can be assumed to be the rapid rise associated with the river occurring at about 6pm  This means that all of the flooding in the back room and the onset of flooding (water coming through the floor boards) in the rest of the house is likely to be due to local water. Greater depths of inundation in front of the house was probably due to river water. Summary 29. It has been established the Avoca River began to overtop its banks in Charlton after about 5.15pm on 14 January 2011. According to PM the water level would need to continue to rise above this level for widespread flooding to occur and there would be a lag time before the rising river water moved across the town inundating housing. 30. PM considered that 6.00pm was a reasonable estimate of time delay between the river reaching major flood level and the flood wave moving across the town. WT also observed that flooding directly from the river in Charlton would have occurred from around 6.00pm on 14 January. 31. The Applicant says water entered the rear of her building at about 5.30pm and through the floor boards to the front section of the home, before 6.00pm. 32. WT was of the opinion that the inundation was from overflows of the Calder Highway tributary which was a combination of water from Yeungroon Creek and later from breakout flows from the Avoca River further upstream. WT considered this water first inundated the dwelling at about 6.00pm and later from water directly from the Avoca River overtopping in Charlton. 33. PM considered water from the south and east of Charlton would have entered the town through a number of linear depressions and mixed with surface water to cause the inundation prior to the Avoca River overtopping its banks. 34. A colour photo contained in WT‟s report of 4 July 2011 shows the flooding mechanisms of the Applicant‟s property. Arrows indicate breakouts from Yeungroon Creek and Avoca River upstream of Charlton approaching from the south east of the town and breakouts later in the day from the Avoca River to the west of Charlton. 35. It is therefore common ground between the experts that water which inundated parts of Charlton approached Charlton fro m the south and east. It was from this direction that water first entered the Applicant‟s property. 36. The question then arises as to whether the water which covered that landscape was flood water as defined by the policy. 37. According to WT the water was a combination of flows from breakout flows from Yeungroon Creek and the Avoca River further upstream from Charlton. Case No: 283705 Determination Page 10 of 15 It appears from the report that the Avoca River streamflow data from which the river levels were based was taken at Charlton (fig3.4). 38. In discussing the streamflow data WT observed: “There is no streamflow data available for Yeungroon Creek, the Charlton St Arnaud Road tributary or the Calder Highway tributary. It is important to note that while the recorded water level at the gauge can be used to indicate when water came directly from the Avoca River in the channel to Charlton, it will not provide any indication of timing flows across Charlton – namely from any breakouts upstream of the town from Yeungroon Creek or either the Charlton St Arnaud Roa d tributary or the Calder Highway tributary.” 39. According to the reports the gauge on which the finding was made was located at the Charlton weir downstream of Charlton thus measuring overland flows from Yeungroon Creek catchment which had combined with river water downstream of Charlton. There was no separate stream flow data available for Yeungroon Creek, the Charlton-St Arnaud Road tributary or the Calder Highway tributary. 40. Secondly, both experts comment that breakouts from the Avoca River upstream of Charlton occurred later. 41. Although a gauge is located at Coonooer no information had been provided to show the river levels further upstream, the level at which the river would breach its banks, the timing of any breakouts and the delay which may occur for these breakouts to mix with water in the Yeungroon catchment. 42. Given the source of the water and timing is critical to the outcome of this matter, the Panel is of the opinion that any references to unsubstantiated breakouts from the Avoca River further upstream must be treated with caution. Where evidence is to the contrary, the contrary evidence is to be preferred. 43. The Panel Chair Ombudsman and Panel members have previously visited numerous properties in the Charlton area and in the Applicant‟s locality. The Panel has found that the landscape over which the water flowed from the south and east of the town cannot be regarded as a natural watercourse. 44. The following ruling was made by the High Court in Gartner v Kidman [1962] HCA 27: 108 CLR 12 (30 May 1962): “Thi s distinction between watercourse and depression follows the language of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a depression which took rainwater for about three months of a year fell short of the legal definition of a natural watercourse. To constitute such a watercourse as a matter of law, there must be a stream of water flowing in a defined channel or between something in the nature of banks. The stream may be very small and need not run, nor need the banks be clearly or sharply defined. But there must be a course, marked on earth by visible signs, along which water usually flows in order to constitute a watercourse such as creates riparian rights (1899VLR at p485 (at p16) Case No: 283705 Determination Page 11 of 15 45. Although the area from which the water flowed is d esignated as “Yeungroon Creek”, that appellation alone cannot be taken as evidence of a watercourse. The landscape to the south and south east of the town does not have evidence of visible banks between which water flows, further, water does not usually flow along this stretch of land, which is only vaguely described by a range of indentations and vegetation. 46. In the Panel‟s view the landscape may best be described as a flood plain over which water flows in a direction determined by the rise and fall of the land. 47. This view is further supported by the description given by PM who observed Yeungroon Creek has been in-filled with flood deposits over many years. The course of the creek to the south of the town is marked by linear depressions and vegetation. 48. Additionally, photographs accompanying the WT report of 21/8/12, apart from the gauge located downstream of Charlton, depict culverts including at the crossing of the Charlton-St Arnaud Road and flat expanses of land at a road crossing about 8km upstream of Charlton. 49. Accordingly, the Panel accepts that water which came from the Yeungroon Creek area to the south and south east of the town may not be regarded as water which was from a natural watercourse. 50. The Applicant described the water which inundated her property as exceptionally clear. 51. According to the PM report the presence of clear water was indicative that it was not water from the Avoca River. While WT accepted the general principle of clear water discussed by the PM report, WT did not accept that water from Yeungroon Creek would necessarily contain high levels of sediment to colour the water. 52. While the Panel accepts that clear water of itself is not definitive, given the timing of the initial inundation reported by the Applicant, the direction from which the water originated and the hydrological evidence, the Panel is persuaded that the clear water from the south east which initially entered the Applicant‟s property was not water from the Avoca River. Structural damage to the dwelling 53. The Applicant claims that the inundation of water onto her site has caused foundation movement which in turn has caused distress damage to the structure. 54. The FSP commissioned a structural engineer FG and a geotechnical engineer GS to investigate and report on the effect of the water inundation on the building. The following is relevant information contained in those reports. Case No: 283705 Determination Page 12 of 15 55. FG Engineering – report dated 30 September 2011:  The report was to determine (in part) the likely cause of the distress if preceding stormwater (not flood water) was likely to cause any distress to the residence.  The clay soil on which the building is constructed is expected to be moderately reactive.  There had been seasonal on-going movements and pre-existing distress within the house prior to renovation works carried out by the Applicant about 4 years before.  No distress in the residence had been observed since then or prior to the inundation.  The relatively expected impermeable clay soils would have prevented the stormwater affecting the performance of the footing system of the house. There was no evidence the initial stormwater inundation caused or contributed to any structural damage to the house for the following reasons:  The levels contour diagram indicates no abnormal discernible foundation movements. Instead the levels survey confirms the pattern of floor levels is typical of foundation movement common for a stump footing system as a result of long term seasonable changes in moisture contents of the sub soil.  The distress is relatively minor and did not appear to be recent.  Previous repairs had been carried out and previously repaired distress has re-occurred at the same locations. 56. Geotechnical report GS – dated November 2011  The reactivity of the material at the site was Class H1 -D classification.  The strength of the material under the footings was very stiff with an allowable bearing pressure in excess of 100kPa for footings.  The moisture content tests showed moisture at BHs 1 and 2 were reasonably consistent. Moisture content at footing exposure at 1.0m was considerably drier than all others. This variation in moisture can lead to differential movement. 57. FG engineering reviewed the geotechnical report and by email dated 19 November 2011 made the following comments.  The report classifies the site at H1-D which confirms the assumptions in his report regarding soil reactivity and subsequent long term movement of the house.  His assumptions were more conservative than the field classification confirming the movement of the house would have been caused by the long-term contributing factors in the presence of highly reactive soils at the site. Case No: 283705 Determination Page 13 of 15 58. After analysis of the expert evidence the Panel is satisfied that the pooling of the stormwater runoff on the Applicant‟s property which preceded the river water had no measurable impact on the footings and in turn on the structural integrity of the building. Conclusion 59. Notwithstanding the previous paragraph‟s finding, the Panel is, however, of the opinion, the evidence leads to the conclusion the water which initially entered the Applicant‟s property was surface runoff rainwater. 60. The Panel accepts that the major part of the damage was caused by the subsequent inundation of flood water from the Avoca River combined with surface rainwater. The FSP therefore is not liable for the total cost of rectifying the damage claimed. 61. Nevertheless, in the Panel‟s view the initial inundation would have caused some damage, although somewhat limited, prior to the arrival of floodwaters. And as previously stated, the Panel is satisfied on the basis of the evidence presented, that any structural damage to the building was not caused by stormwater runoff. Internal building damage and contents damage 62. The floor level at the rear of Applicant‟s dwelling is 350mm above ground level and the front section is another 50mm higher but due to the effect of the ground slope is effectively 450mm above the ground. 63. The issue for the Panel is to determine what level of inundation to the home relates to the initial stormwater runoff and what level relates to flood waters from the Avoca River. 64. As previously stated, the Panel has had the opportunity of conducting numerous site visits in and around the Charlton area. The opportunity to conduct these site visits has been of great assistance to the Panel and enabled it to form a general opinion regarding the circumstances of the events that occurred in January 2011 in Charlton. 65. By letter dated 27 January 2012 the FSP‟s loss adjuster informed the Applicant it had been engaged to determine the extent of damage caused by rainwater run-off as opposed to flood which had previously been denied. The loss adjuster offered settlement of the claim as follows: “Repairs as per [contractors] quote $ 7,520.00 Remainder of contents $10,000.00 Sub total $17,520.00 Less policy excess $ 100.00 Final settlement $17,420.00” Case No: 283705 Determination Page 14 of 15 66. In respect to the repairs for which the contractor on 12 December 2011 has quoted the price of $7,520, the scope of works refers to repairs to the sun room and includes:  Remove and replace chip board flooring  Supply and install new carpet  PC allowance of $35 per square metre of carpet  Remove and replace skirting  Prepare, sand and paint skirting and walls as required  Remove all associated debris 67. Having considered the evidence presented in this matter and given the findings made by the Panel in respect of their numerous visits to Charlton, the Panel is satisfied that the offer made by the FSP in respect to the above mentioned repairs is a reasonable estimate of repairs required as a result of inundation to the home by stormwater runoff. 68. In the Panel‟s view, payment of the amount offered for repairs would discharge the FSP‟s obligation for damage to the home. 69. Insofar as the Applicant has claimed damage to contents in the shed, this in the Panel‟s vie w is a separate and distinct part of the dispute. 70. The loss adjuster refers to an inventory of contents in the shed submitted by the Applicant in the sum of $30,000. However, as the damaged contents had been discarded the offer of $10,000 was made. 71. It is unclear to the Panel what payments, if any, were previously made to the Applicant in relation to her contents and on what basis her claim for $30,000 was reduced to $10,000. 72. The Panel has considered the likely impact of stormwater runoff in the area of the s hed and based on the evidence and the Panel‟s knowledge and experience of this flood event, in the Panel‟s view the level of inundation would on the balance of probabilities been at a height of about 150mm above ground level in the vicinity of the shed. 73. On that basis the FSP is responsible for rectifying or replacing damaged contents in the shed occasioned to the level of 150mm above the ground. 74. In the circumstances there is insufficient information for the Panel to form a view of the cost of the damage to contents which may have been caused by the inundation by runoff stormwater to a level of 150mm above ground level in the shed. As such, the parties are asked to work cooperatively together to establish this sum. 75. In the event that the parties are unable to come to an agreement, then either party may refer the matter back to the Panel within 30 days of acceptance of the Determination by the Applicant. Case No: 283705 Determination Page 15 of 15 Determination 76. Based on the available material the Panel determines: a. The FSP is to indemnify the Applicant in respect to the scope of works detailed within the contractor‟s quotation of 12 December 2011. b. The FSP is to indemnify the Applicant for the contents affected by the initial stormwater inundation of the shed to a level of 150mm. The parties are enjoined to work together to establish the monetary sum associated with this matter but if the parties are not able to reach agreement, then either party may refer the matter back to the Panel for further determination. c. The FSP is not liable for any damage caused in excess of the coverage referred to above. d. The FSP is not liable for rectifying structural damage.