Text of the determination
Case No: 283705 Determination Page 1 of 15
Case number: 283705
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
13 February 2013
Background
1. The Applicant‟s home and contents in Charlton are insured under a Personal
Insurance Policy issued by the Financial Services Provider (FSP).
2. On 14 January 2011 the home was inundated by water following intense
rainfall in the area over several days.
3. A claim under the policy for damage caused by the inundation was denied by
the FSP on the ground the damage was due to flood water and excluded
from cover provided by the policy.
4. The FSP accepted a claim for spoilt food on the ground that the relevant
authority had cut power to the Applicant‟s home in the interest of public
health and safety.
5. The Applicant contends the damage to her home was caused by local
stormwater run-off and that her claim should succeed.
Summary of Applicant’s p osition
6. The Applicant is represented by a law firm. Any reference to the Applicant in
this determination will include th e Applicant‟s representative.
7. The Applicant submits that it was storm and rainwater run-off associated with
heavy rainfall between 10 and 14 January 2011 which inundated her home
causing damage to the building and contents.
8. The Applicant relies substantially on reports (2) provided by hydrologist PM.
PM concludes it is likely that rainwater which fell in the paddocks to the
south and south-east of Charlton would have accumulated and run-off along
natural drainage lines into the town because the soils in the south and south-
east would have been saturated due to days of heavy rain.
9. She was at home on 14 January 2011 and observed water first entering her
yard at around 5.00pm. Water first entered her home at about 5.30pm. The
water was clear.
Determination
Case No: 283705 Determination Page 2 of 15
10. The first water that entered her home was through the rear room which is
lower than the rest of her home. Soon after, in advance of 6.00pm, water
seeped up through the floor boards and entered the front rooms of the
house.
11. The Applicant says given the timing and colour of the water, it is clear the
inundation was by storm and rain water.
12. PM noted the home is just 125m from the drain running through the east of
Charlton and concluded that the inundation was likely to have been caused
by local stormwater runoff. He concluded that this early stormwater would
have caused inundation to the back room of the home and the initial
inundation through the floor boards in the rest of the house.
Summary of FSP’ s position
13. The FSP submits:
The cause of the inundation was overflow from the Avoca River.
This comes within the scope of the policy definition of “flood” and
therefore is excluded from cover.
The cause for distress to the Applicant‟s building was the flood water.
14. The FSP relies substantially on a hydrological report provided by WT. It also
relies on reports from its engineers and geo-technical testers.
15. The FSP argues that it is clear from the conclusion drawn by WT the location
of the risk address to the east of Armstrong Street and timing of the event,
that any water which entered the home on the evening of 14 January 2011
must have been overflow from the Avoca River.
16. Payment for the spoilt food was made on the understanding that the power
was not out as a result of the flood but in order to protect public safety. Even
if the cause for the power shortage was inundation of the power box by flood
water then the loss is not covered and the Applicant has been reimbursed in
excess of her entitlement under the policy. This is not a basis for accepting
the remainder of the claim.
Cause of distress to the building
17. The FSP contends the stormwater runoff could not possibly have penetrated
the soil resulting in shifting of the building‟s foundations. Instead, the
damage is most likely pre-existing and as a result of gradual wear of the
foundation stumps.
18. The FSP refers to „FG‟ engineering and „GS‟ geotechnical reports in this
regard.
Case No: 283705 Determination Page 3 of 15
19. The FSP relies on the following policy terms:
“Words with special meaning
...
“Flood” means the inundation of normally dry land by water escaping, or
being released from, the normal confines of a reservoir, natural watercourse
or lake (whether or not they have been altered or modified). ...”
...
SECTION A – HOME COVER
...
Defined Events Cover
We will pay for loss or damage caused by the following Defined Events:
...
8 Storm or rainwater, but we will not pay for loss or damage; …
...
Additional Benefits
...
Frozen food
When your Contents are insured by the Policy, we will pay up to $1,000 for
spoilage of frozen food in domestic freezers caused by:
1. ...
2. The failure of the electricity supply;
3. ...
.;..
What you are not insured for
Under Section A – Home Cover we will not pay for:
...
2 Loss or damage to your property caused by:
1. Flood, ...”
Issue
20. Whether the FSP was entitled to deny liability for damage to the A pplicant‟s
home and contents arising from the inundation on 14 January 2011.
Reasons for Determination
21. Due to the complex nature of this dispute, FOS has considered it appropriate
to refer the dispute to a Panel in accordance with the Operational Guidelines
to the FOS Terms of Reference. The dispute has not been the subject of a
FOS Recommendation and has proceeded direct to Determination.
Case No: 283705 Determination Page 4 of 15
22. The decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the ins urance industry and a
representative with extensive experience in consumer claims.
23. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
24. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties.
25. There has been an exchange of material between the parties. Accordingly
the Panel will refer only to relevant information contained within the expert
reports.
26. WT report dated 21 August 2012 – commissioned by the FSP.
The flooding of the Applicant‟s property and dwelling was caused by
overflows from the Calder Highway tributary. At the time of inundation,
water from the tributary would have consisted of a combination of
breakout flows from the Yeungroon Creek and Avoca River further
upstream. Inundation of the dwelling would have occurred at about 6pm
on 14 January. The depth of inundation would have increased when the
area was later flooded directly by water from the Avoca River.
Flooding from breakouts and transferred flows from the St Arnaud-Charlton
tributary, Yeungroon Creek and Avoca River
Given the size of the catchment, the Charlton-St Arnaud Road tributary
would have contributed flows prior to flows from the Yeungroon Creek
and the Avoca River. Observations by residents indicate that in 1997
the Charlton-St Arnaud Road was changed so that the tributary culvert
passing under the road was altered. The resulting culvert was
considered insufficient to convey flows, causing flows to back up
behind this road.
Modelling suggests that the Avoca River and Yeungroon Creek
transferred flows across the flood plain upstream of town which
occurred from about 5am on 14 January.
Site inspection
The Applicant advised:
Water initially flowed from the rear corner of the property and rose
quickly from between 5-6pm on 14 January 2011. Prior to that
there had been little water on the property.
She left the property at about 6pm on that day at which time water
had started entering the house. Her sons stayed at the house
throughout the event.
The initial inundation occurred from 5pm on that day and began
entering the dwelling from around 6pm.
Case No: 283705 Determination Page 5 of 15
There had been some shallow water in the streets and gutters
through the day prior to the inundatio n of her property.
The water which inundated her property was clear. It initially rose
to a level of about 6- 8” above the floor level and then from about
9pm it rose a further 10”.
The floor level of the dwelling above ground level was 350mm.
Flooding mech anism at the Applicant’s property
Water would have firstly flowed towards the property from the Calder
Highway tributary of the Avoca River from east to west. The waterway
referred to as „Calder highway tributary‟ is not part of the VicMap
1:250,000 topographical River and Stream layer as defined by DSE.
Instead, the area of the channel is covered by a drainage easement
from Watson Street to Calder Highway.
Given the response times of the catchment of the tributary upstream of
the Calder Highway is 2 hours, the peak discharge associated with the
rainfall would have been expected to have occurred close to the time
the rainfall ceased.
Any significant continuing flows in the tributary after about 8am would
have been caused by overland flows resulting from breakouts from
Yeungroon Creek, the Charlton St Arnaud Road tributary and later from
the Avoca River further upstream.
Given the size of the catchments, flooding from this tributary after about
8am would have been principally by overland flows resulting from
breakouts from Yeungroon Creek and later, from the Avoca River
further upstream.
As the inundation of the Applicant‟s property occurred at about 5pm
flooding at this location was due to flood water originating from
Yeungroon Creek and breakouts from the A voca River further
upstream.
Later in the evening it is likely that flooding occurred directly from the
Avoca River.
Clear water is not necessarily an indicator of stormwater. It is more an
indicator of where the water has come from, in this case the vegetated
catchment with little opportunity to pick up sediment, rather than a bare
river channel.
27. PM report dated 3 November 2011 - commissioned by the Applicant
Rainfall
The radar data for Charlton indicates the rainfall was highly
concentrated in short duration bursts. The rainfall which produced the
15mm/hour actually occurred over a period of about 12 minutes.
Case No: 283705 Determination Page 6 of 15
This situation is similar for the rainfall over night on 13-14 January
2011.
The rainfall intensities in these bursts are much bigger than the
recorded hourly rates.
Overflow from local drainage systems
Given the intensity of rainfall which was much more than hourly rainfall
rates, overflow from local drainage systems and culverts was highly
likely. Especially given that the drainage system was already close to
capacity from earlier rainfall bursts.
The timing of overflow would correspond closely to the timing of the
rainfall.
The first possible incident of stormwater drainage overflow would have
occurred around 0700 on 13 January 2011. Any of the intense rainfall
periods recorded between 13 and 14 January 2011 could have been
responsible for overflow of stormwater drainage systems. The greater
probability being from midnight to 0400 on 14 January.
Direct overflow is less likely after this time.
Without augmentation from other sources stormwater drainage
overflow would be short lived.
Runoff from surrounding areas
Runoff was possible from Charlton which does not e nter the drainage
systems and runoff from rural areas.
During periods of heavy rainfall bursts, water would have overflowed
and contributed to surface runoff. Without augmentation from other
sources stormwater drainage overflow would have been short-lived.
It is highly likely that rainfall which fell on 13 and 14 January was
saturation overland flow and would have led to inundation of Charlton
on 13 and 14 January before floodwater from Avoca entered the town.
Water falling south and east of Armstrong and High Streets will tend to
move east with water to the west and north tending to move to the river.
Water runoff as overland flow would concentrate water in the eastern
part of Charlton.
The combination of surface runoff from the surrounding area being
directed toward east Charlton combined with periodic overflow from
drainage systems in other parts of the town would lead to inundation by
stormwater and locally derived surface water on the morning of 14
January.
That inundation from locally derived water rather than Avoca River
water is further supported by the changing sediment loads of water
seen in Charlton.
Case No: 283705 Determination Page 7 of 15
Yeungroon Creek
Yeungroon Creek is a former branch of the Avoca River which has
been abandoned and filled in with flood deposits over many years.
Much of its length has been in-filled in the extent that there is no longer
a well-defined channel. It acts as a natural drainage line.
The course of the creek is marked by a series of linear depressions
which breakout from the Avoca River channel north of Wychitella
Channel junction. Half way along its length it became defined by a line
of vegetation. South of Charlton its course is marked by a linear
depression and vegetation. East of Charlton it is marked by a more
clearly defined channel.
Direction of storm water and floodwaters
The combination of surface water from surrounding areas directed to
east Charlton thus overloading the storm water drainage system in this
part of town combined with periodic addition of overflow from
stormwater drainage system in other parts of town would lead to
tendency for the parts of Charlton in and adjacent to the depressions
(see fig 1) to be inundated by stormwater and locally derived surface
water on the morning of 14 January.
That inundation was from locally derived water rather than Avoca River
water is further supported by the changing sediment loads in the water
seen in Charlton.
Clear water
When the Avoca River overtopped its banks and Charlton was
inundated by floodwater the source of that water can be clearly see n
because of its high sediment load.
Flooding from Avoca River
Minor flood level was reached at 0400 on 13 January 2011. Moderate
flood levels were reached at 2045 on 13 January. Major flood level was
reached at 1715 on 14 January.
Significant inundation of Charlton from the Avoca River did not begin
until late afternoon on 14 January 2011 and became more severe
through the evening and night. Some outlying parts of Charlton would
have been inundated mid-afternoon.
28. In a second report dated March 2012 PM stated:
Storm water drainage
The stormwater drainage system empties directly into the Avoca close
to Calder Highway bridge. As the river rose the stormwater outlet would
have been inundated by the river water and the drainage system would
have back filled to capacity preventing stormwater from draining away.
Case No: 283705 Determination Page 8 of 15
From the morning of 13 January (2011) onwards the stormwater
drainage system would have been at full capacity and runoff rainwater
would not be able to drain away. Stormwater accumulation therefore is
a factor from mid morning on 13 January (2011) onwards.
Clear water
The first accounts of sediment laden water occurred at about 6.00pm
(14 January 2011) associated with a rapid rise in water level.
Mixing of clear and muddy water was a gradual process and likely took
some time for water sourced from the river to flow across the town and
mix with locally sourced stormwater.
Major flood level
Major flood level is 7.5m. This level was reached at 5.15pm on 14
January (2011). Water has to rise above this level for widespread
inundation from the river to occur.
This indicates that significant inundation for flood water probably
occurred after 5.15pm (14 January 2011). It is possible other lower
points of the river allowed water to leave the river and inundate parts o f
the town earlier than this.
Summary of to wn wide findings
The site visit confirmed that stormwater would have played a major role
in the town flooding. The stormwater drainage system would have been
inundated by rising water from the river long before the river rose over
its banks.
The topography of the town reinforces the significance of the
depression in the east of the town as a collection point for stormwater
draining over the surface.
Modelling indicates this part of the town was inundated independently
of the river long before the western part of town was inundated directly
from the river.
Flooding across the town began in the east and progressed westward.
A gradual rise from the clearly local water occurred up to about 5.30pm
(14 January 2011) and sometime around 6pm (same day) a rapid rise
associated with inundation from the river began.
Site inspection of Applicant’s property
The back of the house is 35cm above ground level with a 5cm rise
between the back room and the front of the house. Due to the slope of
the ground, the front of the house is 45cm above the ground.
The property would have been affected by local water overflowing from
the drain relatively early and to relatively high depths given that it is
closer to the drain.
Case No: 283705 Determination Page 9 of 15
By comparison to accounts by nearby properties, the timing of the
transition from local flooding to river flooding can be assumed to be the
rapid rise associated with the river occurring at about 6pm
This means that all of the flooding in the back room and the onset of
flooding (water coming through the floor boards) in the rest of the
house is likely to be due to local water. Greater depths of inundation in
front of the house was probably due to river water.
Summary
29. It has been established the Avoca River began to overtop its banks in
Charlton after about 5.15pm on 14 January 2011. According to PM the water
level would need to continue to rise above this level for widespread flooding
to occur and there would be a lag time before the rising river water moved
across the town inundating housing.
30. PM considered that 6.00pm was a reasonable estimate of time delay
between the river reaching major flood level and the flood wave moving
across the town. WT also observed that flooding directly from the river in
Charlton would have occurred from around 6.00pm on 14 January.
31. The Applicant says water entered the rear of her building at about 5.30pm
and through the floor boards to the front section of the home, before 6.00pm.
32. WT was of the opinion that the inundation was from overflows of the Calder
Highway tributary which was a combination of water from Yeungroon Creek
and later from breakout flows from the Avoca River further upstream. WT
considered this water first inundated the dwelling at about 6.00pm and later
from water directly from the Avoca River overtopping in Charlton.
33. PM considered water from the south and east of Charlton would have
entered the town through a number of linear depressions and mixed with
surface water to cause the inundation prior to the Avoca River overtopping
its banks.
34. A colour photo contained in WT‟s report of 4 July 2011 shows the flooding
mechanisms of the Applicant‟s property. Arrows indicate breakouts from
Yeungroon Creek and Avoca River upstream of Charlton approaching from
the south east of the town and breakouts later in the day from the Avoca
River to the west of Charlton.
35. It is therefore common ground between the experts that water which
inundated parts of Charlton approached Charlton fro m the south and east. It
was from this direction that water first entered the Applicant‟s property.
36. The question then arises as to whether the water which covered that
landscape was flood water as defined by the policy.
37. According to WT the water was a combination of flows from breakout flows
from Yeungroon Creek and the Avoca River further upstream from Charlton.
Case No: 283705 Determination Page 10 of 15
It appears from the report that the Avoca River streamflow data from which
the river levels were based was taken at Charlton (fig3.4).
38. In discussing the streamflow data WT observed:
“There is no streamflow data available for Yeungroon Creek, the Charlton St
Arnaud Road tributary or the Calder Highway tributary. It is important to note
that while the recorded water level at the gauge can be used to indicate when
water came directly from the Avoca River in the channel to Charlton, it will not
provide any indication of timing flows across Charlton – namely from any
breakouts upstream of the town from Yeungroon Creek or either the Charlton
St Arnaud Roa d tributary or the Calder Highway tributary.”
39. According to the reports the gauge on which the finding was made was
located at the Charlton weir downstream of Charlton thus measuring
overland flows from Yeungroon Creek catchment which had combined with
river water downstream of Charlton. There was no separate stream flow data
available for Yeungroon Creek, the Charlton-St Arnaud Road tributary or the
Calder Highway tributary.
40. Secondly, both experts comment that breakouts from the Avoca River
upstream of Charlton occurred later.
41. Although a gauge is located at Coonooer no information had been provided
to show the river levels further upstream, the level at which the river would
breach its banks, the timing of any breakouts and the delay which may occur
for these breakouts to mix with water in the Yeungroon catchment.
42. Given the source of the water and timing is critical to the outcome of this
matter, the Panel is of the opinion that any references to unsubstantiated
breakouts from the Avoca River further upstream must be treated with
caution. Where evidence is to the contrary, the contrary evidence is to be
preferred.
43. The Panel Chair Ombudsman and Panel members have previously visited
numerous properties in the Charlton area and in the Applicant‟s locality. The
Panel has found that the landscape over which the water flowed from the
south and east of the town cannot be regarded as a natural watercourse.
44. The following ruling was made by the High Court in Gartner v Kidman [1962]
HCA 27: 108 CLR 12 (30 May 1962):
“Thi s distinction between watercourse and depression follows the language of
Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a
depression which took rainwater for about three months of a year fell short of
the legal definition of a natural watercourse. To constitute such a watercourse
as a matter of law, there must be a stream of water flowing in a defined
channel or between something in the nature of banks. The stream may be
very small and need not run, nor need the banks be clearly or sharply defined.
But there must be a course, marked on earth by visible signs, along which
water usually flows in order to constitute a watercourse such as creates
riparian rights (1899VLR at p485 (at p16)
Case No: 283705 Determination Page 11 of 15
45. Although the area from which the water flowed is d esignated as “Yeungroon
Creek”, that appellation alone cannot be taken as evidence of a watercourse.
The landscape to the south and south east of the town does not have
evidence of visible banks between which water flows, further, water does not
usually flow along this stretch of land, which is only vaguely described by a
range of indentations and vegetation.
46. In the Panel‟s view the landscape may best be described as a flood plain
over which water flows in a direction determined by the rise and fall of the
land.
47. This view is further supported by the description given by PM who observed
Yeungroon Creek has been in-filled with flood deposits over many years.
The course of the creek to the south of the town is marked by linear
depressions and vegetation.
48. Additionally, photographs accompanying the WT report of 21/8/12, apart
from the gauge located downstream of Charlton, depict culverts including at
the crossing of the Charlton-St Arnaud Road and flat expanses of land at a
road crossing about 8km upstream of Charlton.
49. Accordingly, the Panel accepts that water which came from the Yeungroon
Creek area to the south and south east of the town may not be regarded as
water which was from a natural watercourse.
50. The Applicant described the water which inundated her property as
exceptionally clear.
51. According to the PM report the presence of clear water was indicative that it
was not water from the Avoca River. While WT accepted the general
principle of clear water discussed by the PM report, WT did not accept that
water from Yeungroon Creek would necessarily contain high levels of
sediment to colour the water.
52. While the Panel accepts that clear water of itself is not definitive, given the
timing of the initial inundation reported by the Applicant, the direction from
which the water originated and the hydrological evidence, the Panel is
persuaded that the clear water from the south east which initially entered the
Applicant‟s property was not water from the Avoca River.
Structural damage to the dwelling
53. The Applicant claims that the inundation of water onto her site has caused
foundation movement which in turn has caused distress damage to the
structure.
54. The FSP commissioned a structural engineer FG and a geotechnical
engineer GS to investigate and report on the effect of the water inundation
on the building. The following is relevant information contained in those
reports.
Case No: 283705 Determination Page 12 of 15
55. FG Engineering – report dated 30 September 2011:
The report was to determine (in part) the likely cause of the distress if
preceding stormwater (not flood water) was likely to cause any distress
to the residence.
The clay soil on which the building is constructed is expected to be
moderately reactive.
There had been seasonal on-going movements and pre-existing
distress within the house prior to renovation works carried out by the
Applicant about 4 years before.
No distress in the residence had been observed since then or prior to
the inundation.
The relatively expected impermeable clay soils would have prevented
the stormwater affecting the performance of the footing system of the
house. There was no evidence the initial stormwater inundation caused
or contributed to any structural damage to the house for the following
reasons:
The levels contour diagram indicates no abnormal discernible
foundation movements. Instead the levels survey confirms the
pattern of floor levels is typical of foundation movement common
for a stump footing system as a result of long term seasonable
changes in moisture contents of the sub soil.
The distress is relatively minor and did not appear to be recent.
Previous repairs had been carried out and previously repaired
distress has re-occurred at the same locations.
56. Geotechnical report GS – dated November 2011
The reactivity of the material at the site was Class H1 -D classification.
The strength of the material under the footings was very stiff with an
allowable bearing pressure in excess of 100kPa for footings.
The moisture content tests showed moisture at BHs 1 and 2 were
reasonably consistent. Moisture content at footing exposure at 1.0m
was considerably drier than all others. This variation in moisture can
lead to differential movement.
57. FG engineering reviewed the geotechnical report and by email dated 19
November 2011 made the following comments.
The report classifies the site at H1-D which confirms the assumptions in
his report regarding soil reactivity and subsequent long term movement
of the house.
His assumptions were more conservative than the field classification
confirming the movement of the house would have been caused by the
long-term contributing factors in the presence of highly reactive soils at
the site.
Case No: 283705 Determination Page 13 of 15
58. After analysis of the expert evidence the Panel is satisfied that the pooling of
the stormwater runoff on the Applicant‟s property which preceded the river
water had no measurable impact on the footings and in turn on the structural
integrity of the building.
Conclusion
59. Notwithstanding the previous paragraph‟s finding, the Panel is, however, of
the opinion, the evidence leads to the conclusion the water which initially
entered the Applicant‟s property was surface runoff rainwater.
60. The Panel accepts that the major part of the damage was caused by the
subsequent inundation of flood water from the Avoca River combined with
surface rainwater. The FSP therefore is not liable for the total cost of
rectifying the damage claimed.
61. Nevertheless, in the Panel‟s view the initial inundation would have caused
some damage, although somewhat limited, prior to the arrival of floodwaters.
And as previously stated, the Panel is satisfied on the basis of the evidence
presented, that any structural damage to the building was not caused by
stormwater runoff.
Internal building damage and contents damage
62. The floor level at the rear of Applicant‟s dwelling is 350mm above ground
level and the front section is another 50mm higher but due to the effect of
the ground slope is effectively 450mm above the ground.
63. The issue for the Panel is to determine what level of inundation to the home
relates to the initial stormwater runoff and what level relates to flood waters
from the Avoca River.
64. As previously stated, the Panel has had the opportunity of conducting
numerous site visits in and around the Charlton area. The opportunity to
conduct these site visits has been of great assistance to the Panel and
enabled it to form a general opinion regarding the circumstances of the
events that occurred in January 2011 in Charlton.
65. By letter dated 27 January 2012 the FSP‟s loss adjuster informed the
Applicant it had been engaged to determine the extent of damage caused by
rainwater run-off as opposed to flood which had previously been denied. The
loss adjuster offered settlement of the claim as follows:
“Repairs as per [contractors] quote $ 7,520.00
Remainder of contents $10,000.00
Sub total $17,520.00
Less policy excess $ 100.00
Final settlement $17,420.00”
Case No: 283705 Determination Page 14 of 15
66. In respect to the repairs for which the contractor on 12 December 2011 has
quoted the price of $7,520, the scope of works refers to repairs to the sun
room and includes:
Remove and replace chip board flooring
Supply and install new carpet
PC allowance of $35 per square metre of carpet
Remove and replace skirting
Prepare, sand and paint skirting and walls as required
Remove all associated debris
67. Having considered the evidence presented in this matter and given the
findings made by the Panel in respect of their numerous visits to Charlton,
the Panel is satisfied that the offer made by the FSP in respect to the above
mentioned repairs is a reasonable estimate of repairs required as a result of
inundation to the home by stormwater runoff.
68. In the Panel‟s view, payment of the amount offered for repairs would
discharge the FSP‟s obligation for damage to the home.
69. Insofar as the Applicant has claimed damage to contents in the shed, this in
the Panel‟s vie w is a separate and distinct part of the dispute.
70. The loss adjuster refers to an inventory of contents in the shed submitted by
the Applicant in the sum of $30,000. However, as the damaged contents had
been discarded the offer of $10,000 was made.
71. It is unclear to the Panel what payments, if any, were previously made to the
Applicant in relation to her contents and on what basis her claim for $30,000
was reduced to $10,000.
72. The Panel has considered the likely impact of stormwater runoff in the area
of the s hed and based on the evidence and the Panel‟s knowledge and
experience of this flood event, in the Panel‟s view the level of inundation
would on the balance of probabilities been at a height of about 150mm
above ground level in the vicinity of the shed.
73. On that basis the FSP is responsible for rectifying or replacing damaged
contents in the shed occasioned to the level of 150mm above the ground.
74. In the circumstances there is insufficient information for the Panel to form a
view of the cost of the damage to contents which may have been caused by
the inundation by runoff stormwater to a level of 150mm above ground level
in the shed. As such, the parties are asked to work cooperatively together to
establish this sum.
75. In the event that the parties are unable to come to an agreement, then either
party may refer the matter back to the Panel within 30 days of acceptance of
the Determination by the Applicant.
Case No: 283705 Determination Page 15 of 15
Determination
76. Based on the available material the Panel determines:
a. The FSP is to indemnify the Applicant in respect to the scope of works
detailed within the contractor‟s quotation of 12 December 2011.
b. The FSP is to indemnify the Applicant for the contents affected by the
initial stormwater inundation of the shed to a level of 150mm. The
parties are enjoined to work together to establish the monetary sum
associated with this matter but if the parties are not able to reach
agreement, then either party may refer the matter back to the Panel for
further determination.
c. The FSP is not liable for any damage caused in excess of the coverage
referred to above.
d. The FSP is not liable for rectifying structural damage.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.