Home / Financial Firm (Unknown - Insurer) / Determination 283614

Determination 283614

New cracking claim declined under exclusions and causation

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for new cracking in their home that they attributed to earlier grout-injection repairs the FSP had carried out, and the FSP declined the claim. AFCA found the applicants had not established that the cracking was caused by a covered event or by the repairs.

The insured bears the onus of proving on the balance of probabilities that the loss falls within the policy, which requires identifying the proximate cause of the damage.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 283614 Determination Page 1 of 7 Case number: 283614 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition 20 March 2013 Background 1. The Applicants incepted a homebuilding insurance policy with the Financial Services Provider (FSP) on 9 November 2005. 2. On 20 November 2009 the Applicants contacted the FSP to report damage was occurring to external bricks, internal doors, cornices and walls. The Applicants were unsure as to the cause of this damage but indicated the damage had been occurring since approximately 20 November 2008. 3. Following investigation by the FSP it was unable to accept the claim as it was not established the damage was ca used by an event covered by the policy. 4. On 21 December 2009 the Applicants arranged for a plumber to attend the property to perform an investigation in relation to the damage. The plumber concluded the property had sustained broken pipes in three different areas. 5. In response to this the Applicants arranged for an engineer (PW) to attend the property and provide a report. Based on information contained in this report the FSP agreed to indemnify the Applicants for the damage. The repair works, which included grout injection, were to be undertaken as outlined by the engineer. 6. In March 2012 the Applicants contacted the FSP to report that cracking was again occurring at the property. The FSP allocated a new claim number. 7. The FSP arranged for the engineer (PW) to attend the property to ascertain the cause of the cracking; as to whether the cracking was related to previous repairs or was caused by earth movement. However, based on the available information the FSP did not accept the damage was caused by previous repairs or was caused by an insured event covered by the policy. 8. Although the Applicants obtained further engineering reports the FSP maintained its decision it was not liable for the new cracking. 9. The Applicants have referred this matter to the Service seeking indemnity under the policy for damage on the basis damage has occurred to the property as a result of repairs authorised and undertaken by the FSP. Determination Case No: 283614 Determination Page 2 of 7 Summary of Applicants ’ position 10. The Applicants hold the FSP liable for the damage caused to the property following initial repairs. They say the damage is as a result of poor workmanship arising from the grout injection applied. 11. The Applicants say the method of repairs undertaken was inappropriate. No allowance was made for reactive soil and/or changing weather patterns. A more appropriate method of repairs should have been undertaken rather than the grout injection. Summary of FSP’s position 12. The FSP states that based on the factual, expert evidence and legal precedents: the Applicants have not estab lished, on the balance of probabilities, the proximate cause of the damage was an event covered by the policy or that the damage resulted from remedial works.  on the balance of probabilities, the proximate cause of the damage, was caused by events excluded by the policy.  even if it was established that the damage was caused by an event covered by the policy the Wayne Tank principle would operate to exclude the claim. 13. The FSP relies on the following policy provisions: “ What you are not covered for-general exclusions we will NOT cover  loss, damage, injury or death that occurs as a result of  …  wear, tear, rust, corrosion, deterioration or erosion  …  atmospheric conditions or extreme temperature  …  subsidence or landslide unless it happens immediately following an earthquake or explosion  ...  faulty design or workmanship  …  mechanical, structural or electrical failure of an item ... Settling claims-under buildings If we agree to cover the claim of the buildings insurance we will Case No: 283614 Determination Page 3 of 7 repair or rebuild that part of your home sustained loss or damage, or ... Things that may put your claim or cover at risk You may put your insurance claim or cover at risk if you do not meet your obligations to us. We may refuse a claim, cancel your policy, or do both if you do not take all reasonable care to protect your home and contents against loss or damage … do not retain your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained ” Issues 14. Whether the damage occurring to the property is being caused by an event covered by the policy. 15. Whether the FSP is liable for repairs on the ground the damage is the result of poor workmanship. Reasons for decision 16. FOS has considered it is appropriate to expedite the dispute in accorda nce with clause 8.6 of the FOS Terms of Reference. This is because of the issue in dispute and quantum. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. There has been an exchange of material between the parties. It therefore is not intended to recite details of the information in this Determination except where considered relevant. 18. When making a claim under an insurance policy, the responsibility rests with the policyholder to establish on the bala nce of probabilities that the loss claimed falls within the terms of the policy. The Applicants must therefore provide substantive evidence relating to the damage. Opinions obtained from independent persons appropriately qualified are helpful in determining whether damage claimed is covered by the policy. 19. The courts have determined that in order to decide whether the damage is covered by the policy the proximate cause of the damage must be established. The proximate cause is not necessarily an occurrence which is last in the point of time but rather the dominant factor in the damage. 20. It is also well established law ( Wayne Tank and Pump Co. Ltd v Employers’ Liability Assurance Corp. Ltd. [1973] 3 AII E.R. 825) that where there are two Case No: 283614 Determination Page 4 of 7 effective causes of a loss, one of which is excluded and one which is included in an insurance policy, the excluded clause operates to over-ride the included clause and defeats the claim. 21. It is not disputed that the FSP accepted a claim for damage caused by leaking pipes. Repairs were undertaken which included grout injection. However, 12 months after repairs the Applicants identified further cracking for which they hold the FSP responsible. They assert the cracking has resulted from the repairs involving grout injection. It is reported that the new cracking is in different locations on the building. 22. The Applicants obtained two independent engineers reports (DL and BD) who indicated that grout injection was an inappropriate method of repairs. 23. The FSP has discounted the reports as neither DL nor BD has inspected the property. Further, the FSP says DL is said to be a friend of the Applicants and therefore his opinion is not unbiased. 24. The FSP states the damage has not been caused by events covered by the policy, nor is it a result of the remedial works undertaken, namely grout injection. 25. The FSP has referred to policy exclusions to support its position of denial. However, the Panel will only consider the exclusions if it is established the damage has been caused by an event covered b y the policy. The broad reference to several exclusions by the FSP, without appropriate supportive expert evidence to establish the relevance of the exclusions, does not assist. 26. The Panel has considered the various reports relied upon by the parties. DL noted in his report dated 2 April 2012: “It is clear to me the property is on a reactive soil that was affected by the drought causing it to shrink and the leaking drain causing it to swell locally.... By grouting up any void beneath the floor slab this has allowed no further movement due to the swelling of the soils now that the drought has broken, which would appear to me to be the reason why the cracking has appeared. It would be important to provide an allowance for further movements and possible cracking until it is concluded that the sensitive subsoil has fully rehydrated. Conclusion … It seems apparent that the initial problem was caused by leaking pipe and an extensive drought which cause changes in a reactive soil on which the building is founded. In my opinion the grout injection was not appropriate and, if it has been done without due care then, it could have caused further distortion and potential damage to the structure. With any buffer in ground movement removed by grouting up the voids beneath the slab it is my opinion that further damage can occur due to hogging from the swelling soil and an allowance should be provided for this.” Case No: 283614 Determination Page 5 of 7 27. In BD’s report dated 31 October 2012 he advised: “In this case the void beneath the slab was determined by [HBW] to be dominantly due to the shrinkage of the underlying reactive clay, and possibly due to the settlement of loose fill originally supporting the slab. By recommending that the void be filled with grout, without verifying that the underlying reactive clays were approaching saturation and matching maximum expansion, it has left no room for the clays to expand without causing movement and damage of the structure. [HBW] have confirmed that the swelling of the underlying reactive clays has occurred since grouting and hence further and ongoing damage is to be expected as moisture levels increase during extended periods. 5 Conclusion The grouting of the void beneath the slab was a poorly conceived approach, with no prospect of achieving a long-term rectification of the building, and in fact exacerbating the extent of damage that will occur following heavy and lengthy rain periods.” 28. The FSP provided copies of PW’s reports along with his responses to the findings of DL and BD. 29. The Panel notes the following responses b y PW in his analysis dated 1 May 2012 of DL’s findings: “2.2.8 ) By grouting up any void beneath the floor slab this has allowed the further movement due to swelling of the soils now that the drought has broken, which would appear to me to be the reason why new cracking has appeared. It would be important to provide an allowance for further movements and possible cracking until it is concluded that the sensitive subsoil has fully rehydrated. i In April 2011, we were not certain that the subsoil movement had abated it said so in clause 3.1 of our report 2010-015RP3. ii We warned of the consequences of the premature repair of linings in clause 3.2 with the advice that, “ Repair of damage to the brickwork and internal linings may be short lived if the subsoil continues to move.” iii Our recommendations to grout inject prefaced by statement about risk, namely, “ If all parties are prepared to take the risk that the movement has ceased and the building is now stable…”. iv We were aware of the risks of future movement as evidenced in the statement, “ Some of these details are designed to accommodate some further differential movement in the building.” v The Insured chose to take the risk regarding subsoil movement. vi Subsequent events have shown the building has moved slightly since repairs were carried out. ... 2.2.10) In my opinion the ground injection was not appropriate and, if it has been done without due care then, it could have caused further distortion and potential damage to the structure . Case No: 283614 Determination Page 6 of 7 i It is the ongoing ground movement that is causing further distortion, not the grout injection 2.2.11) With any buffer in ground movement removed by grouting up the voids beneath the slab is my opinion that further damage can occur due to hogging from the swelling soil and an allowance should be provided for this . i The swelling soils are not causing hogging of the slab. The slab is still in a sagged shape. ii It appears that DL asserts that we should have left the void beneath the slab. iii One of the insured’s complaints is that the floor in the guards is now drummy. It is drummy because there is a void beneath the slab. 30. In response to BD’s findings PW advised on 17 December 2012: “2.2.4) It is our understanding that the insured had our report and, by virtue of insisting the works be carried out, has accepted the risks associated with the grout injection. 2.2.5) We note that, like insured’s previous engineers report, [BD] was silent on this warning in a report. 2.2.6) One must not lose sight of the fact that the remedial works were aimed at correcting damage due to a leaking drain and NOT to provide the dwelling with a new and stable foundation system. ... 2.5 [BD] states that the damage occurred between March 2012 and October 2012 following a dry spell. No level measurement have been taken to determine the slab movement that may have occurred in that time period or that caused that superstructure damage. A “dry spell” would normally cause drying and shrinkage of the subsoil around the perimeter of the building. If drying shrinkage has led to the damage then it is prima face evidence that the slab has subsided. In this event the grouting injection has been of no detriment to the building’s performance. 2.6 It should be remembered that the footing system beneath this building has less strength and less stiffness than would be provided under the current footing design standard for the reactivity of this site. If due consideration was given to the surrounding vegetation, the footing would be significantly stiffer and stronger than a deemed to comply design in the standard for the site reactivity. Given the significant changes in subsoil moisture resulting from atmospheric changes, we are not at all surprised that the building foundations are continuing to move, and, because of the weak and flexible footing system, cause damage to the superstructure. 2.7 We do not believe the grouting of the void beneath the slab was a poorly conceived approach or that it has exacerbated the extent of damage in any way. 2.8 Based on the available evidence, we are of the view that the building is now being subjected to “normal” seasonal differential ground movement exacerbated by the drying effects of the vegetation, which could be described as “normal wear and tear”. ... Case No: 283614 Determination Page 7 of 7 2.11 There is nothing in [BD’s] report to bring us to believe that grout injection has had any detrimental effect on the performance of this dwelling. The current building movement is due to seasonal subsoil movement fluctuations or “normal wear and tear” for this building which sits atop a relatively weak and flexible footing system. 31. The Panel is mindful that neither DL nor BD have actually inspected the property but are making their findings based on the reports done by PW. 32. They have reported on the basis they believe the remedial work undertaken has caused cracking and that other remedial options should have been undertaken; such as underpinning. PW was of the view the repair undertaken was to reinstate the property back to its pre-loss condition and the grout injection achieved this. 33. The Applicants have indicated that further damage is still occurring at the property. 34. Regardless, the Panel notes neither DL nor BD can specifically state the damage is a result of the remedial works, but rather it draws from their findings that reactive soil and changing weather patterns are a contributing factor. 35. Having carefully examined all of the evidence available to it the Panel is not satisfied the Applicants have established their onus to prove that the cause of the cracking is either claim related or the FSP’s liability. Determination 36. The Panel determines the FSP was entitled to deny the claim.