Home / Financial Firm (Unknown - Insurer) / Determination 283562

Determination 283562

Flood exclusion used to decline stormwater inundation claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owners' home in Charlton was inundated in January 2011 and the FSP declined the claim as flood. The Panel found the initial stormwater inundation was covered, so the FSP must indemnify that part, with the amount to be settled and interest at the statutory rate.

Stormwater runoff that inundated the property before floodwater from the Avoca River arrived is not excluded flood and is covered under the storm and rainwater cover.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 283562 Determination Page 1 of 10 Case number: 283562 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision – Flood - Denial of claim 10 January 2013 Background 1. The Applicants held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP) which covered loss or damage arising from the specified defined events subject to the relevant policy limitations. 2. The insured property in Charlton sustained extensive damage when inundated by water on 14 January 2011 following the significant weather events experienced in Victoria in January 2011. 3. The Applicants made a claim for damage to their building and contents following the inundation of the property. The FSP has rejected the claim on the basis the damage was due to flood which is a policy exclusion. 4. The Applicants remain dissatisfied with the FSP‟s decision to decline their claim on the basis the loss is due to the excluded event of “Flood”. Summary of Applicants ’ position 5. The Applicants in disputing the FSP‟s decision to decline the claim have sought the assistance of legal representatives “MB”. In the interest of brevity both MB and the Applicants will be referred to as the “the Applicants” for the purpose of this determination. 6. The Applicants maintain:  They suffered damage to the insured building and contents on 14 January 2011 following heavy rainfall and the subsequent inundation of their property.  When the male Applicant „JT‟ woke up on the morning of the 14 January the shed and swimming pool were inundated with water. The water had not entered their home at 7.00am when he left to go to his work, however, it was level with the back steps.  They rely upon a hydrology report prepared and submitted by their preferred hydrologist „PM‟ and maintain the property was inundated by Determination Case No: 283562 Determination Page 2 of 10 stormwater runoff and therefore the resultant damage is covered under the policy.  The loss adjusters “M” are not qualifi ed to determine that the damage claimed is due to flood.  The FSP‟s preferred hydrologists‟ (W) original report dated 18 February 2011 commissioned by the FSP is of limited utility; it is general in nature and clearly excludes consideration of eye witness accounts, topographical and drainage data. W does acknowledge that inundation of the properties east of Armstrong Street early in the morning can be attributed to stormwater inundation.  Irrespective of whether Yeungroon Creek (the creek) can be defined as a watercourse or not, water must be able to „escape‟ from it to constitute floodwater. It is clear that water cannot be contained in the upper aspects of Yeungroon Creek (the creek) and so water from it cannot be floodwater for the purpose of the policy.  The FSP bears the burden to establish the exclusion relied upon which the Applicants do not believe it has been able to do in this instance.  W‟s report of 5 July 2012 differs from its earlier reports in a number of aspects. More importantly, W‟s earlier evid ence concluded stormwater inundation of properties prior to the arrival of floodwater from the Avoca River (the River) was possible east of Armstrong Street. In its most recent report is now maintains all earlier inundation is likely to have been sourced from tributaries not mentioned earlier.  The Applicants are seeking for their claim to be covered in full by the FSP due to the damage arising from stormwater inundation being covered under the policy. Summary of FSP’s position 7. The FSP relies upon the evidence made available by its commissioned hydrologists W to conclude that the flows (including the 7.00am and 11.00am on 14 February) of water responsible for the inundation of the property would have been due to a combination of ponding local stormwater and breakout flows from the Calder Highway Tributary and Charlton St Arnaud Road Tributary. Also, that these breakouts from the tributaries would have been due to breakout flows from the creek and Avoca River (the River) upstream of Charlton. 8. The Applicants have not made available any evidence based upon a site specific assessment of their property in response to the reports commissioned by the FSP. The report relied upon and submitted by PM is quite general. 9. One of the central themes of all hydrological reports considered is that inundation by stormwater run-off was not possible due to the fact that the Case No: 283562 Determination Page 3 of 10 recorded rainfall intensity data for 14 January (an ARI of 1 year) shows that there was not sufficient rainfall to generate stormwater run-off. 10. In respect to the classification of the creek, the policy definition of the event „flood‟ does not require the creek to have banks, rather only whether it is considered a watercourse or not. Even PM in his report of 3 November 2011 acknowledges the creek as a „named watercourse‟. 11. In the instance the Service does not accept the earlier inundation of the Applicants‟ home to be due to floodwater the FSP maintains it was due to a combination of water which was flood and water that was not flood and therefore constitutes floodwater for the purpose of the policy as per the Wayne Tank principle. 12. Therefore, in line with the available evidence and the relevant policy limitations the FSP was entitled to decline indemnity to the Applicants for the damage to the insured property. 13. The FSP relies on the following policy provisions: “Words with special meaning “Flood” means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharge from any sewerage of waste water systems due to pressure induced by flood water. … Defined Events Cover We will pay for loss or damage at the Address caused by the following Defined Events: 8. Storm or rainwater, but we will not pay for loss or damage: a. … …. What you are not insured for Under Section A – Home cover we will not pay for: 2. Loss or damage to your property caused by: a. Flood, the action of water from the sea, high sea water, tidal action or Tsunami;” Issues 14. Whether damage to the Applicants‟ property was caused by floodwater as defined by the policy. 15. Whether the FSP was entitled to decline indemnity to the Applicants under the policy. Case No: 283562 Determination Page 4 of 10 Reasons for decision 16. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 18. On 11 December 2012, the Panel Chair Ombudsman and Panel member attended on site where they met with the male Applicant and a representative of the FSP. 19. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 20. The Panel is satisfied the parties do not dispute the following:  The Applicants held an active Home and Contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicants received the relevant polic y documentation including the Product Disclosure Statement (PDS) and Certificate of Insurance.  The insured property suffered extensive damage due to water inundation arising from the significant weather events experienced in the area during January 2011.  The policy provides cover for loss or damage due to the listed defined events including „Storm or rainwater‟ subject to the noted policy limitations/exclusions. 21. The Panel having reviewed the available evidence is satisfied that the policy provides cover for loss or damage arising from the insured event „storm and rainwater‟. Further, that the damage to the insured property occurred following significant weather events (i.e. storm and rainfalls) experienced in the vicinity of the insured property. It is not disputed that the initial inundation commenced sometime before 7.00am on 14 January 2011 and water continued to rise during the day. It is also not in dispute that the home was subsequently inundated by floodwater from the Avoca River sometime in the evening of 14 January to a level of about 600mm (or about waist high). 22. Therefore the main issue in contention between the parties is whether the insured property was initially inundated by stormwater prior to the arrival of floodwaters which would give rise to a degree of indemnity under the policy. The Panel is satisfied that the property was ultimately inundated by floodwater to the maximum level, however, to what extent the property may have been damaged by initial stormwater inundation has been considered below. Case No: 283562 Determination Page 5 of 10 Cause of the loss 23. The parties each rely upon information made available by their preferred consultants. The Panel notes that this information has been exchanged between the parties, each having had the opportunity to comment. Accordingly, in the interest of brevity, the Panel will only reiterate information from these reports it finds necessary in providing this Determination. “M’ Assessment Report dated 17 February 2011  An assessment of the insured property was undertaken on 31 January 2011. The buildi ng was estimated to be 25 years old with the property maintained in a very good condition.  It confirmed extensive damage to both building and contents setting an estimate reserve to cover the loss at $75,000.  M recommended the appointment of a hydrologist to determine the cause of the inundation. PM’s Charlton Floods - January 2011 dated 3 November 2011  The town of Charlton experienced heavy rainfall between 10 January - 14 January with extensive flooding in the area from the Avoca River from 14 January onwards.  Total rainfall over this period was recorded at 168.6mm with 66.2mm falling between 9.00am on 13 January and 9.00am on 14 January.  The highest intensity rainfall recorded was 15mm/hr between 7.00am - 8.00am on 13 January. There was no rainfall recorded after 8.00am on 14 January.  Although the records show the rainfall intensity on an hourly basis, rainfall periods at Charlton were highly concentrated in short duration burst e.g. 10 to 12 minute intervals. Accordingly, if calculated on this basis it would represent 20-50 year ARI rainfall events as opposed to 1- 2 year ARI events (based on hourly intervals).  Accordingly, overflow from local drainage systems and culverts were highly likely as these systems are only designed to cope with 2-5 year ARI rainfall events.  Time of overflow would have to correspond closely with the timing of the intense rainfall periods and based on this the first stormwater drainage overflow event would have occurred at around 7.00am on 13 January.  There are two possible sources of rainwater run-off in Charlton, run-off in the town which does not enter the stormwater drainage system and run-off from surrounding rural areas.  All rainfall that fell on 13 January and 14 January would have become saturated overland flow and followed natural drainage lines into Case No: 283562 Determination Page 6 of 10 Charlton. This would have led to the inundation of Charlton on these dates prior to the arrival of floodwaters from Avoca River.  Floodwaters from Avoca River would be of high sediment loads (muddy/mucky) and would not be clear. Clear water inundation would support that prior to the arrival of floodwaters from Avoca River there was water sourced from local stormwater.  Depending on the exact locations of the properties, they will have begun to have been inundated by floodwater sometime on the afternoon or early evening 14 January. Any inundation before this time would be from runoff particularly corresponding to times when heavy rainfall were occurring (13 January and early morning 14 January).  Evidence in respect to water inundation of properties which occurred particularly before 5.00pm on 14 January should be taken into account. W’s Flood Assessment Report 18 February 2011  Multiple site inspections were undertaken on 24 January 2011.  The average rainfall records for the upper regions of the Avoca River catchment are about 600mm per annum.  The Avoca River has flooded the town of Charlton a number of times in the past due to high rainfalls.  The Avoca River catchment soaked from previous rainfalls resulted in a higher than average conversion of rainfall to runoff, increasing the water flowing directly into watercourses and resulting in flooding across Victoria.  Flood warnings were issued for a number of rivers including the Avoca River with one of the towns affected by the flooding being Charlton.  Historically Charlton has been flooded from two directions in a north south plain with an area remaining flood free through the centre of town along the St Arnaud – Charlton Road.  The most intense rainfalls periods in Charlton were experienced in the morning of 11 January (2011) and early morning 13 January (2011), with the maximum flood level in Avoca River reaching its peak early morning 15 January (2011).  Flooding of the township was similar to the September 2010 event, however, a much greater volume of water has been experienced in the eastern end of town on this occasion (January 2011).  Given the timing of the flooding of the eastern edge is similar to that of the gauge readings it is suggested that the Yeurngoon Creek and Avoca River flows merged to become one system.  Any flooding occurring after lunchtime (14 January 2011) can be directly attributed to Avoca River/Yeurngoon Creek flooding.  Floor inundation (sic) that occurred east of Armstrong Street early morning (14 January 2011) can be attributed to stormwater flooding. Case No: 283562 Determination Page 7 of 10  The inundation of the property was due to flood. W’s Flood Assessment Report 21 August 2012  The site of interest is a residential property located in Donald Street, Charlton.  The town of Charlton is surrounded by a high ridge to both the east and west of town constricting the floodplain through the township.  The catchment areas for the following watercourses are:  Yeungroon Creek (the creek) 72km 2  Charlton St Arnaud Road Tributary (CSAT) 7km 2  Calder Highway Tributary (CHT) 3km 2  The stormwater runoff generated in the catchments will concentrate along drainage lines and normally flow into the Avoca River (the River) upstream of Charlton for CSAT and downstream for CHT and to the east and further downstream of Charlton for the Creek.  Charlton received its largest rainfall total on the Thursday (13 January 2011) of 66mm recorded to 9.00am on Friday 14 January. The available date shows the rainfall over the area occurred in three main bursts.  The highest one minute rainfall intensity occurred at 6.28am on 13 January at 1.44mm/per minute.  The maximum rainfall intensities are not exceptional and are generally equivalent to an ARI of 1-2 years.  Locally derived stormwater flows could not have caused significant flooding in Charlton after 7.00am-8.00am on 14 January.  Most of the flows caused by direct stormwater runoff generated from within the town and the catchment of Calder Highway would have passed through the town to the Avoca River by about 8.00am on 14 January.  The continuing flows into Charlton from about 8.00am (14 January) would have been caused by overland flows resulting from breakouts from the CSAT, the Creek and the River from further upstream.  Given the size of its catchment, the CSAT would have contributed flows into Charlton prior to the creek and the river.  An inspection of the Applicants‟ property was undertaken on 14 August 2012 at 10.30am.  Discussions with the Applicants confirmed:  When JT woke on the morning of 14 January (2011) he found the swimming pool and she had been inundated as well as other (external) parts of the property inundated up to one foot.  The water flow was noted to be coming from the south east. Case No: 283562 Determination Page 8 of 10  He left to go to work at 7.00am at which point there was no water in their home however it was up to the level of the back steps.  Their children (present at the time) reported that the lounge room, which is lower than the rest of the house, began getting inundated around 11.00am that morning.  The water was clear for the most part of the day which became dirty mid afternoon and even dirtier by the evening.  JT returned home at 5.15pm at which point water was at the level of the skirting boards in the upper parts of the home. Between 7.00pm – 11.30pm water rose by a further two feet and them to waist deep levels.  The back step was measured to be at the approximate level of 200mm above surrounding ground levels, the upper (floor) level of the house at 380mm above ground level and the sunken lounge floor level at 210mm.  The area surrounding the property is low-lying and poorly drained. It was considered that the shallow inundation of the pool, sheds and other parts of the property at around 7.00am would be due to a combination of local stormwater and breakout flows from the CHT and CSAT.  The inundation of the home above floor level at around 11.00am that day would have been caused predominantly by breakout flows from the CSAT. These breakout flows would have been due to breakout flows from the creek and the River further upstream of Charlton.  Later the property would have been inundated directly from the River from around 6.00pm and which would have continued to rise to its peak water levels on 15 January.  Clear water is not necessarily an indicator of stormwater; it is more an indicator of where the water has come from, in this case a flat vegetated catchment with little opportunity to pick up sediment, rather than a bare river channel. 24. In view of the issues arising from the inundation of many properties in Charlton, the Panel Chair Ombudsman and a member of the Panel travelled to the township and conducted site inspections of a number of the properties on 27 June 2012. Subsequently, the Panel Chair Ombudsman and Panel member conducted a site specific inspection on 11 December 2012. The site visits undertaken by representatives of the Service of the Charlton area and more specifically individual properties have assisted the Panel in gaining a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from the Avoca River. 25. The Panel having considered the available evidence including direct witness statements from persons independent of the claim during its visit to Charlton, is satisfied that the water which flowed towards the centre of town from the Case No: 283562 Determination Page 9 of 10 south was stormwater run-off prior to the arrival of floodwaters. The culverts built under the Charlton St Arnaud Road were inadequate to channel the approaching stormwater runoff from the south/southeast. This stormwater approached the town as overland flow along a flood plain with no clear boundaries and/or bank. 26. There is no dispute between the parties that the external portion of the insured property (sheds, pool, air-conditioning units, pool pumps etc) was inundated prior to 7.00am and further it was due to these flows from the south/southeast that the initial inundation of the Applicants‟ home above floor level occurred. The Panel therefore accepts that the insured property was initially inundated both inside and out by stormwater runoff and then subsequently inundated to the peak level of inundation within the home by flood waters from the Avoca River later in the day. 27. The male Applicant advised the Panel Chair Ombudsman and Panel member during the onsite visit, at which a representative of the FSP attended, that when he returned home at 5.30pm, water was already inside the home and filled the sunken lounge area. 28. This is consistent with the male Applicant‟s statement to the FSP‟s hydrologist to the effect that he returned home at 5.15pm, at which point the water was at the level of the skirting boards in the upper parts of the house. The Panel is also satisfied that there is no evidence to suggest that the Avoca River had breached its banks prior to this time. Between 7.00pm and 11.00pm the water level rose by around 2 feet and was waist deep by then. 29. The Panel is satisfied that his rise in the water level around 7.00pm was a result of the arrival of flood water from the Avoca River. 30. The male Applicant accepts that ultimately, the home was inundated by a wave of flood water from the Avoca River. 31. The policy clearly provides cover for loss or damage arising from stormwater runoff and therefore in line with the Applicants‟ direct witness evidence which has not been disputed, the Panel is satisfied that the inundation of the insured property up to a level equal to the skirting boards of the upper level (above the sunken lounge room) of the insured property was due to an event insured under the policy. 32. The Panel is also satisfied that the loss arising from the initial inundation of the sheds, pool, air conditioning unit, pool pumps etc. to a level equal to the level of the skirting boards above ground level is also as a result of stormwater runoff. 33. The Panel has not been provided with sufficient information which would allow it to come to an informed decision as to the extent/degree (monetary) of the FSP‟s liability under the claim arising from the initial stormwater inundation of the insured property. Case No: 283562 Determination Page 10 of 10 34. Accordingly, the Panel urges the parties to act in a cooperative ma nner to reasonably establish the extent of damage to the insured property arising from the initial inundation including contents stored in the sheds. Determination 35. On the basis of the available information the Panel determines that the FSP is liable under the policy to provide indemnity to the Applicants in line with the matters discussed above. 36. Insofar as the FSP determines to cash settle the dispute, the FSP is to pay to the Applicants interest at the statutory rate, in line with Section 57 of the Act, upon the final settlement figure agreed between the parties from the date of denial of the claim to final settlement of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.