Text of the determination
Case No: 283561 Determination Page 1 of 15
Case number: 283561
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Flood – Policy Exclusion - Denial of claim
4 January 2013
Background
1. The Applicants held a Home Building and Contents Insurance Policy (the
policy) with the Financial Services Provider (FSP).
2. The insured property in Charlton sustained extensive damage when
inundated by water on 14 January 2011 following the significant weather
events experienced in Victoria.
3. The Applicants made a claim for damage to the insured property; however,
the FSP has rejected the claim on the basis the damage was due to flood,
which is a policy exclusion.
4. The Applicants remain dissatisfied with the FSP‟s decision to decline the
claim and maintain the damage was due to stormwater inundation.
Summary of Applicants ’ position
5. The Applicants in disputing the FSP‟s decision to decline the claim have
sought the assistance of legal representatives “M”. In the interest of brevity
both M and the Applicants will be referred to as “the Applicants” for the
purpose of this determination.
6. The Applicants maintain:
They woke up at 5.30am on 14 January to find the property surrounded
by water.
30cm-50cm of water had already entered their sheds and the backyard.
By 10.30am water was lapping at the front veranda door and the river
had not yet broken its banks.
The property is on the eastern side of the town, away from the river,
with the water arriving from the east.
Water started to enter the home at approximately 4.30pm on 14
January with the Applicants leaving the property at around 6.00pm.
Water started coming out of drains in the main street at around 12 noon
on 14 January.
Determination
Case No: 283561 Determination Page 2 of 15
7. The Applicants do not accept the FSP‟s hydrologists‟ view that this event
was similar to the one that occurred in September 2010, as on this occasion
the water came from the back of the property as opposed to the front which
was the case in the September 2010 event.
8. The Applicants rely upon the information/evidence made available by their
preferred hydrology consultant „PM‟ coupled with their direct evidence to
maintain their home was inundated by stormwater prior to the Avoca River
breaking its banks.
9. The FSP bears the onus of proving that the exclusion upon which it relies in
rejecting the claim actually applies to the circumstances of the loss; the
Applicants do not accept the FSP has established its flood exclusion in
relation to their loss.
10. The Applicants submit that as a result of the inundation, their home, and in
particular the sub floor area, has suffered structural damage.
Summary of FSP’s position
11. The FSP has accepted the Applicants‟ claim for loss of or damage to the
sheds and contents stored within which were inundated with stormwater
runoff before 8.00am on 14 January 2011.
12. It submits that the inundation of the dwellings on High Street (including the
Applicants) on the evening of 14 January 2011 was unquestionably a result
of overflow from the Avoca River (the river).
13. The FSP relies upon evidence from its expert consultants. Further, it notes
that the Applic ants‟ hydrologist PM, in his report dated March 2012, in
particular refers to the dwelling‟s close proximity to the drain which forms
part of the town‟s stormwater drainage system and the fact that it would have
exceeded its capacity and caused the water inundation.
14. This supports the view of its preferred hydrologist „W‟s that there was not a
sufficient volume of water on the property prior to the overflow from
Yeungroon Creek (the creek) to have caused damage to the dwelling. The
FSP has submitted multiple expert reports including a geotechnical report to
support its position that the dwelling did not suffer any structural damage
arising from an insured event.
15. Alternatively, even if the Service did not accept that it was water from the
creek that flooded the property, it maintains that the inundation was due to a
mixture of floodwater due to the breakouts from the creek and the water
which was not flood, therefore, it was entitled to decline indemnity in line with
the Wayne Tank legal principle.
16. In respect t o the Applicants‟ claim that the January 2011 event allegedly
caused structural damage to the property, the FSP rejects this based on its
appointed consultant engineer‟s report which maintains that damage to the
Case No: 283561 Determination Page 3 of 15
structure was due to earth movement (policy exclusion) which has been
occurring over an extended period of time.
17. Accordingly, in line with the evidence available to it, the FSP maintains it was
entitled to decline the Applicants‟ claim other than the damage to the sheds
and contents stored within, arising from stormwater inundation on the
morning of 14 January 2011.
18. The FSP relies on the following policy provisions:
“ Accidental Damage Cover
We will pay for Accidental loss or Damage to your Buildings or Contents at the
Address other than the Occurren ces or items referred to in „What you are not
insured for.
…
Words with special meaning
“Flood” means the inundation of normally dry land by water escaping, or
being released from, the normal confines of a reservoir, natural watercourse
or lake (whether or not they have been altered or modified). Flood also
includes water discharge from any sewerage or waste water systems due to
pressure induced by floodwater.
…
What you are not insured for
Under Section A – Home Cover we will not pay for:
Loss or damage to your property caused by:
a. flood, the action of water from the sea, high sea water, tidal action or
tsunami;
b. earth movement, vibration, erosion, landslide or subsidence (except
when caused by earth quake)”
Issues
19. Whether damage to the Applicants‟ property was caused by flood water as
defined by the policy.
20. Whether the FSP was entitled to decline indemnity to the Applicants under
the policy.
Reasons for decision
21. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to the Panel in accordance with the Operational Guidelines
to the FOS Terms of Reference. This is because of the complex nature of
the issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
Case No: 283561 Determination Page 4 of 15
22. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
23. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
24. On 28 June 2012, the Panel Chair Ombudsman and Case Manager,
attended on site where they met with the female Applicant and a
representative of the FSP.
25. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
26. The Panel is satisfied the parties do not dispute the following:
The Applicants held an active home building and contents insurance
policy with the FSP at the time of loss.
The FSP provided and the Applicants received the relevant policy
documentation including the Product Disclosure Statement (PDS) and
Certificate of Insurance prior to the loss.
The insured property suffered extensive damage due to water
inundation arising from the significant weather events experienced in
the area during January 2011.
The evidence in relation to rainfall readings, river levels, rainfall
periods, timing of the river breaking its banks and levels of inundation
are reasonably consistent within the consultants‟ reports relied upon by
the parties.
The Applicants were at home when the dwelling was initially inundated
above floor level with clear water at around 4.30pm on 14 January.
The policy provides cover for accidental loss or damage, however,
excludes from cover damage arising from the event „Flood‟.
27. The Panel having reviewed the available evidence is satisfied that the main
issue in contention between the parties relates to whether the insured
property was initially inundated by stormwater alone, which would give rise
to a degree of indemnity under the policy. The Panel is satisfied that the
property was ultimately inundated by floodwater to the maximum level;
however, the question as to whether there was an extent of initial stormwater
inundation has been considered below.
Cause of the Loss
28. The Panel has been provided with m ultiple consultants‟ reports obtained and
relied upon by the parties. The Panel notes that this information has been
exchanged between the parties, each having had the opportunity to
Case No: 283561 Determination Page 5 of 15
comment. Accordingly, in the interest of brevity, the Panel will only restate
information from these reports if found necessary in providing this
Determination.
Assessors’ (MY) Site Report dated 9 June 2011
Inspection undertaken at the insured property on 22 February 2011.
Various contents items stored underneath the back veranda and porch
at the side of the house damaged due to severe storm conditions over
three days.
Total loss in this respect was assessed to be reasonably $14,560.
Letter from the Buloke Shire Council
The easement on the Applicants‟ property and land runn ing
immediately along the western side is a drainage reserve as part of the
council‟s drainage system in Charlton.
The drainage reserve is not part of the natural flow scenario of the
Yeungroon Creek, which runs nearly one kilometre east of the property.
P M’s Charlton Floods: January 2011 - Site Specific Report dated March 2012
Site visit (Charlton) undertaken on 2 -3 March 2012, with interviews also
carried out with the homeowners.
A survey revealed that the stormwater drainage system empties directly
into the Avoca River close to the Calder Highway Bridge. The
implication of this being as river levels rose in the Avoca River the
stormwater outlet would have been inundated with river water. This
would result in the drains being backfilled to capacity preventing
stormwater on the surface from draining away.
A survey revealed that the upper height of the stormwater outlet pipe is
4.6m (relative to the river height records). This water level was reached
early in the morning on 13 January [2011]. From this point on the
stormwater drainage system in Charlton would not be able to drain
away freely. Stormwater accumulation therefore becomes an issue in
Charlton from mid-morning on 13 January.
A survey reveals that the eastern side of Charlton has a significant
depression and occupies lower land than that to the western side of
Charlton. The town slopes towards the north i.e. Armstrong Street is
35cm higher at the junction with Donald Street compared to the High
Street side, and Wilson Street is 45cm higher at the junction with
Watson Street compared to the High Street end.
Therefore, water moves through the town (high to low) until it is
impeded by the train tracks that run parallel to Davies Street. Both
topographical survey and new modelling indicate that properties in the
eastern side of Charlton, especially those close to High Street were
Case No: 283561 Determination Page 6 of 15
inundated by locally accumulating stormwater which followed along a
drainage line independent of any watercourses close to Charlton.
The witness accounts provide varied evidence in respect to the arrival
of sediment laden water flows associated with the rapid rise in water
levels. The likely explanation for this is that inundation from the river (in
the afternoon of 14 January) was widespread, with water levels rising
accordingly. However, the complete mixing of the two water bodies had
not yet occurred in the central and high parts of town in the afternoon.
The mixing of clear water and muddy water was a gradual process and
it is likely that it took some time for water sourced directly from the river
to flow across the whole town and mix with locally sourced stormwater.
In this situation flooding in some houses was therefore controlled by the
rise in the river level but the actual water at the site was stormwater.
Major flood level for Charlton is 7.5m at the gauging station near the
bridge over the Avoca River, which was reached at 5.15pm on 14
January. It is possible that other parts of the riverbank to the south and
west of Charlton had low points which allowed water to leave the river
and inundate parts of the town somewhat earlier than 6.00pm. Flood
modelling indicates earlier overtopping of the river played a part in
inundating the west and southwest areas of Charlton.
Witness accounts were consistent in that the water came from the
south east of town and standing water had filled the drains by the
morning of 14 January.
Clearwater before 6.00pm 14 January is likely to be stormwater. After
this time water levels may have risen because of the influence of river
water. The presence of clear water cannot be taken as an indicator of
local stormwater after 6.00pm.
For properties on a slab close to the ground stormwater levels may
have been sufficient to cause damage to the lower parts and
furnishings within properties. However, for houses on raised slabs it is
unlikely that stormwater would be responsible for damage to the interior
of the property footings.
The relevant property is located to the south side of High Street midway
between the junctions of Wilson Street and Jenkins Street.
It is located immediately adjacent to the major drain running through
the east of Charlton.
The male Applicant was interviewed at 2.05pm on 2 March 2012 and
he advised:
Water started rising out of the drain at 3.00pm on 14 January.
By 4.30pm water was entering the home and an inundation level
of 15cm was observed before the property was evacuated.
PM concluded that the property is at one of the lowest elevation levels
in the town. It is a natural drainage route for stormwater.
Case No: 283561 Determination Page 7 of 15
It is highly likely that stormwater collected in the areas around Charlton
was routed through this area.
Its close proximity to the drain and the fact that it is not raised above
ground level means stormwater inundation almost certainly occurred up
to the likely depths of upwards of 25cm.
PM’s Email dated 18 July 2012
The issue of concern is where the water west of the town came from?
Yeungroon Creek only has a channel with defined banks downstream
of Charlton. Upstream of Charlton it is basically a shallowed grassed
swale.
All of the water in this area is essentially local water flowing over grass,
as acknowledged by the FSP‟s hydrologists „W‟, and is not river water.
W’s (additional) Flood Assessment Report (site specific) 2 July 2012
The insured property included a residential dwelling and is located in
Charlton.
The town of Charlton is surrounded by a high ridge to both the east and
west of town constricting the floodplain through the township.
The catchment areas for the following watercourses are:
Yeungroon Creek (the Creek) 72km 2
Charlton St Arnaud Road Tributary (CSAT) 7km 2
Calder Highway Tributary (CHT) 3km 2
The stormwater runoff generated in the catchments will concentrate
along drainage lines and normally flow into the Avoca River (the river)
upstream of Charlton for CSAT and downstream for CHT and to the
east and further downstream of Charlton for the creek.
Charlton received its largest rainfall total on the Thursday (13 January)
of 66mm recorded to 9.00am on Friday 14 January. The available data
shows the rainfall over the area occurred in three main bursts.
The highest one minute rainfall intensity occurred at 6.28am on 13
January at 1.44mm/per minute.
The maximum rainfall intensities are not exceptional and are generally
equivalent to an ARI of 1-2 years.
Locally derived stormwater flows could not have caused significant
flooding in Charlton after 7.00am-8.00am on 14 January.
Most of the flows caused by direct stormwater runoff generated from
within the town and the catchment of Calder Highway would have
passed through the town to the Avoca River by about 8.00am on 14
January.
Case No: 283561 Determination Page 8 of 15
The continuing flows into Charlton from about 8.00am (14 January)
would have been caused by overland flows resulting from breakouts
from the CSAT, the creek and the river from further upstream.
Given the size of its catchment, the CSAT would have contributed flows
into Charlton prior to the creek and the river.
The site of interest is a residential property located on the south side of
High Street in Charlton and the CHT (tributary) runs along the
northwest boundary of the property.
A Land Subject to Inundation Overlay (LSIO) and Floodway Overlay
(FO) indicate that the property is located within the Floodway Overlay.
The LSIO and FO were based on 1 in 100 year flood events.
The consultant spoke to the Applicants who pointed out the stormwater
drain that runs along the western side of the property. The drain
consists of an open earth lined channel that crosses High Street via a
bank of culverts. The Applicants advised:
At 5.30am on 14 January this stormwater drain was full and
running into the front and back yards including the sheds
constructed upon the property.
At 10.30am water was lapping at the front veranda.
By 4.30pm water had inundated the dwelling and by 6.00pm it
was knee deep in the front and thigh deep in the back.
The water came quickly, was clear and rose rapidly.
The property lies within the FO for what this report refers to as CHT of
the Avoca River and runs adjacent to the property.
This indicates the site has a history of flooding.
Given the size of the catchment it would respond within two hours of
peak intensity rainfall. The peak discharge associated with this rainfall
would have been expected to have occurred by the time that rainfall
ceased around 5.02am 14 January.
Any significant continuing flows in the tributary from after about 8.00am
would have been caused by overland flows resulting from breakouts
from, the creek, the Charlton St Arnaud Road tributary and later the
Avoca River.
29. The FSP has also commissioned reports from exp erts „MC‟ and „F‟
(engineers) in relation to the alleged structural damage the Applicants
maintain was due to the inundation of their home on 14 January.
MC Inspection Report dated 10 June 2011
It is a three bedroom single storey, brick veneer dwelling with elevated
timber floors set 450mm above adjacent ground levels, of
approximately 40 years of age.
Case No: 283561 Determination Page 9 of 15
The property was inundated by flash flooding passing along the
adjacent open earth drain followed by further flooding as a result of the
flood peak passing down Avoca River some 18 hours after the initial
event.
The local catchment south of the town is a wedge of gently sloping
paddocks lying between back St Arnaud Road and Charlton-St Arnaud
Road.
Road work on both roads in the 1990‟s resulted in raised road
embankments being constructed across the natural drainage
depression running east-west across the slope approximately two
kilometres south of the town boundary.
Very small culverts were installed with long term residents warning
authorities at the time that these works would result in flooding of the
town.
The effects of the inundation of the subfloor at the Applicants‟ property
would have resulted in increased moisture levels of the foundation
soils. Particularly in houses of this type where water can enter through
subfloor vents or cracks in the brick veneer but is unable to escape
without pumping, or long term infiltration into the ground.
The other obvious effect would be increased moisture levels in the
subfloor timbers and timber flooring, either due to direct contact or
through high airborne moisture.
MC inspected the ground under the residence (some five months after
the event) and it was found to be moist to touch even though the floor
had been removed and some fan drying efforts had been undertaken.
The damage observed was consistent with movement within timber
frames and veneers that would result from timber swelling due to
moisture uptake and/or ground heave or settlement under and around
foundations.
The serious cracking damage to internal linings, although unable to be
confirmed by observations, is also consistent with the likely frame
movements due to subfloor inundation.
The fresh cracks and opening of gaps in veneer around doorways and
windows is also consistent with effects of ground movement resulting
from wetting of subfloor soils and differential drying after the event.
MC concluded that the saturation of ground supporting the timber floors
and footings coupled with movements related to timbers swelling, had
caused substantial damage to the timber floors, internal linings and
brick veneers.
The estimates of cost of repair attributable to the subfloor inundation
was adjudged to be around $70,000.
F Engineering – Investigation Report dated 10 October 2011
An inspection of the property was completed on 6 September 2011.
Case No: 283561 Determination Page 10 of 15
The entire internal timber floor area and its subfloor structure at the
property was flooded up to approximately 150mm above floor level for
approximately three days.
The owner advised the property was inundated due to heavy rain falls,
in particular, the overflow of stormwater from drains in front on the
street due to inadequate site drainage, prior to the arrival of water from
the overflowing river.
The site is located on relatively flat land and is considered to have poor
drainage. There are numerous medium to large trees located within
10m of the residence.
A geotechnical investigation by „G‟ on 16 September 2011 was also
completed and confirmed the site having clay, sand and silt fluvial
deposits and having a soil reactivity classed as highly reactive i.e. class
H-D type soils. However, due to the abnormal moisture conditions
expected to have been caused by the presence of trees, the site would
also be classified as having „P‟ soils.
The Applicants advised that although repairs to the distressed
brickwork had been carried out in the past, the current distress re-
appeared following the January 2011 event and has continued to
increase since.
The geotechnical investigation comprised of bore holes (6), footing
exposures (2), pocket penetrometers and dynamic penetrometers
testing, dynamic Core penetrometers tests and soil sampling for
moisture content at varied levels down to two metres. .
The investigation confirmed that the soil foundation of the property was
not adversely affected by the event and that no foundation movement
had occurred due to the event in January 2011.
Also, water would not ingress to depths that would cause significant
foundation movement from a storm event. The silty clay material is of
high plasticity with a low permeable rate. This type of clay soil serves
as a barrier and stormwater would sit on top of this barrier until it
evaporates.
An inspection of the timber floor confirmed that the distress to the
timber flooring including its cupping and lifting is caused by the
inundation of the internal floor area.
The distress to the house does not appear to be recent, and it is
evident that previous repairs have been carried out. In F‟s opinion,
movement and distress to this house had been occurring for many
years and prior to the January 2011 event.
A contributing factor for the damage is the close proximity of the trees
to the property. There is no evidence that the initial stormwater
inundation event has caused or contributed to any structural damage to
this house.
Case No: 283561 Determination Page 11 of 15
30. In view of the issues arising in this dispute, the Panel Chair Ombudsman and
a Case Manager of FOS conducted a site inspection of the property in the
presence of the female Applicant (TC) and a representative of the FSP, on
27 June 2012. The Panel notes the following information from the site
inspection:
TC advised that the property was on foundations and not a slab, also
that the floor level is about one foot (approx 300mm) higher than the
surrounding ground level with inundation occurring up to two feet
(approx 600mm) above floor level within the home.
In this regard, the Panel notes that the engineer MC recorded the floor
level as 450mm above the adjacent ground levels. Having attended on
site, the Panel Chair Ombudsman was not satisfied that MC‟s e stimate
in this regard, was accurate.
There were two sheds noted in the rear of the property, one larger shed
at the very rear of the property constructed at ground level and a
smaller shed to the side of the property very near the stormwater drain
and also constructed at ground level. Both sheds contained contents
and were inundated in the morning of 14 January 2011.
TC advised that her husband got up at 5.30am and there was about
50mm of water in the driveway coming out of the stormwater drain into
the yard and flowing from the west, however, there was also water
flowing from the south east.
She advised that the fence in the vicinity of the stormwater drain (north
of the property) was leaning over in a south to north direction, which
she believed to be the opposite direction one would expect it to be
leaning in, had water come from the drain.
By 9.30am the back sheds had 250mm of water in them and by
10.30am to 11.00am water was lapping the front veranda and flowing
down the drain at a great rate.
Water was slowly rising and at 2.00pm-3.00pm they went out to look at
the river on the St Arnaud Road but the banks had not yet broken. On
returning to the property at around 4.00/30pm water was seeping inside
the house and kept rising and they left at 6.00pm.
TC showed the Ombudsman the front wall of the property and indicated
that the brick wall was moving and all the tiles had come off the wall
because of the damage caused by the flood event.
31. The site visits undertaken by the Panel representatives of the Charlton area
and more specifically individual properties including the Applicants, have
assisted the Service in gaining a greater understanding of the topography
and impact of the stormwater runoff in the area prior to the arrival of
floodwater from Avoca River.
32. The Panel has carefully reviewed all of the evidence. In considering this
dispute, the Panel notes that the policy provides cover for accidental loss or
damage, subject to various exclusions. In this instance there is no doubt that
Case No: 283561 Determination Page 12 of 15
the Applicants‟ property suffered accidental damage on 14 January 2011
and so a prima facie claim under the policy has been established. The onus
shifts to the FSP to prove an exclusion contained within its policy, should it
wish to rely on such to refuse the claim.
33. The Panel also notes that the FSP has altered its original decision to decline
the claim in its entirety i.e. it has accepted the Applicants‟ claim for damage
to the sheds and contents stored within them arising from the inundation of
these structures which occurred in the morning of 14 January 2011.
Therefore, the dispute before the Service is limited to consideration as to
whether the dwelling was inundated by stormwater above floor level and also
whether it has been established that the dwelling has suffered structural
damage which would fall within the scope of cover available under the policy.
34. The Panel has considered the evidence in respect to the inundation above
floor level including the various expert reports and the observations from the
site visit.
35. The Panel has also considered the impact of the work undertaken at the
Charlton-St Arnaud Road on the natural flow of the water from the floodplain
to the east of Charlton, which, in the Panel‟s view, is an important
consideration.
36. The Ombudsman, Panel member and FOS Case Manager, together with
FSP representatives and a number of local residents have visited the area
as part of their site inspections. The road had been elevated to allow access
to the airport during floods. In doing so, it dissects the natural floodplain in
the area. Although, a number of pipes/culverts have been positioned under
the road, they were not sufficient to cope with the overland flow and
according to locals, the flow was then diverted initially east of Armstrong
Road and eventually through the town. When the road was dug up by
machinery on 15 January 2011, the level of inundation within Charlton
started to drop.
37. This information was provided by a number of local residents independently
of the Applicants to the Ombudsman and Case Manager and i n the presence
of the FSP representatives. The site visits of individual properties undertaken
by the Panel in the Charlton area (prior to considering the Applicants‟ claim)
have assisted the Service in gaining a greater understanding of the
topography and impact of the stormwater runoff in the area prior to the
arrival of floodwater from Avoca River.
38. Following these visits to the area by FOS personnel and based on
discussion with all parties, the Panel is of the opinion the landscape over
which the water flowed from the south and east of the town cannot be
regarded as a natural watercourse. Although the area from which the water
flowed is designated as “Yeungroon Creek”, that appellation alone cannot be
taken as evidence of a watercourse.
39. The following ruling was made by the High Court in Gartner v Kidman [1962]
HCA 27: 108 CLR 12 (30 May 1962):
Case No: 283561 Determination Page 13 of 15
“This distinction between watercourse and depression follows the language of
Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a
depression which took rainwater for about three months of a year fell short of
the legal definition of a natural watercourse. To constitute such a watercourse
as a matter of law, there must be a stream of water flowing in a defined
channel or between something in the nature of banks. The stream may be
very small and need not run, nor need the banks be clearly or sharply defined.
But there must be a course, marked on earth by visible signs, along which
water usually flows in order to constitute a watercourse such as creates
riparian rights (1899VLR at p485 (at p16)
40. The landscape to the south and south east of the town does not have
evidence of visible banks between which water flows and further, water does
not usually flow along this stretch of land, which is only vaguely outlined by a
range of indentations and vegetation. The landscape may best be described
as a flood plain over which water flows in a direction determined by the rise
and fall of the land.
41. This view is further supported by the description given by PM who observed
Yeungroon Creek has been infilled with flood deposits over many years. The
course of the creek to the south of the town is marked by linear depressions
and vegetation.
42. Accordingly, the Panel accepts that water which came from the Yeungroon
Creek area, to the south and south east of the town, may not be regarded as
water which escaped from the normal confines of a natural watercourse.
43. In the Panel‟s view, stormwater from that flood plain is likely to have
inundated the Applicants‟ property, includin g water which would have
discharged from the stormwater infrastructure to the west of their property,
prior to the arrival of floodwaters from the Avoca River.
44. The Panel notes specifically that the stormwater would have directly
contributed to the water fl owing in the area of the Applicants‟ property.
45. Having observed that area and despite the fact the water flows towards
culverts that run under High Street, due to a lack of defined banks and base
on the south side of High Street, the Panel is not satisfied that the area
through which the stormwater flowed, at that point, is a natural water course
as defined by the policy.
46. The issue remains as to whether this water exceeded the floor level of the
Applicants‟ home prior to the arrival of flood water from the A voca River.
47. The Panel has noted the engineer MC has referred to the floor level as being
450mm above ground level, whereas the Panel observed the floor level to be
approximately 300mm above floor level.
48. The Panel Chair Ombudsman having been onsite with the Case Manager,
the Panel prefers the estimate of 300mm above ground level.
Case No: 283561 Determination Page 14 of 15
49. In addition, having visited many sites in the area, noting the proximity of the
site to the land along which water flowed, noting also the Applicants‟ eye
witness evidence – that by 4.30pm water was seeping into the floor of the
house, the Panel accepts that the floor of the house was inundated by the
stormwater runoff to a level of 100mm above floor level.
50. In this regard, the Panel notes with particular interest the observation of PM,
to the effect that the property is at one of the lowest elevation levels in the
town and a natural drainage route for stormwater.
51. The Panel has carefully considered the evidence made available in relation
to the claim that the structural integrity of the home was affected as a result
of the saturation of the footing soils during the significant weather events in
January 2011. Evidence of these effects on the integrity of the building, that
is, movement in the walls was witnessed by the Ombudsman and Case
Manager during the site visit to the insured property.
52. The Panel notes that the first expert report submitted by MC does
acknowledge the possibility that the building may have been affected by the
inundation of the subfloor area by stormwater and subseque ntly floodwater.
However, the Panel notes in making these comments MC has provided a
number of assumptions without having undertaken extensive research into
the nature, moisture content and condition of the foundation soils and mostly
accepts the mere possibility as opposed to determining that, on the balance
of probabilities, the damage was due to the insured event.
53. In contrast to the MC report, F has made available a more detailed and
researched report which includes a geotechnical investigation into the
nature, moisture level and effects of the foundation soils under the home.
Although, it does acknowledge the possible effects of an event similar to
what occurred at the insured property, it establishes to the Panel‟s
satisfaction that:
The issue in respect to internal and external cracking of the home had
been ongoing and existed prior to the January 2011 event.
The nature of the soil would, on the balance of probabilities, prevent the
water entering the subfloor from penetrating the founding soils to a
level sufficient to effect foundations of the home.
The warping and swelling of the timber structure and flooring would
have occurred due to direct contact with water rising above the floor
level of the property.
That, on the balance of probabilities, the issues in relation to the
structural integrity and cracking of the insured building are due to soil
movement over an extended period of time and from be fore the
January 2011 event.
54. Accordingly, the Panel is satisfied that the Applicants‟ claim for indemni ty in
respect to the structural damage arising due to ground movement arising
from the introduction of moisture to the foundations is excluded from cover in
line with the relevant provisions noted above.
Case No: 283561 Determination Page 15 of 15
55. The FSP‟s liability under the claim includes the da mage to the sheds and
garage area which were built at ground level together with the contents
stored within these structures. The FSP‟s liability also extends to coverage
for any loss arising from inundation to a level of 100mm above floor level
through the home, excluding any structural damage.
56. The Panel has not been provided with sufficient information which would
allow it to come to an informed decision as to the extent/degree (monetary)
of the FSP‟s liability under the claim arising from the initial sto rmwater
inundation of the sheds and garage area and up to 100mm above floor level
within the home.
57. Accordingly, the Panel urges the parties to act in a cooperative manner to
reasonably establish the extent of damage to the insured property arising
from the initial inundation as outlined in the preceding paragraph.
Determination
58. The FSP is required to indemnify the Applicants in accordance with the
terms of this Determination, as detailed above.
59. Should the FSP cash settle any part of this claim, the FSP is to pay interest
calculated pursuant to the Insurance Contracts Act 1984, from the date of
denial of the claim, to the date of acceptance.