Home / Financial Firm (Unknown - Insurer) / Determination 283561

Determination 283561

Denial of inundation and structural damage claim under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' Charlton home and sheds were inundated in January 2011 and the FSP declined the claim as flood. AFCA found the initial stormwater inundation was covered up to 100mm above floor level, including the sheds and contents, but the structural damage was excluded as earth movement.

Stormwater from a non-watercourse flood plain was not flood under the policy definition, while the earth movement exclusion applied to the structural damage.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 283561 Determination Page 1 of 15 Case number: 283561 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood – Policy Exclusion - Denial of claim 4 January 2013 Background 1. The Applicants held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 2. The insured property in Charlton sustained extensive damage when inundated by water on 14 January 2011 following the significant weather events experienced in Victoria. 3. The Applicants made a claim for damage to the insured property; however, the FSP has rejected the claim on the basis the damage was due to flood, which is a policy exclusion. 4. The Applicants remain dissatisfied with the FSP‟s decision to decline the claim and maintain the damage was due to stormwater inundation. Summary of Applicants ’ position 5. The Applicants in disputing the FSP‟s decision to decline the claim have sought the assistance of legal representatives “M”. In the interest of brevity both M and the Applicants will be referred to as “the Applicants” for the purpose of this determination. 6. The Applicants maintain:  They woke up at 5.30am on 14 January to find the property surrounded by water.  30cm-50cm of water had already entered their sheds and the backyard. By 10.30am water was lapping at the front veranda door and the river had not yet broken its banks.  The property is on the eastern side of the town, away from the river, with the water arriving from the east.  Water started to enter the home at approximately 4.30pm on 14 January with the Applicants leaving the property at around 6.00pm.  Water started coming out of drains in the main street at around 12 noon on 14 January. Determination Case No: 283561 Determination Page 2 of 15 7. The Applicants do not accept the FSP‟s hydrologists‟ view that this event was similar to the one that occurred in September 2010, as on this occasion the water came from the back of the property as opposed to the front which was the case in the September 2010 event. 8. The Applicants rely upon the information/evidence made available by their preferred hydrology consultant „PM‟ coupled with their direct evidence to maintain their home was inundated by stormwater prior to the Avoca River breaking its banks. 9. The FSP bears the onus of proving that the exclusion upon which it relies in rejecting the claim actually applies to the circumstances of the loss; the Applicants do not accept the FSP has established its flood exclusion in relation to their loss. 10. The Applicants submit that as a result of the inundation, their home, and in particular the sub floor area, has suffered structural damage. Summary of FSP’s position 11. The FSP has accepted the Applicants‟ claim for loss of or damage to the sheds and contents stored within which were inundated with stormwater runoff before 8.00am on 14 January 2011. 12. It submits that the inundation of the dwellings on High Street (including the Applicants) on the evening of 14 January 2011 was unquestionably a result of overflow from the Avoca River (the river). 13. The FSP relies upon evidence from its expert consultants. Further, it notes that the Applic ants‟ hydrologist PM, in his report dated March 2012, in particular refers to the dwelling‟s close proximity to the drain which forms part of the town‟s stormwater drainage system and the fact that it would have exceeded its capacity and caused the water inundation. 14. This supports the view of its preferred hydrologist „W‟s that there was not a sufficient volume of water on the property prior to the overflow from Yeungroon Creek (the creek) to have caused damage to the dwelling. The FSP has submitted multiple expert reports including a geotechnical report to support its position that the dwelling did not suffer any structural damage arising from an insured event. 15. Alternatively, even if the Service did not accept that it was water from the creek that flooded the property, it maintains that the inundation was due to a mixture of floodwater due to the breakouts from the creek and the water which was not flood, therefore, it was entitled to decline indemnity in line with the Wayne Tank legal principle. 16. In respect t o the Applicants‟ claim that the January 2011 event allegedly caused structural damage to the property, the FSP rejects this based on its appointed consultant engineer‟s report which maintains that damage to the Case No: 283561 Determination Page 3 of 15 structure was due to earth movement (policy exclusion) which has been occurring over an extended period of time. 17. Accordingly, in line with the evidence available to it, the FSP maintains it was entitled to decline the Applicants‟ claim other than the damage to the sheds and contents stored within, arising from stormwater inundation on the morning of 14 January 2011. 18. The FSP relies on the following policy provisions: “ Accidental Damage Cover We will pay for Accidental loss or Damage to your Buildings or Contents at the Address other than the Occurren ces or items referred to in „What you are not insured for. … Words with special meaning “Flood” means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharge from any sewerage or waste water systems due to pressure induced by floodwater. … What you are not insured for Under Section A – Home Cover we will not pay for: Loss or damage to your property caused by: a. flood, the action of water from the sea, high sea water, tidal action or tsunami; b. earth movement, vibration, erosion, landslide or subsidence (except when caused by earth quake)” Issues 19. Whether damage to the Applicants‟ property was caused by flood water as defined by the policy. 20. Whether the FSP was entitled to decline indemnity to the Applicants under the policy. Reasons for decision 21. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 283561 Determination Page 4 of 15 22. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 23. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 24. On 28 June 2012, the Panel Chair Ombudsman and Case Manager, attended on site where they met with the female Applicant and a representative of the FSP. 25. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 26. The Panel is satisfied the parties do not dispute the following:  The Applicants held an active home building and contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicants received the relevant policy documentation including the Product Disclosure Statement (PDS) and Certificate of Insurance prior to the loss.  The insured property suffered extensive damage due to water inundation arising from the significant weather events experienced in the area during January 2011.  The evidence in relation to rainfall readings, river levels, rainfall periods, timing of the river breaking its banks and levels of inundation are reasonably consistent within the consultants‟ reports relied upon by the parties.  The Applicants were at home when the dwelling was initially inundated above floor level with clear water at around 4.30pm on 14 January.  The policy provides cover for accidental loss or damage, however, excludes from cover damage arising from the event „Flood‟. 27. The Panel having reviewed the available evidence is satisfied that the main issue in contention between the parties relates to whether the insured property was initially inundated by stormwater alone, which would give rise to a degree of indemnity under the policy. The Panel is satisfied that the property was ultimately inundated by floodwater to the maximum level; however, the question as to whether there was an extent of initial stormwater inundation has been considered below. Cause of the Loss 28. The Panel has been provided with m ultiple consultants‟ reports obtained and relied upon by the parties. The Panel notes that this information has been exchanged between the parties, each having had the opportunity to Case No: 283561 Determination Page 5 of 15 comment. Accordingly, in the interest of brevity, the Panel will only restate information from these reports if found necessary in providing this Determination. Assessors’ (MY) Site Report dated 9 June 2011  Inspection undertaken at the insured property on 22 February 2011.  Various contents items stored underneath the back veranda and porch at the side of the house damaged due to severe storm conditions over three days.  Total loss in this respect was assessed to be reasonably $14,560. Letter from the Buloke Shire Council  The easement on the Applicants‟ property and land runn ing immediately along the western side is a drainage reserve as part of the council‟s drainage system in Charlton.  The drainage reserve is not part of the natural flow scenario of the Yeungroon Creek, which runs nearly one kilometre east of the property. P M’s Charlton Floods: January 2011 - Site Specific Report dated March 2012  Site visit (Charlton) undertaken on 2 -3 March 2012, with interviews also carried out with the homeowners.  A survey revealed that the stormwater drainage system empties directly into the Avoca River close to the Calder Highway Bridge. The implication of this being as river levels rose in the Avoca River the stormwater outlet would have been inundated with river water. This would result in the drains being backfilled to capacity preventing stormwater on the surface from draining away.  A survey revealed that the upper height of the stormwater outlet pipe is 4.6m (relative to the river height records). This water level was reached early in the morning on 13 January [2011]. From this point on the stormwater drainage system in Charlton would not be able to drain away freely. Stormwater accumulation therefore becomes an issue in Charlton from mid-morning on 13 January.  A survey reveals that the eastern side of Charlton has a significant depression and occupies lower land than that to the western side of Charlton. The town slopes towards the north i.e. Armstrong Street is 35cm higher at the junction with Donald Street compared to the High Street side, and Wilson Street is 45cm higher at the junction with Watson Street compared to the High Street end.  Therefore, water moves through the town (high to low) until it is impeded by the train tracks that run parallel to Davies Street. Both topographical survey and new modelling indicate that properties in the eastern side of Charlton, especially those close to High Street were Case No: 283561 Determination Page 6 of 15 inundated by locally accumulating stormwater which followed along a drainage line independent of any watercourses close to Charlton.  The witness accounts provide varied evidence in respect to the arrival of sediment laden water flows associated with the rapid rise in water levels. The likely explanation for this is that inundation from the river (in the afternoon of 14 January) was widespread, with water levels rising accordingly. However, the complete mixing of the two water bodies had not yet occurred in the central and high parts of town in the afternoon.  The mixing of clear water and muddy water was a gradual process and it is likely that it took some time for water sourced directly from the river to flow across the whole town and mix with locally sourced stormwater.  In this situation flooding in some houses was therefore controlled by the rise in the river level but the actual water at the site was stormwater.  Major flood level for Charlton is 7.5m at the gauging station near the bridge over the Avoca River, which was reached at 5.15pm on 14 January. It is possible that other parts of the riverbank to the south and west of Charlton had low points which allowed water to leave the river and inundate parts of the town somewhat earlier than 6.00pm. Flood modelling indicates earlier overtopping of the river played a part in inundating the west and southwest areas of Charlton.  Witness accounts were consistent in that the water came from the south east of town and standing water had filled the drains by the morning of 14 January.  Clearwater before 6.00pm 14 January is likely to be stormwater. After this time water levels may have risen because of the influence of river water. The presence of clear water cannot be taken as an indicator of local stormwater after 6.00pm.  For properties on a slab close to the ground stormwater levels may have been sufficient to cause damage to the lower parts and furnishings within properties. However, for houses on raised slabs it is unlikely that stormwater would be responsible for damage to the interior of the property footings.  The relevant property is located to the south side of High Street midway between the junctions of Wilson Street and Jenkins Street.  It is located immediately adjacent to the major drain running through the east of Charlton.  The male Applicant was interviewed at 2.05pm on 2 March 2012 and he advised:  Water started rising out of the drain at 3.00pm on 14 January.  By 4.30pm water was entering the home and an inundation level of 15cm was observed before the property was evacuated.  PM concluded that the property is at one of the lowest elevation levels in the town. It is a natural drainage route for stormwater. Case No: 283561 Determination Page 7 of 15  It is highly likely that stormwater collected in the areas around Charlton was routed through this area.  Its close proximity to the drain and the fact that it is not raised above ground level means stormwater inundation almost certainly occurred up to the likely depths of upwards of 25cm. PM’s Email dated 18 July 2012  The issue of concern is where the water west of the town came from?  Yeungroon Creek only has a channel with defined banks downstream of Charlton. Upstream of Charlton it is basically a shallowed grassed swale.  All of the water in this area is essentially local water flowing over grass, as acknowledged by the FSP‟s hydrologists „W‟, and is not river water. W’s (additional) Flood Assessment Report (site specific) 2 July 2012  The insured property included a residential dwelling and is located in Charlton.  The town of Charlton is surrounded by a high ridge to both the east and west of town constricting the floodplain through the township.  The catchment areas for the following watercourses are:  Yeungroon Creek (the Creek) 72km 2  Charlton St Arnaud Road Tributary (CSAT) 7km 2  Calder Highway Tributary (CHT) 3km 2  The stormwater runoff generated in the catchments will concentrate along drainage lines and normally flow into the Avoca River (the river) upstream of Charlton for CSAT and downstream for CHT and to the east and further downstream of Charlton for the creek.  Charlton received its largest rainfall total on the Thursday (13 January) of 66mm recorded to 9.00am on Friday 14 January. The available data shows the rainfall over the area occurred in three main bursts.  The highest one minute rainfall intensity occurred at 6.28am on 13 January at 1.44mm/per minute.  The maximum rainfall intensities are not exceptional and are generally equivalent to an ARI of 1-2 years.  Locally derived stormwater flows could not have caused significant flooding in Charlton after 7.00am-8.00am on 14 January.  Most of the flows caused by direct stormwater runoff generated from within the town and the catchment of Calder Highway would have passed through the town to the Avoca River by about 8.00am on 14 January. Case No: 283561 Determination Page 8 of 15  The continuing flows into Charlton from about 8.00am (14 January) would have been caused by overland flows resulting from breakouts from the CSAT, the creek and the river from further upstream.  Given the size of its catchment, the CSAT would have contributed flows into Charlton prior to the creek and the river.  The site of interest is a residential property located on the south side of High Street in Charlton and the CHT (tributary) runs along the northwest boundary of the property.  A Land Subject to Inundation Overlay (LSIO) and Floodway Overlay (FO) indicate that the property is located within the Floodway Overlay. The LSIO and FO were based on 1 in 100 year flood events.  The consultant spoke to the Applicants who pointed out the stormwater drain that runs along the western side of the property. The drain consists of an open earth lined channel that crosses High Street via a bank of culverts. The Applicants advised:  At 5.30am on 14 January this stormwater drain was full and running into the front and back yards including the sheds constructed upon the property.  At 10.30am water was lapping at the front veranda.  By 4.30pm water had inundated the dwelling and by 6.00pm it was knee deep in the front and thigh deep in the back.  The water came quickly, was clear and rose rapidly.  The property lies within the FO for what this report refers to as CHT of the Avoca River and runs adjacent to the property.  This indicates the site has a history of flooding.  Given the size of the catchment it would respond within two hours of peak intensity rainfall. The peak discharge associated with this rainfall would have been expected to have occurred by the time that rainfall ceased around 5.02am 14 January.  Any significant continuing flows in the tributary from after about 8.00am would have been caused by overland flows resulting from breakouts from, the creek, the Charlton St Arnaud Road tributary and later the Avoca River. 29. The FSP has also commissioned reports from exp erts „MC‟ and „F‟ (engineers) in relation to the alleged structural damage the Applicants maintain was due to the inundation of their home on 14 January. MC Inspection Report dated 10 June 2011  It is a three bedroom single storey, brick veneer dwelling with elevated timber floors set 450mm above adjacent ground levels, of approximately 40 years of age. Case No: 283561 Determination Page 9 of 15  The property was inundated by flash flooding passing along the adjacent open earth drain followed by further flooding as a result of the flood peak passing down Avoca River some 18 hours after the initial event.  The local catchment south of the town is a wedge of gently sloping paddocks lying between back St Arnaud Road and Charlton-St Arnaud Road.  Road work on both roads in the 1990‟s resulted in raised road embankments being constructed across the natural drainage depression running east-west across the slope approximately two kilometres south of the town boundary.  Very small culverts were installed with long term residents warning authorities at the time that these works would result in flooding of the town.  The effects of the inundation of the subfloor at the Applicants‟ property would have resulted in increased moisture levels of the foundation soils. Particularly in houses of this type where water can enter through subfloor vents or cracks in the brick veneer but is unable to escape without pumping, or long term infiltration into the ground.  The other obvious effect would be increased moisture levels in the subfloor timbers and timber flooring, either due to direct contact or through high airborne moisture.  MC inspected the ground under the residence (some five months after the event) and it was found to be moist to touch even though the floor had been removed and some fan drying efforts had been undertaken.  The damage observed was consistent with movement within timber frames and veneers that would result from timber swelling due to moisture uptake and/or ground heave or settlement under and around foundations.  The serious cracking damage to internal linings, although unable to be confirmed by observations, is also consistent with the likely frame movements due to subfloor inundation.  The fresh cracks and opening of gaps in veneer around doorways and windows is also consistent with effects of ground movement resulting from wetting of subfloor soils and differential drying after the event.  MC concluded that the saturation of ground supporting the timber floors and footings coupled with movements related to timbers swelling, had caused substantial damage to the timber floors, internal linings and brick veneers.  The estimates of cost of repair attributable to the subfloor inundation was adjudged to be around $70,000. F Engineering – Investigation Report dated 10 October 2011  An inspection of the property was completed on 6 September 2011. Case No: 283561 Determination Page 10 of 15  The entire internal timber floor area and its subfloor structure at the property was flooded up to approximately 150mm above floor level for approximately three days.  The owner advised the property was inundated due to heavy rain falls, in particular, the overflow of stormwater from drains in front on the street due to inadequate site drainage, prior to the arrival of water from the overflowing river.  The site is located on relatively flat land and is considered to have poor drainage. There are numerous medium to large trees located within 10m of the residence.  A geotechnical investigation by „G‟ on 16 September 2011 was also completed and confirmed the site having clay, sand and silt fluvial deposits and having a soil reactivity classed as highly reactive i.e. class H-D type soils. However, due to the abnormal moisture conditions expected to have been caused by the presence of trees, the site would also be classified as having „P‟ soils.  The Applicants advised that although repairs to the distressed brickwork had been carried out in the past, the current distress re- appeared following the January 2011 event and has continued to increase since.  The geotechnical investigation comprised of bore holes (6), footing exposures (2), pocket penetrometers and dynamic penetrometers testing, dynamic Core penetrometers tests and soil sampling for moisture content at varied levels down to two metres. .  The investigation confirmed that the soil foundation of the property was not adversely affected by the event and that no foundation movement had occurred due to the event in January 2011.  Also, water would not ingress to depths that would cause significant foundation movement from a storm event. The silty clay material is of high plasticity with a low permeable rate. This type of clay soil serves as a barrier and stormwater would sit on top of this barrier until it evaporates.  An inspection of the timber floor confirmed that the distress to the timber flooring including its cupping and lifting is caused by the inundation of the internal floor area.  The distress to the house does not appear to be recent, and it is evident that previous repairs have been carried out. In F‟s opinion, movement and distress to this house had been occurring for many years and prior to the January 2011 event.  A contributing factor for the damage is the close proximity of the trees to the property. There is no evidence that the initial stormwater inundation event has caused or contributed to any structural damage to this house. Case No: 283561 Determination Page 11 of 15 30. In view of the issues arising in this dispute, the Panel Chair Ombudsman and a Case Manager of FOS conducted a site inspection of the property in the presence of the female Applicant (TC) and a representative of the FSP, on 27 June 2012. The Panel notes the following information from the site inspection:  TC advised that the property was on foundations and not a slab, also that the floor level is about one foot (approx 300mm) higher than the surrounding ground level with inundation occurring up to two feet (approx 600mm) above floor level within the home.  In this regard, the Panel notes that the engineer MC recorded the floor level as 450mm above the adjacent ground levels. Having attended on site, the Panel Chair Ombudsman was not satisfied that MC‟s e stimate in this regard, was accurate.  There were two sheds noted in the rear of the property, one larger shed at the very rear of the property constructed at ground level and a smaller shed to the side of the property very near the stormwater drain and also constructed at ground level. Both sheds contained contents and were inundated in the morning of 14 January 2011.  TC advised that her husband got up at 5.30am and there was about 50mm of water in the driveway coming out of the stormwater drain into the yard and flowing from the west, however, there was also water flowing from the south east.  She advised that the fence in the vicinity of the stormwater drain (north of the property) was leaning over in a south to north direction, which she believed to be the opposite direction one would expect it to be leaning in, had water come from the drain.  By 9.30am the back sheds had 250mm of water in them and by 10.30am to 11.00am water was lapping the front veranda and flowing down the drain at a great rate.  Water was slowly rising and at 2.00pm-3.00pm they went out to look at the river on the St Arnaud Road but the banks had not yet broken. On returning to the property at around 4.00/30pm water was seeping inside the house and kept rising and they left at 6.00pm.  TC showed the Ombudsman the front wall of the property and indicated that the brick wall was moving and all the tiles had come off the wall because of the damage caused by the flood event. 31. The site visits undertaken by the Panel representatives of the Charlton area and more specifically individual properties including the Applicants, have assisted the Service in gaining a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from Avoca River. 32. The Panel has carefully reviewed all of the evidence. In considering this dispute, the Panel notes that the policy provides cover for accidental loss or damage, subject to various exclusions. In this instance there is no doubt that Case No: 283561 Determination Page 12 of 15 the Applicants‟ property suffered accidental damage on 14 January 2011 and so a prima facie claim under the policy has been established. The onus shifts to the FSP to prove an exclusion contained within its policy, should it wish to rely on such to refuse the claim. 33. The Panel also notes that the FSP has altered its original decision to decline the claim in its entirety i.e. it has accepted the Applicants‟ claim for damage to the sheds and contents stored within them arising from the inundation of these structures which occurred in the morning of 14 January 2011. Therefore, the dispute before the Service is limited to consideration as to whether the dwelling was inundated by stormwater above floor level and also whether it has been established that the dwelling has suffered structural damage which would fall within the scope of cover available under the policy. 34. The Panel has considered the evidence in respect to the inundation above floor level including the various expert reports and the observations from the site visit. 35. The Panel has also considered the impact of the work undertaken at the Charlton-St Arnaud Road on the natural flow of the water from the floodplain to the east of Charlton, which, in the Panel‟s view, is an important consideration. 36. The Ombudsman, Panel member and FOS Case Manager, together with FSP representatives and a number of local residents have visited the area as part of their site inspections. The road had been elevated to allow access to the airport during floods. In doing so, it dissects the natural floodplain in the area. Although, a number of pipes/culverts have been positioned under the road, they were not sufficient to cope with the overland flow and according to locals, the flow was then diverted initially east of Armstrong Road and eventually through the town. When the road was dug up by machinery on 15 January 2011, the level of inundation within Charlton started to drop. 37. This information was provided by a number of local residents independently of the Applicants to the Ombudsman and Case Manager and i n the presence of the FSP representatives. The site visits of individual properties undertaken by the Panel in the Charlton area (prior to considering the Applicants‟ claim) have assisted the Service in gaining a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from Avoca River. 38. Following these visits to the area by FOS personnel and based on discussion with all parties, the Panel is of the opinion the landscape over which the water flowed from the south and east of the town cannot be regarded as a natural watercourse. Although the area from which the water flowed is designated as “Yeungroon Creek”, that appellation alone cannot be taken as evidence of a watercourse. 39. The following ruling was made by the High Court in Gartner v Kidman [1962] HCA 27: 108 CLR 12 (30 May 1962): Case No: 283561 Determination Page 13 of 15 “This distinction between watercourse and depression follows the language of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a depression which took rainwater for about three months of a year fell short of the legal definition of a natural watercourse. To constitute such a watercourse as a matter of law, there must be a stream of water flowing in a defined channel or between something in the nature of banks. The stream may be very small and need not run, nor need the banks be clearly or sharply defined. But there must be a course, marked on earth by visible signs, along which water usually flows in order to constitute a watercourse such as creates riparian rights (1899VLR at p485 (at p16) 40. The landscape to the south and south east of the town does not have evidence of visible banks between which water flows and further, water does not usually flow along this stretch of land, which is only vaguely outlined by a range of indentations and vegetation. The landscape may best be described as a flood plain over which water flows in a direction determined by the rise and fall of the land. 41. This view is further supported by the description given by PM who observed Yeungroon Creek has been infilled with flood deposits over many years. The course of the creek to the south of the town is marked by linear depressions and vegetation. 42. Accordingly, the Panel accepts that water which came from the Yeungroon Creek area, to the south and south east of the town, may not be regarded as water which escaped from the normal confines of a natural watercourse. 43. In the Panel‟s view, stormwater from that flood plain is likely to have inundated the Applicants‟ property, includin g water which would have discharged from the stormwater infrastructure to the west of their property, prior to the arrival of floodwaters from the Avoca River. 44. The Panel notes specifically that the stormwater would have directly contributed to the water fl owing in the area of the Applicants‟ property. 45. Having observed that area and despite the fact the water flows towards culverts that run under High Street, due to a lack of defined banks and base on the south side of High Street, the Panel is not satisfied that the area through which the stormwater flowed, at that point, is a natural water course as defined by the policy. 46. The issue remains as to whether this water exceeded the floor level of the Applicants‟ home prior to the arrival of flood water from the A voca River. 47. The Panel has noted the engineer MC has referred to the floor level as being 450mm above ground level, whereas the Panel observed the floor level to be approximately 300mm above floor level. 48. The Panel Chair Ombudsman having been onsite with the Case Manager, the Panel prefers the estimate of 300mm above ground level. Case No: 283561 Determination Page 14 of 15 49. In addition, having visited many sites in the area, noting the proximity of the site to the land along which water flowed, noting also the Applicants‟ eye witness evidence – that by 4.30pm water was seeping into the floor of the house, the Panel accepts that the floor of the house was inundated by the stormwater runoff to a level of 100mm above floor level. 50. In this regard, the Panel notes with particular interest the observation of PM, to the effect that the property is at one of the lowest elevation levels in the town and a natural drainage route for stormwater. 51. The Panel has carefully considered the evidence made available in relation to the claim that the structural integrity of the home was affected as a result of the saturation of the footing soils during the significant weather events in January 2011. Evidence of these effects on the integrity of the building, that is, movement in the walls was witnessed by the Ombudsman and Case Manager during the site visit to the insured property. 52. The Panel notes that the first expert report submitted by MC does acknowledge the possibility that the building may have been affected by the inundation of the subfloor area by stormwater and subseque ntly floodwater. However, the Panel notes in making these comments MC has provided a number of assumptions without having undertaken extensive research into the nature, moisture content and condition of the foundation soils and mostly accepts the mere possibility as opposed to determining that, on the balance of probabilities, the damage was due to the insured event. 53. In contrast to the MC report, F has made available a more detailed and researched report which includes a geotechnical investigation into the nature, moisture level and effects of the foundation soils under the home. Although, it does acknowledge the possible effects of an event similar to what occurred at the insured property, it establishes to the Panel‟s satisfaction that:  The issue in respect to internal and external cracking of the home had been ongoing and existed prior to the January 2011 event.  The nature of the soil would, on the balance of probabilities, prevent the water entering the subfloor from penetrating the founding soils to a level sufficient to effect foundations of the home.  The warping and swelling of the timber structure and flooring would have occurred due to direct contact with water rising above the floor level of the property.  That, on the balance of probabilities, the issues in relation to the structural integrity and cracking of the insured building are due to soil movement over an extended period of time and from be fore the January 2011 event. 54. Accordingly, the Panel is satisfied that the Applicants‟ claim for indemni ty in respect to the structural damage arising due to ground movement arising from the introduction of moisture to the foundations is excluded from cover in line with the relevant provisions noted above. Case No: 283561 Determination Page 15 of 15 55. The FSP‟s liability under the claim includes the da mage to the sheds and garage area which were built at ground level together with the contents stored within these structures. The FSP‟s liability also extends to coverage for any loss arising from inundation to a level of 100mm above floor level through the home, excluding any structural damage. 56. The Panel has not been provided with sufficient information which would allow it to come to an informed decision as to the extent/degree (monetary) of the FSP‟s liability under the claim arising from the initial sto rmwater inundation of the sheds and garage area and up to 100mm above floor level within the home. 57. Accordingly, the Panel urges the parties to act in a cooperative manner to reasonably establish the extent of damage to the insured property arising from the initial inundation as outlined in the preceding paragraph. Determination 58. The FSP is required to indemnify the Applicants in accordance with the terms of this Determination, as detailed above. 59. Should the FSP cash settle any part of this claim, the FSP is to pay interest calculated pursuant to the Insurance Contracts Act 1984, from the date of denial of the claim, to the date of acceptance.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.