Home / Financial Firm (Unknown - Insurer) / Determination 283491
Determination 283491
claim_denial
Summary
Charlton home was inundated in January 2011 and the FSP denied the claim as flood. AFCA found clear run-off rainwater entered first and ordered the FSP to indemnify damage up to 200mm above ground, with interest.
Run-off rainwater preceded the Avoca River overflow, so the storm, rainwater and run-off cover responds to damage up to 200mm above ground level.
Issues
- Claim denial primary · upheld“the FSP is to indemnify the Applicants for damage caused by water inundation up to a height of 200mm from the ground”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 283491 Determination Page 1 of 9
Case number: 283491
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
24 September 2012
Background
1. On 14 January 2011 the Applicants’ home in Charlton Victoria was
inundated with water following intense rainfall in the area.
2. A claim under their Classic Home Insurance for Financial Institutions
Insurance policy was denied by the Financial Services Provider (FSP) on the
ground the damage was caused by flood water and excluded from cover
provided by the policy.
Summary of Applicants ’ position
3. The Applicants are represented by a lawyer. For convenience, any reference
to the Applicants in this determination will include their representative.
4. The Applicants state:
Stormwater run-off associated with heavy rainfall between 10 and 14
January 2011 inundated their home causing damage to the building
and contents.
On 14 January eyewitnesses observed clear water moving from the
paddocks to the south and south-east of their home and entering their
yard on the morning of 14 January. Although they were both absent at
the time, it is reasonable to conclude from the male Applicant’s
observation of waist high clear water in his yard at 5.30pm that water
was in their home in advance of 5.00pm.
Given these observations and the conclusion that water was likely to be
in the house before 5.00pm their position is also supported by the
evidence contained in the hydrology report by PM.
The PM report discussed stormwater associated with overflow of the
local drainage system and stormwater associated with runoff from the
surrounding area.
Given that clear water was observed entering their property from the
surrounding paddocks it is highly probable that the first wave of
Determination
Case No: 283491 Determination Page 2 of 9
inundation was not flood water but stormwater associated with heavy
rain.
They do not dispute that the Avoca River broke its banks; however,
they contend that the initial inundation of stormwater caused the
damage to which this dispute refers.
They also submit that as the FSP unreasonably denied their claim, they
are entitled to interest on the amount to be paid.
Summary of FSP’s position
5. The FSP refers to and relies on a report by its assessor and a hydrologist
report commissioned by it.
6. The FSP states:
The assessor reported the flood waters peaked in the town at about 12
midnight on 14 January 2011.
Water entered the Applicants’ property at about 9.30pm on 14 January
at ground level. Dirty water reached a level of about 30cm in the
dwelling.
The Avoca River broke its banks about 1000m west, the Yeungroon
Creek broke its bank 800m east and the stormwater channel/creek
broke its banks 200m west, of the Applicants’ home.
The hydrologist concluded the inundation of the Applicants’ site was a
result of flooding from the combined Yeungroon Creek/Avoca River
flood plain approximately 12 hours after rainfall in the area.
Based on the information provided by the assessor and the hydrologist
it maintains the Applicants’ loss was a result of flood and as such was
excluded from cover provided by the policy.
The FSP relies on the following policy terms:
“ 9. Storm, rainwater or run-off
...
We will pay for loss or damage caused by storm rainwater or run-off.
...
“run - off” means rainwater that has collected on or has flowed across
normally dry ground or has overflowed from swimming pools and spas.
We will not pay for loss or damage:
a caused by:
flood, or
floodwater combined with run=-off and/or rainwater;
“Flood” means the inundation of normally dry land by water
which has escaped or has been released from the normal
Case No: 283491 Determination Page 3 of 9
confines of any natural watercourse, lake or lagoon whether or
not altered or modified or of any reservoir, canal or dam.”
Issue
7. Whether the FSP was entitled to deny liability for the Applicants’ claim.
Reasons for decision
8. As advised to the parties, FOS has considered it appropriate to refer the
dispute directly to the Panel in accordance with the Operational Guidelines
to the FOS Terms of Reference. This is because of the complex nature of
the issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
9. The decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance matters, and a
representative with expensive experience in consumer claims.
10. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
11. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
12. The Panel has been provided with copies of the assessor’s report, the
hydrologist report commissioned by the FSP and the hydrological report
commissioned by the Applicants.
13. As the documents have been exchanged between the parties it is not
intended to recite in detail the contents of those reports in this determination.
The reports contain the following relevant information.
Loss assessor report dated 7 February 2011
Floodwaters peaked in the town around 12.00 midnight on 14 January
2011.
They were advised that water entered the Applicants’ property at about
9.30pm on 14 January at ground level.
Dirty water reached a level of about 30cm in the dwelling.
Hydrologist report dated 3 May 2011 (WT)
Township summary
The general method of flooding in Charlton was via overflows of the
Avoca River and Yeungroon Creek. The Avoca River peaked at 8.05m
Case No: 283491 Determination Page 4 of 9
resulting in widespread flooding of the town and inundation of multiple
properties.
Any flooding after midday on 14 January can be directly attributed to
Avoca River flooding.
Floor inundation that occurred east of Armstrong Street early morning
on 14 January can be attributed to stormwater flooding.
Site flooding
Based on discussion with the Applicants, observations on site, a review
of topographical and synoptic information and discussions with other
residents, the inundation of the site was a result of flooding from the
combined Yeungroon Creek/Avoca River floodplain approximately 12
hours after the rainfall in the area.
Hydrological report dated 3 November 2011 commissioned by the Applicant
(PM)
Overflow from local drainage systems
Direct overflow of stormwater after 4.00am on 14 January is less likely
but the possibility of overflow because of collection of surface water
from surrounding areas remains.
Run-off from surrounding areas
There are two possible sources of runoff from surrounding areas; runoff
in Charlton which does not enter the drainage system and runoff from
surrounding rural areas.
To the south and east of Charlton is an expanse of low-lying low
gradient land. Soils in these fields would have become saturated in the
days leading up to the intense rainfall on 13 January.
It is highly likely that all the rainfall on 13 and 14 January became
saturation overland flow. This water would have followed natural
drainage lines which led it to entering Charlton.
Yeungroon Creek
There is some question whether Yeungroon Creek is an area of
normally dry land near Yeungroon Road, and not a creek that carries
water.
It was a former anabranch of the Avoca River but along its length it has
been infilled to the extent there is no longer a well defined channel. It
still acts as a natural drainage line.
Case No: 283491 Determination Page 5 of 9
Direction of storm water and floodwater
Low lying land which forms a series of depressions runs approximately
north-south on the east side of Charlton.
The depressions act as the major control of drainage directions in
Charlton.
Movement of runoff from surrounding areas is also strongly controlled
by the surface topography. For a distance of 2/3 kilometres south of
Charlton water falling between the Avoca River and Yeungroon Creek
will be directed to the depressions and flow either toward or along the
depressions.
Under the waterlogged conditions prevailing at Charlton water will
runoff as overland flow and move from where it fell in a down slope
direction. This would have the effect of concentrating water in the
eastern part of Charlton.
Presence of clear water
The presence of clear water in Charlton as documented in various
photographs supports the suggestion that prior to inundation via
overflow from Avoca River, some of the floodwater was sourced locally
from stormwater which either fell in the town or collected to the east of
the town and followed the natural drainage line to inundate low lying
parts of Charlton particularly on the east side.
Summary
14. The FSP seeks to rely on a clause in the policy to deny the claim and
therefore has the burden of establishing on the balance of probabilities that
the terms of the relevant clause applies to defeat the claim.
Time of inundation
15. The assessor reported that she had been advised that water entered the
Applicants’ home at approximately 9.30pm on Friday 14 January 2011. The
assessor does not provide any details of the author of that advice.
16. On the other hand the Applicants originally said the male Applicant observed
clear water in his yard up to waist height at 5.30pm on 14 January 2011.
17. However, the Applicants have since said that the water commenced comi ng
into the yard at about 3.00pm and by about 6.00pm was up to the back door
and within another half inch would have been in the house.
18. The Applicants now agree that when they left the property at around 6.00pm
water had not entered the house and was considerably lower than the waist
height they had previously estimated.
Case No: 283491 Determination Page 6 of 9
19. The Applicants agree it was considerably lower than waist high as had it
been waist height it would have already entered the house.
20. Examination of the hydrologist report referring to his discussion with the
Applicants reveal no mention was made of the time the water entered the
home other than a reference to “flooding began on Friday morning and
disappeared Saturday night”.
21. Given the policy provides cover for run-off rainwater, the time of the initial
inundation is a key issue when considering the policy response to the claim.
22. Given the male Applicant’s eye witness observations, it is likely that water
was on the property before 6.00pm but not in the house until after 6.00pm on
14 January 2011.
Inundation of the Applicants’ property
23. According to the hydrologist WT, the Applicants advised flooding began in
the morning of Friday 14 January.
24. The hydrologist was further advised that flooding in the Applicants’ street
occurred before the remainder of the town was flooded. This was not the
case during the 2010 flood when their street was the last to be flooded.
25. The Applicants’ home is located toward the outskirts of the town on the
east/south east side and close to open ground.
26. In considering the evidence, the Panel notes that PM reported all water from
the river would have been characterised by a high sediment load.
Conversely clear water may be regarded as water from a source other than
the river.
27. The hydrologist WT asserted that it is a simplification to assert that the
difference between flood water as opposed to storm and rainwater is the
presence of clear water, and is highly inadequate to use as justification of
the claim.
28. However, the photographs contained in the PM report show an ob vious
distinction between river flood water and other non river water.
29. The photograph (figure 2 of the PM report) captained “View of sediment
laden floodwater at Charlton” displays very brown water.
30. The photograph (figure 3 of the PM report) captioned “Aer ial view of Charlton
showing waterlogged fields and water with low sediment concentration
occupying linear depressions to the south of the town” shows the colour of
the water differs markedly from that shown as sediment laden water in
Charlton.
Case No: 283491 Determination Page 7 of 9
31. The Panel is therefore persuaded in this matter, that the presence of clear
water although not definitive is a significant indication that the water was not
initially from the river.
32. Further, the caption on photograph figure 3 goes onto state “The depression
in the foreground provided a link to Yeungroon Creek at high flow”.
33. The PM report presents an argument that because of the water logged
condition of the surrounding fields, water from the south and east of Charlton
would have been directed towards a series of li near depressions which led it
to the eastern end of Charlton. His report goes further stating that surface
run-off from this direction would have inundated Charlton on 13 and 14
January.
34. Hydrologist WT states the flooding to a height sufficient to cause significant
damage to the property occurred several hours after the last rainfall event -
reaching waist height as described by the male Applicant. WT therefore
maintains this inundation was caused by flooding in Yeungroon Creek and
was worsened by elevated levels in the Avoca River.
35. Panel members have previously carried out a series of site visits in Charlton
and met with a number of local residents. They all described water flowing
from the south/south east of Charlton across a natural plain. There had bee n
significant development of the Charlton-St Arnaud Road (to the airport)
which dissected the flood plain causing an artificial levy. While culverts went
under the road at a low point, the culverts, according to local residents could
not cope with the overland flow. One resident witnessed water pooling on the
southern side of the road. This water flowed along the road to the low point
along Armstrong Street and eventually over Armstrong Street and High
Street (Calder Highway). This was clear water. This occ urred on the
afternoon of 14 January. When part of the road was dug up using machinery
on 15 January the level of inundation within Charlton started to fall.
36. The Panel notes this issue was not considered by either hydrologist in their
reports.
37. The Panel is also mindful of the issue as to whether the area of land to the
east/southeast of Charlton referred to as Yeungroon Creek is in fact a
watercourse. In parts the land had no defined banks or other formation which
could be described as a watercourse or creek.
38. Support for this opinion is found in the PM report. PM discussed Yeungroon
Creek and observed that most of its length has been infilled to the extent that
it no longer has a well defined channel. The Panel is mindful of the definition
provided by WT, however, having inspected the area and given the nature of
the landscape the Panel has no reason to alter its opinion that parts of
Yeungroon Creek could not properly be described as a watercourse.
39. The evidence has established that water was on the Applic ants’ property
before 6.00pm. This water was clear indicating that at that time it was
unlikely to be water which had overtopped the Avoca River. The evidence
Case No: 283491 Determination Page 8 of 9
has further established the direction of flow of that water was from the
east/south east being across open rural land and from the direction of
Yeungroon Creek.
40. The Panel is satisfied that water approaching Charlton from the east/south
east direction over rural land was not water which was contained within any
defined watercourse and as such may be regarded as run-off rainwater.
41. The Panel has not been provided with any information in relation to the
height of the floor level of the Applicants’ home above ground level.
However, examination of a photograph of the home reveals the building is
relatively low set, on stumps having three steps to the front porch. The
garage appears to be at ground level.
42. The Panel is persuaded that on balance the evidence leads to the
conclusion that the Applicants’ property was first inundated by surface run -
off rainwater prior to inundation by a combination of run-off rainwater and
overflow from the Avoca River.
43. Given the lack of direct evidence as to when the home was first inundated
and at what point floodwater would have mixed with stormwater runoff, an
assessment as to the height of stormwater is problematic.
44. Having physically reviewed a number of other properties in the immediate
area the Panel has some knowledge of the local circumstances for this
inundation event. However, in the absence of direct evidence for this specific
property, the Panel is inclined to rely on its mandate to do what is fair in all
the circumstances.
45. The Panel therefore determines that the FSP is to indemnify the Applicants
for damage to their property to a height of 200mm above the level of the
ground.
46. The Panel encourages the parties to work cooperatively to establish the
extent of damage and the cost of rectification in order to finalise this matter.
Determination
47. On the basis of the available information the Panel determines the FSP is to
indemnify the Applicants for damage caused by water inundation up to a
height of 200mm from the ground.
48. Insofar as the FSP elects to cash settle any part of the claim, it is to pay
interest in accordance with the Insurance Contracts Act 1984 on the sum
payable from 19 August 2011 until the date of payment in accordance with
this Determination.
Case No: 283491 Determination Page 9 of 9
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.