Home / Financial Firm (Unknown - Insurer) / Determination 283491

Determination 283491

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Charlton home was inundated in January 2011 and the FSP denied the claim as flood. AFCA found clear run-off rainwater entered first and ordered the FSP to indemnify damage up to 200mm above ground, with interest.

Run-off rainwater preceded the Avoca River overflow, so the storm, rainwater and run-off cover responds to damage up to 200mm above ground level.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 283491 Determination Page 1 of 9 Case number: 283491 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim - Flood 24 September 2012 Background 1. On 14 January 2011 the Applicants’ home in Charlton Victoria was inundated with water following intense rainfall in the area. 2. A claim under their Classic Home Insurance for Financial Institutions Insurance policy was denied by the Financial Services Provider (FSP) on the ground the damage was caused by flood water and excluded from cover provided by the policy. Summary of Applicants ’ position 3. The Applicants are represented by a lawyer. For convenience, any reference to the Applicants in this determination will include their representative. 4. The Applicants state:  Stormwater run-off associated with heavy rainfall between 10 and 14 January 2011 inundated their home causing damage to the building and contents.  On 14 January eyewitnesses observed clear water moving from the paddocks to the south and south-east of their home and entering their yard on the morning of 14 January. Although they were both absent at the time, it is reasonable to conclude from the male Applicant’s observation of waist high clear water in his yard at 5.30pm that water was in their home in advance of 5.00pm.  Given these observations and the conclusion that water was likely to be in the house before 5.00pm their position is also supported by the evidence contained in the hydrology report by PM.  The PM report discussed stormwater associated with overflow of the local drainage system and stormwater associated with runoff from the surrounding area.  Given that clear water was observed entering their property from the surrounding paddocks it is highly probable that the first wave of Determination Case No: 283491 Determination Page 2 of 9 inundation was not flood water but stormwater associated with heavy rain.  They do not dispute that the Avoca River broke its banks; however, they contend that the initial inundation of stormwater caused the damage to which this dispute refers.  They also submit that as the FSP unreasonably denied their claim, they are entitled to interest on the amount to be paid. Summary of FSP’s position 5. The FSP refers to and relies on a report by its assessor and a hydrologist report commissioned by it. 6. The FSP states:  The assessor reported the flood waters peaked in the town at about 12 midnight on 14 January 2011.  Water entered the Applicants’ property at about 9.30pm on 14 January at ground level. Dirty water reached a level of about 30cm in the dwelling.  The Avoca River broke its banks about 1000m west, the Yeungroon Creek broke its bank 800m east and the stormwater channel/creek broke its banks 200m west, of the Applicants’ home.  The hydrologist concluded the inundation of the Applicants’ site was a result of flooding from the combined Yeungroon Creek/Avoca River flood plain approximately 12 hours after rainfall in the area.  Based on the information provided by the assessor and the hydrologist it maintains the Applicants’ loss was a result of flood and as such was excluded from cover provided by the policy.  The FSP relies on the following policy terms: “ 9. Storm, rainwater or run-off ... We will pay for loss or damage caused by storm rainwater or run-off. ... “run - off” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools and spas. We will not pay for loss or damage: a caused by:  flood, or  floodwater combined with run=-off and/or rainwater; “Flood” means the inundation of normally dry land by water which has escaped or has been released from the normal Case No: 283491 Determination Page 3 of 9 confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam.” Issue 7. Whether the FSP was entitled to deny liability for the Applicants’ claim. Reasons for decision 8. As advised to the parties, FOS has considered it appropriate to refer the dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 9. The decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance matters, and a representative with expensive experience in consumer claims. 10. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 11. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 12. The Panel has been provided with copies of the assessor’s report, the hydrologist report commissioned by the FSP and the hydrological report commissioned by the Applicants. 13. As the documents have been exchanged between the parties it is not intended to recite in detail the contents of those reports in this determination. The reports contain the following relevant information. Loss assessor report dated 7 February 2011  Floodwaters peaked in the town around 12.00 midnight on 14 January 2011.  They were advised that water entered the Applicants’ property at about 9.30pm on 14 January at ground level.  Dirty water reached a level of about 30cm in the dwelling. Hydrologist report dated 3 May 2011 (WT) Township summary  The general method of flooding in Charlton was via overflows of the Avoca River and Yeungroon Creek. The Avoca River peaked at 8.05m Case No: 283491 Determination Page 4 of 9 resulting in widespread flooding of the town and inundation of multiple properties.  Any flooding after midday on 14 January can be directly attributed to Avoca River flooding.  Floor inundation that occurred east of Armstrong Street early morning on 14 January can be attributed to stormwater flooding. Site flooding  Based on discussion with the Applicants, observations on site, a review of topographical and synoptic information and discussions with other residents, the inundation of the site was a result of flooding from the combined Yeungroon Creek/Avoca River floodplain approximately 12 hours after the rainfall in the area. Hydrological report dated 3 November 2011 commissioned by the Applicant (PM) Overflow from local drainage systems  Direct overflow of stormwater after 4.00am on 14 January is less likely but the possibility of overflow because of collection of surface water from surrounding areas remains. Run-off from surrounding areas  There are two possible sources of runoff from surrounding areas; runoff in Charlton which does not enter the drainage system and runoff from surrounding rural areas.  To the south and east of Charlton is an expanse of low-lying low gradient land. Soils in these fields would have become saturated in the days leading up to the intense rainfall on 13 January.  It is highly likely that all the rainfall on 13 and 14 January became saturation overland flow. This water would have followed natural drainage lines which led it to entering Charlton. Yeungroon Creek  There is some question whether Yeungroon Creek is an area of normally dry land near Yeungroon Road, and not a creek that carries water.  It was a former anabranch of the Avoca River but along its length it has been infilled to the extent there is no longer a well defined channel. It still acts as a natural drainage line. Case No: 283491 Determination Page 5 of 9 Direction of storm water and floodwater  Low lying land which forms a series of depressions runs approximately north-south on the east side of Charlton.  The depressions act as the major control of drainage directions in Charlton.  Movement of runoff from surrounding areas is also strongly controlled by the surface topography. For a distance of 2/3 kilometres south of Charlton water falling between the Avoca River and Yeungroon Creek will be directed to the depressions and flow either toward or along the depressions.  Under the waterlogged conditions prevailing at Charlton water will runoff as overland flow and move from where it fell in a down slope direction. This would have the effect of concentrating water in the eastern part of Charlton. Presence of clear water  The presence of clear water in Charlton as documented in various photographs supports the suggestion that prior to inundation via overflow from Avoca River, some of the floodwater was sourced locally from stormwater which either fell in the town or collected to the east of the town and followed the natural drainage line to inundate low lying parts of Charlton particularly on the east side. Summary 14. The FSP seeks to rely on a clause in the policy to deny the claim and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause applies to defeat the claim. Time of inundation 15. The assessor reported that she had been advised that water entered the Applicants’ home at approximately 9.30pm on Friday 14 January 2011. The assessor does not provide any details of the author of that advice. 16. On the other hand the Applicants originally said the male Applicant observed clear water in his yard up to waist height at 5.30pm on 14 January 2011. 17. However, the Applicants have since said that the water commenced comi ng into the yard at about 3.00pm and by about 6.00pm was up to the back door and within another half inch would have been in the house. 18. The Applicants now agree that when they left the property at around 6.00pm water had not entered the house and was considerably lower than the waist height they had previously estimated. Case No: 283491 Determination Page 6 of 9 19. The Applicants agree it was considerably lower than waist high as had it been waist height it would have already entered the house. 20. Examination of the hydrologist report referring to his discussion with the Applicants reveal no mention was made of the time the water entered the home other than a reference to “flooding began on Friday morning and disappeared Saturday night”. 21. Given the policy provides cover for run-off rainwater, the time of the initial inundation is a key issue when considering the policy response to the claim. 22. Given the male Applicant’s eye witness observations, it is likely that water was on the property before 6.00pm but not in the house until after 6.00pm on 14 January 2011. Inundation of the Applicants’ property 23. According to the hydrologist WT, the Applicants advised flooding began in the morning of Friday 14 January. 24. The hydrologist was further advised that flooding in the Applicants’ street occurred before the remainder of the town was flooded. This was not the case during the 2010 flood when their street was the last to be flooded. 25. The Applicants’ home is located toward the outskirts of the town on the east/south east side and close to open ground. 26. In considering the evidence, the Panel notes that PM reported all water from the river would have been characterised by a high sediment load. Conversely clear water may be regarded as water from a source other than the river. 27. The hydrologist WT asserted that it is a simplification to assert that the difference between flood water as opposed to storm and rainwater is the presence of clear water, and is highly inadequate to use as justification of the claim. 28. However, the photographs contained in the PM report show an ob vious distinction between river flood water and other non river water. 29. The photograph (figure 2 of the PM report) captained “View of sediment laden floodwater at Charlton” displays very brown water. 30. The photograph (figure 3 of the PM report) captioned “Aer ial view of Charlton showing waterlogged fields and water with low sediment concentration occupying linear depressions to the south of the town” shows the colour of the water differs markedly from that shown as sediment laden water in Charlton. Case No: 283491 Determination Page 7 of 9 31. The Panel is therefore persuaded in this matter, that the presence of clear water although not definitive is a significant indication that the water was not initially from the river. 32. Further, the caption on photograph figure 3 goes onto state “The depression in the foreground provided a link to Yeungroon Creek at high flow”. 33. The PM report presents an argument that because of the water logged condition of the surrounding fields, water from the south and east of Charlton would have been directed towards a series of li near depressions which led it to the eastern end of Charlton. His report goes further stating that surface run-off from this direction would have inundated Charlton on 13 and 14 January. 34. Hydrologist WT states the flooding to a height sufficient to cause significant damage to the property occurred several hours after the last rainfall event - reaching waist height as described by the male Applicant. WT therefore maintains this inundation was caused by flooding in Yeungroon Creek and was worsened by elevated levels in the Avoca River. 35. Panel members have previously carried out a series of site visits in Charlton and met with a number of local residents. They all described water flowing from the south/south east of Charlton across a natural plain. There had bee n significant development of the Charlton-St Arnaud Road (to the airport) which dissected the flood plain causing an artificial levy. While culverts went under the road at a low point, the culverts, according to local residents could not cope with the overland flow. One resident witnessed water pooling on the southern side of the road. This water flowed along the road to the low point along Armstrong Street and eventually over Armstrong Street and High Street (Calder Highway). This was clear water. This occ urred on the afternoon of 14 January. When part of the road was dug up using machinery on 15 January the level of inundation within Charlton started to fall. 36. The Panel notes this issue was not considered by either hydrologist in their reports. 37. The Panel is also mindful of the issue as to whether the area of land to the east/southeast of Charlton referred to as Yeungroon Creek is in fact a watercourse. In parts the land had no defined banks or other formation which could be described as a watercourse or creek. 38. Support for this opinion is found in the PM report. PM discussed Yeungroon Creek and observed that most of its length has been infilled to the extent that it no longer has a well defined channel. The Panel is mindful of the definition provided by WT, however, having inspected the area and given the nature of the landscape the Panel has no reason to alter its opinion that parts of Yeungroon Creek could not properly be described as a watercourse. 39. The evidence has established that water was on the Applic ants’ property before 6.00pm. This water was clear indicating that at that time it was unlikely to be water which had overtopped the Avoca River. The evidence Case No: 283491 Determination Page 8 of 9 has further established the direction of flow of that water was from the east/south east being across open rural land and from the direction of Yeungroon Creek. 40. The Panel is satisfied that water approaching Charlton from the east/south east direction over rural land was not water which was contained within any defined watercourse and as such may be regarded as run-off rainwater. 41. The Panel has not been provided with any information in relation to the height of the floor level of the Applicants’ home above ground level. However, examination of a photograph of the home reveals the building is relatively low set, on stumps having three steps to the front porch. The garage appears to be at ground level. 42. The Panel is persuaded that on balance the evidence leads to the conclusion that the Applicants’ property was first inundated by surface run - off rainwater prior to inundation by a combination of run-off rainwater and overflow from the Avoca River. 43. Given the lack of direct evidence as to when the home was first inundated and at what point floodwater would have mixed with stormwater runoff, an assessment as to the height of stormwater is problematic. 44. Having physically reviewed a number of other properties in the immediate area the Panel has some knowledge of the local circumstances for this inundation event. However, in the absence of direct evidence for this specific property, the Panel is inclined to rely on its mandate to do what is fair in all the circumstances. 45. The Panel therefore determines that the FSP is to indemnify the Applicants for damage to their property to a height of 200mm above the level of the ground. 46. The Panel encourages the parties to work cooperatively to establish the extent of damage and the cost of rectification in order to finalise this matter. Determination 47. On the basis of the available information the Panel determines the FSP is to indemnify the Applicants for damage caused by water inundation up to a height of 200mm from the ground. 48. Insofar as the FSP elects to cash settle any part of the claim, it is to pay interest in accordance with the Insurance Contracts Act 1984 on the sum payable from 19 August 2011 until the date of payment in accordance with this Determination. Case No: 283491 Determination Page 9 of 9

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.