Home and contents claim for January 2011 flood and stormwater damage declined under flood exclusion
Text of the determination
Case No: 283490 Determination Page 1 of 9
Case number: 283490
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
2 January 2013
Background
1. The Applicants held a Home Building & Contents Insurance Policy with the
Financial Services Provider (FSP).
2. The insured property sustained extensive damage arising from the
significant weather events experienced in Charlton, Victoria in January 2011.
3. They lodged a claim with the FSP who declined to indemnify them on the
basis the loss is due to t he excluded event of “Flood”.
4. The Applicants remain dissatisfied with the FSP‟s decision to decline their
claim and seek to be fully indemnified.
Summary of Applicants ’ position
5. The Applicants in disputing the FSP‟s decision to decline their claim have
sought the assistance of legal representatives “M”. In the interest of brevity
both the Applicants and M will be referred to as the “the Applicants” for the
purpose of this determination.
6. The Applicants maintain:
The initial damage to the property was due to stormwater run-off
inundation arising from the significant rainfall in the area over the period
10 January – 14 January 2011.
The Applicants (supported by statutory declarations) maintain they
were present at the insured property when clear water inunda ted the
property including the garage and shed at around 4.00pm on 14
January 2011.
The stormwater runoff also inundated the foundations of the property
causing structural damage and subsequently began inundating their
home above floor level through the floor boards between 5.00pm-
6.00pm on 14 January.
The Applicants rely upon the evidence made available by their
preferred consultant „PM‟ in his hydrology report dated November 2011.
Determination
Case No: 283490 Determination Page 2 of 9
The Applicants do not dispute the Avoca River subsequently broke its
banks. However, the FSP bears the onus to establish the application of
the exclusion it seeks to rely upon in declining the claim, which they do
not believe it has established.
The reports, including loss adjusters “C” and hydrologists‟ “F”
commissioned by the FSP, are not sufficiently specific to the
Applicants‟ circumstances. Further, the loss adjuster “KB” is not
adequately qualified to provide an opinion on the cause for the water
damage.
The Service should give preference to the hydrology report by “PM”
obtained and relied upon by the Applicants.
It is reasonable, given that runoff from local paddocks was likely and
because of the impact of the elevation of Charlton-St Arnaud Road, to
expect that it would take some time for the intense rainfall from the
south and east of Charlton to reach the township.
Summary of FSP’s position
7. The FSP maintains:
The policy is a “Defined Events” contract of insurance which includes
„Storm and rainwater‟ as one of the listed defined events. However, it
excludes from cover under all sections, loss arising from the event
flood.
The Applicants in their later submissions to the Service have provided a
version of events different to that provided to both C and F. They
originally reported inundation of the property occurred at between
6.00pm-7.00pm with water enter the home at around 7.15pm on 14
January. This has now (after 18 months) been altered to water coming
up through the floorboards between 5.00pm-6.00pm on 14 January.
The FSP maintains the Applicants‟ earlier recollection of the event
should be preferred as this was provided closer to the event with less
chance of error rather than their recollection 18 months later.
PM‟s report states that the Avoca River reached major flood levels at
5.15pm on 14 January 2011, which further confirms inundation
occurring at around 7.00pm would be due to floodwater.
F concluded that all rainfall in the area ceased by 8.00am on 14
January 2011, therefore inundation of the property later in the day was
not the result of direct rainfall.
F‟s hy drology report specifically addresses the cause of water
inundation at the insured property. An analysis of the local catchment
area, rainfall durations, rainfall volumes and intensity levels in the area
conclude that levels of stormwater runoff experienced in January 2011
were likely to have been experienced at the insured property at least
every two years.
Case No: 283490 Determination Page 3 of 9
The property is located on an elevated block of land with the floor level
approximately 300-400mm above surrounding ground levels.
The FSP maintains that KB does hold adequate qualifications to
provide his opinion in respect to the cause of the water damage.
In the event, it is accepted that stormwater did pool, overflow or
couldn‟t escape through the stormwater drainage system, this would
have mixed wit h floodwaters and therefore the “Wayne Tank Principle”
would apply to defeat the claim.
8. The FSP relies on the following policy provisions:
“ Home Building Insurance Policy
What we cover – insured events
You are covered for damage or loss to your home building occurring
during the period of cover and caused by the following events:
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter, guttering
or surface.
No
Damage or loss caused by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
…
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost
or liability caused by or arising from or involving:
flood,
…
Home Contents Insurance Policy
What we cover – insured events
You are covered for damage or loss to your contents while they are in your
home or at the site, occurring during the period of cover, caused by the
following events:
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter, guttering
or surface.
Case No: 283490 Determination Page 4 of 9
No
Damage or loss caused by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
…
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost
or liability caused by or arising from or involving:
flood ”
Issues
9. Whether damage to the Applicants‟ property was caused by flood water as
defined by the policy.
10. Whether the FSP was entitled to decline indemnity to the Applicants under
the policy.
Reasons for decision
11. As advised to the parties, FOS has considered it appropriate to refer this
dispute direct to the Panel in accordance with the Operational Guidelines to
the FOS Terms of Reference. This is because of the complex nature of the
issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
12. The decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance matters and a
representative with extensive experience in consumer claims.
13. The Panel Chair Ombudsman, a Panel member and Case Manager of the
Service have attended on site, where they have met with the Applicants and
representatives of the FSP.
14. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
15. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
Case No: 283490 Determination Page 5 of 9
16. The Panel is satisfied the parties do not dispute the following:
The Applicants held an active home building and contents insurance
policy with the FSP at the time of loss.
The FSP provided and the Applicants received the relevant policy
documentation including the Product Disclosure Statement (PDS) and
Certificate of Insurance.
The insured property suffered extensive damage due to water
inundation arising from the significant weather events experienced in
the area during January 2011.
The policy excludes from cover loss or damage arising from flood
however does provide indemnity for damage arising from
stormwater/rainwater inundation.
17. As there has been an exchange of material between the parties it is not
intended to recite the details of the various hydrological reports in this
determination. The relevant information is summarised as follows:
Loss Adjuster’s “C” Report
An inspection was undertaken on 30 January 2011.
According to the Applicants, inundation of the property occurred on 14
January at around 6.00pm-7.00pm with water entering the house
quickly around 7.10pm which the author found to be consistent with
information provided by other individuals.
There was no suggestion that water entered the property purely as a
result of heavy rainfall in days preceding.
It appeared that the inundation of the home was a direct result of Avoca
River having broken it banks.
The property was found to be on stumps with the habitable floor level at
between 30-40cm (300-400mm). Water came from the front and back
of the property and first inundated the shed and garage built at ground
level.
PM’s Charlton Floods - January 2011 Report, dated 3 November 2011
The town of Charlton experienced heavy rainfall between 10 January-
14 January, with extensive flooding in the area from the Avoca River
from 14 January onwards.
Total rainfall over this period was recorded at 168.6mm with 66.2mm
falling between 9.00am on 13 January and 9.00am on 14 January.
The highest intensity rainfall recorded was 15mm/hr between 7.00am -
8.00am on 13 January. There was no rainfall recorded after 8.00am on
14 January.
Although rainfall intensity is reported on an hourly basis, PM maintains
that the rainfall periods at Charlton were highly concentrated in short
duration bursts e.g. 10 to 12 minute intervals. Accordingly, if calculated
Case No: 283490 Determination Page 6 of 9
on this basis it would represent 20-50 year ARI rainfall events as
opposed to 1-2 year ARI events (based on hourly intervals).
Accordingly, overflow from local drainage systems and culverts were
highly likely as these systems are only designed to cope with 2-5 year
ARI rainfall events.
Time of overflow would have to correspond closely with the timing of
the intense rainfall periods and based on this the first stormwater
drainage overflow event would have occurred at around 7.00am on 13
January.
There are two possible sources of rainwater run-off in Charlton, run-off
which does not enter the stormwater drainage system and second run-
off from surrounding rural areas.
All rainfall that fell on 13 January and 14 January would have become
saturated overland flow and followed natural drainage lines into
Charlton. This would have led to the inundation of Charlton on these
dates prior to the arrival of floodwaters from the Avoca River.
Floodwaters from the Avoca River would be of high sediment loads
(muddy/mucky) and would not be clear. Clear water inundation would
support that prior to the arrival of floodwaters from the Avoca River
there was water sourced from local stormwater.
Depending on the exact locations of the properties, they will have
begun to have been inundated from floodwater sometime on the
afternoon or early evening 14 January. Any inundation before this time
would be from runoff particularly corresponding to times when heavy
rainfall were occurring (13 January and early morning 14 January).
Evidence in respect of water inundation of properties which occurred
particularly before 5.00pm on 14 January should be taken into account.
F’s Flood and Stormwater Investigation Report March 2011
Charlton has a history of flooding.
Catchment area to Avoca River is 274,945 hectares to Charlton
Township. Since the river is narrow and shallow, a significant
catchment to the river is likely to cause frequent flooding within the
area.
Hourly rainfall data indicates the maximum rainfall recorded was
15mm/hr which corresponds to a 1 in 2 year ARI rainfall event.
The town is reasonably flat with a fall of 0.1% across town north to
south.
Site inspections were undertaken on 16 and 17 February in the
presence of homeowners. There were minor inconsistencies observed
regarding the time and date of inundations. Almost all advised water
started inundating dwellings between 3.00pm-6.00pm on 14 January.
The level of water continued rising until the occupants were evacuated
around 8.00pm on 14 January.
Case No: 283490 Determination Page 7 of 9
The last rainfall recorded in the area ceased at 8.00am on 14 Januar y
and therefore the rising water level was not due to direct rainfall.
The property has an approximately 200mm high kerb at the front which
appears to be able to cope with moderate street flows.
The owner advised water started entering the house at 7.00pm on 14
January with the maximum level of about 400mm above floor level.
Similar to other properties, this property could not have been affected
with minor runoff in the street which may be expected at the time water
started to enter the property at approximately 6.00pm.
The hydrologist is of the opinion that the inundation to the property was
due to floodwaters from Avoca River.
18. In view of the issues arising in this dispute, the Panel Chair Ombudsman and
a Case Manager conducted a site inspection of the property in the presence
of the Applicants and a representative of the FSP on 27 June 2012. The
Panel notes the following information from the site inspection:
The male Applicant „RR‟ advised that his wife evacuated the property at
around 7.00pm on 14 January and he remained within the house till
8.00pm.
At around 6.00pm when they went in for dinner both gutters on High
Street were full but the road was still visible. The Ombudsman noted
that the road is like „the top of an oval‟ with the centre of the road hi gher
than the edges to both sides.
The Applicants advised that the water appeared from the south and
came down the two streets which run perpendicular to High Street i.e.
Kaye and Wilson Streets.
After having dinner RR came out and observed that water was
travelling in a northerly direction down the driveway but not a fast flow
and was finding its own level. At around 6.30pm the water was about to
come in the back door and at the same time he noted it had started
coming up through the skirting boards.
The water level markings indicated that water had risen to around
500mm within the house and even higher in the garage (containing a
deep freezer and fridge amongst other contents) and shed (containing
motors etc) built at ground level.
Water that came in the evening from the south was not completely
clear but was much clearer than the water that came even later in the
evening.
The stormwater drain that runs through Charlton is a short distance
east of the property but water at no stage came from that direction and
the Applicants confirmed it at all times came from the south.
19. The Panel notes that there are inconsistencies in the Applicants‟ evidence in
respect of the timing of the inundation. Reports provided to the FSP
indicated that the Applicants had reported inundation at floor level occurred
at or after about 7.00pm on 14 January 2011. However both Applicants
Case No: 283490 Determination Page 8 of 9
attested in their Statutory Declarations that this was incorrect, rather that
water seeped into their home between 5.00pm and 6.00pm.
20. In their discussions with the Panel Chair Ombudsman, they stated that water
first started seeping up through their floorboards and was about to come in
through their back door at about 6.30pm on 14 January 2011.
21. The Panel Chair Ombudsman formed the view that the Applicants were clear
and consistent in their description of events during this discussion, and their
verbal account was an honest and credible account. On that basis the Panel
is inclined to accept this version of events as an accurate representation.
22. The Panel notes that the hydrology reports relied on do not seem to have
considered the impact of the work undertaken at the Charlton-St Arnaud
Road on the natural flow of the water from the floodplain to the Avoca River.
The Ombudsman, Case Manager, FSP representative and a number of local
residents visited the area as part of the site inspection. The road has been
raised to allow access to the airport during floods. In doing so, it dissects the
natural floodplain. Although, a number of pipes/culverts have been
positioned under the road they are not sufficient to cope with the overland
flow and according to locals the flow is diverted initially east of Armstrong
Road and eventually through the town. This is consistent with the Applicants‟
advice of water coming down Kaye and Wilson Streets towards their
property.
23. This information was provided by a number of local residents independently
of the Applicants to the Ombudsman and Case Manager in the presence of
the FSP representatives. The site visits undertaken by the Panel
representatives of the Charlton area and more specifically individual
properties including the Applicants have assisted the Service in gaining a
greater understanding of the topography and impact of the stormwater runoff
in the area prior to the arrival of floodwater from the Avoca River.
24. The Panel notes that the floor level of the house is elevated above the
surrounding ground by around 400mm. Given the time of inundation, which
the Panel is satisfied commenced at about 6.30pm on 14 January, it is
unlikely the inundation of the Applicants‟ home was due to stormwater runoff
alone. More likely the initial inundation inside the home and subsequent
peak level of inundation was due to a combination of flood and stormwater
runoff which would be excluded under the policy.
25. The policy, however, covers stormwater runoff or water escaping any water
main, drain, pipe, street gutter, guttering or surface. In the event of the
inundation being due to a combination of stormwater overland flow and
water escaping the stormwater drains near the property then the policy will
cover the loss.
26. The Panel having considered the evidence in this matter accepts that on a
balance of probabilities the initial inundation of the Applicants‟ property i.e.
the yard, shed, and garage would have been due to water escaping the
stormwater infrastructure in the vicinity of the property and the stormwater
Case No: 283490 Determination Page 9 of 9
flows from the south down Kaye and Wilson Streets from the flood plain to
the south and east of the town.
27. There is no precise calculation of what the initial level of inundation would
have been prior to the mixing of floodwaters from the Avoca River. Therefore
the Panel, is inclined to rely on is remit, as per its Terms of Reference, to do
what it considers is fair in all the circumstances, to assess their inundation to
a height of 150mm above ground level on their property. In assessing this
level of inundation the Panel is informed by the numerous site visits by the
Service‟s representatives in and around the Applicants‟ locality.
28. The Panel determines that the FSP is obliged under the policy to provide
indemnity for loss or damage arising from “ Storm and rainwater including
storm water runoff from areas surrounding the site, or water escaping from
any water main, drain, pipe, street gutter, guttering or surface ” up to a level
of 150mm above ground through the property.
29. The Panel is not satisfied, on the balance of probabilities, that the home was
initially inundated by stormwater runoff.
30. The Panel is mindful of the fact that it has not been provided with sufficient
information which would allow it to come to an informed decision as to the
extent/degree (monetary) of the FSP‟s liability under the claim arising from
the initial stormwater inundation, which is likely to have affected the
Applicants‟ shed and garage and any contents at ground level therein.
31. Accordingly, the Panel urges the parties to act in a cooperative manner to
establish the extent of damage to the insured property limited to the shed
and garage arising from the initial stormwater inundation.
Determination
32. On the basis of the available information the Panel determines that the FSP
is liable under the policy to provide indemnity to the Applicants (within 30
days of receiving this determination) in line with the matters discussed
above.
33. The FSP is to pay to the Applicants interest at the statutory rate, in line with
the Insurance Contracts Act 1984 , upon the final settlement figured agreed
between the parties from 28 March 2011 (date of final decision) to final
settlement of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.