Text of the determination
Case No: 282998 Determination Page 1 of 12
Case number: 282998
General Insurance - Small Business - Commercial Property - FSP Decision -
Denial of claim-Exclusion/ condition
14 June 2013
Background
1. The Applicant is the owner of a building company which holds a Trade
Insurance Policy with the Financial Services Provider (FSP). The policy
covers a number of contingencies including fire and other damage, burglary,
accidental damage, public liability and product liability. The policy includes
cover to the contents and stock, electronics and other business contents.
The risk address is situated in Wagga Wagga , NSW.
2. On 5 March 2012 the Applicant lodged a claim for extensive water damage
to office furniture, trade tools and printers due to heavy rainfall. The date of
loss was variously stated to be 2 March and 4 March 2012.
3. The FSP appointed an assessor and a hydrologist to review the cause of
damage. The FSP then declined the claim on the basis that there were two
inundations but as both arose from the excluded cause of flood, neither
inundation was covered.
4. The Applicant disputes the declinature on the basis that the hydrologist did
not address the date of loss which was prior to 4 March 2012 and 6 March
2012. Further, the Applicant did not receive a copy of the Product Disclosure
Statement (PDS).
Summary of Applicant’s position
5. The Applicant has enclosed a policy schedule issued on 7 March 2012. This
policy provided cover from 4 August 2011 to 4 August 2012. The policy
schedule states there is cover for fire and other damage, accidental damage,
burglary, glass, public and product liability. The document as provided does
not notify of the flood exclusion.
6. The Applicant‟s property sustained water damage to the office/showroom
and warehouse by severe rain and storms. In the following days the
Applicant‟s property was flooded by a creek (which resulted in two distinct
water levels).
Determination
Case No: 282998 Determination Page 2 of 12
7. The Applicant has enclosed rainfall data for March 2012 as evidence of the
high rainfall. The Panel notes the following from the rainfall data:
24 hours to 9.00am on 1 March 2012 - 60.4mm
24 hours to 9.00am on 2 March 2012 - 25mm
24 hours to 9.00am on 3 March 2012 - nil or n/a
24 hours to 9.00am on 4 March 2012 - 95.8mm
8. The site of the business is on a low side of the complex and had all the run-
off from rain. The rain damage happened from the Wednesday (29 February)
Thursday (1 March) and Friday (2 March) rainfall. The water ingress
occurred under the front door, roller door and back PA door in the
warehouse. The Applicant‟s employees showed the FSP‟s hydrologist the
„dirty‟ water mark from this water damage. The water had almost completely
drained by the time an employee entered the site to check for damage. Then
in the following days (Tuesday [6 March] being the worst) the creek behind
the business overflowed and the roads were cut off, raising the water
damage level (“the clean mark”).
9. The Applicant and his employee submit that the hydrologists seems “to have
chopped up our statements and only refers to the creek water when [name
removed] said the water hadn’t gotten into the warehouse by Saturday”. The
hydrologist had been informed that the rain had mostly drained out by then
and the employees moved furniture that could be saved to hig her ground in
the event the creek overflowed.
10. The Applicant has provided photographs demonstrating that the water has a
tendency to pool in heavy rain. The risk address is further on a downward
slope and even the owner of the property has noted that there is inadequate
drainage.
11. The Applicant has enclosed a letter from the commercial property manager
confirming that all other unit occupants had received payment for the
inundation under their insurance covers.
12. The Applicant understands the claim is being declined on the basis that
there is a flood exclusion. However, the Applicant did not receive policy
documentation and had no notice that the flood exclusion applied. He states
this is because the contents portion of cover was added to the existing public
liability policy prior to the renewal in October 2011.
13. The Applicant has agreed that he received policy documents at each
renewal. However, he has not received any since adding the extra cover and
the renewal document had not been received.
14. The Applicant not es the FSP‟s submissions and responds as follows:
The FSP has relied on documents stating the provision of the PDS
occurred but this is not signed by the Applicant. The document also
relates to the increase to the public liability cover. The Applicant
Case No: 282998 Determination Page 3 of 12
received a PDS for the Contract Works and Public Liability but not
Trade Insurance.
The Applicant was informed of the availability of the PDS but not
provided with one as the „broker‟ advised he did not have one but it
could be viewed online. At this time, the Applicant did not have
contents cover.
The postal address changed during December 2009. The „broker‟ was
informed of the new address but the Applicant did not receive any
document as alleged for the 2011/2012 renewal. The Applicant has
enclosed an email dated 18 August 2010 demonstrating notification of
the new address.
The Applicant was not informed of the flood exclusion and was told the
FSP was adding the contents to the existing policy not adding the fire
and other damages section only.
Summary of FSP’ s position
15. The FSP relies on the following policy terms and conditions:
“Your Trade Insurance Policy
...
General definitions
...
6. flood means
The overflow of any lake, river, stream or other watercourse, whether natural
or altered, or of any reservoir, dam, channel or canal onto land not normally
covered by water”
...
Insured events
...
4. Storm and wind
This insured event includes run-off of rainwater that accumulates directly on
and flows across normally dry ground or that overflows from public roadside
gutters, channels and drains that are normally dry or swimming pools, spas or
saunas.
This insured event only includes storm, tempest, wind, rainwater (including
cyclones and tornadoes), snow and hail.
This insured even does not include damage by:
(a) Flood;”
16. The FSP relies on the claim file records from which the Panel notes the
following:
The claim was lodged on 5 March 2012 but the loss date was given as
2 March 2012.
Case No: 282998 Determination Page 4 of 12
On 9 May 2012 the Applicant lodged a complaint on the basis that the
hydrology report does not address the fact, damage occurred on the
Thursday or Friday 1-2 March 2012.
17. The FSP has enclosed an assessor‟s report dated 14 March 2012 from
which the Panel notes the following:
Date of loss is recorded as 2 March 2012.
The assessor placed a reserve of $45,800 on the contents, stocks and
fees associated with the claim.
There is widespread media coverage given to the storms and torrential
rain falling through the Riverina district and Southern area of NSW.
Many townships were evacuated after water catchments were
inundated with rainfall with reports of anywhere between 150mm -
250mm of rainfall. Major flooding occurred to the Murrumbidgee River
resulting in substantial evacuations on 4 March 2012 and further
evacuation on 5 March 2012 following unprecedented rainfall in the
previous days.
The risk address is located between the Murrumbidgee River and
Marshalls Creek.
The Applicant‟s leased sing le storey brick premises (sic) was inundated
up to an amount of 40cm.
18. The FSP has enclosed an assessor‟s report dated 19 July 2012 from which
the Panel notes the following:
There is a broken down-pipe at ground level but there is no evidence
this would cause damage to any items within the premise and the rate
of the leak from the broken downpipe could not cause a la rge
inundation of water to flow through the property. Given the downpipe‟s
location within the workshop, it is believed it could not have caused any
damage to office equipment.
In relation to the overflow of gutters causing moisture to penetrate the
brick wall, the assessor considers the seepage would be minimal and
unable to cause the damage to equipment.
19. The FSP has enclosed a copy of a hydrology report completed by company
“W” from which the Panel notes the following:
W recorded the following informati on from the Applicant‟s employees:
i. Heavy rains occurred on 1-2 March 2012 and on 3 March 2012.
ii. The employees were not present at the premise on the morning
and afternoon of 3 March 2012. At 8.00pm on 3 March 2012 an
employee visited the premise and saw no water in the
workshop/storeroom at this time.
iii. Water entered the workshop/storeroom from two sources on the
night/morning of Sunday 4 March, from the roof; the roof gutters
overflowed via a broken internal downpipe and down the rear wall.
Case No: 282998 Determination Page 5 of 12
Stormwater runoff from the driveway. This water ponds at the door
to the workshop/storeroom area, enters the area and flows toward
the rear (the floor slopes to the rear). Water also ponds/enters the
workshop/storeroom area from the access door in the rear wall.
An embankment running parallel to the rear wall impedes the
drainage of any stormwater finding its way there.
iv. At 7.00pm on 4 March the employee visited the property and
found all the water had drained away.
v. There were two distinct high water marks on the office wall. The
first inundation event generated the lower mark; the higher mark
was associated with river flooding from the Murrumbidgee.
The office was inundated to a maximum depth of 430mm above floor
level during the March 2012 inundation event. The workshop/storeroom
was inundated to a maximum depth of 450mm close to the front door to
550mm at the rear of the premise (the floor slopes to the rear).
There are two inundation marks, one at 200mm and one at 430mm
above floor level. The employee confirmed the higher mark was due to
river inundation from the Murrumbidgee River flood waters on 6 March
2012. The lower mark was caused by inundation on Sunday 4 March
2012. Thus the peak level of the event on Sunday 4 March was some
200-250mm lower than the peak level of the event on Tuesday 6
March.
The leased property is one of a number of units in a commercial
complex situated to the west of “K Road” and to the south of an access
lane. The subject property is situated in the southwest corner of the
complex. Access to the property is via a u-shaped driveway with both
entrance and exit on K Road.
A flood protection embankment has been constructed along the
western bank of Marshalls Creek. The eastern bank of Marshalls Creek
in the „triangle‟ consists of a lower r oughly formed bank. An access lane
at the rear of the properties acts as the drainage path for the triangular
area. Towards the northern limit of the access lane, an open channel
drain delivers run-off to Marshalls Creek which is a tributary of the
Murrumbidgee River. The access lane outflow drain enters Marshalls
Creek about 100m upstream of “H Avenue” Bridge over Marshalls
Creek.
On 4 March 2012 there was high intensity rainfall. The water then
commenced ponding over H Avenue around 7.00am with water rising
rapidly at 8.00am prior to peaking around 9.00am at 100-120cm above
ground level. There were no overflows from Marshalls Creek between
K Road and H Avenue at 11.30am on this date. A number of property
owners commented the water was „clean‟. Then by 7 .00-9.00pm that
night the water levels dropped and had drained out of most premises.
A mix of flood waters from Marshall Creek and Gregadoo Creek,
together with stormwater run-off from local catchments caused the
inundation experienced around the intersectio n of H Avenue and K
Case No: 282998 Determination Page 6 of 12
Road on 4 March 2012. The inundation on this date was not caused by
the Murrumbidgee River.
These waters flow in a north westerly direction into the area bounded
by H Avenue and K Road. These waters overtopped K Road and
flowed into the triangular shaped area bounded by K Road (and down
the access lane) containing the subject property. These waters would
have flowed down the u-shaped driveway into the commercial complex
and ponded opposite the door to the workshop/storeroom and then
entered through this area.
The contribution of the above three sources of water to the mix of water
inundating the area can only be determined by mathematical modelling.
Rain ceased at 8.00am on 4 March 2012 when water levels in the area
around the intersection of H Avenue and K Road were rising. High
water levels in Marshalls Creek will impede the drainage from local
catchments of stormwater run-off into the creek, causing any
subsequent stormwater run-off to pond at upstream locations. It is not
known when water levels in the creek rose sufficiently to impede the
flow of local stormwater into the creek, but it presumably happened
before water levels at the subject property peaked.
The water levels began rising rapidly around the time rainfall ceased
and the rapid rise in water levels indicates that stormwater run-off from
the small local „eastern‟ and „western‟ catchments w ould not have
contributed significantly to the inundation at this time. However,
stormwater run-off from the much larger local Forrest Hill catchment
would have formed part of the mix of water causing inundation at the
subject property.
The subject property was not inundated until around 8.00am on Sunday
4 March 2012 some 18 hours after the most intense rainfall period. The
highest intensity rainfall occurred between 11.00am and 6.00pm on 3
March 2012. Therefore, by itself the stormwater run-off from the three
local catchments would not have inundated the subject property deep
enough to cause damage.
The roof gutters have overflowed and water poured into the
workshop/storeroom via a broken internal downpipe and down the rear
wall to wet the workshop/storeroom floor prior to inundation by overland
flow.
These findings are consistent with the version of events outlined by the
property owners (sic) – [the insured’s – Panel emphasis].
Between K Road and H Avenue, Marshalls Creek does not appear to
have overflowed its banks on Sunday 4 March 2012. The flood waters
from this local reach of Marshalls Creek would not have contributed to
inundation at the subject property on 4 March 2012.
A mix of flood waters from Marshalls Creek and Gregadoo Creek,
together with stormwater run-off from the Forest Hill catchment, caused
rapid rise of water levels at the subject property on Sunday 4 March
2012 (most of this water flowed across “C Street”). It is not possible to
Case No: 282998 Determination Page 7 of 12
quantify the relative contributions of these sources to the inundation
waters. However, by itself, stormwater run-off from local catchment
would not have caused damage at the subject property.
W concludes that water in Gregadoo Creek was forced in the open
channel stormwater drains of Forest Hill catchment to back up along
their respective channels. This led to the mix of flood waters from
Marshalls Creek (to which Gregadoo is a tributary) up through
Gregadoo Creek and stormwater run-off from the Forrest Hill
catchment.
W concluded that the maximum depth of inundation in the office is
430mm above floor level. The maximum depth of inundation in the
workshop/storeroom was 450mm close to the front door rising to
550mm at the rear of the workshop/storeroom as the floor slopes to the
rear.
River flooding on Tuesday 6 March 2012 ca used these maximum
inundation levels at the subject property, when flood waters in the
Murrumbidgee River backed up along Marshalls Creek and overflowed
onto the subject property.
20. The FSP maintains it has forwarded the PDS and policy documentation to
the Applicant at each renewal. The Trade Insurance Policy was in force from
4 August 2008 and was renewed annually. The Trade Insurance PDS
included the fire and other damages issued to the Applicant in the 2011/2012
renewal. The policy clearly identified flood as being excluded from damage.
The information it provides to its clients comprises of PDS and policy
schedules/renewal notices. The FSP originally stated it would provide a
statutory declaration from the person who manually printed the notices at the
instruction of the FSP together with a copy of the PDS that was posted in
2011/2012.
21. The FSP notes that the policy was incepted by its own „Business Insurance
Specialist‟ (BIS) who provided the PDS to the Applicant. A letter signed by
both the FSP BIS and the Applicant at inception, acknowledges this. The
letter indicates the Applicant had purchased public and product liability
coverage which is covered under the Trade Insurance Policy PDS.
22. The FSP BIS followed his usual procedure in renewing the policy and
completed a checklist contemporaneously over the telephone. The BIS
indicated in this checklist posting the PDS to the Applicant. This is indicated
with the box titled „posted‟ being marked with an X and the PDS was posted
in August 2010.
23. The FSP maintains t he Applicant‟s address during this time was in “N
Crescent” and the FSP BIS would have sent it to this address. The FSP
notes that the BIS also contacted it on 26 August 2010 to update the
address to a postal box address.
Case No: 282998 Determination Page 8 of 12
24. The renewal document was arranged over the telephone and the information
indicates that the PDS was posted to the Applicant on 14 September 2011.
The FSP asserts its BIS would have sent the PDS to the changed address.
25. The FSP notes that had any returned mail occurred it would have been sent
to the FSP‟s BIS address. There is no indication from the BIS that mail sent
to the Applicant was returned to the BIS.
26. The FSP contends that the Applicant received the Trade Insurance PDS on
inception and at every renewal period. As this PDS contained the flood
exclusion the FSP maintains the Applicant had notice of same.
27. The FSP has declined the claim on the basis of the hydrologist‟s evidence
that the inundation arose from flood as defined by the policy. Further, the
leaking stormwater downpipe has, according to its assessor and hydrologist,
been insufficient to cause the damage.
28. The FSP notes the Applicant‟s submissions and responds as follows:
The FSP states the information stating the damage occurred on 1-2
March 2012 is contradicted by W. The Applic ant‟s employees did not
raise damage prior to the flood event with W.
The section of the policy relied on by the Applicant does not cover
water inundation but the Applicant‟s public liability.
Issues
29. Whether the FSP is entitled to rely on the policy terms and conditions.
30. Whether the FSP was entitled to decline the claim for inundation.
Reasons for decision
31. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
32. T he Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
33. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
34. There are two discrete issues (listed above) which the Panel will address in
turn below.
Case No: 282998 Determination Page 9 of 12
Whether the FSP is entitled to rely on the policy terms and conditions
35. The Panel notes this policy does not fall under the prescribed contracts set
out in the Insurance Contracts Regulations (1985). As such Section 37 of the
Insurance Contracts Act (1984) (“the Act”) would apply in this instance.
Section 37 requires the FSP to provide notice of a provision in a contract
which is “…of a kind that is not usually included in contracts of insurance that
provide similar insurance cover unless, before the contract was entered into
the insurer clearly informed the insured in writing of the effect of the
provision …”.
36. Although the Applicant referred to the FSP‟s “BIS” as his broker the FSP
acknowledged it was the FSP‟s “Business Specialist”,
37. The Applicant has acknowledged receipt of renewal documentation but not
the PDS documentation.
38. The policy inception documentation which includes the checklist does not
actually state the Applicant was provided with the PDS. The statement is that
the Applicant has acknowledged being informed of the “Availability of the
Product Disclosure Statement”.
39. The FSP were asked to provide further documentation to identify whether
the PDS document had been sent to the Applicant. The Applicant believes
that if they were sent, they may have been sent to an incorrect address.
40. The FSP has provided documentation which indicates the PDS was posted
to the Applicant in August 2008. There is also a check list provided that
indicates that the PDS was posted to the Applicant in August 2010 and again
in September 2011.
41. The Panel is persuaded by the information provided by the FSP that most
likely the FSP has provided the policy documentation to the Applicant.
42. In any event, the Panel notes that Section 37 provides that an insurer may
not rely upon a provision included in a Contract of Insurance (not being a
prescribed Contract of Insurance of a kind that is not usually included in
Contracts of Insurance that provide similar insurance cover unless, before
the contract was entered into the insurer clearly informed an insured in
writing of the effect of the provision). The Panel has examined numerous
business insurance or trade insurance policies. Most policies do not provide
flood cover.
43. The Panel notes that the policy covers insured events including the insured
event of storm and wind damage which is defined as including:
“Runoff of rain water t hat accumulates directly on and flows across normally dry
land or that over flows from public roadsides, gutters, channels, drains that are
normally dry or swimming pools, spas; includes as an insured event water
damage where there is a loss or damage caused directly or indirectly by the
discharge of water from a water main in the immediate vicinity of the building
but seeks to exclude damage for flood which is defined as:
Case No: 282998 Determination Page 10 of 12
The overflow of any lake, river, stream or other water course, whether natural
or altered or of any reservoir, dam, channel, canal onto land not normally
covered by water.”
44. The flood definition includes the overflow of any „channel‟ onto land not
normally covered by water. In contrast, the storm and wind cover allows
cover for “run -off of rainwater that accumulates directly on and flows across
normally dry ground or that overflows from...channels and drains that are
normally dry...”
45. The flood definition appears to exclude overflow from a channel whilst the
storm cover includes overflow from channels and drains. This is
contradictory.
46. The Panel further note the common law definition of channel defined by
Justice Kirby in the case of Provincial Insurance Australia v Consolidated
Wood Products (1991) 25 NSWLR 541 considered the meaning of cha nnel
and preferred the Macquarie Dictionary definition for stormwater channel
which was :
“Stormwater Channel
An artificial passage from stormwater and flood water; floodway.
Also, stormwater canal, stormwater drain.”
47. It is difficult to determine how a channel and drain could fall under the cover
as stated in the policy. The Panel notes it is likely to be the commercial intent
to cover such overflow from the channel and drain.
Cause of inundation
48. Whilst the FSP has relied upon reports from a hydrologist, the hydrologist
does not address the possibility of inundation on 1 / 2 of March 2012 despite
the fact that the Applicant has repeatedly informed the FSP that the date of
loss (i.e.) the initial inundation occurred on 2 March 2012. The Panel further
notes that the hydrology report has not provided information regarding the
timing of the creek overtopping its banks on 4 March 2012 and whether this
would have travelled the distance to the Applicant‟s property.
49. In an attempt to clarify these issues, the Panel Chair Ombudsman conducted
a site inspection of the Applicant‟s property on 15 May 2013.
50. The Applicant no longer operates out of the premise but access to the
premise was provided through the local real estate agent. Present at the site
inspection were the Applicant and representatives from the FSP,
51. During the course of the site inspection, the Applicant provided the Panel
Chair Ombudsman with a Certificate of Currency and maintained this was
the only PDS received. As indicated earlier in this Determination, the Panel
accepts that most likely a valid PDS was sent to the Applicant but in any
event, as flood is a usual exclusion within a business policy, the failure to
provide the PDS would not necessarily defeat the claim.
Case No: 282998 Determination Page 11 of 12
52. The building comprises an office or display area behind which there is a
computer room. Beside the office and computer room, is a large storage
room. The floor of the building is a concrete slab. The slab slopes down
towards the rear of the computer room and slopes even further in the large
storage room,
53. According to the Applicant the property was first inundated on or about 1 or 2
March 2012. The Applicant thought this was the Friday or Saturday night
which the Panel notes would have been 2 or 3 March 2012. The initial
inundation came from an overflow from the roof but did not cause any
significant damage to the property. It was later after the council had blocked
off access to the river at the bridge that stormwater was diverted towards the
property.
54. The property is at the low side of the complex. The nearby road is at the
level of the property and the roadside gutters and curbing is low. The
Applicant maintains that the water drained towards the property.
55. On inspection of the site, it appears that there was no area where the run-off
could go other than towards the Applicant‟s premise. The Applicant
maintains that at the time of this inundation, a nearby river and creek had not
overflowed its banks. The initial inundation compromised the computer room
to a level of approximately 200m and the storage area to a similar level or a
possibly higher level.
56. After the property was first inundated, the council then blocked the
stormwater outlets to the river. This caused the stormwater which would
normally run out to the river to back up through the creek which eventually
overflowed and led to the further inundation of the property. The ultimate
inundation of the property compromised the storage area to a height of
approximately 450-550mm.
57. The inundation of the Applicant‟s property according to the Applicant was
also impacted by the high mounds of dirt that were situated at the rear of the
property. It appears that these mounds of dirt may be designed to act as a
levy but in fact served to channel water towards the rear of the Applicant‟s
prop erty rather than channel it away from the Applicant‟s property.
58. It is unfortunate that the hydrology report, as to the timing of the inundation
of the property, is inconsistent with the information provided by the Applicant.
There seems to be no real attempt to align these times. Bearing this in mind
however, the Panel notes the hydrologist has identified that the Applicant‟s
property is at a low spot for the stormwater drainage from the driveway and
the stormwater run-off tends to pond in this location. The hydrology report
identifies that the water in the vicinity of the Applicant‟s property on the
morning of 4 March 2012 did not appear to originate as overflows from
Marshall‟s Creek, that the water rose rapidly at approximately 8.00am and by
early evening, had fallen.
59. The hydrologist forms a view that the inundation on 4 March 2012 was due
to a combination of stormwater and flood waters from the Marshall‟s Creek;
Case No: 282998 Determination Page 12 of 12
however, the Panel notes it has not been provided with the relevant creek
levels to determine whether overflow could have occurred within that time.
60. The Panel accepts that the rising levels of the water within the creek would
have impacted on the local drainage system and may have caused backflow
in the area. This needs to be considered alongside the definition of storm
and wind contained within the policy.
61. In the Panel‟s view, on the balance of probabilities, the initial inundation of
the Applicant‟s property was most likely caused as a result of stormwater
overflowing from the roadside gutters, channels and drains surrounding the
property. In the Panel‟s view, most likely the initial inundation reached a
height of approximately 200-250mm and the damage sustained as a result of
such inundation would be covered within the terms of the policy.
62. The subsequent inundation of the property has most likely occurred as a
result of river inundation or flood waters. The Applicant does not significantly
dispute this and notes that the high water marks of approximately 450mm to
550mm would have been caused as a result of flood waters.
Determination
63. Accordingly the Panel determines that the FSP meet its liability in
accordance with the terms of the policy with respect to the initial inundation
of the property to a height of 200-250mm through the main display area,
computer room and store room. .
64. As the Applicant no longer occupies the premise, the parties are asked to
work cooperatively together to determine the extent of the loss suffered as a
result of such inundation.
65. Further the Panel determines that the subsequent inundation of the
Applicant‟s property to a height of approximately 450 -550mm was due to
flood and therefore any additional damage sustained as a result of flood is
excluded under the terms of the policy.
66. Insofar as the FSP is to cash settle the Appl icant‟s claim, the Panel
determines that interest should be paid on any cash settlement from 14 June
2012 being the date of the FSP‟s final decision letter until date of payment of
the claim.