Home / Financial Firm (Unknown - Insurer) / Determination 282545

Determination 282545

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicant claimed roof damage from cyclone Yasi, which the FSP declined. AFCA found she had not proved cyclone-caused roof damage and that the corrosion and rust were excluded, so it ordered no payment.

The insured must prove loss within an insured event, and the evidence showed long-term rust and corrosion excluded under the wear, tear and rust exclusion rather than cyclone damage.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 282545 Determination Page 1 of 7 Case number: 282545 General Insurance - Domestic Insurance – Home Building - FSP Decision - Denial of claim 12 December 2012 Background 1. The Applicant is insured under a Home Building and Contents Policy underwritten by the Financial Services Provider (FSP). 2. The cover provided under the policy is for defined events. The Applicant has also selected the optional additional cover for Accidental Damage at the home. 3. During, and immediately after, cyclone Yasi, water leaked into the Applicant‟s home from the roof. The Applicant lodged a claim with the FSP on 9 February 2011 for water damage to the internal areas of the building and storm damage to the roof. 4. Based on reports from two builders, the FSP has accepted the claim for internal water damage but denied the part of the claim relating to damage to the roof. The FSP denied that part of the claim on the basis that water gained entry because of the existing condition and that there was no evidence of the roof having been damaged by the cyclone. 5. The Applicant protested the decision regarding the roof and the FSP engaged a firm of engineers to inspect the roof. The engineer‟s report confirmed that the roof had not been damaged by the cyclone. 6. The Applicant engaged her own engineer who submitted a report stating that there was evidence of permanent lifting of the roof sheets at the point where the sheets lapped. The report also stated that the engineer had observed that roof battens had been lifted away from the rafters. 7. A different engineer from the same firm originally engaged by the FSP inspected the roof and reported that there was no evidence to support the claim for roof damage. He did not observe any lifting of the roof sheets beyond the gap that would normally be expected at the overlap. He did not observe any roof battens having been lifted from the rafters. 8. The FSP has maintained its denial of that part of the claim that relates to structural damage to the roof. Determination Case No: 282545 Determination Page 2 of 7 Summary of Applicant’s position 9. The Applicant says that during cyclone Yasi water entered the house but she mistakenly believed that the high winds had pushed the water up and under the roof sheeting. It was not until after the cyclone, during periods of rain, that she realised that water was still entering the building and that there must be damage to the roof. 10. The Applicant says that the roof was not leaking before the cyclone and now it is and that this indicates that the cyclone caused damage to the roof. 11. The Applicant has engaged an engineer who has submitted a report that says that the cyclone has caused roof sheets to lift and battens to lift off the rafters. 12. A roof plumber engaged by the Applicant has expressed the opinion that the cyclone has lifted the roof sheets without completely dislodging them and this is the cause of the leaks when it rains. 13. The outcome sought by the Applicant is for the FSP to indemnify her for the repairs to the roof where it has been damaged. Summary of FSP’s position 14. The FSP advises that the policy issued to the Applicant is an insured events policy and says that the Applicant has failed to prove that her roof has been damaged by an insured event. 15. The FSP says that multiple qualified professionals (two builders and two engineers) have inspected the property and commented that there is no cyclone-related damage to the roof. 16. The FSP says that the Applicant has the onus of proving that any damage to the roof was caused by an event insured under the policy. The FSP contends that the Applicant has failed to prove that the cyclone caused structural damage to the roof. 17. The FSP says that the causes of the leaks are design and maintenance related issues and that these causes are excluded under the policy. Issues 18. Whether the Applicant has provided sufficient proof to establish that the roof of her home has been damaged. 19. If the Applicant has proven a loss under the policy, whether the FSP has been able to prove the operation of a policy exclusion. Case No: 282545 Determination Page 3 of 7 Reasons for decision 20. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is due to the quantum and complexity of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 21. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 22. It is established insurance law that the insured has the onus to prove a loss or damage comes within an insured event in a policy. The onus of proof then shifts to the insurer to establish the claim can be denied because of a policy exclusion. 23. The issue in dispute here is whether the damage to the roof was caused by the cyclone and has the Applicant proved, on the balance of probabilities, that the damage to the roof can be attributed cyclone Yasi. Damage by cyclone is insured under the policy. If she can establish that then the onus of proof shifts to the FSP if it wants to rely on an exclusion to deny the claim. 24. In a report dated 30 th April 2012, the FSP‟s engineer (whom I will refer to as S) made the following comments: “The residence contains a rear external verandah which has a flatter roof pitch of 9 degrees. The flatter roof sheeting on the verandah area lapped below the steeper roof sheets in the verandah area. The insured claimed that significant water entry has occurred in the rear verandah area and the amenities next to the verandah area. Upon removal of the top layer of roof sheeting from the steeper roof it was revealed that the lapping component underneath from the flatter roof has significantly corroded to the extent that a considerable portion of the roof sheeting has completely eroded away and disappeared from its original location. No waterproofing measures were provided at the lap joints where the roof pitch angle changes abruptly. During weather events, water on lesser pitched roofs would be more likely to be washed back into the roof void via the lap joints. This has been evidenced by the significant amount of debris in the ceiling space under the lapped area. An inspection to the internal area of the residence revealed water damage to the balcony and outside the amenities area with water marks and mould observed on wall and/or ceiling linings. These two areas are located underneath the flat roof pitch where defects on the roof sheerings (sic) were observed.” 25. Further into the report, under the heading “Conclusions”, S makes the following comment: “While we have no objection that t he water leakage to the internal area of the residence occurred during the Cyclone Yasi event, the leakage is due to the Case No: 282545 Determination Page 4 of 7 fact that the heavy rainfall has washed back into the roof cavity through the corroded area which are (sic) pre-existing prior to Cyclone Yasi event. Evidence on site suggests that the issues have been developing over years and the roof has not been checked and maintained for a prolonged period of time. The damage on the roof sheeting is not of sudden, unexpected or catastrophic nature and is not related to the Cyclone Yasi Event in early February 2012 (sic).” 26. Based on the engineer‟s report quoted above, I am satisfied that the entry of water to the Applicant‟s residence during and after Cyclone Yasi does not prove that the roof was damaged during the cyclone. Equally, the fact that the entry of water can be shown to have resulted from damage that was not caused by the cyclone does not prove that there was no other damage caused to the roof by the cyclone. 27. The proof of damage appears to rely solely on the statements made by the engineer engaged by the Applicant. This engineer (whom I will refer to as M) said the following in his report dated 14 February 2012: “The high wind speeds created external uplift forces on the roof sheeting and internal pressure inside the house. Both these forces combined have caused some roof screws to pull out of battens, roof sheets to lift and battens to lift off rafters. When roof screws and batten nails pull out, the timber fibre around the screws and nails is shredded. It is not a permanent structural solution to simply re-screw to battens into the existed (sic) shredded screw hole. New roof screws have to be used in new positions on the batten without pre- existing screw holes. The BSA requires the batten to rafter fixings to be upgraded to batten screws. The roof sheeting has been maintained by the owner and was painted a few years ago. Roof sheet laps have permanently lifted. The roof has leaked, most likely at the lifted sheet laps and the lifted battens. Debris will be lodged between the sheets and future roof leaking will be an issue. Lifted roof sheet laps will provide the starting point for the whole roof sheet to be pealed (sic) off during the next cyclonic event. The above photographs are only a small sample of all the batten connections as it is not practical to lift all the roof sheets to inspect the battens.” 28. The report by M contains a large amount of general advice and comments around building solutions and requirements as well as some conjecture as to the site of leaks. It is not specific as to the location of the damage or the extent of that damage and the photographs provided were not conclusive. 29. The engineer (whom I will refer to as R) who was engaged by the FSP to complete the initial inspecti on of the Applicant‟s premises was given the opportunity to comment on the report by M and made the following comments: “We note that photographs attached to the M report show an area where roof sheets were removed to reveal what appears to be batten lift. We note that we were not afforded the chance of lifting roof sheets at the time of our inspection, because this in itself created further damage to the roof, which then must be repaired. We therefore confirm that, at the time of our inspection we found no evidence of batten lift. We also inspected the framework from underneath where possible and found no evidence of batten lift within this area. Case No: 282545 Determination Page 5 of 7 The photograph included within the M report appears to show one area where one batten has lifted slightly. The report does not however detail the exact location of this area or whether or not other areas were observed to contain the some (sic) evidence of batten lift” 30. R goes on to say in his response to the M report: “If the alleged batten lift is of a localised nat ure, repairs can be completed by simply refixing the individual batten and strapping it to the rafter using a Trip- L-Grip or similar. Such repairs are permissible under the BSA guidelines – Feb 2011, provided that the extent of batten lift is less than 20% of the roof area. Please note however that we did not observe any batten lift, or lifting of the roof sheets at the time of our inspection.” 31. Following the report by M and the response by R, the FSP referred back to the firm of engineers they had previously engaged and engineer S completed a further inspection of the Applicant‟s property. In his report dated 30 April 2012 S stated: “Upon approval by (FSP) we engaged HPG to assist the undersign (sic) to remove and reinstate a number of roof sheets in order to ascertain whether batten lift is evident through observation from the top of the roof. By observing the timber battens at different areas of the roof, including the area where leakage was claimed to have occurred, we did not observe any evidence of batten lift. Minor to moderate corrosion was observed to the roof sheeting. Rusting is particularly severe at lap joints between different sheets and where the roof capping is over-lapped onto the corrugated roof sheeting. Corrosion was also noted to a number o f screw holes.” 32. In relation to the lifting of the lap joints, S made the following comments: “The „Lap - lift‟ claimed by the insured is not a direct result of the Cyclone Yasi event, but a usual typical gap when two sheets are lapped together. It is a normal building practice that when two sheets are overlapped at the edges, the separation gap between the upper and lower sheet would be left unsealed such that any water left in between the sheetings (sic) is allowed to be evaporated away from the area without causing damage to the materials. Since each row of screws are separated 900mm apart, the separation gaps at lapping may occasionally be greater at mid-span in between the support of screws. At one particular location next to the ride (sic) capping, we observed the span to be 1.1m and therefore the gap observed was even larger than normal.” 33. The evidence provided by the FSP‟s engineers, including photographs, indicate a significant amount of corrosion around the lap joints of roof sheets and around screw holes, including rust damage to some screws. I am satisfied that this is damage that would be excluded under the policy. The relevant exclusion reads: “ We do not cover Wear, tear, rust or mould Case No: 282545 Determination Page 6 of 7 Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot Unless this is covered under: - Insured event 1 (storm and flood) - Insured event 2 (burst pipes, leaks and overflows) 34. I am satisfied that the rust and corrosion present in the Applicant‟s roof has been caused over an extended period of time and is not as a result of either of the events listed within the policy exclusion. 35. The explanation provided by S in relation to the gaps between overlapping roof sheets seems reasonable. Photographs of the roof that have been provided with the report do not show any extreme gaps between the sheets. 36. The report provided by M contains no measurements of the gaps between overlapping sheets. The report does not carry any reference to the size of gap that would be considered normal or acceptable. There are photographs accompanying the report but they are not of sufficient quality to prove the existence of extreme or unusually large gaps. 37. The report from M indicates that there has been batten lift and includes a photograph of a batten. It is difficult to ascertain from the photograph whether or not the batten has lifted away from the rafters. Even if I accept that the batten has lifted away, it cannot be inferred from that one example that there is widespread batten lift across the roof. The evidence submitted by the FSP‟s engineers argues to the contrary. 38. Neither the Applicant, nor engineer M, indicates where the lifted batten can be located. Since the onus is on the Applicant to prove that she has suffered a loss that is covered under the policy, it follows that the onus is upon her to show where the damage may be observed. 39. I am satisfied that the Applicant has failed to prove that there is damage to the roof by virtue of the roof sheets having been lifted by cyclonic wind. 40. I am satisfied that the Applicant has failed to prove that there has been lifting of the roof battens away from the rafters, having not provided the location of damage claimed to have been observed by the e ngineer M. Case No: 282545 Determination Page 7 of 7 Determination 41. On the basis of the available information I determine that the FSP is entitled to maintain its denial of this claim for roof damage caused by cyclone Yasi.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.