The body corporate claimed $31,204.75 for basement damage from sewage inundation in January 2011. AFCA found the sewer backed up because of Brisbane River flood waters, so the flood exclusion applied and nothing was payable.

Where flood and a covered cause operate concurrently, the Wayne Tank principle excludes the loss, and river backwater entering the sewer is classed as flood under the policy.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 282496 Determination Page 1 of 7 Case number: 282496 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim - Exclusion/Condition - Flood 27 March 2013 Background 1. The Applicant is Chairman of a Body Corporate that held Residential Strata Insurance Policy with the FSP over a property located in St Lucia Queensland. 2. The Applicant maintains that at approximately 9.30pm on 11 January 2011, flow from the sewerage system commenced into the basement of the premises and continued throughout the night. As a result of the inundation from the sewerage system, the Applicant claimed damage to the garage, store rooms, laundry, toilet and elevator entrance and equipment, the total sum of $31,204.75. 3. The FSP denied the Applicant’s claim on the grounds that the inundation of the property was caused by flood and that flood was excluded under the terms of the policy. In reaching its decision, the FSP considered the Applicant’s argument that the damage was caused by sewerage surcharge and not flood but maintains the timing of the initial sewerage surcharge together with the rising of the Brisbane River water levels strongly supports a conclusion that the inundation was caused by flood. 4. The Applicant disputes the FSP’s decision and in doing so maintain s the claim for damage due to sewerage inundation. Summary of Applicant ’s position 5. The Applicant has provided a number of Statutory Declarations from various witnesses and residents stating that the damage occurred at approximately 9.30pm on 11 January 2011 prior to the water level in the Brisbane River reaching basement level of the property. 6. The Applicant maintains, based on the statements of the witnesses, that the sewerage inundation continued to a height of approximately 0.6m above floor level. Th e water level in the Applicant’s street was in fact above the water level in the basement but the top of the driveway area into the basement was dry. Determination Case No: 282496 Determination Page 2 of 7 7. Based on the witness statements, this is evidence that the property was inundated by sewerage overflowing the relevant sewerage system and not as a result of inundation from the flood waters of the Brisbane River. There had been ongoing problems with the sewerage line in the street. 8. The Applicant maintains that the Notice of Response contradicts the photographs, Statutory Declarations and statements provided which show that the inundation was by sewerage outflow. The Applicant believes the claims the damage was due to the overflow of the Brisbane River are fictitious, physically impossible and unrelated to the actual event. The FSP argues the proposed water flowed uphill from the river through a non- existence stormwater drain or into the sewer and hence into the basement and that this is fictitious. 9. The Notice of Response provides no new information to establish that the damage was caused by flood. The hydrologist report does not deal with the hydraulics in the sewerage system. 10. The FSP errs in saying that the Applicant is not qualified. One of the owners (JC) is a professional civil engineer with 40 years experience in hydrology and hydraulics. 11. The hydrologist report claims that flooding in a nearby park led to the damage but does not indicate how or when this occurred. If the park was inundated, this occurred the following day when the river reached its peak and after the overflow of sewerage occurred. Neither the park nor the property was flooded at the time the sewer overflowed. Summary of FSP’s position 12. Upon review of the report by loss assessor M, it initially declined the claim on the basis that the damage was caused by flood, which is excluded under the policy. At review, two site specific hydrology reports were prepared by hydrologist W. Based on these reports the FSP confirmed the claim denial. Based on the report commissioned by the Insurance Council of Australia (ICA report), it also ruled out stormwater runoff as a likely cause of the damage to the insured property. 13. The damage was caused by the heavy rainfall in the days preceding the flood and the deliberate release of large volumes of water from the Wivenhoe Dam, which caused backwater flooding. 14. The timing of the inundation of sewerage in the basement at around 9.30pm on 11 January 2011 is consistent with backwater flow from the Brisbane River. 15. The initial inundation in the basement of the property was the result of backflow pressure on the sewerage line network as a result of the rising waters of the river flowing through the stormwater drainage system, overflowing onto land and entering the sewerage network. Case No: 282496 Determination Page 3 of 7 16. M incorrectly reported that the water came up from a stormwater drain but M corrected this in its second report and had no material effect on the FSP’s assessment of the claim. 17. The Applicant is not a qualified hydrologist and has failed to show how the FSP’s assessment is fictitious, physically impossible or unrelated to the cause of damage. It notes that W’s hydrologist also has extensive experience in the hydraulics of stormwater and sewer systems. 18. The statements the Applicant has supplied confirm that there was an initial sewerage inundation in the basement, which is not in dispute between the parties. However, these statements provide no objective evidence on the cause of inundation of the property. 19. The actions of another insurer are not relevant to the current dispute between the parties. 20. The FSP relies on the following policy provisions: “ General definitions – the meaning of some words The words listed below have been given a specific meaning in this Policy and these specific meanings apply when the words begin with a capital letter. There are other definitions which are specific to Policies 2, 3, 5 to 10 and these appear in the appropriate Policy section. ... Flood means when water that is normally contained in a Water Catchment System increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water. ... Water Catchment System means: a a river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry that only run during periods of rain; b a dam, reservoir, storm water channel or canal. ... Policy 1 – Insured Property ... What we insure We insure You up to the Sum Insured shown for Policy 1 in the Schedule, against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which occurs during the Period of Insurance. Case No: 282496 Determination Page 4 of 7 ... Exclusions – what we do not insure 1 We will not pay for loss or damage: a caused by Flood. ” Issue 21. Whether the cause of the Applicant ’s loss was covered under the policy. Reasons for decision 22. Due to the nature of the dispute, the parties have been informed that the matter has been referred to Determination in line with the Operational Guidelines to the Financial Ombudsman Service’s (FOS’s) Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 23. I have reviewed the submissions of the parties and observe there is no dispute that the basement of the insured property was damaged by water coming from the sewer system. The central issue is whether the overflow of the sewerage system was due to flood as defined under the terms of the policy. 24. There is no dispute between the parties that the policy extends to cover accidental loss or damage meaning the policy covers sudden, unexpected drainage. The cover is subject to a general exclusion for flood. 25. Flood is defined to mean: “Water that i s normally contained in a water catchment system increases because of rainfalls, snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority and the water overflows on to land that is not normally covered by water.” 26. The definition of flood contained within the policy is a common definition of flood. 27. Given there is no dispute that the insured’s building was inundated by sewerage, the loss can fairly be described as accidental loss and the FSP will be liable for that loss unless the FSP can establish on the balance of probabilities that the flood exclusion applies to the situation. 28. The Applicant has provided a number of statements from various owners confirming the observation of sewerage flowing from the basement sewerage system at approximately 9.30pm on 11 January 2011. There are a number of reports from the various owners/residents noting that whilst the basement was inundated by sewerage, there was no water from the Brisbane River or water coming up from the stormwater drain. Case No: 282496 Determination Page 5 of 7 29. One resident noted it was not possible for flow to occur from the river to the basement as there was no connection between the two. Another resident described the water in the street as being above the water level in the basement with the top of the driveway area into the basin dry acting like a dike with water at different levels on both sides. 30. There does not appear to be any real dispute between the parties with respect to the timing of the inundation or the fact that the inundation was caused through sewerage and water entering the basement from the drainage system. 31. The FSP provided an assessor’s report dated 3 March 2011. I note , that report refers to the date of the event being 13 January 2011 which is not consistent with the information provided by the Applicant. The report identifies that the Applicant claimed a sewerage drain backed up, and contaminated water began discharging out of the toilet in the basement common area and later that night a man hole situated at the top of the basement had burst open and water began back flowing down the driveway inundating the basement area to a height of approximately 1.7m. 32. A site specific hydrologist report was subsequently obtained. According to the report by W da ted 26 May 2011, the Applicant’s property was located within the extent of the backwater flooding from the Brisbane River and the water observed in the street at the front of the Applicant’s property on the Wednesday morning was the Brisbane River water backing up the Perrin Creek. The hydrologist considered it also likely that the Brisbane River backed up the underground stormwater pipes and overflowed into the street. 33. Insofar as the sewerage network was concerned, the hydrologist considered the sewerage network within the basement of the b uilding surcharged and inundated the basement above floor level prior to the Brisbane River water overflowing from the street into the basement. The hydrologist considered it likely that the sewer system surcharged due to high water levels in the Brisbane River. 34. Because of concerns with the report and issues raised by the Applicant, the FSP obtained a further hydrologist report on 11 November 2011. 35. The report includes particulars of the key sewerage pipe network and notes there is a sewerage overflow outlet into the Perrin Creek. 36. According to the hydrologist, the basement level of the sewerage drainage network invert is estimated about 5.3m AHD. The invert of the main sewerage pipe along the street near the property is about 3.4m AHD. Under normal operating conditions, sewerage from the property would drain under gravity via the sewer pipes to the Heroes Avenue Pump Station. Sewerage would be collected in a wet well and pumped out via a rising sewer main pipe(s) in a northerly direction. During times when the inflows into the pump station exceed the maximum pumping rate, sewerage could overflow from the wet well via overflow pipes into Perrin Creek at an invert level of about Case No: 282496 Determination Page 6 of 7 1.1m. It is possible however that the overflow pipe is fitted with a one way valve that prevents water from the Creek back flowing into the sewer pipe. 37. Once the water in the creek reached the height of the pump station of about 3.8m AHD the roof of the wet well would have been inundated and the Brisbane River flood waters would have flowed into the wet well via the inspection cover and inundated the sewer main pipes. This would in turn reduce the hydraulic capacity of the gravity fed sewerage network causing the water level of the property sewer pipes to be elevated causing sewerage to backup and over flow the low level sewer pipes. 38. The hydrologist calculated the reported time of the initial inundation being consistent with the estimated Brisbane River flood level in the creek being 3.8m AHD. The hydrologist considered this corresponded with the estimated time of the initial inundation of the Heroes Avenue Pump Station wet well and given the above, considered that the basement of the building was initially inundated above floor level by the back-up of sewerage through the sewer pipes due to the entry of flood water into the sewerage system. 39. Having reviewed the evidence to hand, I am satisfied that W’s reports provide a thorough explanation as to how floodwaters in this particular case were the likely cause of backflow of sewage waters in the sewerage network. As such, I accept on balance that the proximate cause of damage was floodwaters from the River. 40. The Applicant insists that the FSP’s explanations have been proven to be fictitious, physically impossible and unrelated to the actual cause of damage. 41. However, other than rejecting the FSP’s position and advising that JC is a qualified hydrologist, the Applicant has not provided any expert evidence or plausible alternative explanation as to the backflow of water from the sewerage network. 42. As such, I am not satisfied that their statements are sufficient to overcome the FSP’s expert’s explanation of the likely damage. 43. Established case law provides that:  if there are two concurrent causes of a loss where one is subject to cover and the other is not, an insurer is not liable for the loss (refer to Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57); and  a watercourse is said to overflow its normal banks when all the water that would otherwise drain into it cannot be contained in it because it is full, and all the surplus water is then overflow (refer to K Sika Plastics limited v Cornhill Insurance Co Limited [1982] 2 NZLR 50). 44. In this instance, if sewer waters mixed with floodwaters and concurrently caused the loss, then under the Wayne Tank principle, the damage is excluded from cover. Case No: 282496 Determination Page 7 of 7 45. The law also recognises that water from a watercourse flowing back and causing inundation of a property is, subject to the terms of the particular policy, properly classified as flood. 46. Having considered all of the information exchanged, I am satisfied that, on the balance of probabilities, the likely proximate cause of damage was the rising levels of the floodwaters of the Brisbane River. I am satisfied that the FSP is entitled to rely on the flood exclusion to deny liability for the claim. Determination 47. On the basis of the available information I determine that the FSP is entitled to deny the Applicant’s claim under the terms and conditions of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.