Text of the determination
Case No: 282435 Determination Page 1 of 16
Case number: 282435
Credit - Business Finance - Business Loans - Financial Difficulty - Decline of
Financial Difficulty Request
Credit - Business Finance - Business Loans - FSP Decision - Maladministration
in loan management
Deposit Taking - Current Accounts - Business Transaction Accounts -
Transactions - Unauthorised transactions
1 August 2014
Summary
Description
The Applicants dispute relates to whether the FSP was entitled to require
principal and interest repayments to commence under the Bill Facility on
25 April 2012 and the ancillary issues that arose from this.
Basis of Determination
The Bill facility clearly stated that principal and interest repayments were to
commence under the Bill Facility on 25 April 2012 and the earlier
agreement for payments to be made on the 5 th day of the month only
related to interest only repayments. However the FSP did overcharge the
Applicants default interest on the Business Loan during the period from 26
April to 2 May 2012.
Determination
The FSP should refund the default interest of $420.77, plus an amount of
$50 to compensate for interest on that amount, to F Company within 14
days of the Applicants accepting the Determination.
Background
1. This dispute is brought by FF and AF on behalf of themselves, F Pty Ltd as
trustee for the F family trust (F Company), SF, and I2H Pty Ltd (IH
Company).
2. F Company had facilities with the FSP including:
Business Loan (variable rate) for $544,350 (Business Loan);
Determination
Case No: 282435 Determination Page 2 of 16
Bill Facility Limit $1,890,500 (Bill Facility);
Account number 1067 7336 (Account 1);
Account number 1067 7328 (Account 2); and
Premium Business Account (Business Account).
3. The FSP cancelled the Bill Facility and Business Loan and served a demand
for payment on F Company on 27 April 2012.
4. F Company, FF and AF have subsequently sold security properties to repay
the FSP.
5. IH Company also had facilities with the FSP including an overdraft facility
which was cancelled by the FSP.
Summary of Applicant’s position
F Company
6. The FSP did not assist F Company when it was informed that F Company
was in financial difficulty on or around 15 April 2012 following the FSP‟s
appointment of Receivers to FPG Pty Ltd (FPG), the company which
employed FF .
7. The FSP, without notice or consent, changed the payment date on the Bill
Facility from the 5 th of the month to the 24 th of the month. This accelerated
the payment date by 12 days when the FSP knew, or ought to have known,
that F Company would not receive rental income to cover the payment by
that time, and caused the F Company to default on its payment.
8. The FSP cancelled the facilities and issued demand notices within seven
days. The FSP set off the credit balance from two other F Company
accounts without consent.
9. The FSP debited $2,600 on 2 April 2012, and attempted to debit $22,529.44
on 24 April 2012, from Account 1 without authority.
10. The FSP, through receivers it appointed to FPG refused to hand over books
and records of F Company that were held at FPG‟s premises.
11. The FSP incorrectly appointed a receiver to F Company after the dispute
was lodged with FOS. As a result, F Company was not able to obtain finance
from another bank to refinance its facilities with the FSP. The FSP closed F
Company‟s trading account and failed to return approximately $10,000.
12. F Company, AF and FF felt pressured and sold assets under value to repay
money owing to the FSP under the Business Loan and the Bill Facility.
Case No: 282435 Determination Page 3 of 16
FF and AF
13. The FSP pressured them into paying $150,000 to reduce amounts
outstanding on FPG‟s loans.
14. The receivers for FPG have re fused to hand over FF‟s personal laptop which
was held at FPG‟s premises.
SF and IH Company
15. The receivers for FPG refused to hand over books and records of IH
Company that were held at FPG‟s premises.
16. As a result, SF was not able to sell IH Company to a potential purchaser.
17. The FSP incorrectly cancelled IH Company‟s overdraft facility.
Summary of FSP’s position
18. The payment dates for the Bill Facility were in accordance with the letter of
variation dated 25 March 2010 (Letter of Variation) which stated that the
commencement date for principal and interest payments was 24 April 2012.
The Letter of Variation also stated that F Company was required to maintain
sufficient funds in Account 1 to meet the payments.
19. The F Company accounts were regularly in arrears from the start. It allowed
the Business Loan and Bill Facility payments to go through despite a lack of
credit funds in Account 1.
20. In October 2011, the FSP informally agreed to assist F Company by varying
the interest payment date on the Bill Facility to the first week of each month.
It did not agree to change the repayment date of 24 April 2012 as outlined in
the Letter of Variation.
21. It notified F Company of the change to principal and interest repayments
verbally in February 2012 and by its letter dated 20 April 2012 which it sent
by ordinary post and email.
22. It rolled the Bill Facility for 19 days from 5 April 2012 to 24 April 2012 in order
to commence the principal and interest repayments in accordance with the
Letter of Variation.
23. It did not accelerate the Bill Facility and the rollover dates were not changed
without notice. If it had continued to act in accordance with the informal
agreement in October 2011, it would have rolled the Bill Facility to the first
week of April which would have caused the facility to go into default 19 days
earlier than it did.
Case No: 282435 Determination Page 4 of 16
24. The FSP cancelled the Bill Facility due to insufficient funds being held in
Account 1 to meet the rollover costs. It cancelled the Business Loan under
the cross default provisions set out in the facilit ies‟ terms and conditions.
25. It debited $2,600.24 from Account 1 for debit interest which was redirected
from the Business Loan account, and attempted to debit $22,529.44 from
Account 1 on 24 April 2012 for rollover costs of the Bill Facility.
26. FF was an account authority for FPG (which is not a party to this dispute)
and was represented to the FSP as being in charge of FPG‟s finances.
Through its discussions with FF, representing FPG, it advised it would be
prepared to forebear from exercising its rights und er FPG‟s loans if $150,000
was paid to reduce FPG‟s debts. It rejects FF‟s claims that she was forced to
pay $150,000 into FPG‟s accounts and, in any event, it has no record of
$150,000 being deposited to FPG‟s accounts between 2 January 2012 and
20 April 2012.
27. The receivers of FPG delivered a number of personal possessions to FF and
SF and have invited them to collect further items.
28. It cancelled IH Company‟s overdraft on 27 January 2012 due to poor
account conduct. At that time IH Company transferred its day to day banking
to another bank.
Issues
29. FOS issued a Recommendation dated 17 December 2013. The
Recommendation found that:
a. An appointed receiver is the agent of the company and not the
mortgagee. In this case the receiver appointed to FPG would be
considered to be an agent of FPG, not the FSP.
b. FOS is not able to review the actions of a validly appointed receiver.
Therefore, we cannot review the actions of the receiver and, in
particular, whether it provided access to the books and documents
requested by the Applicants.
c. FOS could not consider the complaint that FF and AF were pressured
into paying $150,000 to reduce FPG‟s loans as FF and AF were neither
directors of FPG, nor guarantors for FPG‟s facilities with the FSP.
Therefore, no financial service was provided by the FSP to FF and AF
in relation to the FSP requesting that FF and AF make payments to
reduce FPG‟s loans.
d. Although the FSP sent its 20 April 2012 letter to an incorrect mailing
address, it also emailed it to FF at an email address that was functional
and used by FF.
e. In these circumstances, the FSP gave F Company notice that the
principal and interest repayments were due to commence on 25 April
2012.
Case No: 282435 Determination Page 5 of 16
f. The FSP should not have required the payment to be made on 24 April
2012, but could have required payment on 25 April 2012. Both the
Letter of Variation and 20 April 2012 letter refer to the principal and
interest repayments commencing on 25 April 2012.
g. There was no reason the payment could not be made on 25 April 2012
if there were sufficient funds available.
h. The FSP did not make an error or breach an obligation to F Company
by debiting $2,600.24 debited from Account 1 on 2 April 2012 as this
was an amount constituting an interest instalment due on 1 April 2012.
i. The attempt to debit $22,529.44 on 24 April 2012 from Account 1 did
not comprise a breach of an obligation by the FSP as it was an amount
referable to roll over costs that were payable.
j. The FSP was entitled to cancel the Bill Facility and Business Loan as
the Applicant was in default and appropriate notices properly served.
k. However the Business Loan did not fall into default until 3 May, not 26
April 2012 and so default interest should not have been charged until
that date. Therefore the FSP should refund default interest of $589.09.
l. The FSP was entitled to combine or set off the credit funds in Account
2 against amounts owing under the Bill Facility.
m. The FSP‟s appointment of a receiver to F Company after this dispute
had been lodged with FOS was in breach of FOS Terms of Reference.
n. There was no information upon which to be satisfied that F Company
lost the opportunity to refinance with another financial services provider
due the appointment of the receiver.
o. There was insufficient information to be satisfied that the FSP did not
comply with its obligations to assist F Company as a customer in
financial difficulty.
30. The Applicants objected to the Recommendation. Their reasons for rejecting
the Recommendation are set out in their letter dated 31 January 2014 and
are:
a. There was a contractual agreement between the parties that payments
on the Bill Facility were due on the 5 th of each month.
b. The FSP‟s lett er dated 20 April 2012 required principal and interest
payments to commence on 25 April 2012. As 20 April 2012 was a
Friday this had the effect that service in the course of ordinary mail
could not take place until after the direct debit for principal and interest
payments arose. This was unconscionable.
c. The FSP knew or ought to have known that the Applicants no longer
lived at the address where the 20 April 2012 letter was sent.
d. Had proper service taken place the Applicants would have ensured
they had access to sufficient funds to make the required payments,
such as borrowing from FF‟s mother.
Case No: 282435 Determination Page 6 of 16
e. There was no reasonable basis for changing the pa yment date under
the Bill Facility from the 5 th of the month to the 25 th of the month as this
effectively accelerated repayments by 19 days.
f. Correspondence shows that the FSP accelerated the payments in
order to facilitate a default to allow it to appoint a Receiver and
Manager to the company.
g. The Receiver and Manager of FPG was the agent of the FSP. This is
apparent from the FSP‟s ability to withdraw their appointment when it
was realised there was a dispute at FOS. Accordingly the FSP is liable
for any misconduct by the Receiver and Manager.
h. The Receiver and Manger of FPG still holds records of FF and the
Applicants and this has meant that the Applicants do not have access
to all information to defend their dispute.
i. FF was under a special disadvantage as the mother of the director of
FPG and was put under undue pressure to deposit funds into the FPG
accounts to prevent the FSP appointing a Receiver and Manger to
FPG.
j. The sum of $10,000 was taken from a personal account of FF. FF
cannot provide further details as her personal diary and laptop are still
held by the Receivers and Managers.
k. The appointment of a Receiver and Manager to F Company created a
black mark on their credit file which prevented the Applicants
refinancing their debts to the FSP.
l. The Applicants did seek financial difficulty assistance. Evidence of this
is contained on FF‟s laptop which is still held by the Receiver and
Manager.
m. The FSP‟s offer to provide financial difficulty assistance by reducing
interest and allowing the Applicants until 31 October 2012 to repay the
debts was only made after the dispute was lodged with FOS. The offer
was made in a letter that was not received by the Applicants as it was
sent to an incorrect address.
n. IH was forced to sell its assets to repay its debt to the FSP because it
was a related party to FPG, FF and her son. The Receiver and Manger
withheld a laptop computer owned by IH and this contained IH
accounts and limited the ability to sell the business.
o. The dispute has caused FF extreme stress and affected her health.
31. The FSP accepted the Recommendation.
Case No: 282435 Determination Page 7 of 16
Reasons for decision
Requirement to make a principal and interest repayment to the Bill Facility on
25 April 2012
32. The Applicants say that the FSP changed the date of repayments under the
Bill facility. The Applicant and the FSP agree that In October 2011, the FSP
informally agreed to assist F Company by varying the interest only payment
date on the Bill Facility to the 5 th day of each month.
33. The Applican t says that the FSP‟s conduct in requiring principal and interest
repayments to commence on 25 April 2012 was unconscionable and was
contrary to the agreement between the parties for repayments to be made
on the fifth day of each month. The Applicants also say that they did not
receive prior notice of the change of payment date from the fifth of the month
to 25 April 2012.
34. On 25 March 2010 F Company and the FSP entered into a Letter of
Variation which varied the Business Loan and Bill Facility agreements that F
Company had entered into in 2006. The offer was subject to the terms set
out in the Letter of Variation and the Terms and Conditions for Commercial
Lending Facilities dated 13 March 2009 (Terms and Conditions). The Letter
of Variation stated that interest only payments would apply for the first 34
months with “reductions in face value of outstanding Bills for the remainder
of the term.” It also stated that the start date of the reductions in the face
value of the bills was 25 April 2012 and set out the repayment sum of
$15,750.
35. The agreement between the FSP and F Company to allow interest only
payments to be made on the fifth day of each month was an informal one,
entered into to assist F Company, and does not appear to have been
documented as a variation to the contract. It is not disputed this agreement
was made. However the FSP states that although it agreed to interest only
repayments being made on the fifth of the month it did not agree to change
the repayment date of 25 April 2012 as outlined in the Letter of Variation.
36. The Applicants‟ submissions say that the FSP‟s conduct was unfair in two
ways. First they seem to suggest that requiring repayment of principal and
interest on 25 April 2012 was contrary to the agreement made with the FSP.
In support of this the Applicants point to the fact that this meant that they had
to make that payment only 19 days after the preceding interest only
repayment on 5 March 2012.
37. The difficulty confronting the Applicants ‟ position is that it stands on the
assumption that the agreement by the FSP to allow the Applicants to make
interest only repayments under the Bill facility on the on the fifth day of each
month meant that the requirement for principal and interest repayme nts to
commence on 25 April 2012 was also deferred until 5 April 2012. There is
no information to suggest that the informal variation extended beyond the
interest only repayments. The FSP has consistently stated that the informal
Case No: 282435 Determination Page 8 of 16
arrangement was limited to the interest only payments. In those
circumstances, and where the Bill Facility explicitly states that principal and
interest repayments commence on the 25 April 2012, there is insufficient
information to find that there was an agreement to the contrary.
38. The Applicants second argu ment is that service of the FSP‟s letter dated 20
April 2012 requiring principal and interest payments commencing on 25 April
2012 was not properly effected. In that regard the Applicants rely upon the
requirement allowing 2 business days for service by ordinary mail as set out
in the Service and Execution of Process Act 1992. It also says the letter was
sent to an address that the FSP was aware was no longer current.
39. The Recommendation accepted that the FSP had mailed the letter to an
incorrect address. However, more significantly it found that the letter was
also sent to the Applicants at two different email addresses. The
Recommendation noted the Applicants contention that those email
addresses became inactive when Receivers were appointed to FPG on 19
March 2012. However, an email from one of the Applicants (FF) to the
receiver of FPG on 7 July 2012, and an email to FOS on 3 August 2012,
included two email addresses at the bottom of the correspondence under
FF‟s name. Th is suggests they were contact email addresses for FF. One of
those email addresses was one of the email addresses to which the FSP
sent its 20 April 2012 letter. If that email address was no longer functional, it
is surprising it was included on FF‟s email s sent four and five months after
the receiver‟s appointment to FPG.
40. Further, FF sent an email to FOS on 14 January 2013 from one of the email
addresses she said was inactive.
41. Based on this information, the Recommendation found that although the
FSP sent its 20 April 2012 letter to an incorrect mailing address, it also
emailed it to FF at an email address that was functional and in fact used by
FF.
42. The Applicants submissions do not directly address this issue apart from:
a. Calling on the FSP to provide evidence that the Applicants received the
20 April 2012 letter,
b. Stating that the Receiver had obtained the Applicants records and this
prejudiced their ability to respond to some issues.
43. However in circumstances where the Applicants cannot provide any
explanation for the matters raised in paragraphs 40 and 41 I accept that
service by email took place.
Was the FSP’s conduct unjust?
44. The Applicant also says that the FSP‟s conduct in requiring principal and
interest repayments to commence on 25 April 2012 and the s hort notice of
that requirement were unfair and designed to force a default and terminate
the facility.
Case No: 282435 Determination Page 9 of 16
45. In that regard the A pplicant refers to an email from the FSP‟s lawyers to the
FSP which the Applicant says relates to the FSP seeking advice on
changing the Bill Facility payment date.
46. However a review of that advice shows that it relates to whether there had
been an enforceable default that was sufficient to allow the FSP to issue a
demand for payment of the balance of the amount owing under both the Bill
Facility and other facilities. The principal issue upon which advice was
sought was whether the FSP‟s historical conduct in having previously
allowed the Applicants to overdraw on the nominated account to meet
required interest only payments prejudiced the FSP. I do note that the
advice did note that “there are only two full business days between the date
of the Letter and the rollover date and if the borrower did not receive the
letter, then that may be problematic”.
47. As I set out earlier I have determi ned that the 20 April 2012 letter was sent to
a valid email address. However I am very concerned by the letter being sent
only 2 business days before the scheduled date for commencement of
principal and interest repayments. Nonetheless that date had been agreed
and was clearly disclosed, in the Letter of Offer for the Bill facility dated 25
March 2010.
48. Further, as the Recommendation noted, there is no information to show that
the Applicants would have been able to meet the repayment even if the
repayment date had not been on the fifth of the month as the Applicants said
it should have been, or if the FSP had allowed more time for payment.
49. The Applicants were receiving rental income of $12,925 each month. This
amount was paid on the first of the month so the bill rollover was changed to
the fifth of the month to align with the receipt of rental income. The
Applicants refer to statements for Account 2 that show rental payments into
the account.
50. The monthly rental income of $12,925 would not have been sufficient to
meet the monthly principal and interest repayments under the Bill Facility as
the principal payments alone were $15,750. FF says the rents were due to
increase under the leases but has not produced supporting information to
show this.
51. In addition, the statements for Account 1 and Account 2 do not show
sufficient funds in either or both accounts to meet the principal and interest
repayments for the Bill Facility after 25 April 2012 until the accounts closed
in August 2012.
52. The Applicants response to this is that they would have ensured the funds
were available even if they would have had to borrow funds from family.
However, they did not do so and it is significant that principal and interest
payments were not made to the account on 5 May 2012 – the date that the
Applicants presumably say is when the principal and interest payments
ought to have commenced.
Case No: 282435 Determination Page 10 of 16
53. In those circumstances, an event of default occurred in relation to the Bill
Facility and the FSP was entitled to cancel the Bill Facility and issue demand
notices.
Cancellation of the Business Loan
54. The Applicants also dispute the cancellation of the Business Loan. The FSP
says that the Business Loan was cancelled unde r the cross default
provisions of the FSP‟s usual terms and conditions.
55. Clause 12.1 of the Terms and Conditions applicable to the Business Loan
state that:
“An event of default occurs if:
...
(c) the Borrower:
(i) defaults in the due observance and performance of any of the other
covenants or agreements binding it contained:
(A) in this contract; or
(B) in any other contract between the Bank and the Borrower for the
provision of a finance facility;...
...and
where that default can be remedied, the default remains unremedied 5
Business Days after written notice is given to the Borrower by the Bank
requiring the Borrower to remedy the default;”
56. As set out above, I am satisfied that as F Company defaulted under the Bill
Facility, and as the default was not remedied within five days of the notice
given by the FSP on 27 April 2012, it was also in default under the Business
Loan.
57. However, the FSP commenced charging default interest from 26 April 2012.
Default interest should not have commenced until after five days the notice
was given on 25 April 2012, that is, on 1 May 2012. Therefore the FSP
should refund default interest of $420.77 to F Company.
$2,600.24 debited from Account 1 on 2 April 2012
58. The FSP says that this amount was the interest charge for the Business
Loan. It says that it was authorised to make this debit under the Letter of
Variation. The Letter of Variation is stated to be subject to the Terms and
Conditions.
59. The Letter of Variation states that interest payments for the Business Loan
are due o n the first business day of each month. The “Nominated Account
for Facility Payments” is Account 1.
60. Statements for Account 1 show that interest payments for the Business Loan
were debited to the account on the first or second day of each month. In the
Case No: 282435 Determination Page 11 of 16
circumstances, I am satisfied that the FSP did not make an error or breach
an obligation to F Company by debiting Account 1 for the interest instalment
due on the first of the month, being 1 April 2012.
Attempt to debit $22,529.44 on 24 April 2012 from Account 1
61. The amount was debited to Account 1 on 24 April and reversed on 26 April
2012. An unpaid payment fee of $5 was charged to Account 1 on 26 April
2012.
62. Although I have concluded that the FSP should not have attempted to debit
the amount to Account 1 until 25 April 2012 I am not satisfied that F
Company has suffered a loss from this attempted action. There were
insufficient funds in the account on 25 April 2012 so if the FSP had
attempted to debit the amount on that date it would been reversed and the
fee charged in any event.
Actions of the Receiver
63. The Applicants dispute also relates to the failure of the receiver for FPG to
give them, or allow them access to, books and records belonging to the F
Company, FF, SF and IH Company that were held on FPG‟s pre mises. FPG
is not an applicant to this dispute.
64. The Recommendation found that:
a. generally, an appointed receiver is the agent of the company and not
the mortgagee.
b. As a consequence, FOS was not able to review the actions of the
receiver and, in particular, whether it provided access to the books and
documents requested by the Applicants.
65. The Applicants reject these findings and rely upon the decision in Carey v
Korda [2012] WASCA 228 to support their view that a Receiver and Manger
is the agent of the FSP rather than the company. That decision refers to
decisions such as the High Court decision in Visboard v Federal
Commissioner of Taxation [1943] HC 4 which noted that the appointment of a
receiver is for the benefit of the mortgagee but in conducting its powers, it
does so as agent of the company. Accordingly the decision in Carey does
not change the general position that a receiver of the company acts as the
company‟ s agent.
66. Accordingly, I am unable to consider those issues in this dispute that relate
to the Receiver‟s conduct.
Payment by FF and AF to reduce FPG’s debts with the FSP
67. FF and AF have complained that they were pressured into paying $150,000
to reduce FPG‟s loans. The Recommendation noted that FOS can only look
at disputes in relation to a financial service provided by FSP to the
Applicants. FF and AF were neither directors of FPG, nor guarantors for
Case No: 282435 Determination Page 12 of 16
FPG‟s facilities with the FSP. Accordingly, no financial service was provided
by the FSP to FF and AF in relation to the FSP requesting that FF and AF
make payment s to reduce FPG‟s loans and so FOS cannot consider this
aspect of the dispute. Further the Applicant has not provided any detail, or
supporting information of the disputed deposit to FPG‟s account.
68. The Applicants complain that this is unfair and that the dispute should not be
considered in segments. However FOS power to deal with a dispute is
limited by its Terms of Reference and it must consider whether each aspect
of any dispute falls within Terms o f Reference.
69. Accordingly, I am unable to consider this aspect of the dispute.
Closure of F Company’s trading account on 9 May 2012 and set -off from that
account
70. FF said the FSP “closed our trading accounts on or about 9 th May, 2012 and
retained approximately the amount of $10,000”. She does not identify which
accounts were closed. The Applicant says that she is unable to provide
further details as all her relevant documentation is held by the Receiver.
71. As I have stated I am unable to review the conduct of the Receiver. I also
note that the FSP says that at the time it engaged the Receivers it requested
that access to personal property be given to FF. It advises that the Receiver
states that such access was provided.
72. There is no information available to show any accounts in the name of F
Company were closed in May 2012. Account statements show that the
Business account closed in April 2010 and Account 1 and Account 2 closed
in August 2012.
73. The account statements do not show balances of $10,000 in either account
from May 2012 until they closed in August 2012. In the circumstances
therefore, I cannot be satisfied that the FSP closed F Company‟s account in
May 2012 and retained approximately $10,000.
Appointment of a Receiver to F Company on 9 May 2012
74. The FSP appointed a receiver to F Company on 9 May 2012, after this
dispute had been lodged with FOS. Under clause 13.1 of our Terms of
Reference, a financial services provider must not take any action to recover
a debt the subject of the Dispute or to protect any assets securing that debt
or to assign any right to recover that debt, while FOS is dealing with the
Dispute.
75. The Applicants lodged the dispute with FOS on 30 April 2012; therefore the
FSP‟s appointment of the receive r to F Company was a breach of the Terms
of Reference. The FSP acknowledged its error and the receiver‟s
appointment was revoked on 11 May 2012.
Case No: 282435 Determination Page 13 of 16
76. FF says that that F Company lost the opportunity to refinance with another
financial services provider due the appointment of the receiver, which has
caused it and FF and AF to suffer a loss. FF and AF say they felt pressured
to sell properties at undervalue to repay the outstanding facilities.
77. The Recommendation concluded that there was no information or supporting
documents have been provided to show details of the other financial
services provider‟s refinancing offer, or that the offer was withdrawn as a
result of the appointment of the receiver.
78. The Applicants say that it is apparent that the appointment of a Receiver is a
serious „black mark‟ against both the Company and FF . The Applicants say
that they cannot provide supporting information and documentation as it is
held by the Receiver of FPG.
79. I agree that the appointment of a Receiver to the Company was more likely
than not to have serious consequences, including effecting its ability to
obtain credit. In those circumstances it is appropriate to award $3,000 for
consequential loss.
80. I also accept that the appointment of the Receiver caused very real stress
and inconvenience to FF and AF and also award each $3,000 for non-
financial loss.
Did the FSP comply with its obligations to assist F Company as a customer in
financial difficulty in April 2012?
81. FOS is able to review a financial services p rovider‟s decision about whether
to agree to an a pplicant‟s request for a variation to a credit contract. We will
take into account the a pplicant‟s financial circumstances and their ability to
meet a variation to the credit contract.
82. The Applicants say in around April 2012 FF told the FSP that F Company
was in financial difficulty. FF says she wrote to the FSP asking for financial
hardship relief due to the fact that she had become unemployed following
the appointment of receivers to FPG. Shortly thereafter, the Applicants
lodged their dispute with FOS on 30 April 2012.
83. On 13 June 2012, the FSP offered to resolve the dispute by reducing the
interest rate on the F Company facilities and allow it until 31 October 2012 to
repay all its debts to the FSP. The offer was subject to F Company
maintaining repayments of $14,000 per month on the facilities until 31
October 2012. The FSP says that it expected F Company would repay the
facilities from the voluntary sale of security properties. It does not say how it
expected F Company would make the repayments in the meantime.
84. The FSP says that F Company did not respond to this offer. The Applicants
initially said it did not respond to the FSP‟s correspondence because the
dispute was with FOS. It now states that it did not respond on advice of their
lawyers. The FOS dispute was closed on 25 June 2012 and the FSP states
that it wrote to F Company on 26 June 2012 advising that it was prepared to
Case No: 282435 Determination Page 14 of 16
adhere to the proposed resolution and reduced interest rates. The FSP
confirmed that if F Company did not meet the interest cost with a payment of
$14,000 on or before 1 July 2012, it would issue demands and re-commence
recovery action. The Applicants say that they did not respond to this offer as
they did not receive that correspondence
85. The dispute was reopened on 27 June 2012. The FSP continued to apply
the reduced interest rate until the facilities were repaid. F Company, FF and
AF sold security properties with the funds applied towards payment of F
Company‟s outstanding debts to the FSP.
86. The Recommendation found that in circumstances where:
a. there were no copies of the correspondence FF said she sent to the
FSP,
b. there was no information available to show F Company‟s financial
position at the time and what, if any, proposal was put forward by F
Company to overcome its financial difficulty.
there was no information to show that a hardship request was received or
considered by the FSP and that the FSP did not comply with its obligations
to assist F Company as a customer in financial difficulty.
87. The Applicants response in their objection to the Recommendation is that
they do not have access to their emails to prove their requests for financial
difficulty assistance as the Receiver of FPG has FF‟s laptop. However, the
Applicants do not explain why they cannot otherwise access these emails
through an alternate computer. Emails are usually stored on an Internet
Providers email server and can be accessed from any computer linked to the
server with the appropriate access codes.
88. In addition, the FSP provided a copy of its 13 June 2012 letter to FOS shortly
following the Applicants lodging their dispute with FOS. The letter was
addressed to a post office box of F Company. A further copy of that letter
was provided to the Applicants by FOS on 27 July 2012. The Applicants
acknowledged receipt of that letter.
89. In the circumstances I do not have sufficient information available to show
that the FSP failed to comply with its financial difficulty obligations.
Did the FSP make an error or breach an obligation to IH Company when it
closed the company’s overdraft account?
90. On 9 November 2009, IH Company accepted the FSP‟s letter of offer dated
4 September 2009 for a $30,000 overdraft facility secured by a guarantee
from SL and a letter of set-off for $30,000 by IH Company over its
transaction account. The overdraft facility was an “on demand” facility.
91. The FSP wrote to IH Company on 21 December 2011 advising that the
overdraft limit would be cancelled on 27 January 2012, and on that date, it
would exercise its right to set-off credit funds in the transaction account
Case No: 282435 Determination Page 15 of 16
against debit funds in the overdraft account. It was repaid with the cash
security held by the FSP.
92. It wrote to IH Company on 27 January 2012, stating that it had cancelled the
overdraft limit and transferred $30,939.50 from the transaction account to the
overdraft to clear the debit balance and accrued interest of $30,265.78. This
left a credit balance of $673.81 in the overdraft account.
93. The Applicants complain that the FSP took action in relation to IH in
circumstances where there was a „small debt of $15,000‟ as part of a
strategy to exit the Applicants. They also complain that a proposed sale of
IH Company fell through due to the inability to obtain business records that
were on the computers held by the Receivers.
94. As previously stated I am unable to consider issues relating to the conduct of
the Receiver. The overdraft facility was an on demand facility and it was
within the FSP‟s discretion to call up the facility at any time. In
circumstances where there was a default on the overdraft and notice was
provided of the intended cancellation, there is no information available to
suggest that the FSP was not entitled to close the overdraft account and
seek repayment of the balance of the account.
Determination
95. On the basis of the available information I determine
a. The FSP did not make an error or breach an obligation to F Company
when it:
debited $2,600.24 from Account 1;
required a principal and interest repayment to the Bill Facility on
25 April 2012;
debited Account 1 and set off Account 2 to make payments to the
Bill Facility; and
cancelled the Bill Facility.
b. The FSP did make an error when it charged default interest on the
Business Loan during the period from 26 April to 30 April 2012. The
FSP should refund the default interest of $420.77, plus an amount of
$50 to compensate for interest on that amount, to F Company within 14
days of the Applicants accepting the Determination.
c. The FSP made an error or breached an obligation to F Company when
it attempted to debit $22,529.44 from Account 1 on 24 April 2012 but I
am not satisfied that F Company suffered a loss as a result.
d. The FSP did make an error when it appointed a receiver to F Company
on 9 May 2012, and compensation of $3,000 should be paid to each of
F Company, FF and AF. A total award of $9,000.
Case No: 282435 Determination Page 16 of 16
e. There is insufficient information to show that the FSP did not comply
with its obligations to F Company as a customer in financial difficulty.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.