Home / Financial Firm (Unknown - Insurer) / Determination 282349
Determination 282349
Storm water damage claim declined for no assessment opportunity, lack of storm event, wear and maintenance exclusions
Summary
The applicant claimed $13,679 for storm water ingress through a lifted roof sheet and the FSP declined the claim. AFCA accepted storm-created ingress, found the rust was resultant from faulty workmanship, and ordered the FSP to pay the claim.
The storm lifted the roof sheeting, the workmanship exclusion did not apply because the applicant could not reasonably have known of it, and section 54 prejudice did not justify refusal.
Issues
- Claim denial primary · upheld
“I determine the FSP is liable to make payment of the Applicant's claim for damage arising from storm.”
- Poor claim handling secondary · upheld
“It is concerning that the FSP represented it was able to still inspect the property and then cancelled the assessment.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Case No: 282349 Determination Page 1 of 8
Case number: 282349
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
14 March 2013
Background
1. The Applicant held a Home Building Insurance Policy with the Financial
Services Provider (FSP). The policy provided cover to the insured residence
up to $360,000 subject to an excess of $1,000.
2. The Applicant lodged a claim on 27 March 2012 for water damage arising
from a storm. The Applicant stated the storm had occurred approximately 3
weeks ago. The Applicant also noted that he had commenced repairs.
3. The FSP reviewed the claim and declined same on the basis that it had no
opportunity to assess the damage, there was no significant storm event on 6
March 2012, there was a failure to maintain the roof and no storm created
opening.
4. The Applicant disputes the declinature on the basis the damage arose from
storm which is an insured event.
Summary of Applicant’s position
5. The Applicant has enclosed a property maintenance specialist invoice from
“A” dated 4 April 2012. I note the following from this report/invoice:
The property was badly damaged by recent storms and rain. During the
storms a roofing sheet has lifted and bent allowing water to get into the
rear of the property. Water has flooded the kitchen, bathroom, staircase
walls, ceilings and bottom of the gyprock downstairs.
The invoice is in the amount of $13,679 (GST inclusive).
6. The Applicant has enclosed a further report from A which states the
following:
“During recent storms in the area and torrential rainfall the property suffered
severe water damage. A roofing sheet appears to have lifted and bent during
the wild weather allowing water to flow into the rear side of the property.
Causing significant flooding in the kitchen, bathroom, staircase walls, as well
as to the ceilings and the gyp-rock in the downstairs area. Most of the gyprock
that was affected by the water was beyond repair and had gone soft. Most of
Determination Determination
Case No: 282349 Determination Page 2 of 8
the kitchen had swollen and was unrepairable. There was also light fittings
that had been damaged” (sic)
7. The Applicant states there was a storm in the area which caused substantial
damage to the interior of the insured property. As the roof lifted during the
storm, water has entered into the wall cavities.
8. The Applicant was unaware of the damage prior to arriving at the house
during a scheduled holiday from Sydney. Whilst there, the Applicant
commenced repairs to the water damaged walls by removing the gyprock
and kitchen cupboards. Unfortunately, he did not take photographs or
document these repairs.
9. The Applicant contacted the FSP at the start of the process and it informed
him an assessor would go to the property to assess the damage. Three days
later the Applicant was informed by the FSP that the assessor would not
attend as the repairs had already been started. The Applicant states he was
informed that once he completed the works at the property that he should
send receipts and invoices, so that the claim could be processed.
10. The licensed builder who assisted with the repairs has provided a verbal
statement to the FSP regarding the damage viewed.
11. The Applicant seeks indemnity for the damage arising from storm.
Summary of FSP’s position
12. The FSP relies on the following policy terms and conditions:
“Storm
If loss or damage is caused by a storm.
...
Covered
i. Violent wind, cyclone or tornado
ii. Thunderstorm, hail, rain or snow
iii. Sudden, excessive run-off of water as a direct result of a storm in your
local area.
Not covered under Buildings Insurance
iv. Loss or damage caused by water which enters through:
- an opening in the roof or walls that was not created by the storm – for
example, the poor condition of your roof means your home is not
watertight.
...
General Exclusions
The exclusions shown in this section apply to all cover under your policy.
What we don‟t cover
Case No: 282349 Determination Page 3 of 8
Loss, damage, injury or death arising from:
v. Wear, tear, rust, corrosion or deterioration
...
Maintaining and occupying your home
We don‟t cover loss, damage, injury or death arising from:
vi. You are not maintaining your home in good repair and condition. This
means your home must be watertight, structurally sound, secure and
well maintained.”
13. The FSP has enclosed copy of the daily weather observations during March
2012 from Coolangatta Queensland (1.4kms from the insured residence). I
note the following from this document:
On 6 March 2012 the wind speed was 57km/hr and the rainfall was
3mm.
The highest rainfall during March 2012 occurred on 15 March 2012 and
was 30mm.
14. The FSP relies on the Beaufort wind scale. I note that wind speeds between
51 and 62km/hr is classified as a near gale. The scale suggests that a wind
speed is likely to cause structural damage at 76 -87km/hr.
15. The FSP has enclosed copies of the claim lodgement call, a claims call and
a telephone call with A. I note the following from these recordings:
Claim lodgement call dated 27 March 2012
The Applicant reports that the property has extensive water damage
from storm.
The Applicant explains that the „job is already done‟. It is explained to
the Applicant should have advised when he found the damage so an
assessor could be sent out. The FSP stated it would still send an
assessor out.
The Applicant is asked when the damage occurred. He states 3 weeks
prior. The 6 th March is the date offered by the claims consultant. The
Applicant stated it was three weeks ago and the claims consultant
suggests this would be 6 th March to which the Applicant appears to
agree.
Claims call dated 10 April 2012
The Applicant telephones the FSP as he had not received any update
on the claim.
The Applicant states he was informed an assessor was to attend and
then he received a telephone call stating the assessor was not going to
attend.
The FSP informs the Applicant he will be updated further tomorrow.
The Applicant indicates his wish for an assessor to attend.
Case No: 282349 Determination Page 4 of 8
Telephone call between the FSP and A dated 11 April 2012
A informs the FSP that he inspected the roof and noted one of the
sheets at the back of the home had lifted. A indicated the damage was
from floods and bad rains two months ago.
One of the roof sheets lifted due to rusted screws. A stated that
whoever put the solar system up used bathroom silicone rather than
roofing silicone. A noted that all the other screws on the roof are in a
satisfactory condition. A confirmed that bathroom silicone tends to
cause screws to rust whereas roofing silicone does not.
A confirmed the timber framework was satisfactory once it had dried.
However, the gyprock was so soggy that one could put a finger through
it.
A first saw the property mid-March 2012.
A cannot recall the exact date of the storm. He confirms that the owner
came up at the start of March and then found the damage.
16. The FSP states it declined indemnity to the Applicant because it was not
provided the opportunity to assess the damage to the Applicant‟s property.
17. The FSP has relied on the information provided by t he Applicant‟s nominated
builder, who determined that the damage to the roof was not the result of
storm but rather wear and tear.
18. The FSP contends that if the Service determines a listed event did occur,
that the FSP is entitled to decline the claim on the basis of its general
exclusions listed on page 45 of the Policy Disclosure Statement (PDS).
19. The FSP submits that the damage giving rise to the claim was not caused by
storm or any other event in respect of which the policy provides cover. The
water entered the home through an opening that was not storm created.
Further, the damage was due to wear tear, rust, corrosion and deterioration
and failure to maintain the home in good condition.
20. The Applicant has failed to obtain any evidence in support of his claim that
the damage was caused by storm or any other event in respect of which the
policy provides cover, nor has he refuted the evidence provided by the FSP.
21. The evidence from BOM does not support the Applicant‟s assertion that the
damage giving rise to the claim was caused by storm as defined by the
policy on the date which the Applicant claimed the damage occurred.
22. The FSP maintains it is entitled to decline the claim.
Issue
23. Whether the FSP was entitled to decline the Applicant‟s claim for damage.
Case No: 282349 Determination Page 5 of 8
Reasons for decision
24. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
25. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
26. Due to the nature of the dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
27. First, the FSP has claimed it had no opportunity to inspect the loss. I accept
the Applicant had commenced repairs and the repairs were nearly
completed at the time of claim lodgement. However, the Applicant was still
informed an assessor would be sent to inspect the property prior to the
attendance being cancelled. During the telephone conversations the
Applicant cert ainly encourages the assessor‟s attendance at the property
and does not attempt to impede same. It is concerning that the FSP
represented it was able to still inspect the property and then cancelled the
assessment. I consider that the FSP has assisted its own prejudice in this
regard. The FSP has further failed to establish that it would be entitled to
decline the entire claim on this basis given the wording of its PDS. The exact
extent of any prejudice is unknown, as there was still a potential to inspect
the property and interview relevant witnesses. There is no evidence as to the
extent of the prejudice or whether it extends to the entire claim. Given this, I
cannot agree there is sufficient evidence to suggest the declinature of the
entire claim on this basis is appropriate.
28. Second, I am aware that there were a number of storms and floods in the
Queensland and NSW regions during February/March 2012. The FSP has
based part of its declinature on the fact there was insufficient storm activity
on 6 March 2012 or the preceding or following day. My concern with this is
that the Applicant never nominated the date of 6 March 2012. The telephone
recording of the claim lodgement confirms that the Applicant never provided
a date other than a vague indication of „3 weeks ago‟. The FSP‟s employee
then nominates the date of 6 March 2012 and the Applicant eventually
agrees to this date. I further note A‟s evidence that the damage arose from
the storm „2 months‟ ago, which based on the date of 11 April 2012 would
mean it occurred in February 2012. A also believed the Applicant had
attended the property early March 2012.
29. A review of the BOM for February 2012 and March 2012 indicates significant
wind and storm activity during each month. In fact, on 25 February 2012 the
BOM records 80mm of rain which is quite a significant amount of rainfall.
Case No: 282349 Determination Page 6 of 8
30. Both the Applicant and A indicate that the water damage arose from “the
storms”. It is reasonable to conclude that both A and the Applicant are
referring to the extreme weather events during this period.
31. Whilst I have received submissions regarding the applicable exclusions, I
have no evidence that the water damage to the property arose from any
other mechanism other than storm. There is no evidence that the water
came from a leaking pipe or any other source of inundation.
32. Based on the evidence before me, I am prepared to accept that the damage
did arise from stormwater ingress. The question then becomes, does the
damage fall within the covering provisions of the policy or is it subject to one
of the exclusions.
33. The covering provisions of storm damage require the loss to arise from a
violent wind, thunderstorm, rain or sudden excessive run-off of water as a
direct result of storm in the locale of the insured property. The loss or
damage must be caused by a storm created opening.
34. For reasons stated above, I accept in February/March 2012 that there was
significant storm activity in the area of the insured property. This is
particularly given the Insurance Council of Australia‟s declaration of
catastrophe relating to these storms/weather events.
35. A review of the only expert evidence before me indicates that in A‟s opinion
the damage to the roof which allowed water ingress was the result of storm.
In particular, the roof sheet was bent back during storms. A does concede
that the rusted roof screws did allow this to occur.
36. The opening up of the roof and bending back of the sheet was caused by the
storm event albeit due to the weakness in the rusted screws. Given the
action of the storm lifted and bent the roof sheeting, I have difficulty
accepting that the storm did not create or assist in creating the opening
through which water ingress occurred.
37. I will now consider the exclusions on which the FSP has relied. The FSP has
argued that the loss arose due to wear tear, rust, corrosion and deterioration
and failure to maintain the home in good condition. However, A‟s evidence
contradicts the FSP‟s position. A has provided an opinion that the screws to
the rest of the roof sheeting were in „alright‟ condition but that th e person
who installed the solar panels had utilised bathroom rather than roof silicone
which rusts the nails. A‟s evidence is unrefuted and appears to be
corroborated by the fact only one section of the roof displayed this type of
damage.
38. Based on the evidence I conclude that the damage to the screws was due to
faulty workmanship rather than wear tear, rust, corrosion and deterioration
and failure to maintain the home in good condition. According to A, the rust
is a side effect of the defective workmanship. The loss or damage has not
solely arisen from wear, tear, rust, corrosion or deterioration of its own
accord but rather the application of an inappropriate silicone. The rust is
Case No: 282349 Determination Page 7 of 8
therefore not the proximate cause but resultant damage of the defective
workmanship.
39. I note the FSP‟s policy contains the following General Exclusion:
“faulty design or workmanship that you knew about or should have reasonably
known about”
40. Given the wording of the exclusion, it appears that the Applicant would be
required to know or should reasonably have known about the faulty
workmanship in order for this exclusion to apply.
41. There is no evidence that the Applicant was aware of the improper use of
silicone or ought reasonably to have known this had occurred and its likely
deleterious effect on the roofing screws. Accordingly, there is no basis to
apply the exclusion of faulty workmanship to this particular claim.
42. Finally and importantly, the FSP submits that it denied indemnity because it
was not provided the opportunity to assess the damage properly. I refer to
my comments in paragraphs 27 and 28 above. The FSP‟s submission did
not identify any condition in the PDS that obliges the Applicant to not carry
out any repairs prior to lodging the claim. I have perused the PDS but I am
unable to find a condition in the policy to support the FSP‟s ground for
denial. Whilst this is a somewhat unusual omission from a building insurance
policy, I am not prepared to infer or imply an inclusion of such a term in the
contract.
43. Since drafting th e Determination through the Service‟s Case Manager, I
requested the FSP to identify the relevant provision in the PDS on which
they rely. They have been unable to do so but have referred me to a section
of the PDS that deals with handling claims. The relevant provision states:
“Inspections and Quotes
If we ask you, you must
Let us or our representatives inspect your home or contents
Allow us to obtain quotations from any repairer or supplier”.
44. While that section requests the Applicant to allow the FSP‟s representative
to inspect the home and to obtain quotations from a repairer, there is no
requirement or condition that the Applicant must have the FSP‟s permission
or consent to carry out repairs.
45. The FSP then seeks to rely on Section 54 of the Insurance Contracts Act
(1984) and the prejudice suffered by the FSP by the Applicant‟s decision to
repair the roof without allowing the FSP the opportunity to assess the
damage.
Section 54 of the Insurance Contracts Act 1984 (insofar as it is relevant to this
claim) provides that where but for this section an insurer may refuse to pay a
claim, either in whole or in part by reason of some act of the insured or another
person, being an act that occurred after the contract was entered into, the insurer
may not refuse to pay that claim by reason only of that act, but its liability in
Case No: 282349 Determination Page 8 of 8
respect of the claim is reduced by the amount that fairly represents the extent to
which the insurer‟s interests were prejudiced b y that act, and where the act could
reasonably be regarded as being capable of causing or contributing to a loss in
respect of which cover is provided by the contract, the insurer may refuse to pay
the claim.
46. In my view Section 54 of the Act does not assist the FSP. It is a provision
directed to protecting policyholders ie a shield for the policyholder and not a
sword for the FSP (see Lipari and Anor v Union Des Assurances De Paris
IARD (1998) 10 ANZ Ins Cases 61 – 415).
Determination
47. On the basis of the available information I determine the FSP is liable to
make payment of the Applicant‟s claim for damage arising from storm.