Home / Financial Firm (Unknown - Insurer) / Determination 282074
Determination 282074
Fire damage claim settlement amount disputed; total loss and further payments sought
Summary
After a tenant-caused fire at the applicant's investment property, the FSP cash settled repairs and paid rental loss, then made a good faith payment totalling $227,430. The applicant sought a further $180,000 plus GST, including because the council ordered demolition. AFCA found the FSP need only pay $1,519 for an air conditioner and range hood, as the builder's work caused the extra cost.
The FSP cash settled the fire loss on a competitive quote, and it was not liable for additional costs caused by the applicant's unlicensed builder, so the claimed further payment was not owed under the policy.
Issues
- Claim amount dispute primary · not upheld
“the FSP has no obligation to make any further payment other than the amount of $1,519”
- Repairs or contractors secondary · not upheld
“the actions of the Applicant's builder have been the cause of the increased costs to reinstate the property”
Subjects and remedies
pay claim
Text of the determination
Case No: 282074 Determination Page 1 of 6
Case number: 282074
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
14 March 2013
Background
1. The Applicant incepted a landlord insurance policy with the Financial
Services Provider (FSP) on 21 January 2009 to cover an investment
property. The property was insured to the sum of $561,750 and subject to a
policy excess of $500.
2. On 3 June 2011 the Applicant lodged a claim under the policy as a result of
damage caused to the property by fire. During the investigations into the
circumstances of the loss it was indicated that a person of interest for the
cause of the fire was the tenant of the property.
3. A scope of works (SOW) and quotes to repair damage based on the SOW
were obtained by the FSP. The most competitive quote for repairs was
$196,420, including asbestos removal for $16,170. The Applicant also
arranged for her builder (KD) to quote for the repairs in the amount of
$229,616 which included $2,500 for asbestos removal.
4. The FSP advised it could authorise its preferred builder to undertake the
repair or cash settle on the quoted amount of $196,420 less the policy
excess.
5. As the Applicant wished KD to undertake repairs the claim was cash settled.
The Applicant asked about cost of any variations that may arise. The FSP
advised this would be done on an individual basis. The FSP paid the
Applicant for loss of rental payments.
6. However, due to issues with KD removing asbestos he was issued with
prohibition and improvement notices. Work ceased at the property. The
Applicant arranged for reports regarding asbestos removal including a
procedure for removal.
7. The Applicant referred the matter back to the FSP for consideration of the
further rental payments which it did not agree to.
8. The Applicant advised the local Council issued an emergency order on the
property indicating that fire damage structures should be demolished. The
Applicant requested that it reconsider the claim as a total loss based on the
Council order.
Determination
Case No: 282074 Determination Page 2 of 6
9. The FSP in reviewing the claim did not consider the building to be a total
loss. Indeed, the issues that now had arisen were not claim related but
resulted from the actions of KD.
10. In a letter to the Applicant dated 29 March 2012 the FSP advised its liability
under a malicious damage claim by a tenant was limited to $10,000. The fire
was the result of a malicious or intentional act by the tenant. It confirmed the
claimant was being indemnified as a result of a fire.
Summary of Applicant’s position
11. The Applicant says the FSP has not correctly assessed her claim. Work
ceased at the property because of this. She says the FSP failed to obtain a
hygienist report in relation to the asbestos.
12. She has since obtained a builder’s quote and to complete the works a further
$200,000 is required. This is in addition to the amount the FSP has already
paid her.
13. The Applicant says the FSP would pay her for any variations that may arise.
14. The Applicant says that because the Council have ordered the demolition of
the property, the FSP should pay her the sum insured under the policy.
Summary of FSP’s position
15. The FSP says based on the factual and expert evidence and the relevant
law:
it is not a obliged to pay the Applicant any more than $10,000 under the
policy in relation to damage caused by the fire started by the tenant;
the Applicant has not established any entitlement under the policy
beyond the $10,000 limit;
despite the limitations of the policy, it has paid the Applicant a “good
faith” payment of $227,430; over 22.7 times the Applicant’s legal
entitlement under the policy.
16. The FSP relies on the following policy provisions:
“Vandalism or a malicious or intentional act -by tenant or their guest
If loss or damage is caused by vandalism or malicious or intentional act by
tenant or their guest
Covered
vandalism or a malicious act by tenant or their guest
intentional and deliberate damage by tenant or their guest
…
Case No: 282074 Determination Page 3 of 6
For this event, the most we pay under Buildings Insurance is $10,000 and
under Contents Insurance is $10,000.
...
Fire
If loss or damage is caused by a fire.
Covered
fire.
Not covered
if the fire was started with the intention to cause damage by:
i. you, or
ii. someone who enters your rental property or site with your consent (this
does not include a tenant or their guest)
damage which results from scorching or melting when your rental property
or contents did not catch fire.”
Issue
17. Whether the FSP’s settlement fulfils its obligations under the terms and
conditions of the policy.
Reasons for decision
18. FOS has considered it appropriate to expedite the dispute in accordance
with clause 8.6 of the FOS Terms of Reference. This is because of the issue
in dispute and substantive quantum involved. This dispute has not been the
subject of a FOS Recommendation and has proceeded directly to
Determination.
19. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
20. There has been an exchange of material between the parties. For the sake
of brevity, the Panel does not intend to recite material in this Determination
except where considered relevant to the FSP’s decision to deny the claim.
21. The Applicant lodged a claim under the policy as a result of fire which
destroyed the insured property purported to have been caused by the tenant.
The policy provides cover for loss or damage caused by fire.
22. In its submission and correspondence the FSP has referred to the insured
event “Malicious damage or vandalism” and has referred to the policy
limitation clause for this insured event to the circumstances of the claim. It
says it has paid the Applicant beyond the limitation allowed for under the
policy.
Case No: 282074 Determination Page 4 of 6
23. The FSP submits it has made a good faith payment to the Applicant in the
sum of $227,430 for repair costs and lost rental income and it has not sought
repayment of this amount.
24. Although the FSP can indicate that the fire that caused the loss was the
result of a malicious or intentional act that caused the loss , the Panel is
satisfied the applicable insured event is “fire”. Indeed, it is noted the FSP had
since lodgement of the claim treated the event as fire, knowing the
circumstances. There was never any consideration that the loss may have
fallen within the event “malicious damage” until such time it was reviewed 10
months later.
25. In any case, the Panel considers in the circumstances of the loss the FSP
cannot impose policy conditions that only apply to another event covered by
the policy.
26. The Panel will now turn it s mind as to whether the FSP’s settlement fulfils its
obligations under the terms and conditions of the policy.
27. The Applicant is seeking an additional payment of $180,000 plus GST. This
is in addition to the amount paid in the sum of $227,430 for repair costs and
lost rental income. The Applicant is relying upon a SOW obtained from
another builder to complete repairs.
28. The Panel has considered the material submitted by the parties, including
the various reports regarding the property.
29. In a response dated 15 February 2013 the FSP conceded a further payment
of $1,519 to the Applicant to replace the all mounted air conditioning unit in
the lounge and for the replacement of the range hood in the kitchen as
provided in its consultant’s report.
30. The FSP says this payment will only be made on instructions from the
Service. The Panel is unsure as to why the FSP requires instructions from
the Service to make payment for items it accepts it is liable for.
31. The Panel recommends the FSP make payment of $1,519 to the Applicant
forthwith.
Settlement
32. Following lodgement of the claim a SOW was obtained to repair fire related
damage. The building was not a total loss and there were areas that were
unaffected by the fire. KD quoted for repairs based on the SOW. All quotes
submitted included asbestos removal.
33. The Applicant wished to have KD undertake the works. Further, it is noted
the Applicant wished KD to undertake other work in the property at the same
time that was not fire related.
34. The FSP cash settled the Applicant for the cost of repairs based on the most
competitive quote. The FSP is entitled to do this as allowed for under the
Case No: 282074 Determination Page 5 of 6
terms and conditions of the policy. As the FSP did not arrange or authorise
repairs it was not liable for work undertaken by KD.
35. The FSP did agree to consider any variations that may arise in regard to fire
related damage but on an individual basis.
36. KD commenced repairs and removal of asbestos. However, there were
concerns with KD’s demolition progress and p rohibition notices were issued
against him due to issues with the work that had been undertaken including
the asbestos removal. It was later raised that KD was not qualified to
undertake asbestos removal himself.
37. Due to work ceasing on the property the Co uncil issued orders indicating
demolishing of fire damaged structures. The Applicant referred the matter
back to the FSP indicating it had not correctly assessed the damage in
regard to asbestos removal and the possibility the property was a total loss.
38. The FSP arranged for the building consultant (BH), who provided the initial
SOW, to inspect the property and provide a report.
39. BH noted in his report dated 22 May 2012 (summarised):
The Applicant engaged the services of KD to carry out the
reinstatement works;
Demolitions works undertaken by KD had not been carried out in
accordance with the Code of Practice prepared by Safe Work Australia
and WHS regulations;
KD is not a licensed asbestos removal contractor;
KD’s licence restricted him to works not requiring home warranty
insurance and as such he should not have conducted any works at the
site;
Demolition works breached Council guidelines and the appropriate
method of handling and removal;
KD damaged non-fire affected sections of the building that were well
away from fire affected areas thus creating a far significant issue in
relation to the areas requiring asbestos handling and removal. None of
these areas should have been damaged;
the building could have been repaired by an appropriately licensed and
suitably skilled contractor;
the works undertaken by KD has spread asbestos contamination risks
to areas not previously affected;
BH report of 5 July 2011 addresses the issues relating to the presence
of asbestos and contactors carrying out the remedial works should
have been well aware of the risks involved and followed the appropriate
guidelines;
the works undertaken by KD have significantly increased the repair cost
well beyond the initial obtained quotes;
Case No: 282074 Determination Page 6 of 6
the building has been left so long exposed to the elements due to
delays caused by KD not being suitably licensed and not carrying out
works appropriately have caused damage related to deterioration to
structural element of the building;
remedial works can be undertaken without the need for demolition.
40. In an alysing the material, the Panel opines the actions of the Applicant’s
builder have been the cause of the increased costs to reinstate the property
back to its pre-fire condition. The FSP indicated the builder was the
Applicant’s brother -in-law. She has not disputed this.
41. The FSP cash settled the Applicant for the cost of repairs and was therefore
not liable for her builder’s actions. Although the Applicant has submitted a
SOW from another builder to complete repairs the Panel is not satisfied this
is a variation of fire related damage, but rather is to remedy the works
undertaken by KD or works that have been accounted for in the initial BH
SOW.
42. The Panel concludes the FSP is not obliged to make any further payment to
the Applicant for the repair of the building as it is satisfied that the required
repairs could have been achieved for the quoted amount paid by the FSP to
an appropriate builder.
Determination
43. On the basis of the available information the Panel determines the FSP has
no obligation to make any further payment other than the amount of $1,519
as advised for the air conditioning unit and range hood.
44. The Panel notes the Applicant has raised the issue in regard to stolen
contents. The FSP says no claim has been submitted for this. The Panel
recommends that the Applicant submits a claim for contents asserted to
have been stolen from the site to enable consideration by the FSP under the
terms and conditions of the policy.