Home / Financial Firm (Unknown - Insurer) / Determination 281957

Determination 281957

Flood exclusion denial of home and contents inundation claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner's claim for water inundation in the January 2011 Queensland floods was denied as flood damage. AFCA upheld the flood exclusion for the ultimate damage but ordered indemnity for stormwater inundation up to 200mm above ground, with statutory interest on any cash settlement and no figure stated.

Water escaping from a watercourse is flood under the policy definition and excluded, but stormwater that reached the home and shed before river flood water is covered to the 200mm level.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 281957 Determination Page 1 of 13 Case number: 281957 General Insurance - Domestic Insurance - Home Building and Contents - FSP Decision - Denial of claim 18 March 2013 Background 1. The Applicant held a home building and contents policy, albeit as separate policies, with the Financial Services Provider (FSP), which provided accidental damage cover over both his home and contents in Karalee, Queensland. 2. After his home was inundated with water during the severe weather events in South East Queensland in January 2011, the Applicant lodged a claim with the FSP for the damage. 3. The FSP denied the claim on the basis that the damage was caused by flood, which is excluded under the policy. 4. The Applicant disagrees with the decision and wants the FSP to pay his claim. Summary of Applicant’s position 5. The Applicant is represented and for simplicity and convenience, throughout the remainder of this Determination the Applicant and his representative will be referred to collectively as ―the Applicant‖. 6. He says that he took out the policy through the financial institution ―C‖, which provided his home loan and acted as the FSP‘s agent. 7. According to the Applicant, C was aware that his property was in a flood prone area but did not make him aware that the policy excluded flood. Although he understands that all policies have limitations, he did not consider that C would provide him with a policy which was not appropriate to his needs. 8. He says that the FSP through the actions of its agent has failed in its duty of utmost good faith and should pay his claim as a result. 9. The policy explanation of flood is confusing and a reasonable consumer would have difficulty working out what is covered and what is excluded under Determination Case No: 281957 Determination Page 2 of 13 the policy. The FSP has therefore failed to clearly inform him of the flood exclusion and standard cover should apply. 10. Shortly after he lodged his claim with the FSP he received a letter advising that his claim was denied, without any reference to an assessment taking place. It was only after he disputed the decision that the FSP performed an assessment and arranged for a hydrology report and he believes that the FSP has not acted in good faith in this regard. He also questions the validity of a hydrology report which was produced a considerable time after the inundation event. 11. The Applicant says that the water which inundated his property was due to a storm event which should be covered under his policy. 12. In the alternative, he argues that the water overflowed from the river because of releases from the Wivenhoe Dam and because dam releases are not excluded under the policy, the FSP should cover his loss. Summary of FSP’s position 13. The FSP says that the choice of any particular insurance product should be made by the person taking out the policy based on their own circumstances and needs. It is not able to provide advice with respect to the suitability of a policy to a customer‘s needs and rejects the Applicant‘s assertion that it has breached its duty of utmost good faith. 14. The Applicant has confirmed that he received the Product Disclosure Statement (PDS) for the policy and that he was aware of the applicable cooling-off period. The FSP says its policy wording clearly explains the meaning of the word flood and that the policy excludes from coverage loss or damage caused by flood, so it clearly informed the Applicant of the flood exclusion. 15. It says that the evidence indicates that the Applicant‘s property was inundated by water from the Bremer River, which it says is flood as defined and excluded under the policy. The Applicant‘s own statement indicates that stormwater did not enter his home at the time he left the property and the evidence confirms that the inundation occurred well after rain had ceased. 16. The FSP also says that regardless of how water entered the river, the damage to the Applicant‘s property was caused by water escaping from the normal confines of the river and that this is flood. 17. The FSP defends its initial decision to not appoint an assessor or hydrologist, saying that based on the information it had available at the time it was evident that a physical inspection would not be required in order to make its claim decision. Case No: 281957 Determination Page 3 of 13 18. The FSP relies on the following policy provisions: ― Accidental Damage Cover We will cover your buildings and contents for any accidental loss or damage. There are also a number of incidents we will cover under specific conditions – these are listed in the following pages. If you make a claim, you will need to pay any excesses that apply – you will only need to pay this amount once. Any cover we provide is subject to exclusions. For exclusions to this cover, see page 31 Incident cover provided under specific conditions. ... Storm, rainwater or wind BUILDING CONTENTS We will cover your buildings or contents for loss or damage as a result of storm, rainwater or wind. We will not cover loss or damage caused by a named cyclone within 48 hours of the start date of your policy, unless  you took out your insurance with us immediately after another insurance policy covering the same building or contents expired, without a break in cover  you took out your insurance with us immediately after the risk passed to you as purchaser of your buildings  you took out your insurance with us immediately after you signed a lease contract for your buildings. We will not cover  swimming pool covers, including  solar covers and plastic liners  water entering your buildings  through an opening made for any building, renovation or repair work  because of a structural defect, faulty design or faulty workmanship when your buildings were constructed  free-standing fences made of corrugated fibrous material that do not have a supporting frame, unless  they have been installed and constructed according to the manufacturer‘s specifications  free-standing gates, fences or walls that are made of timber or are more than 15 years old. ... Water or liquid damage Case No: 281957 Determination Page 4 of 13 We will cover your buildings or contents for loss or damage caused by water or liquid. We will also cover the cost of repairing any damage that occurs while looking for the cause. We will not cover your buildings or contents for loss or damage caused by  flood ... We will not cover the cost of repairing the item that caused the escape or the water or liquid. ... Exclusions to your cover Any cover we provide is subject to the following exclusions. Accidental Damage cover, Additional cover and Strata Mortgagee Protection exclusions We will not cover loss or damage as the result of, or caused by ...  flood ... General Exclusions We will not cover loss or damage, or liability as the result of, or caused by ...  flood or storm surge ... Glossary of words with a special meaning Accidental loss or damage Damage to, loss or destruction of the building that make up your home, or your contents or valuable items, when it is caused by an unintentional act, or an unforseen and uncontrollable incident. ... Flood The covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel or dam. ‖ Issues 19. Whether the FSP clearly informed the Applicant of the flood exclusion of the policy. 20. Whether the FSP has breached its duty of utmost good faith. 21. Whether the inundation of the Applicant‘s home was caused by flood. Case No: 281957 Determination Page 5 of 13 22. Whether the FSP‘s investigation of the Applicant‘s claim was appropriate. Reasons for decision 23. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‘s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 24. There has been an exchange of information and the Panel is satisfied that both parties have had the opportunity to address the issues raised. 25. On 12 March 2013 the Panel Chair Ombudsman attended on site where he met with the Applicant and representatives of the FSP. Clearly informed 26. There is no dispute that the Applicant received the PDS and policy wording provided to him by C. 27. The Applicant has described why he believes the PDS for the policy is not clear in explaining that flood is excluded from cover. 28. The Panel has reviewed the policy wording and notes that:  The term ‗flood‘ is clearly defined in the glossary of terms with a special meaning.  The policy clearly states that any cover provided under the policy is subject to exclusions.  The policy clearly states that its Accidental Damage cover excludes loss or damage as a result of or arising from flood.  The general exclusions section of the policy details that loss, damage and liability as a result of or caused by ‗flood and storm surge‘ are not covered. 29. The Panel acknowledges that the Applicant has said that although ‗flood‘ is defined in the policy, the meaning of ‗storm‘, ‗rainwater‘ and ‗w ind — which together are listed as an incident for which cover is provided under specific conditions — are not similarly defined. 30. However, a term which is not specifically defined as having ‗special meaning‘ in the policy would take on its common use or normal meaning. In the Panel‘s view, ‗storm‘, ‗rainwater‘ and ‗wind‘ are terms which a reasonable person in the circumstances would be able to understand. 31. The Panel also acknowledges that the Applicant has expressed concern about the cross-referencing in the policy and has stated that a policyholder Case No: 281957 Determination Page 6 of 13 would be forced to read through a policy from cover to cover, in order to understand what is covered and what is not covered under the policy. 32. After reviewing the PDS, the Panel is satisfied that the policy clear ly explains what is meant by ‗flood‘, that flood is not covered under the policy and that a reasonable person in the circumstances would be able to understand what is covered and what is excluded from cover. 33. The Panel therefore finds that by having provided the Applicant with a PDS and policy wording for the policy, it has fulfilled its obligation under Section 35 (2) of the Insurance Contracts Act 1984 to clearly inform him of the exclusion of flood from cover. 34. In addition, the Panel recognises that the onus is on the policyholder to read and understand their policy documents and to ensure that the policy is suitable for their own particular requirements and circumstances. Duty of utmost good faith 35. The Applicant has alleged the FSP through its agent breached its duty of utmost good faith by providing him with a policy which was not suitable to his needs, knowing that his home was in a flood prone area. 36. The Panel considers the Applican t‘s arguments regarding the duty of utmost good faith are misconceived. There is no legal principle that supports the Applicant ‘s argument that an insurer‘s duty of utmost good faith extends to enquiring and ensuring its policy is appropriate to the insured‘s needs. Such a duty is generally associated with insurance brokers. 37. Further, the FSP‘s policy, which the Panel has found the Applicant received before the policy commenced:  Is a standard home insurance policy that is available to the general public as opposed to being tailored to the Applicant‘s needs, and  Had a 21 day cooling-off period which provided the Applicant ample opportunity to review the contract and obtain advice on it to ensure it was suitable to his needs. 38. Given this, the Panel does not accept the FSP breached its duty of utmost good faith with respect to offering its standard home insurance policy to the Applicant. Cause of inundation 39. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the face of the facts, that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove that an exclusion applies if it wishes to deny or limit its liability for the loss. Case No: 281957 Determination Page 7 of 13 40. The policy provides cover for any accidental loss or damage to the insured home buildings and contents. It also lists a number of incidents (including ―Storm, rainwater and wind‖ and ―Water or liquid damage‖, among others) for which cover is provided subject to specific conditions. 41. The policy defines accidental loss or damage as ―damage to, loss or destruction of the buildings that make up your home, or your contents and valuable items, when it is caused by an unintentional act, or an unforeseen or uncontrollable incident.‖ 42. The Panel notes that the policy was current at the time of the loss and accepts that the damage to the Applicant‘s home and contents was unintended from his viewpoint. 43. For these reasons, the Panel is satisfied that the Applicant has established a prima facie claim under the policy and the onus now shifts to the FSP to prove that an exclusion applies. Source of water causing inundation 44. The FSP says that the damage to the Applicant‘s home and contents was caused by floodwater and has provided a report from hydrologist ―WP‖, which was produced after an inspection of the property on 25 January 2012. The report indicated the inspection took place on 25 January 2011, however, the Panel is convinced that this is a typographical error. 45. In its report, WP states the following abo ut the Applicant‘s property and its location:  The Bremer River flows in an easterly direction approximately 200m east of the dwelling.  The site is considered to be within the lower reaches of the Bremer River catchment with the (Bremer) river discharging i nto the Brisbane River approximately 3.5km downstream.  An unnamed tributary, which flows in an easterly direction along the northern extent of the property, drains a small catchment (approximately 7 hectares) located to the west of the property.  The area is drained by overland flows on the western side of Lyndon Way which are consolidated into a single channel, which flows beneath the road (near the north-west corner of the site) and on towards the Bremer River, 200m to the north-east.  The Applicant‘s home is a raised single-storey dwelling,  Available terrain elevation data indicate that the ground level of the home is between approximately 13.5m AHD and 13.8m AHD.  The property grades to approximately 11m AHD at the eastern extent before lowering steeply along the banks of the Bremer River. 46. WP states the following about river water levels: Case No: 281957 Determination Page 8 of 13  The Bundamba and the Moggill river water level gauges are located approximately 4.7kms upstream and 3.8kms downstream of the Applicant‘s property respectively.  The Bundamba gauge showed a peak level of 19.4m AHD occurred at 3.10pm on 12 January 2011. The Moggill gauge showed a peak of 17.87m AHD occurred at 2.00pm on 12 January 2011, which is 2.37m above the designated ―major‖ flood level of 15.5m AHD.  After interpolating the readings from the Bundamba and the Moggill gauges, the estimated peak water level at the Applicant‘s property would have been approximately 18.3m AHD, and would have occurred at 2.30pm on 12 January 2011. This estimate is consistent with debris marks visible from aerial photography of the site taken on 13 January 2011. 47. In the report‘s conclusion, WP opines that the inundation of the Applicant‘s property was caused by water escaping from the normal confines of the Brisbane River (although the Panel accep ts that this should read ―the Bremer River‖), and travelling upstream through the unnamed tributary and on towards the site. 48. The Panel has reviewed the report by WP and notes that the information about the peak levels of the Bremer River contained within, is consistent with the area hydrology report, jointly produced by three established hydrology firms and commissioned by the Insurance Council of Australia (ICA). 49. The Panel also notes that the WP report does not provide any information about the time at which water first inundated the property. However, the Panel is satisfied that the Applicant‘s home building and contents were, on the balance of probabilities, ultimately inundated by water escaping from the Bremer River and its unnamed tributary. Proximate cause of the damage 50. The Applicant argues that the proximate cause of the damage to his home and contents was the release of water from the Wivenhoe Dam by the dam engineers. 51. He says that the policy defines flood as including water escaping from a dam but the definition does not include water which is released from a dam. 52. He says that the water which inundated his property was not flood as defined in the policy. 53. The FSP counters that under the policy, flood caused by the escape of water from a watercourse is specifically excluded from cover. 54. The FSP acknowledges that water from the Wivenhoe Dam was released and did not ‗escape‘. It argues, however, that the Wivenhoe Dam was built on the Brisbane River and is therefore a modification — albeit a significant modification — of the natural watercourse. Case No: 281957 Determination Page 9 of 13 55. It says that ultimately, the water which damaged the Applicant‘s property escaped from a watercourse and not the Wivenhoe Dam. While the water from the dam was a significant input to the river‘s water level it was no t the only source of water in the river at the time of the flood; water came from the Brisbane River greater catchment which includes rain water and normal drainage of the catchment. 56. The Panel has considered the submissions from both parties on this matter . It accepts that the releases of water from the Wivenhoe Dam were at least in part responsible for the increased levels of the Brisbane River and that water from the Brisbane River back-flowed up the Bremer River and its tributaries. 57. However, the policy clearly defines flood as being ―the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is modified...‖ 58. The Panel accepts that regardless of how water entered the Bremer River (an d its unnamed tributary to the north of the Applicant‘s property), once that water escaped the normal confines of the river or unnamed tributary, it became flood, as defined under the policy. 59. As damage caused by flood is excluded from coverage under the po licy, the Panel finds that the FSP is entitled to deny liability for the damage to the Applicant‘s home building and contents caused by flood. Damage caused by initial inundation 60. The Applicant says that his property was initially inundated by stormwater due to a storm event prior to being inundated by water from the Bremer River. In support of this position, he has provided a Statutory Declaration (SD) in which he states: ―At about 11.00am or 12 noon on 11 January 2011, I noticed that the water had risen higher. I left things in the shed and went up into the house to move everything from downstairs to upstairs. As I was coming up from the shed to the house, I observed that the water was flowing quickly from the road to the property. As there is no kerb, the water ran from the road, across the grass verge and through the entrance to the property, and flowed straight to the river. The concrete pad under the house was wet by this time. We left the property at about 6.30pm. At this time, the water was over the vegetable garden. The water had not come into the house at this time, apart from the water from the road which was still running through the property. As we left the property, we had to drive through a small gulley (not far from the shopping centre at Karalee), [J] drove through first in his 4WD — he got through the water — I got through as well but the water was touching the door of my ute — if we left the property any later the car would have been swept into the creek...‖ 61. The FSP says that the Applicant does not state that water was coming into the house as in the upstairs kitchen, bedrooms et al, however by implication Case No: 281957 Determination Page 10 of 13 the SD in referring to the ‗wet concrete pad under the house‘ gives rise to a reasonable understanding that there may have been initial inundation of the ‗underneath storage area and laundry‘. 62. The Panel has considered the submission and sworn statement from the Applicant, and the material provided by the FSP. 63. The report by WP in which the Applicant‘s home is described as a ―raised single level dwelling‖ and photographs in the WP report and those provided by the FSP confirm this. The report by the FSP‘s assessor states that the Applicant‘s home is a ―highset Queenslander‖ and that the habitable floor level is approximately 2m from the ground level. 64. During the site visit, the Panel Chair Ombudsman confirmed this description of the Applicant‘s home. 65. The Panel Chair Ombudsman also noted that the home and shed are significantly below the level of the road and that the land on the other side of the road slopes upwards, away from the road. The Panel is satisfied that these observations support the Applicant‘s eye witness evidence of stormwater runoff through the property. 66. The Applicant has stated that when he noticed that water ―had risen higher‖ (the Panel assumes this refers to the water in the Bremer River which flows along the rear (eastern) boundary of his property) he left things in the shed to move contents from downstairs to upstairs within the house. 67. The Panel also accepts that while the Applicant may have observed water flowing from the road and through his property, based on the Applicant‘s own statement that flowing water had not entered his house itself when he left the property at 6.30pm. 68. In its report, WP examined rainfall data from the Bundamba (Hanlon St) rainfall gauge, located 3.1km from the Applicant‘s property, and states that approximately 165mm of rain was delivered in the 56 hours from 10.00am Sunday 10 January 2011 to 6.00pm 12 January 2011. 69. The WP report notes that the peak intensity of the rainfall in the vicinity of the Applicant‘s property prior to the inundation was estimated to be a 1 to 5 years Average Recurrence Interval (ARI) event. The report‘s author states that given the small catchment size draining local runoff to the site it is unlikely that the inundation of the Applicant‘s property would have occurred solely due to stormwater runoff resulting from the low intensity rainfall. 70. Neither the FSP nor WP have provided any indication as to the timing of the arrival of t he floodwater at the house on the Applicant‘s property. However, given the upstairs habitable area of the Applicant‘s home is approximately 2m from ground level, the Panel considers it is implausible that the stormwater flowing from the road could inundate the property to a height of 2m prior to the arrival of the floodwater from the Bremer River. Case No: 281957 Determination Page 11 of 13 71. However, the Panel is satisfied that the stormwater runoff would have impacted any contents items on the ground in both the shed and underneath the home. 72. The Applicant advised the Panel Chair Ombudsman that he was able to move all of the contents from underneath the home, except for the larger furniture items. Within the shed, the Applicant moved all of the contents save for wood he was using for pool table legs. 73. Having observed the topography of the area, the Panel is satisfied that stormwater up to a level of 200mm above ground, impacted both the shed and under the home, prior to the arrival of the flood water. 74. In those circumstances, the Applicant is entitled , upon the provision of appropriate evidence, to be indemnified for any loss arising from an inundation to the level of 200mm above ground under the home and in the shed. 75. The Panel notes that it has not been presented with evidence to assist with the calculation of the loss and as such, asks the parties to work cooperatively to finalise that aspect of the claim. If the parties are unable to do so, then the matter can be referred back to the Service for further determination. Did the FSP appropriately invest igate the Applicant’s claim? 76. The Applicant says that when he lodged his claim, the FSP did not appoint an assessor or a hydrologist to inspect his property. Instead it declined his claim based on limited information and only when he later disputed the decision did the FSP arrange for an assessment and inspection by a hydrologist. 77. He says the FSP, through its conduct in this respect, has breached its duty of utmost good faith. 78. He also asserts that the hydrology report was produced more than twelve months after the inundation of his property and relies on conjecture and assumptions rather than direct personal observations and so is of little assistance to the FSP. 79. The FSP has defended its actions with respect to the Applicant‘s claim. It says that at the time of the flood event in Queensland, resources were limited. Based on a review of the circumstances of the Applicant‘s claim, it was decided that a physical inspection would not be required before the claim was denied. 80. It also says that the length of time b etween the inundation and hydrologist‘s report production is irrelevant as the river level and rainfall data, the topography, the path of the Brisbane and Bremer Rivers and the contours of the land have not changed. Case No: 281957 Determination Page 12 of 13 81. The Panel notes that the FSP‘s decision to deny the Applicant‘s claim was made without the benefit of any contemporaneous physical inspection of the property or the damage which had been sustained, as even its assessor‘s report is dated 28 November 2011. 82. The claim decision, communicated to the Applicant in a letter dated 28 January 2011, was also made before the publication of the ICA hydrology reports. 83. In the view of the Panel, the process followed by the FSP was not ideal. However, the Panel recognises that during catastrophes such as the January 2011 weather event, assessment and hydrological resources are in high demand and it accepts that the FSP would need to prioritise the use of the limited resources available. 84. The Panel also notes that the Applicant disputed the claim decision many months after the claim decision and that once the dispute was lodged, the FSP appointed an assessor and a hydrologist to inspect the property and establish the cause of the damage. 85. After considering the submissions from the parties, the Panel is of the view th at the FSP‘s handling of the Applicant‘s claim was adequate under the circumstances. 86. The Panel finds no evidence that the FSP through its actions during the handling of the Applicant‘s claim breached its duty of utmost good faith. 87. Further, the Panel finds that the validity of the hydrology report by WP is not diminished merely because it was produced more than a year after the inundation event. Determination 88. On the basis of the available information the Panel determines that:  The FSP clearly informed the Applicant that flood was excluded from coverage under the policy.  The FSP has not breached its duty of utmost good faith.  The cause of the ultimate damage to the Applicant‘s home building and contents was flood as defined in the policy and the FSP is entitled to deny liability for this ultimate damage.  The FSP is obliged to indemnify the Applicant‘s loss arising from stormwater inundation to a level of 200mm above ground below the Applicant‘s home and within the shed.  The FSP is required to pay interest at the statutory rate on any cash settlement from the date of denial of the claim to the date of settlement. Case No: 281957 Determination Page 13 of 13  The FSP‘s investigation of the Applicant‘s claim was adequate under the circumstances.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.