Partial denial of flood damage claim for structural damage, fixtures, carpets and accommodation
Text of the determination
Case No: 281750 Determination Page 1 of 12
Case number: 281750
General Insurance – Domestic Insurance – Home Buildings and Contents
Insurance – Stormwater/flood damage – Extent of damage – S 57 Insurance
Contracts Act 1984
3 June 2013
Background
1. The Applicant had partial representation from a third party. For the sake of
simplicity, reference to the Applicant will include her representative.
2. The Applicant insured her home building and contents under a Home Building
Insurance Policy against loss or damage caused by insured events for
$242,000 and $71,500 respectively with a $300 policy excess. The property is
operated as a farm and is situated at Chincilla, Queensland, approximately
300kms north west of Brisbane.
3. On or about 26 December 2010, the Applicant‟s house was inunda ted by storm
and flood water. The Financial Services Provider (FSP) accepted the claim and
paid $2,000 for emergency assistance.
4. The FSP also cash settled part of the claim for the amount of $3,537.38 for
sanitising the home, cleaning the entry area and replacement of vinyl tiles and
$14,751 for damaged contents items.
5. However, the Applicant submits that she suffered the following additional
damage to the:
Concrete rainwater tank;
Laundry wall;
Lounge room ceiling;
Verandah floor surface;
Rear foyer wall;
Bathroom vanity and kitchen cabinets, carpet, built-in robes, and
wardrobes; and
Purchase of a demountable building and hire of a storage container.
6. The FSP denied liability for the Applicant‟s claim on the ground that the
storm/floodwater did not cause the damage.
Determination
Case No: 281750 Determination Page 2 of 12
Summary of Applicant’ s Position
7. The Applicant submits that the floodwater caused damage to the floor
coverings, kitchen cupboards, walls, ceilings, bathroom, wardrobes, beds and
curtains for which the FSP denied liability.
8. A concrete water tank was also damaged and concrete around the house was
damaged and not repaired or replaced. Her house was not habitable and she
purchased a „donger‟ so that she could live on -site and no compensation has
been paid for this expense.
9. During the 2010/2011 flood events, the Applicant‟s property was flooded and
she was not able to gain access to her home for ten days because the roads
were closed. Upon arriving home, the Applicant discovered that water and
sewerage had flowed through her home. The fences around the house yard
and the property had also been knocked down.
10. The Applicant set about cleaning her home which she considered was probably
the wrong thing to do as when the FSP‟s loss assessor attended about six
weeks after the flood he stated that there was no flood damage.
11. The Applicant and her son moved back into the home after about ten days and
everything seemed to be in order until she had to close the home because of a
mouse plague. Before this, all windows had been left open to let air circulate
through the house.
12. Once the house was closed up, mould started to appear. It was removed with
bleach but soon came back. The Applicant then became sick from a mild
infection. The Applicant and her son then moved out of the house.
13. The Applicant inspected underneath the carpets, which were laid on the
concrete slab, and found a lot of mould. She then arranged for a builder to
remove the carpets from the bedrooms. When this was being carried out, the
Applicant discovered the built-in wardrobes were also mouldy and they fell
apart when moved. The kitchen cupboards had mould and sewerage under
them and they were also removed.
14. The cupboards were placed in a bedroom so that the assessor could inspect
them and then into a hired container. The kickboards along with the bathroom
vanity were removed from the house and disposed of as they were mouldy and
contaminated with sewerage.
15. On the day the FSP‟s assessor attended, the kitchen cupboards were stacked
in one of the bedrooms, he had to climb over part of it to inspect the room. The
Applicant also informed the assessor that the wardrobes were available in the
container. The FSP has stated that they were not available, but this is not true.
At the FSP‟s request she provided photographs but the FSP still did not send
an assessor out to inspect them.
16. The items were not disposed of until early in 2012 when the hired shipping
container was returned.
Case No: 281750 Determination Page 3 of 12
17. In July 2011, the FSP sent a hygienist to prepare a Sanitation Report. However,
she had twice sanitised her home before the testing had been carried out. Once
immediately after the flood and the second just after the house had been
stripped. The house had been left with all doors and windows open.
18. The Applicant submits that her policy provides that accommodation is to be
provided if her home in not habitable. This option was refused as she had
purchased a new donger to live at the property. A shipping container was also
hired to store what remaining possessions she had.
19. A concrete water tank was also damaged. Before the flood, the tank was in use
and full of water. After the flood it was no longer full of water, even after all the
rain. The water tank is the only supply of water to the house. Therefore, had it
been leaking before the flood it would have been repaired. It did not leak befo re
the flood.
20. The laundry wall, lounge room ceiling and verandah floor were also not cracked
before the flood, but cracked soon after.
21. When she insured her home, she had no knowledge of any inadequate
foundation. She cannot confirm how long it took for cracks to appear as she
was flooded out of her home. The cracks were present when she returned to
her home on 15 January 2011.
22. The FSP has stated that the concrete was of poor quality. She agrees that the
concrete appears to be of poor quality but this was not evident when she
purchased the property. It was made more evident by the flood waters and the
washing down process.
23. In respect to the carpets, the Applicant contacted the FSP just after the floods
and before she had cleaned them. The Applicant asked about stripping the
carpets out. She was informed that this would be in order as long as she kept
them for inspection.
24. The carpets were only a couple of years old and she tried to save them. They
did not look too bad after she had cleaned them a few times but they did start to
smell. She then took the FSP‟s advice and removed the carpets and kept them
for inspection. The carpets were outside the back door but the assessor walked
past them without looking at them.
25. It was not until they were removed that she discovered the amount of
contamination and mould that was hidden under the carpet. She considers that
she should not have tried to save them.
26. The fact that flood water entered her home has been verified and she does not
understand how the FSP disputes this because the evidence has been cleaned
away.
27. She agrees there was minimal damage to painted timber etc which is why she
cleaned and did not remove door jambs etc. She has pine furniture that was in
the house at the time of the flood that has visible water damage.
Case No: 281750 Determination Page 4 of 12
28. Further, flood affected items were kept on site for inspection until early 2012
and the FSP was made aware of this.
Summary of FSP’s Position
29. The FSP accepted the claim for flood damage to the Applicant‟s property and
contents. The contents component of the claim was cash settled for the cost of
replacement of electrical goods.
30. However, a dispute has arisen over settlement of the building component of the
claim. The FSP submits that it has attended to the event-related damage to the
home. The Applicant alleged that home repairs were to cost $15,000 but now
alleges that they have cost her $80,000, but the Applicant has not submitted
any evidence or other material to justify, particularise, or substantiate these
losses or expenses.
31. The FSP engaged an engineering consultant, “ JHA ” , to assess the damage
caused to the Applicant‟s property by the flood inundation. A Scope of Works
(SOW) was prepared for the necessary repairs.
32. The Applicant has now sought to include in the contents claim, further items
including floor coverings, kitchen cupboards, bathroom, wardrobes, beds,
curtains, and repainting of the home , but has not presented any expert
evidence in respect to these losses.
33. The FSP‟s loss assessor inspected the property on 6 February 2011 and
reported that inundation to a level of 0.05m (50mm) occurred. The loss
assessor also identified cracking damage to various parts of the home, a
cracked concrete water tank and damage to the verandah slab. He
recommended an engineer be appointed to assess the cause of the damage.
34. JHA submitted a report dated 12 March 2011 in which he stated:
Concrete water tank
The tank was surveyed for plumb and was found to be well within normal
tolerance for a cast in-situ reinforced concrete tank;
There is no evidence that the tank is subsiding or leaning past an
acceptable vertical line as a result of any flood action;
The base of the tank is believed to have a slight leak adjacent to the edge
of the rear of the verandah which should be addressed under normal
owner maintenance.
35. The FSP submits that there is no evidence of event-related damage to the
water tank.
36. Laundry wall
Case No: 281750 Determination Page 5 of 12
There is a „step - stair‟ crack in concrete block wall forming the end of the
laundry below an aluminium window;
The cracking is indicative of foundation movement under this section of
the external wall;
The rear window wall had subsided 20mm in 1.8m, this being the section
of the laundry wall built out under the right hand side verandah of the
original house;
The cracking of the block wall at the end of the laundry is the result of
settlement and consolidation of the founding soils under the unsupported
concrete verandah floor which was used as a foundation to build the
laundry walls;
The subsidence may have been aggravated by the introduction of the
flood water;
It is JHA‟s professional opinion that the settlement and cracking occurred
well before the flood;
The omission of a foundation under this section of the laundry wall has
been the main contributing factor which has caused the cracking and
separation of the block wall.
37. The FSP submits that the damage has been caused by subsidence or other
earth movement, which is specifically excluded from cover under the terms and
conditions of the policy.
38. It further submits that there is no evidence of any subsidence damage within 72
hours of the insured event such as would bring the damage within the terms
and conditions of the policy.
39. Lounge room ceiling
The cracked plaster joint is a result of thermal expansion and contracting
of the low-pitched roof frame heating the ceiling space causing the
timber roof frame to move and crack the plaster ceiling;
The cracking in the plasterboard ceiling is not related to any foundation
or floor slab movement as a consequence of the flood.
40. The FSP submits that the damage has been caused by thermal expansion and
contraction of the roof frame rather than by an insured event.
41. Verandah floor surface
The surface of the concrete floors of the verandah is very soft and
breaking away in numerous locations.
Case No: 281750 Determination Page 6 of 12
The extent of crumbling to the surface of the concrete and of the
corrosion to the steel reinforcement has not just happened and has
taken quite some time to reach that point of surface damage.
JHA considered the crumbling surface of the concrete around the
verandah is due to poor batching of the concrete at the time of pouring
the floors, or a delay in laying the concrete, causing the chemical
reaction to commence before the surface of the mix could be floated and
steel trowelled to seal it.
The crumbling surface of the concrete on the verandah floors is not a
result of the recent flood event but is directly related to the poor condition
of the concrete at the time of pouring, and poor surface finishing prior to
the setting of the concrete.
Rear door foyer wall
42. JHA reported: „ The cause of the slight cracking and separation is a direct result
of differential movement of the old verandah floor against the floor slab of the
main dwelling. The movement in this section of the house is not, in our
professional opinion, related to the recent flood event. ’
Kitchen cupboards and carpets
43. The FSP submits that the Applicant removed the kitchen cupboards and
bedroom carpets without authorisation from the FSP. Therefore, the FSP has
been prejudiced in investigating the claim and that such prejudice is to the
extent of 100% of such claims.
Summary
44. The FSP submits that:
the insured property was assessed by a qualified engineer, two
assessors, and a hygiene specialist and that the Applicant‟s claims have
been met and settled based upon their recommendations;
there is no supporting evidence that the cracks to the home were the
result of the claimed events;
the cracking occurred as a result of subsidence, shrinkage or any other
earth movement which are specifically excluded under all sections of the
policy;
it is th e Applicant‟s responsibility to maintain her home and remedy any
defects she becomes aware of in order to prevent further damage from
occurring;
there is no evidence to hand to suggest that the damage for which the
Applicant is claiming occurred as a result of the claimed event or events,
or any insured event as defined in the policy.
Case No: 281750 Determination Page 7 of 12
45. The FSP relies on the policy terms and conditions to decline the Applicant‟s
additional claims.
Issue
46. Whether the FSP has correctly declined the Applicant‟s claims for damage to
the :
Concrete rainwater tank;
Laundry wall cracking;
Lounge room ceiling cracking;
Verandah floor surface;
Rear foyer wall cracking;
Bathroom vanity and kitchen cabinets, carpet, built-in robes, and wardrobes;
and
Demountable building and storage container.
Reasons for Decision
47. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the FOS
Terms of Reference. Thus, this dispute has not been subject to a FOS
Recommendation and has proceeded directly to Determination. The parties
have been previously advised that a Determination will be issued in this case.
48. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence, it is not necessary to go into all of this material.
49. On or about 26 December 2010, the Applicant‟s farm property was inundated
by storm and flood water. The FSP accepted liability and cash settled the
Applicant‟s contents claim for the amount of $14,751 and the cost of sanitising
the home. The Applicant was not able to move back into her home until 15
January 2011.
50. The FSP declined the Applicant‟s claim with respect to damage to the concrete
rainwater tank, laundry wall, lounge room ceiling, verandah floor surface, rear
foyer wall, bathroom, vanity and kitchen cabinets, carpets, built-in robes,
wardrobes and the cost of purchasing a demountable building and storage
container, on the grounds that such loss sustained was not caused by the
insured event of storm and flood.
51. In the FSP‟s IDR letter of 12 April 2012, the FSP offered to increase the
settlement sum paid to the Applicant by $787.38, based on a quote received
from TBS with respect to the removal and replacement of the vinyl floors and
the cleaning and sanitising of the interior surfaces of the dwelling.
Case No: 281750 Determination Page 8 of 12
52. Whilst there is no dispute that the Applicant‟s property was inundated, little
evidence is provided by either party as to the extent of that inundation. The
assessor‟s report refers to the inundation being to a height of 50mm above floor
level whilst the engineering report dated 12 March 2011 does not identify the
height of the inundation throughout the property. I note the report from “MW”
dated 16 August 2011 states there were no visible signs of water entry to the
internal parts of the dwelling. The report is inconsistent with the other
information on file. The report is provided five months after the inspection and I
am not satisfied the rep ort is based on a thorough inspection of the Applicant‟s
property or a proper consideration of the nature of the inundation of the
Applicant‟s property.
53. A report provided by a builder on behalf of the Applicant, indicates that water
had inundated the house to a depth of 150mm. The builder has identified the
discovery of mould and moisture under the carpets and wardrobes in the
house. There was evidence of mould and moisture in the concrete gaps in and
around the house and he advised the Applicant that the property would need to
be sanitised and left to dry before it could be sealed. The removal of the kitchen
exposed more mould and what appeared to be sewerage residue. He noted the
kitchen was stored for future use but that the kicks were damaged. This report
was provided to the FSP.
54. The original assessor‟s report identifies the Applicant‟s claim with respect to
structural damage to the concrete stormwater tank, cracks to the block work
and external walls, water damage to the study/office, cracks to the kitchen
family room ceiling, issues with the concrete verandah slab and numerous
damage contents items including carpets.
55. The assessor concluded that the water damaged areas of the home appeared
to be consistent with the Applicant‟s claim although the assessor recommended
a structural engineer be consulted to attend the property.
56. The structural engineer did not attend the property until 10 March 2011. The
report does not address the damage to the kitchen, bathrooms or carpets.
57. The engineer ‟s report dealt with some of the structural damage. He considered
the water tank had a slight leak but there was no evidence to indicate the tank
was subsiding or leaning past an acceptable vertical line as a result of any flood
action. Any repair should be addressed as part of normal maintenance. The
cracking of the laundry wall and the subsiding of that wall was indicative of
foundation movement, however, the engineer found consistent level readings
around the majority of the external walls with the exception of the walls forming
the boundary of the external laundry. According to the engineer, this area had
been added to the original building sometime after the house was built and had
used the original concrete floor of the verandah with the concrete block work for
the walls laid on top of that original verandah floor. The cracking appears to be
due to poor workmanship and not as a result of the flood. The consultant
considered the consolidation of the ground combined with the added weight of
the concrete blocks, contributed to the settlement of the old concrete floor of
the verandah causing the cracking and although it may have been aggravated
Case No: 281750 Determination Page 9 of 12
by recent flooding, their opinion was that the settlement and cracking occurred
well before the flood event.
58. The lounge room ceiling cracking was considered to be as a result of the
thermal expansion and contraction of the low pitch roof frame and again, not as
a result of the flooding of the property, whilst the verandah floor surface
crumpling was identified as being directly related to the poor condition of the
concrete at the time of pouring and the poor surface finishing. Finally, the
engineer considered the rear door foyer wall cracking which he considered to
be a direct result of the differential movement of the old verandah floor against
the floor slab of the main dwelling. It again was not related to the recent flood.
59. The Applicant has referred to the work undertaken to clean the house following
the flood. The Applicant denies that the water tank was leaking prior to the flood
and notes it was the only source of water supply to the house. The Applicant
denies any knowledge of the inadequate foundation and maintains the cracks
were not there prior to the flood. The Applicant accepts that the concrete
appears to be of poor quality but maintains this was not evident at the time the
home was purchased or insured. The wall cracks did not appear until well after
the flood.
60. Although there was a delay of two and half months before the engineer was
able to provide a report on the property, no evidence has been offered by the
Applicant to dispute the engineer‟s findings. In the absence of an evidence to
the contrary, I am satisfied the FSP is entitled to rely on the report of the
structural engineer to deny liability with respect to the structural damage.
61. I am not so persuaded, however, with respect to the damage sustained to the
carpets, bathroom vanity and kitchen cabinets, or the built-in robes and
wardrobes. It is clear from the assessor‟s report that the FSP accepts the
property was inundated. As indicated, the exact height of inundation is unclear
but it would appear that the property was inundated as a result of flood water
mixing with sewerage.
62. The Applicant has attempted to mitigate her loss. The Applicant steamed
cleaned the carpets and they appeared to be alright. However, she later
discovered mould had grown in the underlay of the carpets and a builder
advised her to remove them from the house, which she did. The builder also
advised her to leave the house completely open for several months to dry.
63. Although the FSP claims the Applicant disposed of the carpets before its
assessor could view them, the FSP was aware of the nature of the inundation.
In my view, a proper inspection of the property would have identified the
damaged areas and potential for further damage to develop.
64. It is reasonable to accept that the Applicant‟s carpets would have sustained
damage having being inundated by flood water and sewerage. It is reasonable
to accept that these carpets should have been removed from the property
earlier than what occurred and the fact that they were left sitting for sometime
satisfies me that most likely this would have caused additional damage. So far
Case No: 281750 Determination Page 10 of 12
as the cost of replacing the carpets are concerned, I am satisfied that the FSP
is liable to indemnify the Applicant under the terms of the policy.
65. It is apparent from the information exchanged that damage was sustained to
the kitchen cupboard kick boards altho ugh not the cupboards themselves and
also to the bathroom vanity. Again, although the FSP submits that it was unable
to inspect the vanity and kitchen cupboards, I accept that the Applicant had
these items available and I accept that the FSP could have, if a proper
inspection of the damage to the Applicant‟s property been conducted
determined the extent of any damage to the vanity and kitchen cupboards.
66. The quotation provided by the Applicant referred to the refitting of the existing
kitchen cupboards on new timber bases and the fitting of a new vanity to the
bathroom.
67. Based on the information exchanged, I am satisfied that the vanity in the
bathroom required replacing, while the kitchen cupboards were only partially
damaged. I am satisfied that the FSP should cash settle the Applicant for the
cost of refitting the kitchen cupboards on the new timber base and for the cost
of replacing the new vanity cupboards to the bathroom.
68. I also find that the damage sustained to the built-in robes and wardrobes is
most likely due to the inundation. The Applicant has advised that this damage
was not identified until they had moved the carpets at which time they were
found to be mouldy and began to fall apart. Again, although the FSP maintains
it was unable to inspect the robes and wardrobes, the evidence is that the
Applicant had stored these items in a container which had in fact been pointed
out to the FSP‟s loss assessor. Again the nature of the inundation of the
Applicant‟s property is such that I am satisfied on the ba lance of probabilities
that the built-in robes and wardrobes would have been damaged by the
inundation to such an extent that they would have had to have been replaced.
69. In determining this, I am satisfied that the nature of the inundation including
sewerage inundation would be such as to require the replacement of these
items. Accordingly, I am satisfied that the FSP should cash settle the
Applicant‟s claim with respect to the cost of replacing the built -in robes and
wardrobes in accordance with the terms of the policy.
70. The Applicant has also sought accommodation costs based on the cost of
purchasing a demountable building.
71. Whilst the policy covers accommodation costs for a period of up to 52 weeks in
total when a person is unable to live in the home, the evidence presented by
the Applicant is that she was able to live in the home for periods after 15
January 2011.
72. It is unclear from the information exchanged whether the FSP has already
covered the Applicant‟s accommodation cost for the initial period or exactly
what costs were incurred by the Applicant during the period from 26 December
2010 until 15 January 2011. I am satisfied based on the information exchanged
Case No: 281750 Determination Page 11 of 12
that the Applicant is entitled to be indemnified for the accommodation costs
incurred during that period if this is not already paid.
73. With respect to the additional periods of accommodation, the policy does not
provide indemnity for the purpose of purchasing the relocatable home but it is
clear based on the information exchanged that the Applicant would not have
been able to reside in her home whilst repairs were being conducted.
74. In these circumstances I accept that it is reasonable for the FSP to pay
reasonable accommodation costs for the period that the Applicant would not
have been able to reside in the home once the kitchen and bathroom were
removed and until such time that they could have been repaired. As the precise
periods have not been made available to the Service, the Applicant and the
FSP are asked to work co-operatively together, to determine a reasonable
period for which the reasonable costs of accommodation, calculated at the
weekly rent the Applicant would receive for the home if it had not been
damaged, would be paid.
75. Finally the Applicant has had to hire a storage container for the purpose of
storing contents removed from the home whilst the floor was drying out and the
mould was being removed. I am satisfied that the hiring of the storage container
was a consequence of the insured event and that the Applicant is entitled to be
reimbursed for the costs of this hire.
76. The Applicant has submitted an invoice dated 16 August 2011 for the amount
of $628.42 to FOS for the hire of the storage container from 24 June 2011 to 3
November 2011.
Determination
77. Notwithstanding the Applicant‟s submission that her home building did not
contain any cracks in it until after the flood event, I am persuaded by the report
of the structural engineer, JHA, that the flood event did not cause or contribute
to the damage to the building.
78. Accordingly, I determine that the FSP is:
a) entitled to deny liability for the cost of repairs to, or replacement of the:
Concrete water tank;
Laundry wall;
Lounge room ceiling;
Verandah concrete floor surface; and
Rear foyer wall.
b) to indemnify the Applicant as follows:
Carpets – to pay the cost of replacing the carpets;
Case No: 281750 Determination Page 12 of 12
Bathroom vanity and kitchen cupboards – the cost of replacing the
vanity and re-instating the kitchen cupboards with new timber bases;
Built-in robes and wardrobes – to pay the cost of replacing the built-
in robes and wardrobes;
Accommodation costs – the Applicant is to submit to the FSP a
schedule of periods of time when she was unable to occupy her
home due to issues arising from the flood event. The Applicant is to
submit the schedule to the FSP within 30 days of the date of this
Determination. Once received the parties are asked to work co-
operatively to determine the total accommodation costs and the FSP
is to cash settle the claim;
Storage container – to pay the Applicant the amount of $628.42 for
the hire of the container.
79. The Applicant is to submit invoices to the FSP for the above mentioned items to
be paid by it with the exception of the storage container.
80. If there is any dispute as to settlement of this determination, the matter may be
referred back to FOS for determination.
81. Further, I determine the FSP is liable to pay interest under Section 57 of the
Insurance Contracts Act 1984 at the rate prescribed in the Insurance Contracts
Regulations for the period from 1 2 April 2012, the date of the FSP‟s IDR
decision letter, to the date of settlement of this Determination.