Home / Financial Firm (Unknown - Insurer) / Determination 281665

Determination 281665

Claim denial - storm damage excluded as subsidence and earth movement, no storm-created opening

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Storm damage to a home's walls and tiles was claimed after re-stumping works, and the FSP declined the claim, having offered $1,000 earlier. AFCA found no storm-created opening and that the damage related to soil movement and subsidence, which the policy excludes.

Storm cover requires water entry through a storm-created opening, and subsidence and earth movement are general exclusions that apply to the storm cover.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 281665 Determination Page 1 of 6 Case number: 281665 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 31 October 2012 Background 1. This is a review of a Recommendation by the Service’s Case Manager dated 11 October 2012. The Applicant has rejected the Recommendation and in accordance with the Terms of Reference the matter has been referred to me for Determination. 2. The relevant background, summaries of the parties’ position and issue to be determined are set out in paragraphs 1 to 21 of the Recommendation and I will restate same. 1. “ The Applicant holds a Home Insurance policy with the Financial Services Provider (FSP) covering a residential home. The policy covers the building up to $159,000 subject to a building excess of $2,000. 2. The Applicant lodged a claim on 22 February 2012 for damage to the property as a result of storms on 25 December 2011. 3. The FSP reviewed the claim and declined same on the basis that the stumps to the home had rotted over a period of time and the cause of damage was excluded from cover. 4. The Applicant disputes the declinature on the basis that the damage arose from the covered event of storm. Summary of Applicant’s position 5. On 25 December 2011 there was a hail storm which resulted in flooding under the Ap plicant’s house. It was approximately 1 month later that the Applicant noted the cracking to the walls of his home and the tiles falling down. 6. The Applicant engaged a builder to rectify the issue and the builder advised him to re-block the home. The builder commenced work on 14 February 2012 and installed 50 new concrete stumps. When the holes for the stumps were dug, the holes filled with water after 15 minutes. The Applicant contends this confirms there is a stormwater issue under the home. 7. The Applicant then telephoned the FSP regarding the claim and was asked to provide a document regarding the works to the home. The FSP then sent out an engineer to report on the damage to the home. It was not until 2 months later that the FSP provided a response to the Applicant stating it could only pay $1,000. The Applicant considers this insufficient to cover his property damage. The Applicant also notes he had to contact the FSP multiple time to obtain a response on his claim. 8. The Applicant submits the damage to his home has arisen from storm water as a substantial quantity of water was under the home during the re-blocking Determination Case No: 281665 Determination Page 2 of 6 of the home and the water still exists under the house. There is no leaking to the home it is solely storm water under the home. This issue still exists. 9. The Applicant has accused his builder of providing deliberately untrue information to the FSP because he has not completed the works appropriately. Further, the builder deliberately put a report in about the work to the property stating “moisture” instead of “water” because otherwise the FSP will want to know why the Applicant did not remove the water. 10. The Applicant denies there were rotted stumps as all the stumps in his property were concrete. The builder merely added new stumps. Summary of FSP’s position 11. The FSP relies on the following policy terms and conditions: “THE POLICY DOESN’T COVER EVERYTHING General exclusions – apply to the overall policy X Unless included in additional cover, we will not cover loss, damage or legal liability caused by: ... Wear and tear and lack of maintenance, including rust, corrosion, deterioration, except in the case of escape of liquid (refer page 21), or legal liability claims; Gradual loss or damage of any kind’ ... Erosion or earth movement including shrinkage; Subsidence and landslide, unless it happens immediately following na earthquake or explosion; ... Storm You are covered for loss or damage as a result of storm You are not covered for storm damage to: ... The building or contents as a result of water, wind or hail has entered the building through an opening not created by the storm;” 12. The FSP has enclosed daily weather observations for the location of the insured property. The recorded rainfall for 25 December 2011 is 2.8 and the rainfall for 26 December is 71. 13. The FSP relies on an engineering report from which I note the following: The Applicant informed the engineer that the he received 200mm of flooding on Christmas day 2011. The water drained away after several hours and it was not until one month later he noted the cracking. As a result of this damage the Applicant engaged for re-stumping work to be done two days prior to the engineer’s attendance. The engineer noted a number of vertical and horizontal cracks to the walls throughout the residence of varying widths. There were cracks at the junction of ceiling and cornice and cornice and walls. The engineer also noted that Case No: 281665 Determination Page 3 of 6 tiles had fallen from the eastern wall of the kitchen at the northern end. There were drummy wall tiles in the bathroom. The engineer observed the exterior of the residence had paving level 400mm below floor level. On the eastern side of the residence at the northern and southern ends, he observed grated drainage outlets in the paving. He did not observe any tell tale watermarks on the fencing or rendered wall surface. The engineer confirmed that all the stumps were replaced with concrete stumps. The engineer could not determine the cause of the damage to the interior and exterior of the residence as all the stumps had been replaced and work completed two days prior to his inspection. The engineer noted that the damage is consistent with what is seen when soil fails under the stumps as a result of saturation during flooding. The interior damage is also similar to damage which occurs during re-stumping. 14. The engineer has provided an email dated 16 April 2012 to the FSP confirming that he could not definitively confirm the cause of loss. The engineer does not that “...This type of damage normally occurs after the soil has been saturated for an extended period of time; usually a week or more, which allows the stumps to subside, resulting in damage to the plaster and brickwork. However, similar damage occurs to the interior of a residence when houses are restumped......the ground was quite dry at the time of my inspection and therefore there was no need for me to suspect drainage was a problem at that point in time.” 15. The FSP has provided a report dated 21 March 2012 from the Applicant’s re - blocker. I note the following from this report: The re-blocker was engaged to complete re-blocking works at the property in February 2012. The re-blocker encountered a great amount of moisture. The re-blocker informed the Applicant that there was water under the house which means the 17 year guarantee is void if the problem is not rectified. The re-blocker believes the moisture problem will cause the house to have great movement. 16. The FSP has provided an email dated 13 April 2012 to the re-blocker summarising a telephone conversation between the parties and asking for confirmation. There is no confirmation from the re-blocker but I note the following from the email: The re-blocker is normally contacted ne (sic) week prior to commencing the job. The works were for re-stumping and for private works. The re-blocker went through the home with the owner prior to the job to confirm property condition. There were cracks consistent with cracking over time. The re-blocking company also completed works to replace the veranda. Red gum stumps do not rot in a short time and the stumps at this address were removed due to rot. These rotten stumps had a direct benefit on the cracking which occurred in the home. In the re- blocker’s opinion the damage arose from rotted stumps and not the storm event. Fresh cracking may have been evidence as a result of re-stumping. Case No: 281665 Determination Page 4 of 6 There was a suggestion that this sinking issue had occurred 6 years. I note the re-blocker spoken to did not perform the works. 17. The FSP submits that the Applicant has not proven a single event has caused the damage. Further, the FSP believes that a similar event occurred 6 years ago. 18. The Applicant failed to allow the FSP an opportunity to inspect the property prior to carrying out repairs which has prejudiced the claim. However the engineer did indicate the soil would need to be saturated for at least a week or more to cause stump subsidence. 19. The reports received by the FSP suggest the cracking damage is consistent with subsidence and/or re-stumping. However, neither are insured events under the policy as the insured event of storm requires the damage to be caused as a result of a storm created opening. 20. The FSP submits that the general exclusions of wear and tear, lack of maintenance, gradual loss, erosion and earth movement including subsidence apply to this claim. Issues 21. Whether the FSP was entitled to decline the Applicant’s claim for storm damage. ” Reasons for Decision 3. There has been a full exchange of information and each party has had the opportunity to address the issues that have been raised. I have read all of the exchanged information and I have considered the parties’ submissions including the Applicant’s further submission for storm cover of email dated 18 October 2012. 4. In making her Recommendation the Service’s Case Manager set out her reasons in paragraphs 23 to 30 and I will restate same. 23. “I have read each party’s submissions and materials and will only ref er to the relevant submissions and materials raised. 24. It is an accepted principle of insurance law that the onus rests with an insured to prove, upon the balance of probabilities, that they have sustained a loss caused by an event insured for under the policy in force at the date of loss [ Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466]. Where the claimant satisfies the onus of proof as above, the burden then shifts to the insurer to establish that the claim falls within an exclusion from cover [ Bond air Services Ltd v Hill (1955) 2 Q.B 417; Legal and General Assurance Society Ltd v The commonwealth of Australia & Precision Cranes and Hoists Pty Ltd (1985) 3 ANZ Insurance cases 60-621] 25. The policy provides cover for storm damage to the home provided the damage occurs as a result of water, wind or hail enter ing the building through an opening created by the storm. 26. The policy does not cover subsidence, earth movement or wear and tear. Case No: 281665 Determination Page 5 of 6 27. The Applicant states his property was damaged as a result of the Christmas Day 2011 storms. The Applicant appears to be arguing that the stormwater inundated the property up to 200mm and entered the subfloor of the home. This stormwater destabilised the stumps which led to movement of the home and cracking. This was noted until approximately 1 month later when cracking appeared. 28. The FSP has provided expert evidence noting that the stumps would need to be submerged for at least 1 week or more to become unstable. The Applicant however has stated that the water went away after a few hours which would not be indicative of the stormwater being the cause of stump movement. This is particularly given the engineer’s observation there were no watermarks (which would be expected from pooling of a large volume of water) and the subfloor was dry at the time of inspection. There is an indication by the Applicant’s re -blocker of moisture causing the damage. However there is no statement regarding where the moisture came from and the Applicant has indicated the re- blocker is untruthful. 29. The FSP has also alleged that the stumps were replaced and not simply added to as alleged by the Applicant. However, the Applicant states the stumps were only added to. I note the FSP has not received proper confirmation from the builder regarding the existence of rotten stumps. T he Applicant’s actions though have also precluded the FSP from inspecting the subfloor prior to re-stumping. The engineer has stated the type of internal damage viewed is also consistent with re-stumping. If 50-70 stumps were added to the subfloor to assist in re-levelling the floor this would create the possibility that such movement caused some internal damage. 30. I consider that the Applicant has not established that the damage occurred as the result of an insured event. There is no evidence that the water entered through a storm created opening to cause the damage. Even if I were to accept that the damage arose from this particular storm, the loss is still excluded because it relates to movement of the soil around the stumps. Earth movement and subsidence are general exclusions that apply to the storm cover. Accordingly, the cause of the loss being moisture/soil movement around the stumps is not covered by the policy. ” 5. In summary, the Case Manager noted that the policy covers the damage caused as a result of water, wind or hail entering a building through an opening created by the storm. She further noted the policy does not cover subsidence, earth movement or wear and tear. 6. The Applicant is entitled to indemnity under the policy providing he can establish that the damage was caused by a covered event, that is, storm damage resulting from an opening created by the storm. 7. I am in agreement with the Service’s Case Manager Recommendation and I agree with the reasons that she has given. 8. There is no evidence before me that the damage complained of was caused by water entering through a storm created opening. Furthermore, the evidence indicates that the damage relates to movement of the soil around Case No: 281665 Determination Page 6 of 6 the stumps but damage caused by earth movement and subsidence are excluded from storm cover. 9. One of the difficulties in this case is that the Applicant failed to comply with a condition of the policy requiring referral of damage to the FSP prior to the carrying out of repair work. This is a requirement in all house building claims to prevent prejudice to the FSP in determining the cause of damage. The FSP has not sought to rely on this by the Applicant and I do not take it into account in making my Determination. 10. The expert evidence supplied by the Applicant does not support his contention that he is entitled to indemnity under the policy. Whilst it supports the view that moisture under the house will cause house movement does not prove that the damage was caused by water entering the properties through an opening created by the storm. I accept that the cause of the loss was probably moisture subsidence or movements around the area of the stumps and this is not covered by the terms of the policy. Determination 11. The FSP was entitled to deny the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.