Home / Financial Firm (Unknown - Insurer) / Determination 281665
Determination 281665
Claim denial - storm damage excluded as subsidence and earth movement, no storm-created opening
Summary
Storm damage to a home's walls and tiles was claimed after re-stumping works, and the FSP declined the claim, having offered $1,000 earlier. AFCA found no storm-created opening and that the damage related to soil movement and subsidence, which the policy excludes.
Storm cover requires water entry through a storm-created opening, and subsidence and earth movement are general exclusions that apply to the storm cover.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to deny the claim. The damage relates to movement of the soil around the stumps, which is excluded from storm cover.”
- Product terms interpretation secondary · not upheld
“The policy covers storm damage only where water enters through an opening created by the storm.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 281665 Determination Page 1 of 6
Case number: 281665
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
31 October 2012
Background
1. This is a review of a Recommendation by the Service’s Case Manager dated
11 October 2012. The Applicant has rejected the Recommendation and in
accordance with the Terms of Reference the matter has been referred to me
for Determination.
2. The relevant background, summaries of the parties’ position and issue to be
determined are set out in paragraphs 1 to 21 of the Recommendation and I
will restate same.
1. “ The Applicant holds a Home Insurance policy with the Financial Services
Provider (FSP) covering a residential home. The policy covers the building up
to $159,000 subject to a building excess of $2,000.
2. The Applicant lodged a claim on 22 February 2012 for damage to the property
as a result of storms on 25 December 2011.
3. The FSP reviewed the claim and declined same on the basis that the stumps
to the home had rotted over a period of time and the cause of damage was
excluded from cover.
4. The Applicant disputes the declinature on the basis that the damage arose
from the covered event of storm.
Summary of Applicant’s position
5. On 25 December 2011 there was a hail storm which resulted in flooding under
the Ap plicant’s house. It was approximately 1 month later that the Applicant
noted the cracking to the walls of his home and the tiles falling down.
6. The Applicant engaged a builder to rectify the issue and the builder advised
him to re-block the home. The builder commenced work on 14 February 2012
and installed 50 new concrete stumps. When the holes for the stumps were
dug, the holes filled with water after 15 minutes. The Applicant contends this
confirms there is a stormwater issue under the home.
7. The Applicant then telephoned the FSP regarding the claim and was asked to
provide a document regarding the works to the home. The FSP then sent out
an engineer to report on the damage to the home. It was not until 2 months
later that the FSP provided a response to the Applicant stating it could only
pay $1,000. The Applicant considers this insufficient to cover his property
damage. The Applicant also notes he had to contact the FSP multiple time to
obtain a response on his claim.
8. The Applicant submits the damage to his home has arisen from storm water
as a substantial quantity of water was under the home during the re-blocking
Determination
Case No: 281665 Determination Page 2 of 6
of the home and the water still exists under the house. There is no leaking to
the home it is solely storm water under the home. This issue still exists.
9. The Applicant has accused his builder of providing deliberately untrue
information to the FSP because he has not completed the works
appropriately. Further, the builder deliberately put a report in about the work to
the property stating “moisture” instead of “water” because otherwise the FSP
will want to know why the Applicant did not remove the water.
10. The Applicant denies there were rotted stumps as all the stumps in his
property were concrete. The builder merely added new stumps.
Summary of FSP’s position
11. The FSP relies on the following policy terms and conditions:
“THE POLICY DOESN’T COVER EVERYTHING
General exclusions – apply to the overall policy
X Unless included in additional cover, we will not cover loss, damage or legal
liability caused by:
...
Wear and tear and lack of maintenance, including rust, corrosion,
deterioration, except in the case of escape of liquid (refer page 21), or legal
liability claims;
Gradual loss or damage of any kind’
...
Erosion or earth movement including shrinkage;
Subsidence and landslide, unless it happens immediately following na
earthquake or explosion;
...
Storm
You are covered for loss or damage as a result of storm
You are not covered for storm damage to:
...
The building or contents as a result of water, wind or hail has entered the
building through an opening not created by the storm;”
12. The FSP has enclosed daily weather observations for the location of the
insured property. The recorded rainfall for 25 December 2011 is 2.8 and the
rainfall for 26 December is 71.
13. The FSP relies on an engineering report from which I note the following:
The Applicant informed the engineer that the he received 200mm of flooding
on Christmas day 2011. The water drained away after several hours and it
was not until one month later he noted the cracking. As a result of this
damage the Applicant engaged for re-stumping work to be done two days
prior to the engineer’s attendance.
The engineer noted a number of vertical and horizontal cracks to the walls
throughout the residence of varying widths. There were cracks at the junction
of ceiling and cornice and cornice and walls. The engineer also noted that
Case No: 281665 Determination Page 3 of 6
tiles had fallen from the eastern wall of the kitchen at the northern end. There
were drummy wall tiles in the bathroom.
The engineer observed the exterior of the residence had paving level 400mm
below floor level. On the eastern side of the residence at the northern and
southern ends, he observed grated drainage outlets in the paving. He did not
observe any tell tale watermarks on the fencing or rendered wall surface.
The engineer confirmed that all the stumps were replaced with concrete
stumps.
The engineer could not determine the cause of the damage to the interior and
exterior of the residence as all the stumps had been replaced and work
completed two days prior to his inspection. The engineer noted that the
damage is consistent with what is seen when soil fails under the stumps as a
result of saturation during flooding. The interior damage is also similar to
damage which occurs during re-stumping.
14. The engineer has provided an email dated 16 April 2012 to the FSP
confirming that he could not definitively confirm the cause of loss. The
engineer does not that “...This type of damage normally occurs after the soil
has been saturated for an extended period of time; usually a week or more,
which allows the stumps to subside, resulting in damage to the plaster and
brickwork. However, similar damage occurs to the interior of a residence
when houses are restumped......the ground was quite dry at the time of my
inspection and therefore there was no need for me to suspect drainage was a
problem at that point in time.”
15. The FSP has provided a report dated 21 March 2012 from the Applicant’s re -
blocker. I note the following from this report:
The re-blocker was engaged to complete re-blocking works at the property in
February 2012.
The re-blocker encountered a great amount of moisture.
The re-blocker informed the Applicant that there was water under the house
which means the 17 year guarantee is void if the problem is not rectified.
The re-blocker believes the moisture problem will cause the house to have
great movement.
16. The FSP has provided an email dated 13 April 2012 to the re-blocker
summarising a telephone conversation between the parties and asking for
confirmation. There is no confirmation from the re-blocker but I note the
following from the email:
The re-blocker is normally contacted ne (sic) week prior to commencing the
job.
The works were for re-stumping and for private works.
The re-blocker went through the home with the owner prior to the job to
confirm property condition. There were cracks consistent with cracking over
time.
The re-blocking company also completed works to replace the veranda.
Red gum stumps do not rot in a short time and the stumps at this address
were removed due to rot. These rotten stumps had a direct benefit on the
cracking which occurred in the home. In the re- blocker’s opinion the damage
arose from rotted stumps and not the storm event.
Fresh cracking may have been evidence as a result of re-stumping.
Case No: 281665 Determination Page 4 of 6
There was a suggestion that this sinking issue had occurred 6 years.
I note the re-blocker spoken to did not perform the works.
17. The FSP submits that the Applicant has not proven a single event has caused
the damage. Further, the FSP believes that a similar event occurred 6 years
ago.
18. The Applicant failed to allow the FSP an opportunity to inspect the property
prior to carrying out repairs which has prejudiced the claim. However the
engineer did indicate the soil would need to be saturated for at least a week or
more to cause stump subsidence.
19. The reports received by the FSP suggest the cracking damage is consistent
with subsidence and/or re-stumping. However, neither are insured events
under the policy as the insured event of storm requires the damage to be
caused as a result of a storm created opening.
20. The FSP submits that the general exclusions of wear and tear, lack of
maintenance, gradual loss, erosion and earth movement including subsidence
apply to this claim.
Issues
21. Whether the FSP was entitled to decline the Applicant’s claim for storm
damage. ”
Reasons for Decision
3. There has been a full exchange of information and each party has had the
opportunity to address the issues that have been raised. I have read all of
the exchanged information and I have considered the parties’ submissions
including the Applicant’s further submission for storm cover of email dated
18 October 2012.
4. In making her Recommendation the Service’s Case Manager set out her
reasons in paragraphs 23 to 30 and I will restate same.
23. “I have read each party’s submissions and materials and will only ref er
to the relevant submissions and materials raised.
24. It is an accepted principle of insurance law that the onus rests with an
insured to prove, upon the balance of probabilities, that they have
sustained a loss caused by an event insured for under the policy in
force at the date of loss [ Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s
Rep 466]. Where the claimant satisfies the onus of proof as above, the
burden then shifts to the insurer to establish that the claim falls within an
exclusion from cover [ Bond air Services Ltd v Hill (1955) 2 Q.B 417;
Legal and General Assurance Society Ltd v The commonwealth of
Australia & Precision Cranes and Hoists Pty Ltd (1985) 3 ANZ
Insurance cases 60-621]
25. The policy provides cover for storm damage to the home provided the
damage occurs as a result of water, wind or hail enter ing the building
through an opening created by the storm.
26. The policy does not cover subsidence, earth movement or wear and
tear.
Case No: 281665 Determination Page 5 of 6
27. The Applicant states his property was damaged as a result of the
Christmas Day 2011 storms. The Applicant appears to be arguing that
the stormwater inundated the property up to 200mm and entered the
subfloor of the home. This stormwater destabilised the stumps which led
to movement of the home and cracking. This was noted until
approximately 1 month later when cracking appeared.
28. The FSP has provided expert evidence noting that the stumps would
need to be submerged for at least 1 week or more to become unstable.
The Applicant however has stated that the water went away after a few
hours which would not be indicative of the stormwater being the cause
of stump movement. This is particularly given the engineer’s
observation there were no watermarks (which would be expected from
pooling of a large volume of water) and the subfloor was dry at the time
of inspection. There is an indication by the Applicant’s re -blocker of
moisture causing the damage. However there is no statement regarding
where the moisture came from and the Applicant has indicated the re-
blocker is untruthful.
29. The FSP has also alleged that the stumps were replaced and not simply
added to as alleged by the Applicant. However, the Applicant states the
stumps were only added to. I note the FSP has not received proper
confirmation from the builder regarding the existence of rotten stumps.
T he Applicant’s actions though have also precluded the FSP from
inspecting the subfloor prior to re-stumping. The engineer has stated the
type of internal damage viewed is also consistent with re-stumping. If
50-70 stumps were added to the subfloor to assist in re-levelling the
floor this would create the possibility that such movement caused some
internal damage.
30. I consider that the Applicant has not established that the damage
occurred as the result of an insured event. There is no evidence that the
water entered through a storm created opening to cause the damage.
Even if I were to accept that the damage arose from this particular
storm, the loss is still excluded because it relates to movement of the
soil around the stumps. Earth movement and subsidence are general
exclusions that apply to the storm cover. Accordingly, the cause of the
loss being moisture/soil movement around the stumps is not covered by
the policy. ”
5. In summary, the Case Manager noted that the policy covers the damage
caused as a result of water, wind or hail entering a building through an
opening created by the storm. She further noted the policy does not cover
subsidence, earth movement or wear and tear.
6. The Applicant is entitled to indemnity under the policy providing he can
establish that the damage was caused by a covered event, that is, storm
damage resulting from an opening created by the storm.
7. I am in agreement with the Service’s Case Manager Recommendation and I
agree with the reasons that she has given.
8. There is no evidence before me that the damage complained of was caused
by water entering through a storm created opening. Furthermore, the
evidence indicates that the damage relates to movement of the soil around
Case No: 281665 Determination Page 6 of 6
the stumps but damage caused by earth movement and subsidence are
excluded from storm cover.
9. One of the difficulties in this case is that the Applicant failed to comply with a
condition of the policy requiring referral of damage to the FSP prior to the
carrying out of repair work. This is a requirement in all house building claims
to prevent prejudice to the FSP in determining the cause of damage. The
FSP has not sought to rely on this by the Applicant and I do not take it into
account in making my Determination.
10. The expert evidence supplied by the Applicant does not support his
contention that he is entitled to indemnity under the policy. Whilst it supports
the view that moisture under the house will cause house movement does not
prove that the damage was caused by water entering the properties through
an opening created by the storm. I accept that the cause of the loss was
probably moisture subsidence or movements around the area of the stumps
and this is not covered by the terms of the policy.
Determination
11. The FSP was entitled to deny the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.