Home / Financial Firm (Unknown - Insurer) / Determination 281296

Determination 281296

Cash settlement amount for flood-damaged home building

FirmFinancial Firm (Unknown - Insurer)
Decided2013-07-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$105,620
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Flood-damaged home claim disputed over the building settlement amount. AFCA accepted most flood damage but ordered extra payments for part restumping, cladding, asbestos removal and temporary accommodation, and rejected other claimed items.

Pre-existing damage is excluded, but flood-caused damage must be indemnified, with the insurer liable for proportions of disputed items where the scope of works was incomplete.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 281296 Determination Page 1 of 16 Case number: 281296 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 28 June 2013 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP). The policy provided insured events cover over the Applicant‟s home in North Wagga Wagga, New South Wales. 2. On or about 7 March 2012, the Applicant‟ s home was inundated by water and he lodged a claim with the FSP for damage to both his home building and his home contents. 3. The FSP determined that the cause of the inundation of the Applicant‟s home and contents was flood, which is covered under the policy. It accepted the home contents claim and cash settled the Applicant for the contents sum insured value of the policy. 4. The FSP determined that some of the damage to the Applicant‟s home building was pre-existing and offered $66,685.50 as cash settlement for the claim, being the amount it assessed it would cost to repair the damage caused by the inundation. It also paid the Applicant an amount for temporary accommodation. 5. The Applicant disagrees with the amount of the FSP‟s settlement offer for the building and also wants the FSP to pay additional temporary accommodation costs. Summary of Applicant’s position 6. The Applicant says that 800m of fencing was damaged by the flood and he cannot understand why the FSP‟s assessor and building consultant did not photograph or observe this damage, despite their repeat visits to the property. 7. He says all of the external cladding of the house was subject to immersion and had been damaged by swelling and this was not limited to the front of the property as contended by the FSP. Determination Case No: 281296 Determination Page 2 of 16 8. The Applicant says he has a quotation from builder “W” which indicates that the FSP‟s scope of works would not adequately allow for the bathroom/laundry to be legally repaired. He believes he would suffer significant out-of-pocket expenses if he had to repair that area with the funds allowed for in the scope of works. 9. W also provided his professional opinion that the re-stumping of the house was required to make good the sub-floor movement from the flood. 10. He says that the FSP‟s scope of works does not cater for the removal of asbestos sheeting from the house. 11. Further, he says that the scope of works identifies the need for an extended drying-out period prior to the commencement of repairs and the FSP should be required to pay for his temporary accommodation during this period. 12. He also seeks $4,000 for the supply and installation of a kit shed onsite. Summary of FSP’s position 13. The FSP says that the evidence indicates that the Applicant‟s home and shed have a number of pre-existing maintenance issues. 14. After an initial assessment was performed, it engaged a building consultant to inspect the property and produce a scope of works for the repairs to the flood related damage. 15. It then obtained three quotes from builders for the repairs based on the sco pe of works by “RK”, and offered settlement to the Applicant based on the highest of these quotes. 16. The FSP says it has paid the Applicant eight weeks temporary accommodation. Further temporary accommodation has been included in the settlement offer to the Applicant, covering the period from 2 May 2012 until eight weeks after the settlement offer which would allow for the repairs to take place. 17. The FSP relies on the following policy provisions: “ Exclusions for all cover These exclusions apply to all cover under your policy. What we don’t cover Loss, damage, injury or death arising from:  rust, corrosion, gradual deterioration, depreciation, wear or tear  erosion  mould ... Case No: 281296 Determination Page 3 of 16  the settling, shrinkage or expansion in buildings, foundations, walls or pavements ... Maintaining and occupying your home We don‟t cover loss, damage, injury or death arising from: ...  previous damage that has not been repaired. ...  you not maintaining your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained  you not maintaining your site in good repair and condition ... Temporary accommodation for home owners If a lis ted event caused loss or damage to your home and we agree you can‟t live in it and you need to move out so it can be repaired or rebuilt. Covered under Building Insurance  Costs for temporary accommodation that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site ... We pay these costs for a reasonable time we agree it should take to repair or rebuild your home. If you have a:  Home policy, for up to 12 months from when the listed event took place ... Conditions ...  We must agree to pay the costs before you make any arrangements  We won‟t cover costs caused by any unreasonable delays in repairing or rebuilding your home.” Issue 18. Whether the FSP‟s settlement offer is fair and reasonable. Reasons for decision 19. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. Case No: 281296 Determination Page 4 of 16 20. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 21. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. 22. It is not in dispute that the Applicant‟s home contents were damaged by flood and the FSP has paid the policy‟s contents sum insured to the Applicant as settlement for the damage. 23. It is also not in dispute that the building was damaged by flood and that the FSP is liable for the damage. 24. The central issue for the Panel to consider is whether the Applicant‟s home was subject to pre-existing damage and if so, whether the FSP has appropriately assessed the damage caused by the flood. Damage to the Applicant’s home 25. The FSP says that its assessor “GA” inspected the Applicant‟s property on 16 March 2012 and reported that the house was approximately 100 years old and both the house and the shed were in a poor condition with a number of pre-existing maintenance issues. 26. GA noted that the old wooden stumps to the house had been packed prior to the flood event in an attempt to get the dwelling level. He also noted that with respect to the shed on the property, the Applicant had advised him that “the shed was at an angle prior to the flood event, but not as bad”, or words to that effect. 27. The FSP engaged building consultant and engineer, RK, to inspect the property and produce a report on the flood related damage and a scope of works for the repairs to that damage. 28. The Applicant says that the scope of work does not cover all the damage to the property and has produced a quote from builder W for the repairs to his home. 29. The Applicant has also challenged several of RK‟s findings with respect to the condition of his home and the extent of the damage caused by the flood. RK has also provided a response to the issues raised by the Applicant about the findings of his report. 30. In view of the issues raised by the parties, a site inspection was conducted at the property by the Panel Chair Ombudsman on 10 May 2013. Present were the Applicant, the FSP, assessor and engineer RK. 31. It is obvious from the site inspection that the property itself is a very old property and required significant maintenance. There is no doubt however, Case No: 281296 Determination Page 5 of 16 that the Applicant was in the process of performing some of this maintenance and these efforts have been impacted by the inundation of the property. 32. The Applicant described the property being inundated to a height of approximately 1.5m, possibly more and was in that state for the best part of 5 or 6 days following the flood. 33. An inspection of the property revealed some cupping in the flooring, with the flooring that had previously been sealed appearing to have cupped and needing replacement. Flooring that had not been sealed but was natural appeared to have dried out and whilst it was agreed that there might be some weakness in the joints given the possible movement, most likely these floors would only require some sanding and patching to get them back to their pre-flood condition. 34. It was agreed between the parties that the floors were quite old and not all of the damage was due to floods, as some of it was pre-existing. 35. It was agreed that the walls of the front bedroom would require replacing and this would impact on the cornicing which would also need to be replaced. The ceiling would require repainting. All of the damage to the front bedroom would need to be repaired in accordance with the terms of the policy. 36. The passage way had plaster walls. It is agreed that the plaster on these walls could be repaired by only replacing those parts to a half way level. Painting would need to occur to the height of the ceiling and the floors would need to be sanded. 37. The lounge room walls were of timber construction and had dried out with only minimal damage observed. The floor however, was sloped and there floorboards appeared to be cupping. This is likely to be flood related and would fall within the terms of the policy. Repainting of the walls would also be required, as would repair of any of the damaged wall boards. 38. The floor of the second bedroom was also cupped and would need to be repaired or replaced although it was agreed, that over time much of the area had settled. 39. The kitchen area sustained significant damage. The floor however, was unsealed and had returned largely to its pre-flood state. The FSP has agreed that all of the cupboards require replacing and the plaster requires replacing at least to the first joint level. 40. The laundry area had been stripped out. The FSP has proposed that the laundry floor would require sanding and would otherwise simply replace various cabinets, shower, basin etc. The FSP noted that the walls of the laundry are fibre type sheeting (possibly asbestos) and did not consider it had been damaged. The Panel Chair Ombudsman observed that there had been significant movement in this room and there was some damage to the sheeting where taps, hoses etc came through. Case No: 281296 Determination Page 6 of 16 41. The Applicant explained that he had been slowly renovating the property prior to the inundation. He had works performed to level the house, although admits that the stumps were basic. He advised that he had work performed previously and work performed after the 2010 floods. According to the Applicant, it is only since the 2011 floods that the house had moved to the extent that it now has, with there being significant movement to the front lounge and to the laundry. 42. RK advised at the site inspection that as the stumps were old, he considered the movement was due to the pre-existing condition of the stumps. He advised that he could not say the extent of the pre -existing damage but as there was pre-existing damage, he considered this was the proximate cause of the movement. However, it seems entirely possible that the house would have moved due to the 2011 floods, given that it was inundated for a period of 5 to 6 days. 43. In looking at the exterior of the house, the FSP and the engineer advised that when they first attended, a lot of the cladding had been removed. The Applicant conceded the cladding was near its use-by date and conceded he removed some of the cladding following the floods. 44. As for the rear shed, it was leaning substantially. The Applicant co nceded it was leaning beforehand but maintains it was worse after the flood. The parties agree it needs to be demolished. 45. There were a lot of children‟s toys, building and discarded material scattered around the yard. It appears that no real attempt had been made clean up the yard or keep the block clean following the floods. The Applicant explained that he has been occupied since the floods, looking after his children full time as his former partner has become quite ill. The Applicant has been residing in rental accommodation since the flood and has little time to attend the property. 46. The parties agreed following the site inspection that the FSP‟s engineer would do a further scope of works and assessment to consider the additional damage observed and to see if the parties could resolve the dispute. 47. The FSP has subsequently offered the Applicant the sum of $84,936.63 based on further assessment of the damaged property. The assessment is based on the following: Damage to property $80,936.63 Temporary accommodation $2,000 Temporary accommodation $2,000 Total payment $84,936.63 In addition the FSP has offered the sum of $7,010.32 by way of ex gratia payment as a contribution towards the cost of restumping the property and a further sum of $9,000 representing the balance of the total cover provided by Case No: 281296 Determination Page 7 of 16 the policy for temporary accommodation calculated as being 36 weeks at $250 per week. 48. The Applicant has rejected the FSP‟s offer and maintains the quotes provided by the FSP‟s builder are unreal istically low. 49. In the circumstances, it is appropriate to now review the submissions made by both parties and to address the disputed issues under the following headings: General condition of home 50. In a statutory declaration dated 11 January 2013, GA has provided an account of his observations from inspections of the Applicant‟s property on 16 March 2012 and 16 July 2012. GA has stated the following with respect to the general condition of the house: “The dwelling was approximately 100 years old and both the dwelling and the shed were in poor condition with a number of maintenance issues.” 51. RK in his report stated the following about the general condition of the house: “Existing property maintenance internally and externally had been relatively poor prior to t he event.” 52. The Applicant has challenged the claim of poor maintenance, saying that all painted surfaces are not flaking and are sound and that the house was functional and level prior to the inundation. 53. The Panel accepts that the house was a 100 year old house that had sustained pre-existing damage and required maintenance prior to the inundation. The Panel accepts however, that the Applicant was in the process of performing maintenance on the property including the levelling of the house. Stumps and sub-floor 54. In his 11 January 2012 statutory declaration, GA has stated the following with respect to the stumps and sub-flooring of the house: “On this inspection I saw the piers again as I did on my first inspection, I saw attempts to re-level the dwelling with a lot of wood packing and two jacks still under the dwelling. I took photos during this inspection...which show the condition of the packing and piers. The packers shown in the photos indicate that there was a sub floor drop over time and that it was substantial because of the amount of packers used on the older stumps.” 55. The 5 April 2012 report by RK states that there is no evidence that the footings or piers have been damaged by the (flood) event. He says that the sub-floor was in poor condition prior to the event and there are several rot or termite effected bearers and almost all the bearers show evidence of Case No: 281296 Determination Page 8 of 16 significant long term deflection none of which has been the result of a single event (including the flood event). 56. The Applicant says there has been significant scouring around the wooden stumps with soil removed to approximately 200mm in one case. He says that as a result of this and the period of flooding, the stumps have moved differentially due to differing sizes and loads, inducing significant move ment and damage to floors and walls internally. 57. The Applicant also says that the incidence of rot and termite damage is grossly exaggerated, as is the case for the state of the bearers. He says the floors were sturdy prior to the flood and are now poorly supported and subject to movement when walked on. 58. In response to the Applicant‟s statements about the house stumps, RK has stated that there was no general scouring, and scouring at one pier does not explain the significant level variances seen. 59. RK also stated that there was ample evidence that temporary subfloor piering and supplementation of floor members has occurred prior to the (flood) event. He said that this indicated ongoing deterioration and movement of the floor structure that had generally pre-dated the event. 60. Further RK stated the following: “In relation to the floors, especially note the high number of intermediate new stumps, the existence of two jacks in the floor structure and the existence of packers on the vast majority of original stumps. All indicate that the floor and subfloor piers were in structurally poor condition. Also note that almost all old piers are leaning and the new piers are not. Packers have been displaced from the old piers. The floor structure is tight to the packers that were all in existence at the time of the first inspection. At the rear of the dwelling one stump has erosion around it. This stump has settled some 50 mm from the house floor. A stump immediately adjacent is a similar distance below the floor. A packer has been installed in this stump prior to the flood and still exists. This indicates both the erosion and the stump settlement predated the flood.” 61. The Applicant says that the quotation from W was the result of an inspection of the house and utilised RK‟s rep ort as the basis of the repairable damage. He says that W “...included restumping as his professional opinion was this was required to make the sub- floor good.” 62. The Panel has reviewed the submissions from both parties, and has examined the photographs provided by the FSP of the house stumps. 63. It is apparent to the Panel that attempts have been made to use packers over some of the stumps of the house and that other stumps are not in contact with the bearers. 64. Further, attempts appear to have been made to install temporary piers under the house; several photographs show concrete blocks packed with several Case No: 281296 Determination Page 9 of 16 layers of timber, and one of the photographs depicts what appears to be a car jack on a concrete block situated between two brick piers. 65. RK had stated that the packing and temporary piers pre -date the flood event. The Applicant does not disagree with this and maintains that he had a professional restumper assist with the packing. He was in the process of replacing other sumps at the time of the floods. He believed the floods caused scouring around the stumps which caused differential movement. 66. The Panel notes that although the quotation from W includes restumping of the house, it does not include any statement of opinion with respect to whether the damage to the stumps was caused by the flood. 67. Although the photographs do not conclusively show any rot or termite damage in the sub floor, the Panel accepts the opinion of RK that such damage was present. In the absence of any expert evidence to the contrary, the Panel is satisfied that the sub floor has experienced rot and termite damage prior to the flood. 68. In the Panel‟s view, it is likely that some damage was sustained to the stumps as a result of the floods that would have caused movement to the property. The Panel does not accept however, that the FSP should be liable for the total cost of restumping but accepts that the FSP should contribute partially to the cost of restumping. In the Panel‟s view, it would be appropriate for the FSP to contribute 25% of the cost of restumping/re- levelling the property. 69. The Panel is satisfied that the sub floor of the property did not suffer any additional damages as a result of the floods and that the FSP is not liable to meet the cost of repairing the sub floor. Drying period 70. The Applicant has pointed to a comment in RK‟s report suggesting that a substantial drying period would be required prior to repairs commencing mainly due to the expansive nature of the site soils on which the dwelling is constructed. 71. According to the Applicant, this is in conflict with a previous statement by RK that there were many items of work required to bring the property back into good order (including the straightening and re-supporting of the floor structure). 72. However, the Panel also notes R K‟s response on this issue is that the extended drying period is recommended to ensure that drying distress does not damage the rectification works. He also stated that at the time of his inspection, no drying distress was evident but that this movement is often delayed and is generally self correcting over time but will leave behind visual evidence of distress in internal finishes. Case No: 281296 Determination Page 10 of 16 73. Following the site inspection, the Panel is satisfied that the additional period of drying was required and does not accept th e Applicant‟s argument that it was in conflict with the requirement for the straightening and re-supporting of the floor structure. 74. The Panel accepts however, that the FSP must meet the cost associated with repairing any visual evidence of distress caused as a result of the movement through the drying process including the repainting of the interior walls and sanding those floors of the property that did not suffer cupping and did not require replacement. Floors 75. The 5 April 2012 report by RK states the following with respect to the floors in the Applicant‟s house: “The floorboard have however been saturated and are swelling. This has resulted in heaving of the flooring in bedroom 2. Other floors are cupped and are uneven. This appears generally to be consistent with the pre-flood condition.” (sic) 76. The Applicant states that all floors have been damaged by flood. 77. RK has responded to the Applicant‟s statement with the following: “In my opinion, only B2 was „damaged‟ by the event at the time of my inspection.” 78. After examining the submissions and photographs of the house, the Panel is satisfied that much of the damage to the floors would have been present in the house prior to the flood. 79. The Panel notes the revised scope of works prepared by RK following the site inspection, identifies the damage sustained to the floors throughout the house. The Panel accepts that the revised scope of works accurately reflects the flood related damage and accurately identifies those floors that require punching and sanding to be ready for floor covering and those floors that require replacement and installation of new TNG floor boards. The Panel determines that the FSP is liable for the damage to the floors as identified in the revised scope of works. External Cladding 80. The report from RK states the following with regard to the external wall cladding of the Applicant‟s house : “The external wall linings have been installed on timber battens over the original weatherboards. The „new‟ cladding has been in very poor condition prior to the inundation and has been largely removed from the eastern wall, and the eastern wall of the bathroom, the lower section of the western wall. The front wall had been generally intact. Where immersed the cladding has swollen.” Case No: 281296 Determination Page 11 of 16 81. The Applicant has stated that there was significant impact damage to external cladding on the northern wall of the bathroom and the western wall where debris accumulated. 82. In response to the Applicant‟s statement, RK confirmed that there were significant areas of cladding removed prior to the (flood) event and that he saw no impact damage that materially altered the pre -event condition of the cladding. 83. During the site inspection it was apparent that there was damage to the cladding on the eastern wall of the property. The Applicant conceded some of this cladding had been removed prior to the flood but other cladding had been removed after the flooding. 84. The Panel notes under the scope of works, the FSP has only allowed for the replacement of the external linings of the front wall of the dwelling but has not made any allowance with respect to the replacement of the external linings on the eastern wall or other walls of the property that would have been inundated. 85. The Panel notes the FSP‟s engineer concedes that once immersed, the cladd ing would have swollen. In the Panel‟s view, although it is difficult to determine the extent of the damage to the cladding, given the property was inundated to a level of approximately 1.5 meters it would be fair in the circumstances for the FSP to meet the cost of replacing the cladding on the front wall of the dwelling together with 50% of the cost of replacing the cladding on the western, northern and eastern walls of the property. The Panel accepts that most likely this cladding would have been damaged. 86. The Panel determines the FSP prepare an appropriate scope of works with respect to the cost of this damage and to provide full costing to the Applicant and to settle on the basis of 50% of those costs. Asbestos 87. The report by RK states that there are some fibre cement linings externally and internally and that these most likely contain asbestos. 88. The Applicant submits that the current laundry wall linings are asbestos sheets and are attached vertically and that whole sheets should be removed intact and replaced. 89. RK agrees with the Applicant‟s statement in this regard. 90. The Applicant noted that even although RK agreed that the whole asbestos sheets need to be removed, there is no provision for cost of asbestos sheet removal in any of the quotes provided by the FSP. He says there will be an extra cost for removal of material and labour cost in replacing this sheeting. 91. The Panel is satisfied that the presence of asbestos in the Applicant‟s home means that particular attention needs to be paid to its removal. To this end, Case No: 281296 Determination Page 12 of 16 the Panel notes that the quote provided by the FSP‟s builder — upon which it based its offer of settlement — does not make any allowance for removal of asbestos sheeting and its replacement with a suitable alternative material. 92. The Panel further notes that the revised scope of works does not include any appropriate allowance for the removal and replacement of the asbestos sheets. 93. Accordingly, the Panel determines that the FSP is required to obtain a further scope of works and to provide allowance for the removal of the asbestos sheeting and its replacement with a suitable alternative material. Bathroom/Laundry 94. In his report, RK stated the following about the bathroom of the Applicant‟s house: “The bathroom floor in particular has significant long -term deterioration due to the lack of floor coverings and drainage. It has not been protected from water for a long time. The bathroom floor was not fully fitted out at the time of the event. It had neither floor coverings nor effective wet sealing. This had resulted in quite significant deterioration prior to the event.” 95. The Applicant says that the bathroom floor is arguably in better condition and definitely no worse than the other floors and that the assertion of long -term deterioration is a gross exaggeration. He says that the shower was enclosed and did not leak onto the floor but was damaged by debris which entered the room. 96. RK responded to the Applicant‟s statements by confirming that his comment about long-term deterioration referred to the long term rot at floor edges in particular and includes both the flooring and floor structure. RK stated that a single flood event does not cause rot in the time interval between the flood and his inspection. He also confirmed that the lack of floor covering was confirmed by the Applicant and the lack of water sealing was observed. 97. The Applicant says that the FSP proposed to supply and fit bathroom fittings which will not be compliant with the building code and that while all internal sheeting in the main house is to be removed, the asbestos sheeting in the bathroom — which was inundated to a greater depth — is not proposed to be removed. 98. RK reported the inundation in the bathroom to be to a height of 1,675mm (compared to an inundation of the remainder of the house of 1,350mm). The Panel notes that the scope of works provided by RK included the removal of wall linings to the remainder of the house but that this item was absent from the bathroom scope of works. Case No: 281296 Determination Page 13 of 16 99. However, RK also reported in the conclusions section of his report that the wet area linings in the laundry, toilet and bathroom are generally intact and the walls are straight with no discernible movement. 100. Although the Applicant has stated that the FSP has proposed to supply and install bathroom fittings which will not be compliant with the building code, he has not provided any specific information regarding which fittings included in the builder‟s quote (upon which the FSP‟s settlement offer is based) would not be compliant with the building code. 101. The quote provided by the Applicant from W includes an entry for the repair of the bathroom as follows: “Bathroom to be brought to code. Compressed fibro floor and waterproofing membrane.” 102. The Panel is of the view that the Applicant‟s statement about non - compliance with the building code was in relation to the flooring of the bathroom. 103. The Panel is satisfied following the site inspection that the Applicant‟s bathroom had significant pre-existing damage and had deteriorated prior to the flood. The Panel accepts however that the flood has caused movement to the house and damage to the internal fittings within the bathroom as well as damage to the asbestos lined walls as commented on earlier. The Panel accepts that the rot identified to the floor of the bathroom cannot be attributed to the flood event and in the circumstances the FSP is not liable to meet the cost of replacement of the floor of the bathroom. 104. The Panel notes from the revised scope of works that in addition to the supply of various appliances, the FSP agrees to the supply and installation of one cover strip, supply and install of architraves (the scope of works refers to kitchen door, the Panel believes this should refer to laundry door), supply and fitting of electrical plates as well as the painting of new windows reveals and cover strip. In addition, the Panel believes as indicated earlier, the FSP should meet the cost of removal and replacement of the asbestos sheeting with suitable alternative material. Shed 105. In his statutory declaration of 11 January 2013, GA stated that when he inspected the property he observed that the shed was not level and the Applicant said to him “the shed was at an angle prior to the event, but not as bad” or words to that effect. 106. According to RK‟s report of 5 April 2012: “The external shed was evidently in very poor condition prior to the event. The internal stored materials support it. There has been no discernible damaged caused to this shed.” (sic) Case No: 281296 Determination Page 14 of 16 107. The Applicant has responded to the comments in RK‟s report by saying that the external shed has been twisted to the west from water movement against the eastern wall and that the internal material did not support the shed and were clear of the walls. 108. RK made further comment about the shed following the Applicant‟s response, saying that the shed is very old with significant deterioration. He said that there was no evidence that fresh movement had occurred. In addition, RK stated that: “It is clearly seen at the rear of the shed that wire ties have been installed to stabilise the structure. These still exist unbroken. This indicates the lean has not altered in recent times.” 109. The Panel, following the site inspection and after reviewing the photographs and other material provided to the Service, is in no doubt that the Applicant‟s shed was in extremely poor condition prior to the flood and accepts that the flood caused no significant damage to the shed. During the site inspection, the Applicant indicated he was prepared to withdraw the claim with respect to the shed. 110. The Panel is satisfie d the FSP is not liable for any damage to the Applicant‟s shed or for the supply and installation of a kit shed as claimed by the Applicant Other damage 111. Although the Applicant has claimed that he has had to repair the fences as a priority to secure the property and either burnt or disposed of the debris as rubbish, he has presented no evidence to support a view that the damage to the boundary fencing of the property or to the internal fences was caused as a result of the flood. 112. The Panel accepts the comments by RK that most of the internal fences seen were in very poor condition, many with no wire or overgrown. 113. In the circumstances, the Panel does not accept that the Applicant has established that the fencing has sustained damage as a result of an insured event. 114. The Panel also notes that the Applicant claims the front veranda boards were damaged as a result of the stormwater drain now being misaligned. According to RK, the flooring was very significantly deteriorated by long term exposure and there is no evidence that supports a claim of recent movement at the southern wall of the lounge room causing damage to the flooring of the front veranda. 115. There is no doubt based on the information exchanged and following the site inspection that the Applicant‟s veranda was in poor condition and in need of maintenance prior to the flooding event occurring. In the Panel‟s view, the evidence as presented does not establish that the flooring of the front veranda was damaged as a result of the flood. Case No: 281296 Determination Page 15 of 16 Temporary Accommodation 116. The FSP has allowed in its offer to the Applicant, a payment of accommodation for the period 2 May 2012 to 19 June 2012 of $1,750 plus accommodation for a repair period of eight weeks totalling $2,000. The FSP‟s policy provides for payment of accommodation up to a maximum period of 12 months. The Applicant has advised that he has been living in rented accommodation since the incident. 117. Even though the house clearly has some pre existing maintenance issues it is apparent that the Applicant has been unable to repair the property back to its pre-flood condition it would be unreasonable to expect the Applicant to return to the property whilst there are issues with the asbestos sheeting. As this is one of the issues in dispute and has delayed the repairs the fact that the Applicant is still in temporary accommodation is not unreasonable. 118. Given the issues involved the Panel accepts it is fair in the circumstances that the FSP cover the temporary accommodation costs for the maximum period of 52 weeks at the rate of $250 per week. Calculation of loss 119. The Panel notes the FSP has already provided a revised scope of works and has costed the building claim at $80,936.63. 120. The Panel accepts the revised scope of works as reasonable in the circumstances. In addition to the items costed in the revised scope of works, the Panel determines the FSP is liable to meet 25% of the cost assessed by way of the scope of works for the restumping of the dwelling. 121. On the basis of the information exchanged, the Panel assesses 25% of the cost of restumping of the dwelling to amount to $11,683. 122. The Panel further determines that the FSP is to obtain a scope of works with respect to the cost of replacing 50% of the cladding to the property in addition to the cost of replacing the external linings of the front walls as allowed in the revised scope of works. Upon receipt of the scope of works and costing, the FSP is to cash settle the Applicant with respect to this amount. 123. Further the FSP is to obtain a scope of works to assess the costs associated with removal of asbestos from the bathroom/laundry area and the cost of its replacement with suitable alternative materials. The FSP is required to increase its cash settlement offer to allow for the removal and replacement of the asbestos consistent with the assessment. Determination 124. On the basis of the available information the Panel determines that the FSP cash settle the Applicant‟s claim in accordance with the terms of this Case No: 281296 Determination Page 16 of 16 determination for the sum of $80,936.93 in accordance with the revised scope of works plus an additional $11,683 representing an allowance of 25% of the cost of restumping the property 125. In addition the FSP is to obtain an assessment of the cost to replace 50% of the external cladding in addition to the cost of replacing the external linings of the front wall of the dwelling and upon receipt of the assessment of the scope of works, is to cash settle the Applicant with respect to this aspect of the claim. 126. Further, the FSP is to obtain an assessment as to the cost of removing and replacing the asbestos lining of the bathroom/laundry and is to cash settle the Applicant‟s claim with respect to that assessment. 127. Further, the FSP is to cash settle the applicant an amount of $13,000 representing cost of temporary accommodation calculated at $250 per week for a period of 52 weeks. Insofar as the FSP has already made payment of any accommodation cost to the Applicant, the FSP is entitled to deduct that amount from the cash settlement payment to the Applicant. 128. Insofar as interest is to be paid, given the assessment of the cash settlement of this claim as based on current scope of works, the Panel determines it is not appropriate to pay interest in these circumstances.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.