Determination 281197

Claim denied for structural cracking with multiple excluded causes

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants claimed for severe cracking to their home and the FSP denied the claim after extensive investigation found several causes, each excluded. The Panel held the FSP was entitled to deny the claim and need not investigate further.

The Wayne Tank principle applies where one covered cause operates alongside excluded causes, so the excluded causes defeat the whole claim.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 281197 Determination Page 1 of 12 Case number: 281197 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim 7 March 2013 Background 1. The Applicants hold a home building insurance policy with the Financial Services Provider (FSP) which was current at the time of claim lodgement. The policy provided a sum insured for buildings of $358,071 with an applicable policy excess of $500. 2. On 12 November 2010 the Applicants’ daughter contacted the FSP to advise that there was severe cracking to th e Applicants’ residence. She further advised that the cracking had been present for several years and that there had been some issues with a leaking toilet. 3. The FSP arranged extensive investigation of the Applicants’ premises in order to determine the cause of damage. No singular cause was identified, rather numerous causes excluded by the policy were found. 4. The FSP denied the Applicants ’ claim on the balance of probabilities that the causes of the damage were excluded by the policy. 5. The Applicants dispute the FSP’s decision and have requested the FSP to continue its investigation until the exact cause can be determined. Summary of Applicants ’ position 6. The Applicants say that they contacted the FSP with regards to the large cracks in their home to see if there was any cover under their building insurance policy. 7. It was the FSP who voluntarily undertook investigations as to the cause of the damage. As a result of those investigations, no definitive cause has been identified. 8. The FSP should continue the investigation process until the exact cause is located and if the cause is an insured event, rectify the damage to their residence. Determination Case No: 281197 Determination Page 2 of 12 9. They have been led to believe repeatedly throughout the claims process that their claim would be covered. Summary of FSP’s position 10. The FSP says it has undertaken extensive investigation of the Applicants’ property over an 18 month period. 11. Whilst no definitive cause has been found, a number of possible or contributing causes have been identified. These causes are all excluded under the terms and conditions of the policy. 12. As the Applicants have failed to prove that they have sustained a loss caused by an insured event, and that the investigation it has undertaken has shown numerous uninsured causes, it is entitled to deny the App licants’ claim. 13. The FSP relies on the following policy provisions of its Product Disclosure Statement (PDS): “ Storm If your home or contents suffer loss or damage caused by  a violent wind, cyclone or tornado  thunderstorm or hail which may be accompanied by rain or snow, or  a sudden, excessive run-off of water as a direct result of a storm in your local area ... we will under buildings insurance  rebuild or repair that part of your home that was damaged ...” (Page 15) “ Water – leaking or escaping If your home or contents suffer loss or damage caused by water leaking or escaping from  pipes  road gutters or curbing  house gutters or drainpipes  baths, sinks, toilets, basins or any other fixed plumbing apparatus  washing machines, dishwashers  refrigerators, heating or cooling systems with a water dispenser  waterbeds  an aquarium that holds 60 litres or more of water ... Case No: 281197 Determination Page 3 of 12 we will under buildings insurance  rebuild or repair that part of your home that was damaged however  ...  we will NOT pay to locate the cause of damage unless we have agreed to the costs beforehand.” (Page 17) “ Buildings – what we will cover under buildings insurance We cover domestic residential buildings for replacement or repairs up to the buildings sum insured we will under buildings insurance  rebuild or repair that part of your home that was damaged as a result of an incident described on pages 6 to 17. ” (Page 23) “ What you are not covered for – general exclusions we will NOT cover  loss, damage, injury or death that occurs as a result of  ...  wear, tear, rust, corrosion, deterioration or erosion  ...  subsidence or landslide unless it happens immediately following an earthquake or explosion  ...  tree roots  ...  faulty design or workmanship  ...  mechanic al, structural or electrical failure of an item ...” (Page 35) Issues 14. Whether the FSP is required to conduct any further investigation into the cause of the damage. 15. Whether the FSP is entitled to deny the Applicants’ claim. Case No: 281197 Determination Page 4 of 12 Reasons for decision 16. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. I am satisfied there has been a full exchange of material between the parties and that each party has had the opportunity of clarifying the issues that arise from the material. 18. The Applicants say that they originally contacted the FSP querying whether large cracks observed at their property over the preceding six or seven years were claimable under their insurance policy with the FSP. The FSP advised they would arrange assessment and investigation to determine the cause of the cracks. 19. The Applicants are of the opinion that no conclusive cause or causes have been identified by the FSP’s investigations and in fact some of the reports prepared by the FSP’s experts indicate further investigations are warranted. As such, the Applicants expect that the FSP should complete those investigations until the exact cause is determined. 20. The FSP says that it has conducted extensive investigations into the cause of the damage to the Applicants’ home over an 18 month period. It says that on the balance of probabilities based on those reports, the probable causes are numerous. 21. The FSP relies on expert reports from I, an investigative and technical building consultant, and C, a structural building engineer. During the course of their original inspection of the property, a wate r leak detection test was also carried out of all the main water supplies at the Applicants’ property. 22. I am satisfied that the damage to the Applicants’ home is the subject in which expert evidence is admissible and the FSP was entitled to refer to the evidence of I and C who both examined the property. I am also satisfied that I and C were qualified to provide such expert evidence. 23. In I’s initial report of 21 December 2010, he summarises his findings and that of C: “ By way of summary , [C} and I have concluded the following: 2.1 That movement and crack damage to the dwelling is not as a result of leakage from mains pressure water supply pipes or the dwelling’s sewer system. There was no apparent leakage from the mains pressure water supply pipes and the encountered leakage from the sewer system was minor, too far removed and has caused no resultant damage. 2.2 That there are no site indicators to suggest that a relationship exists between movement and crack damage to the dwelling and the Board Sewer located in the adjoining rear property. This Board Sewer is 2.7 Case No: 281197 Determination Page 5 of 12 metres deep and flows from west to east, parallel with the insured’s rear boundary. 2.3 That on the basis of information provided by your insured, movement and crack damage has been occurring for at least 6-7 years. 2.4 That it was not possible to establish with certainty the cause of movement and crack damage to the dwelling because of acces restrictions. Concrete pavement around the perimeter of the granny flat prevented exploratory excavation along the base of the east and south walls. Your insured should engage a structural engineer to undertake invasive investigation (concrete pathways will need to be removed to facilitate excavation for foundation soil and footing assessment). 2.5 That in the course of the site inspection it was noted that the principal dwelling’s roof frame was distressed (settling into the roof void) [please refer to the photograph on page 5 of the [C] report]. The insured was alerted to the problem. 2.6 That in the course of the site inspection it was noted that the in-ground concrete swimming pool was fully drained (empty) but with insufficient provision for hydrostatic relief. Your insured was alerted to the possibility of uplift of the pool (pool popping out of the ground) in the event of sustained rainfall and that a pool expert should be engaged to provide additional hydrostatic relief alternatively, to re-fill the pool. 2.7 Cautionary alert – Your insured has been advised that both the granny flat east side wall and the distressed roof frame to the principal dwelling are likely to collapse in the event of further settlement. Please inform your insured of the need to affect appropriate stabilisation measures, immediately, to prevent collapse and possible injury. Item 3 – Determination The cause of movement and crack damage to the dwelling could not be definitely determined because of restricted access. That said, there is no evidence of a relationship between observed damage and: 3.1 A storm event; 3.2 Leakage from mains pressure pipes or waste water drainage pipes. 3.3 The Board Sewer.” 24. In C’s report dated 18 December 2010, he concludes: “ 3.0 Conclusion 3.1 Our investigation into the cause of damage to the rear granny flat portion of this dwelling has not produced a result other than to state that observed displacement and fracture damage is neither storm caused nor from leaking water supply pipes (none encountered) nor from drainage services (only minor leakage discovered from a sewer pipe section too far removed to be a problem). Case No: 281197 Determination Page 6 of 12 3.2 A further serious structural problem with the house roof framing has been discovered. There is no supporting evidence to link this with the damage to the granny flat. 3.3 We consider damage in both locations as dangerous because we cannot yet establish what the cause is and, therefore, the likihood is present of further rapid deterioration in the stability of the supporting structures at both granny flat and roof locations. While we know the granny flat problem has been around for 6-7 years at least, the roof collapse appears to be a complete surprise to the insured. 3.4 Your insured needs to engage a structural engineer as soon as possible to investigate structural failures in the granny flat and house roof frame. Access will need to be provided in both locations, specifically removal of the external concrete path at the base of the south and east walls of the granny flat as well as removal of a ceiling section beneath the collapsing roof frame. 3.5 Although not part of our brief, we were surprise to find the large swimming pool had been emptied by the insured at this time of year. We are not aware of any connection to the two serious structural issues but we will keep the action in mind. The insured was made aware of the “float - up” danger of hi s action in emptying the pool especially during wet weather. Tehre was some staining at the deep end to indicate water entering through the relief valve, or just rain water accumulation. An east-west oriented rack was visible in the bottom of the pool.” (s ic) 25. I also note other relevant comments made by C in his report in relation to possible causes of the cracking and the results of the leak detection procedure. C reports: NB: EWW refers to the east-west wing and NSW refers to the north-south wing of the A pplicant’s residence. “Inconsistent with the naturally occurring reactive foundations and resultant low-level house damage in the area is the rear left-hand-side (L.H.S.) of the building which supported the first floor granny flat. This part of the building was subject to sever structural damage consistent with settlement and lateral displacement to the east, at the back corner of the site.” (Page 4 of report) “Preliminary assessments and considerations Initial structural assessment of the overall building condition identified three different, and possibly separate, areas of structural concern. 1. Low level internal and external building disturbance throughout, consistent with houses constructed on reactive clay soil foundations prior to the implementation of the Australian Standard 2870 – Residential slabs and footings. 2. Partial collapse of the roof framing at the junction of the EWW and the NSW. 3. Substantial disturbance of the south-east corner of the composite dwelling beyond normal expansion/contraction movements in the foundation soils.” (Page 5 of report) Case No: 281197 Determination Page 7 of 12 “1. As the structural concerns noted in items 2. and 3. present a significant and overriding danger to the inhabitants of the property, we can omit further reference to item 1 as a relatively harmless non-issue for the moment. ... 2. While urgent consideration of item 2. is required, the ceiling hatch at the south end of the NSW could not provide access to the sunken roof area. As the existing roof is sarked another ceiling location, preferable closer to the roof ridge intersection, has to be selected and opened so that the roof framing can be examined and, if necessary, made safe from further collapse. We can only speculate that the roof collapse is attributable to an original design or building defect, or possibly due to the progressive destruction of critical support members by termite attack. ... 3. Our investigation of the disturbed south-east corner of the dwelling involving the ground floor pool equipment room and the overhead kitchen of the granny flat is also thwarted. The obstacle this time is our inability to access the foundation and footings concealed under a concrete path which seals the area between the boundary fence and the building walls.” (Page 6 of report) 26. The Applicants say that these reports seem to suggest that they have caused or contributed in some way to the cracking to their home, based on the detailed advice regarding unrelated issues to the cracks that the experts have observed . I am of the opinion the comments regarding the Applicants’ roof and pool were not intended to imply this, rather I and C, and the FSP, have a responsibility to advise the Applicants of any additional issues which may have been identified, as a way of risk managing the property. This also provides the Applicants with an opportunity to rectify any other issues before possible damage or loss occurs. 27. In addition, the Applicants have a responsibility to maintain their home and the observations noted by I and C have been provided to assist the Applicants in this regard. I am therefore satisfied that the FSP and its experts have not intended these comments to be a suggestion that the Applicants’ actions or inactions have contributed to the cracking to their home. 28. A review of C’s report, revealed the following further and relevant information:  Previous repairs undertaken by the Applicants to the area of concern indicated an existing knowledge by the Applicants of the damage.  A single storey building in the south-west corner of the neighbouring property to the east side was similarly damaged and a third property on the south side of the boundary and to the east showed settlement damage at a pool surround.  There are 7 conifer trees on the boundary fence approximately 2m from the rear of the property. Case No: 281197 Determination Page 8 of 12  The main sewer line, operated/controlled by SW (the Sewer Board), appeared from plans to run directly underneath the co nifer trees, approximately 2.7m underground.  There was no evidence on the ground to indicate that tree activity had caused any sewer leaks and there was no indication on the ground to indicate any sewer leaks at all.  Any investigation into the sewer would be difficult as it required some convincing evidence of a leak to arrange SW to conduct investigations and only SW was authorised to conduct such investigations.  The conifer tree at the extreme east of the boundary lines up exactly with the gap between the east side of the granny flat building and the west side of the adjacent damaged building in the property to the east. This indicates that should tree root activity of this particular tree be confined between the footings of the two buildings, then the moisture extraction from the soil may be similarly concentrated leading to excessive settlement of the ground between the buildings.  The leak detection test and CCTV test conducted by the appointed plumber found no fracture or displacement of the line through the area of interest. Some settlement of the pipe was detected and this would be sufficient to retain water just prior to joining the line through the area of interest, which may be indicative of excessive ground settlement which would also affect the in-ground drain.  The plumber discovered a fault with the sewer line emanating from the another location on the property. The pipe in this area was fractured, offset and showed evidence of tree root invasion, however the waste line concerned was too far remote and not significant enough to cause the foundation problem causing the cracking.  No other water leaks at the property were located by the plumber.  The pool equipment room was something of an enigma with regard to the rear wall panel which was a single ski n brick wall and which had been added a considerable time prior to the reported damage. It was to fill in an opening at this location however there is no explanation as to why the opening existed in the first place.  It is C’s opinion that this room may als o be a separate addition and may be supported on a footing system partially, or at the south side fully independent of the house footing system. C opined that if this was the case, the independence of the room footing would have contributed to the lateral drift and downward rotation of the area concerned, which had caused the cracking. 29. On receipt of these reports, the FSP denied the Applicants’ claim. 30. The Applicants contacted the FSP at the beginning of March 2011 to advise that a neighbouring property had suffered a sewer leak/damage from the SW sewer line. It was decided that further investigation should be undertaken, especially in relation to the main sewer line, controlled by SW. Case No: 281197 Determination Page 9 of 12 31. Unfortunately, these investigations were somewhat delayed through the difficulties encountered by I in liaising with SW, and this hampered I’s investigation. 32. In I’s report of 24 March 2011, upon completion of these investigations, he reported the difficulties he encountered when attempting to co-ordinate site inspections with SW and obtaining details from SW. The Applicants’ neighbour who had suffered the sewer leak in his backyard, had appointed a plumber to attend to the leak. It was this plumber who first contacted SW. 33. During his discussions with the Applicants’ neighbour and the plumber, I ascertained that the plumber, when investigating and attempting to repair/clean up the sewer leak, noticed that a more prominent leak was coming from the main sewer line belonging to SW. He contacted SW who sent a representative to investigate the matter . In the plumber’s presence, SW conducted a CCTV test of the SW pipe and found that it had suffered tree root invasion. 34. The plumber further advised, and I later confirmed this with SW, that SW attempted to remove the tree roots from the pipe a nd in the process, their equipment became lodged within the line. It took some two to three weeks to arrange for this equipment to be freed. 35. During the course of his enquiries with SW, I attempted to meet with SW onsite, obtain details of their investigations including copies of any CCTV footage and obtain information in relation to the likelihood of damage occurring to the Applicants’ property. Unfortunately, SW was uncooperative in this regard. 36. I am satisfied that I made every effort to investigate the involvement of SW and the main sewer pipe in relation to the damage to the Applicants’ property. 37. Due to the lack of co-operation of SW, the FSP authorised I to arrange other less invasive investigations to continue. This involved the sampling of soil at the Applicants’ property to determine if any possible sewer leak from SW’s main sewer line could have contributed to the damage at the Applicants’ property. 38. As a result, a geotechnical engineer, D, attended the property and took soil samples from the area immediately adjacent to where the damage to the property was evident (BH1), and a “control” sample (BH2) from the front of the property, which is far enough removed from the main sewer line to allow a control sample to be taken. 39. D found evidence within BH1 of traces of ammonia, which can indicate the presence of sewerage; however, the results are inconclusive as the source of the ammonia could not be determined. 40. D also provided his opinion based on his assessment of the soil, which he summarised as: Case No: 281197 Determination Page 10 of 12 “The site f actors and related information determined from the investigation, relevant to the performance of the footings supporting the addition at the rear SE corner of the dwelling at [Applicants’ address], are summarised as follows:- i. a high plasticity residual clay soil profile with a high potential for reactive (shrink-swell) behaviour, ii. evidence of footing movements (possibly from reactive soil behaviour) elsewhere about the dwelling footprint, iii. clay fill (with similar characteristics to the natural soil) of 1m depth at the location of the wall movement, iv. a possibility that the footings supporting the addition were not piered to a depth below the fill and below influence from the adjacent sewer main trench v. disturbed ground nearby in the vicinity of the 3m deep sewer main trench on the adjoining property, vi. trees growing on the adjoining property in the immediate vicinity of the cracked wall area, within close proximity (less than current tree height and future mature height) and possible root intrusion within the footing zone, vii. an old break in the sewer main at this location, and its recent investigation and repair by [SW], viii. no evidence determined from CCTV examination of the sewer and drainage line connections on [Applicants’ address] in the vicinity of the rear SE corner that there are or were any breaks or leakages from those services, and ix. a period of 31 – 32 years from the time of construction of the addition (about late 1972), to the reported first indication of current wall movement problems, namely about late 2003/late 2004 (some 6 – 7 years prior to December 2010, as reported by the owner to [C]); however, progressive movements are evident in the 30 year period prior to 2003/2004 from the patching and repairs seen in this area of the building. There is no information from the details of original construction, either for the swelling in its original form (construction prior to 1966), or for the two- storey addition (possible late 1972), that confirms whether or not piers were utilised for the footings, at either phase of development. The serious extent of differential movement between the original construction and the two- storey addition points to a difference in footings or the foundation soil conditions. Again, it is noted that there is a substantial depth of (non- engi neered) clay fill at the rear SE corner of the addition.” 41. D goes on to say that it is unusual that shallow footings on uncontrolled clay fill of significant depth would perform adequately for 30 years or more and then suddenly settle in a different manner. Some degree of settlement and wall cracking/movement would occur, however it would be to a manageable degree. 42. After reviewing the expert reports, I am of the opinion that a definitive cause has not been confirmed. However, a number of possible causes have been Case No: 281197 Determination Page 11 of 12 provided, one of which is the possible leakage of sewerage from the SW mains pipe. 43. In the absence of any expert evidence from the Applicants to the contrary, I am therefore satisfied, that whilst a singular cause cannot be established, there are a number of causes which appear to have contributed to the damage at the Applicants ’ property. 44. The onus of proof rests on the Applicants to establish that, on the balance of probabilities, they have suffered a loss caused by an insured event. Once the Applicants have established that the loss was caused by an event insured under their policy, the onus then shifts to the FSP to show that, on the balance of probabilities, the loss falls within an exclusion clause in the policy. It is important that the Applicants understand they have the primary onus of proving the loss and damage was caused by the insured event. 45. In this instance, the FSP has attempted to assist the Applicants, due to their longstanding association with the FSP, by arranging investigations into the cause of damage. I am of the opinion that the FSP was under no obligation to arrange these investigations. 46. Unfortunately, the result of those investigations, whilst largely inconclusive, did not assist the Applicants in proving their loss fell within an insured event of the policy. However, the investigations did indicate that the various contributing causes were in fact excluded under the policy. 47. The Applicants have also suggested that the FSP has indicated at various times throughout the claim and inves tigation process, that their claim “may” be covered, or that the cause “may” be a nearby leaking sewerage main/pipe. Arguably, this brings into consideration the doctrine of estoppel. 48. In broad terms, the doctrine of estoppel seeks to ensure that a person who leads another to act to his or her detriment, by relying on a statement made by this person should be held responsible for those statement(s) insofar as the representations made were relied upon. Statements or representations may be in the form of an express promise or they may be inferred from the conduct of a person. (See page 159 of Business Law of Australia [7 th Edition]). 49. I have no doubt that the FSP has given indications to the Applicants throughout the claims process that should it be determined that the cause is a leaking sewerage main/pipe, then there may be some cover provided to them under the policy. However, there is no evidence before me to suggest that the Applicants have relied on this information to their detriment. That is, there is nothing to indicate that the Applicants have taken any steps to repair or rebuild their property at their own expense on the advice of the FSP. 50. The FSP refers to the Wayne Tank principle which provides that when there is loss due to causes that operate simultaneously or congruently, one cause being covered and any others being excluded under the policy, the exclusion operates to the detriment of the total claim. Case No: 281197 Determination Page 12 of 12 51. The investigations undertaken by the FSP have revealed that there are a number of probable causes for the damage noticed at the Applicants’ premises. In this instance, none of those causes are insured events under the cover provided by the FSP. 52. However, if I consider that a possible contributing cause of the damage is an insured event, for example, a leaking sewerage line or pipe, it does not distract from the fact that other causes have been identified. In accordance with the Wayne Tank principle, these other identified causes are excluded under the policy, and as such, this entitles the FSP to deny the Applicants’ claim in its entirety. 53. Whilst I sympathise with the Applicants ’ position and the extensive damage to their home, they still have an onus to mitigate their loss and to prove that their loss has been caused by an insured event. From the material before me, I cannot see that the Applicants have made any attempt to arrange for their own investigation of the cause of the damage and I suggest had they done this, it may have been useful in helping them resolve the current issues with their home. Determination 54. On the basis of the available information I determine that the FSP has undertaken extensive investigations in an effort to assist the Applicants and are not required to undertake any further investigations. 55. I further determine that based on the evidence provided by the FSP as a result of its investigations, it is entitled to deny the Applicants’ claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.