The applicant's Bellbowrie contents were damaged by January 2011 inundation and the insurer declined the claim under the flood exclusion. AFCA found the applicant's oral misrepresentation claim unproven, the PDS gave notice of the flood exclusion, and the inundation was riverine flood mixed with pooled stormwater.

Riverine water mixed with stormwater runoff is deemed flood under Australian common law, which the policy excludes, and the PDS gave adequate notice under section 35 of the Insurance Contracts Act.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 281093 Determination Page 1 of 11 Case number: 281093 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 15 February 2013 Background 1. The Applicant holds a Home Contents policy with the Financial Services Provider (FSP). The policy provides cover for up to $115,000 on the contents subject to a $300 excess. 2. During the period 11- 12 January 2011 the Applicant‟s residence in Bellbowrie Queensland was inundated with water causing loss and damage to her contents. 3. The FSP declined the claim on the basis the loss and damage arose from flood which is an excluded cause of loss. 4. The Applicant disputes the declinature on the basis that the loss and damage arose from storm water runoff which is an insured event. The Applicant further states the FSP failed to meet its obligations under Section 35 of the Insurance Contracts Act 1984 (“the Act”) and misrepresented the policy at inception. Summary of App licant’s position 5. The Applicant relies on the following policy terms and conditions: “Storm Is a violent wind, cyclone, tornado, thunderstorm or hail which may be accompanied by rain or snow, or a sudden, excessive runoff of water as a direct result of a storm in your local area. It does not mean persistent rain by itself.” 6. The Applicant relies on the Hydrology Report entitled „Impact of January 2011 South- East Queensland Weather Event at Brisbane and Ipswich‟. The report acknowledges that “ some local drainage systems may have been overwhelmed by the runoff that was generated ”. 7. The Applicant has provided the following information regarding her property and the inundation event:  The property has a history of being affected by storm water inundation. When it rains heavily the stormwater often pools in the back yard and Determination Case No: 281093 Determination Page 2 of 11 would usually take up to two days to drain. A photograph of this occurrence in December 2010 has been provided.  The Applicant recalls that it was raining heavily on 10 January 2011 as that was her birthday. Based on her local knowledge she was concerned that some of the roads may be cut off, so later that day she evacuated the property. Her sons collected a few personal items each and she relocated them to their father‟s house.  The Applicant was not present when the water first entered the property. However, she does recall there being at least the same volume of water pooled in the backyard, when she evacuated, as that shown in the attached photograph. 8. The Applicant has held insurance with the FSP since 2004 and does not recall at policy inception over the phone of being informed of the flood exclusion. The Applicant further states she does not recall receiving a PDS prior to making the initial payment for the policy. The Applicant states that as the PDS was not received until after the insurance policy was in place, that the FSP cannot argue it drew this exclusion to the attention of the Applicant. Accordingly, the FSP has breached its obligations under Section 35 of the Act and the cover should revert to the prescribed contract terms under the Insurance Contracts Regulations which includes flood. The Panel notes that the Applicant later refuted the FSP‟s allegations she had made admissions regarding receiving the PDS. Further, any PDS the Applicant was reading from at the time of the inundation arose was extracted from the internet. 9. The Applicant contends that the FSP‟s employee “C” misrepresented the policy cover to her at phone inception. The Applicant asked C if she was covered for “everything” and C replied “yes”. The Applicant entirely relied upon this representation and was therefore induced to believe that she had the most comprehensive coverage available and was denied an opportunity to find an insurance policy which would actually pro vide full comprehensive cover. 10. The Applicant submits the damage to the property first occurred from a sudden excessive runoff of water as a direct result of storm, which is covered by the policy. The Applicant also notes that water was pooling in the backyard and unable to drain and was overflowing out of the drain prior to her evacuation. The drains at the property have been problematic and stormwater often pools after heavy rain. This supports a finding the property was subject to stormwater inundation prior to riverine flooding. The Applicant contends that the initial inundation arose from overfilled stormwater drains/runoff, storm activity and rainwater. Further, the Wayne Tank principle does not apply as it is a separate and distinct event from the eventual flood. 11. The Applicant comments on the site specific hydrology report dated 17/1/2012 from hydrology company “W” in the following ways:  Page 9 of the report, section titled: Timing of Rainfall that Caused the Inundation, the Applicant submits that the high intensity rainfall on 10 and 11 January 2011, coupled with the significant drainage issues at the property led to the initial inundation of the property with water attributable to storm. Case No: 281093 Determination Page 3 of 11  The property has a history of drainage issues, during periods of heavy rain, water would pool in the backyard, often taking two days to drain. The Applicant observed a large pool of water in the backyard on 10 January 2011, prior to evacuating the premises.  The report by W does not adequately address these drainage issues at the home.  The classification of the catchment that drains towards the property as „relatively small‟ is vague. There is also a failure to discuss the street incline and the topography of the land adjacent to the back of the property where the excessive runoff of stormwater is likely to have pooled.  The report does not properly address the Applicant‟s allegation that the property was inundated by stormwater runoff prior to any floodwaters arriving.  The peak water level does not address the initial time or cause of inundation to the property and only discusses the peak. 12. The Applicant contends the Statutory Declaration of the FSP‟s employee G cannot be given substantial evidential weight, as it is not evidence of the actual telephone conversation which took place. 13. The Applicant‟s recollections of the representations of the FSP at the inception of the policy should be accepted in the absence of evidence to the contrary. Summary of FSP’s position 14. The FSP relies on the following policy terms and conditions: “Flood Is the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this Policy.” 15. The FSP has enclosed a statutory declaration from an employee N. The Panel notes the following from N:  N is employed in the FSP‟s print development team.  N reviewed the records for the Applicant and found that her policy was initiated on 30 August 2004.  As of 26 July 2004 the print stream was implemented. The records indicated the PDS (06/04) was included in the print stream and sent to the Applicant‟s mail address. This particular PDS contained the flood exclusion.  N also reviewed further mail- outs to the Applicant‟s address. Case No: 281093 Determination Page 4 of 11  N notes that renewal documentation was sent to the Applicant in August 2010. Australia Post confirmed lodgement of the job number relevant to the Applicant‟s documentation in a batch of env elopes. It further reported the documents had been posted. 16. The FSP has enclosed statutory declaration from an employee “D”. The Panel notes the following from D:  D is employed in the FSP‟s customer and channel support‟s team. This team is responsible for r eviewing mail marked „return to sender‟.  D reviewed the records for the Applicant and confirmed there was no policy notation indicating that mail has ever been received by the FSP that is marked or noted returned to sender. D indicates this should occur if mail is received which has been marked „return to sender‟.  D notes that there has never been any mail received or marked „return to sender‟ in respect of the Applicant.  D confirms the policy documentation (including the PDS) has not been returned. 17. The FSP has enclosed a statutory declaration from G from which the Panel notes the following:  G was the manager of C (who incepted the policy).  C is no longer employed with the FSP. C was a competent representative who had both experience and knowledge.  C was tra ined to follow and in G‟s experience always did follow the mandated procedures to incept a policy of insurance with potential customers. The mandated procedure is scripted and regimented with little opportunity for a representative to add to the procedure.  C has attached the scripting which includes the statement “Your policy does not cover you for flood”.  G states that she has no reason to believe C did not follow this procedure in the Applicant‟s case.  G considers that had the Applicant asked C if the policy covered „everything‟ that C was experienced enough to know that the policy does not cover flood.  G also confirms her belief that if C had been asked by the Applicant if the policy covered „everything‟ that C was trained and experienced enough to know t hat no policy covers „everything‟ and, specifically that the Policy did not cover flood. 18. The FSP has enclosed a transcript of a telephone call lodging the claim. The Panel notes the following from this transcript:  The Applicant states water reached approximately 1m high in the home.  In response to whether the water had come from lakes or rivers the Applicant responds “probably”. Case No: 281093 Determination Page 5 of 11  The Applicant is informed flood is not covered but asks about whether her only exclusion is „professional recreational sporting activities‟. She is referred to the general exclusion of flood but the FSP employee seems unfamiliar with the exclusion the Applicant is quoting.  The Applicant indicates that the storm came down on Tuesday 11 January 2011 and the water rose on Wednesday morning.  The Applicant is uncertain regarding the timing of the inundation or rising of the water. The FSP employee advises that: “Tuesday‟s not going to disadvantage you darlin‟, it‟s exactly the same as I‟ve been putting for every other person in Queensland , so that‟s not going to disadvantage you, the date – what‟s going to disadvantage you is that you‟re not covered for flood, that‟s the point, it doesn‟t matter what day it‟s going to happen on”.  The Applicant sustained loss to 90% of her contents togethe r with food spoilage. 19. The FSP has enclosed an assessor report dated 22/01/2011 from which the Panel notes the following:  The Applicant left the property at 3.00pm on 10 January 2011.  The Applicant was uncertain as to what time the water inundated the property and a date of 13 January 2011 was nominated.  The points of water entry are listed as doors and weep holes.  The water built up gradually and the water affected the property for 36 hours.  The internal inundation level is listed as 700mm.  The water came from the north and there is a notation of a body of water down the road from the local parkland.  The report records the type of water that entered the property as creek/river.  The Applicant is recorded as understanding flood is not covered but believes the water was from storm runoff from local stormwater runoff blocking up drains. 20. The FSP has enclosed a site specific hydrology report dated 17/1/2012 from „W‟ from which the Panel notes the following:  The Brisbane River is 650m to the east of the Applic ant‟s property. There is higher ground to the south and west of the property. There is a large open area of low-lying ground to the north and east of the site. The property is also 14kms downstream from the confluence of the Brisbane and Bremer Rivers.  The terrain of the property itself slopes from south to north towards a low lying park reserve. The terrain levels vary from 13m AHD in the north eastern corner to 14.6m AHD along the southern boundary. It was estimated during site observations that the ground floor level of the dwelling is situated at approximately 14.4m AHD. Case No: 281093 Determination Page 6 of 11  The Council reports the estimated peak height of the Brisbane River at the property as 14.6m AHD.  Rainfall data in the area indicates the following rainfall levels: i. A rainfall gauge 2.3km south-east of the property recorded 80mm in 24 hours from 9.00am on 9 January 2011. ii. A further 50mm was recorded between 6 .00am and 4.00pm on 11 January 2011. The peak intensity was approximately 52mm/hr and lasted for approximately 30 minutes which corresponds to a 10year ARI. iii. A rainfall gauge 4.5km north of the property recorded 120mm on 9 January 2011 and 10 January 2011. iv. 95mm of rainfall was recorded over a 24 hour period on Tuesday 11 January 2011 with rainfall intensity peaking at 78mm/hr. This 72 hour period of nearly continuous rainfall is estimated to have a 2-5year ARI.  River level data taken from a gauge 14kms upstream from the site indicates a peak level of 17.9mAHD at 2.00pm on 12 January 2011. This level is 2.37m above the designated major flood level of 15.5m AHD. Another gauge 6km downstream of the site indicates a peak level of 12.9m AHD occurring at 5.50pm on 12 January 2011. This level is approximately 3m above the designated major flood level of 10m AHD.  W interpolated the river level data and concluded that the peak river level at the site would have been 14.4m AHD occurring at 4.40pm on 12 January 2011. The inundation which occurred at the site was the result of flows within the Brisbane River backing up into the area of low ground that lies to the north and east of the street and onwards towards the site.  The aerial photographs taken on Thursday 13 January 2011 depict a continuous body of water existed between the river and the site.  W opined that the small size of the catchment that drains towards the property and into the unnamed tributary to the north-east of the property means it is unlikely that sufficient local stormwater runoff was generated for this to be a contributing factor to the inundation that occurred at the property.  The floodwaters that inundated the area of the insured property can almost entirely be attributed to flows from the Brisbane River.  As the ground level at the dwelling is located at approximately 14.4m AHD, the dwelling is likely to have been inundated to a peak depth of approximately 0.2m above the ground floor level during the event. This inundation would have been caused by flows exceeding the confines of the Brisbane River and backing up towards the property.  The peak flood level at the property occurred approximately 26 hours after the end of the intense rainfall in the upper catchment. 21. The FSP submits that the evidence demonstrates the Applicant was in fact sent the PDS. Further, she made admissions of receipt and read from the Case No: 281093 Determination Page 7 of 11 PDS at the time of claim lodgement. The FSP further contends that Section 69 of the Act allows the PDS to be sent after policy inception and that this will still comply with Section 35 of the Act. 22. The FSP denies that C misrepresented the policy coverage to the Applicant. The script specifically states that flood is not covered and there was no indication that C would have deviated from the protocols. Further, the Applicant has not suggested that C informed her flood coverage existed. The FSP also submits that C would be unlikely to st ate „everything‟ was covered. In any event the PDS was provided to the Applicant and this would confirm the terms of cover. The FSP also contends that the Applicant‟s recall of events does not constitute evidence. 23. The account provided by the Applicant is that water pooled in the backyard, not that any water entered the premises. The rainfall data demonstrates that more rain fell prior to the Applicant‟s departure th an afterwards and was altogether insufficient to inundate the property. If rainwater was responsible for the inundation then it would have occurred prior to the time of the Applicant‟s departure. Further, the topographical data indicates a clear gradient from the Brisbane River to the property with no dips, depressions or other significant topographical features. 24. The FSP relies on the assessor‟s report which confirms that the Applicant was uncertain when water entered the property, the water did come up gradually and was from creek or river water. The property was inundated by water that approached from the north from the nearby park. 25. The FSP relies on the hydrology report which confirms the water which inundated the home arose from creek or river water. This falls within the policy definition of flood. Alternatively, even if the Applicant could demonstrate that the storm event contributed to the inundation, then the Wayne Tank principle would apply. Issues 26. Whether the FSP orally misrepresented the policy to the Applicant at inception. 27. Whether the FSP is entitled to rely on its policy terms and conditions. 28. Whether the FSP was entitled to decline the Applicant‟s claim for water inundation. Reasons for decision 29. Due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded Case No: 281093 Determination Page 8 of 11 directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 30. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 31. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 32. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 33. The Panel considers that there are three discrete issues (listed above) which will be dealt with separately below. Whether the FSP orally misrepresented the policy to the Applicant at inception 34. The Panel notes the Applicant has alleged misrepresentation occurred because the FSP stated she was insured for „everything‟. The FSP has disputed this occurred and stated that the policy inception scripting included a statement that flood was not covered. 35. The Panel notes the Applicant‟s recollection of the telephone call. Clearly she was a direct witness to the telephone call incepting the policy and as such she has a genuine belief that such representation was made. Conversely, although the statement by G regarding the scripting of the telephone call has some evidential weight, this is not direct evidence of whether C stated to the Applicant that everything was covered. 36. Nevertheless, in order to demonstrate that a misrepresentation occurred the Applicant has to establish that a false material statement of fact was made which was intended to induce her to enter into the contract, that the FSP intended it to do so and it was relied on by the Applicant to her detriment. 37. The alleged misrepresentation in this case was that the policy covered „everything‟. This statement is somewhat vague an d it is unclear whether such a statement referred to all the contents or every single event without policy exclusions or both these items. The Panel has difficulty accepting that the statement would induce the Applicant to believe everything was covered without any policy restrictions. Further, the statement is quite vague and does not constitute a proper representation of any particular point of coverage. 38. The Panel further notes that there was no representation that flood was covered or that the Applicant was induced into entering the contract on that basis. The FSP has provided evidence that the scripting in fact included confirmation to the contrary, that is, flood was not covered. If the scripting was indeed followed, the Applicant would have received information that she was not covered for everything. 39. The later production of the PDS would also demonstrate that the policy covered certain events subject to restrictions. Case No: 281093 Determination Page 9 of 11 40. The Panel does not accept that the evidence before it is sufficient to make a finding of oral misrepresentation at policy inception. Whether the FSP is entitled to rely on its policy terms and conditions 41. The Panel has reviewed the data provided by the FSP which evidences the Applicant was mailed a PDS in 2004. There was no returned mail noted for the Applicant‟s policy on the FSP‟s records. This would indicate that there was no returned mail from the Applicant‟s address. 42. The Applicant‟s submissions are somewhat inconsistent. The Applicant states she did not receive a PDS from the FSP. However, in her submissions dated 24 November 2011 the Applicant submits “ she also does not recall receiving a PDS prior to making the initial payment for the policy” . The Panel notes the Applicant read from a PDS over the telephone at claim lodgement, although it is now stated that this was extracted from the internet. 43. The Panel notes the Applicant‟s submissions are unclear whether she never received a PDS at all or is intended to indicate non-receipt at policy inception. 44. The Panel confirms that Section 69 of the Act allows the PDS to be provided within 14 days of the policy inception if it is not practicable to have provided the information prior. The information regarding whether the PDS was received prior is disputed and unclear. However, if the Applicant has received a PDS after policy inception then this would still enliven the FSP‟s obligations under Section 35 of the Act. 45. The Panel accepts that the Applicant had received a copy of the PDS, which included the flood exclusion in 2004. The Applicant therefore had the PDS prior to the renewal and entry of the 2010-2011 policy. 46. Accordingly, the Panel finds that the FSP has provided the Applicant with relevant notice of the policy terms and conditions prior to the relevant period of insurance. 47. For completeness, the Panel also notes that the policy is written in plain English and is appropriately indexed. It notes those events for which cover is provided and also clearly states that flood is excluded from cover. In the Panel‟s view had the Applicant read the policy she would have had little difficulty in noting that damage caused by flood is excluded. Whether the FSP was entitled t o decline the Applicant’s claim for water inundation 48. The Panel notes there is only one expert hydrology report regarding the inundation of the property. 49. The eye witness evidence of the Applicant indicates a pooling of stormwater runoff at the time of her departure at 3.00pm on Monday 10 January 2011. However, due to her necessary evacuation, the Applicant cannot provide Case No: 281093 Determination Page 10 of 11 further evidence as to whether the source of inundation was directly from stormwater runoff or river/creek water. 50. The expert opined, after reviewing rainfall data, that stormwater runoff was unlikely to have caused the inundation. The Panel further notes the rainfall substantially finished on 11 January 2011 and the inundation occurred most likely in the early hours of 12 January 2011. 51. The Applicant is recorded by the assessor as stating that the water rose gradually and that water came from stormwater runoff. Oddly, there is also a statement that water came from the local river/creek. This evidence appears to be somewhat contradictory and it is unclear regarding the source of inundation. 52. It is also noted that at claim lodgement the Applicant is asked whether water has come from lakes or rivers and she responds “probably”. 53. The Panel considers that the evidence of the Applicant on this aspect is limited as she was not in attendance at the property during the inundation. The Panel does accept, however, that the Applicant‟s property had water pooled in the backyard. Further, that as of the time of evacuation the Applicant‟s property had not be en inundated. 54. The hydrologist evidence is that the property was inundated by riverine water. Whilst the Panel is again concerned that the hydrology report does not provide evidence of initial inundation as well as peak inundation or the drainage issues particularly, this does not nullify the evidential weight of the hydrology report. 55. The Panel accepts water had pooled in the backyard, however, there is no evidence that this water entered the home. Further, given the pooled water had not entered the home pri or to the Applicant‟s evacuation and given the relatively low level of rainfall after she evacuated, it appears unlikely that this would have risen to such an extent as to inundate the home. 56. Rather, the evidence indicates that on the balance of probabilities the property would have been inundated by the rising riverine water which would have mixed with the pooled water and inundated the property. Unfortunately, the mixture of stormwater runoff and flood water is deemed to be flood water under Australian common law for insurance purposes. 57. Based on the evidence before it, the Panel accepts that the inundation did arise from riverine water which falls under the policy exclusion of flood. The flood exclusion in the policy is a general exclusion which applies to all cover under the policy. Determination 58. On the basis of the available information the Panel determines the FSP‟s oral policy inception process did not disadvantage the Applicant. Case No: 281093 Determination Page 11 of 11 59. The Panel determines the FSP is entitled to rely on the policy terms and conditions. 60. On the basis of the available information the Panel determines the FSP has appropriately declined the Applicant‟s claim for damage arising from water which is properly classified as floodwater.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.