Home / Financial Firm (Unknown - Insurer) / Determination 281093
Determination 281093
Flood exclusion denial of contents claim
Summary
The applicant's Bellbowrie contents were damaged by January 2011 inundation and the insurer declined the claim under the flood exclusion. AFCA found the applicant's oral misrepresentation claim unproven, the PDS gave notice of the flood exclusion, and the inundation was riverine flood mixed with pooled stormwater.
Riverine water mixed with stormwater runoff is deemed flood under Australian common law, which the policy excludes, and the PDS gave adequate notice under section 35 of the Insurance Contracts Act.
Issues
- Claim denial primary · not upheld
“the FSP has appropriately declined the Applicant's claim for damage arising from water which is properly classified as floodwater.”
- Failure to disclose secondary · not upheld
“the FSP has provided the Applicant with relevant notice of the policy terms and conditions prior to the relevant period of insurance.”
- Misleading conduct secondary · not upheld
“The Panel does not accept that the evidence before it is sufficient to make a finding of oral misrepresentation at policy inception.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 281093 Determination Page 1 of 11
Case number: 281093
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
15 February 2013
Background
1. The Applicant holds a Home Contents policy with the Financial Services
Provider (FSP). The policy provides cover for up to $115,000 on the contents
subject to a $300 excess.
2. During the period 11- 12 January 2011 the Applicant‟s residence in
Bellbowrie Queensland was inundated with water causing loss and damage
to her contents.
3. The FSP declined the claim on the basis the loss and damage arose from
flood which is an excluded cause of loss.
4. The Applicant disputes the declinature on the basis that the loss and
damage arose from storm water runoff which is an insured event. The
Applicant further states the FSP failed to meet its obligations under Section
35 of the Insurance Contracts Act 1984 (“the Act”) and misrepresented the
policy at inception.
Summary of App licant’s position
5. The Applicant relies on the following policy terms and conditions:
“Storm
Is a violent wind, cyclone, tornado, thunderstorm or hail which may be
accompanied by rain or snow, or a sudden, excessive runoff of water as a
direct result of a storm in your local area. It does not mean persistent rain by
itself.”
6. The Applicant relies on the Hydrology Report entitled „Impact of January
2011 South- East Queensland Weather Event at Brisbane and Ipswich‟. The
report acknowledges that “ some local drainage systems may have been
overwhelmed by the runoff that was generated ”.
7. The Applicant has provided the following information regarding her property
and the inundation event:
The property has a history of being affected by storm water inundation.
When it rains heavily the stormwater often pools in the back yard and
Determination
Case No: 281093 Determination Page 2 of 11
would usually take up to two days to drain. A photograph of this
occurrence in December 2010 has been provided.
The Applicant recalls that it was raining heavily on 10 January 2011 as
that was her birthday. Based on her local knowledge she was
concerned that some of the roads may be cut off, so later that day she
evacuated the property. Her sons collected a few personal items each
and she relocated them to their father‟s house.
The Applicant was not present when the water first entered the
property. However, she does recall there being at least the same
volume of water pooled in the backyard, when she evacuated, as that
shown in the attached photograph.
8. The Applicant has held insurance with the FSP since 2004 and does not
recall at policy inception over the phone of being informed of the flood
exclusion. The Applicant further states she does not recall receiving a PDS
prior to making the initial payment for the policy. The Applicant states that as
the PDS was not received until after the insurance policy was in place, that
the FSP cannot argue it drew this exclusion to the attention of the Applicant.
Accordingly, the FSP has breached its obligations under Section 35 of the
Act and the cover should revert to the prescribed contract terms under the
Insurance Contracts Regulations which includes flood. The Panel notes that
the Applicant later refuted the FSP‟s allegations she had made admissions
regarding receiving the PDS. Further, any PDS the Applicant was reading
from at the time of the inundation arose was extracted from the internet.
9. The Applicant contends that the FSP‟s employee “C” misrepresented the
policy cover to her at phone inception. The Applicant asked C if she was
covered for “everything” and C replied “yes”. The Applicant entirely relied
upon this representation and was therefore induced to believe that she had
the most comprehensive coverage available and was denied an opportunity
to find an insurance policy which would actually pro vide full comprehensive
cover.
10. The Applicant submits the damage to the property first occurred from a
sudden excessive runoff of water as a direct result of storm, which is
covered by the policy. The Applicant also notes that water was pooling in the
backyard and unable to drain and was overflowing out of the drain prior to
her evacuation. The drains at the property have been problematic and
stormwater often pools after heavy rain. This supports a finding the property
was subject to stormwater inundation prior to riverine flooding. The Applicant
contends that the initial inundation arose from overfilled stormwater
drains/runoff, storm activity and rainwater. Further, the Wayne Tank principle
does not apply as it is a separate and distinct event from the eventual flood.
11. The Applicant comments on the site specific hydrology report dated
17/1/2012 from hydrology company “W” in the following ways:
Page 9 of the report, section titled: Timing of Rainfall that Caused the
Inundation, the Applicant submits that the high intensity rainfall on 10
and 11 January 2011, coupled with the significant drainage issues at
the property led to the initial inundation of the property with water
attributable to storm.
Case No: 281093 Determination Page 3 of 11
The property has a history of drainage issues, during periods of heavy
rain, water would pool in the backyard, often taking two days to drain.
The Applicant observed a large pool of water in the backyard on 10
January 2011, prior to evacuating the premises.
The report by W does not adequately address these drainage issues at
the home.
The classification of the catchment that drains towards the property as
„relatively small‟ is vague. There is also a failure to discuss the street
incline and the topography of the land adjacent to the back of the
property where the excessive runoff of stormwater is likely to have
pooled.
The report does not properly address the Applicant‟s allegation that the
property was inundated by stormwater runoff prior to any floodwaters
arriving.
The peak water level does not address the initial time or cause of
inundation to the property and only discusses the peak.
12. The Applicant contends the Statutory Declaration of the FSP‟s employee G
cannot be given substantial evidential weight, as it is not evidence of the
actual telephone conversation which took place.
13. The Applicant‟s recollections of the representations of the FSP at the
inception of the policy should be accepted in the absence of evidence to the
contrary.
Summary of FSP’s position
14. The FSP relies on the following policy terms and conditions:
“Flood
Is the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.
Flood is not covered by this Policy.”
15. The FSP has enclosed a statutory declaration from an employee N. The
Panel notes the following from N:
N is employed in the FSP‟s print development team.
N reviewed the records for the Applicant and found that her policy was
initiated on 30 August 2004.
As of 26 July 2004 the print stream was implemented. The records
indicated the PDS (06/04) was included in the print stream and sent to
the Applicant‟s mail address. This particular PDS contained the flood
exclusion.
N also reviewed further mail- outs to the Applicant‟s address.
Case No: 281093 Determination Page 4 of 11
N notes that renewal documentation was sent to the Applicant in
August 2010. Australia Post confirmed lodgement of the job number
relevant to the Applicant‟s documentation in a batch of env elopes. It
further reported the documents had been posted.
16. The FSP has enclosed statutory declaration from an employee “D”. The
Panel notes the following from D:
D is employed in the FSP‟s customer and channel support‟s team. This
team is responsible for r eviewing mail marked „return to sender‟.
D reviewed the records for the Applicant and confirmed there was no
policy notation indicating that mail has ever been received by the FSP
that is marked or noted returned to sender. D indicates this should
occur if mail is received which has been marked „return to sender‟.
D notes that there has never been any mail received or marked „return
to sender‟ in respect of the Applicant.
D confirms the policy documentation (including the PDS) has not been
returned.
17. The FSP has enclosed a statutory declaration from G from which the Panel
notes the following:
G was the manager of C (who incepted the policy).
C is no longer employed with the FSP. C was a competent
representative who had both experience and knowledge.
C was tra ined to follow and in G‟s experience always did follow the
mandated procedures to incept a policy of insurance with potential
customers. The mandated procedure is scripted and regimented with
little opportunity for a representative to add to the procedure.
C has attached the scripting which includes the statement “Your policy
does not cover you for flood”.
G states that she has no reason to believe C did not follow this
procedure in the Applicant‟s case.
G considers that had the Applicant asked C if the policy covered
„everything‟ that C was experienced enough to know that the policy
does not cover flood.
G also confirms her belief that if C had been asked by the Applicant if
the policy covered „everything‟ that C was trained and experienced
enough to know t hat no policy covers „everything‟ and, specifically that
the Policy did not cover flood.
18. The FSP has enclosed a transcript of a telephone call lodging the claim. The
Panel notes the following from this transcript:
The Applicant states water reached approximately 1m high in the
home.
In response to whether the water had come from lakes or rivers the
Applicant responds “probably”.
Case No: 281093 Determination Page 5 of 11
The Applicant is informed flood is not covered but asks about whether
her only exclusion is „professional recreational sporting activities‟. She
is referred to the general exclusion of flood but the FSP employee
seems unfamiliar with the exclusion the Applicant is quoting.
The Applicant indicates that the storm came down on Tuesday 11
January 2011 and the water rose on Wednesday morning.
The Applicant is uncertain regarding the timing of the inundation or
rising of the water. The FSP employee advises that:
“Tuesday‟s not going to disadvantage you darlin‟, it‟s exactly the same as I‟ve
been putting for every other person in Queensland , so that‟s not going to
disadvantage you, the date – what‟s going to disadvantage you is that you‟re
not covered for flood, that‟s the point, it doesn‟t matter what day it‟s going to
happen on”.
The Applicant sustained loss to 90% of her contents togethe r with food
spoilage.
19. The FSP has enclosed an assessor report dated 22/01/2011 from which the
Panel notes the following:
The Applicant left the property at 3.00pm on 10 January 2011.
The Applicant was uncertain as to what time the water inundated the
property and a date of 13 January 2011 was nominated.
The points of water entry are listed as doors and weep holes.
The water built up gradually and the water affected the property for 36
hours.
The internal inundation level is listed as 700mm.
The water came from the north and there is a notation of a body of
water down the road from the local parkland.
The report records the type of water that entered the property as
creek/river.
The Applicant is recorded as understanding flood is not covered but
believes the water was from storm runoff from local stormwater runoff
blocking up drains.
20. The FSP has enclosed a site specific hydrology report dated 17/1/2012 from
„W‟ from which the Panel notes the following:
The Brisbane River is 650m to the east of the Applic ant‟s property.
There is higher ground to the south and west of the property. There is a
large open area of low-lying ground to the north and east of the site.
The property is also 14kms downstream from the confluence of the
Brisbane and Bremer Rivers.
The terrain of the property itself slopes from south to north towards a
low lying park reserve. The terrain levels vary from 13m AHD in the
north eastern corner to 14.6m AHD along the southern boundary. It
was estimated during site observations that the ground floor level of the
dwelling is situated at approximately 14.4m AHD.
Case No: 281093 Determination Page 6 of 11
The Council reports the estimated peak height of the Brisbane River at
the property as 14.6m AHD.
Rainfall data in the area indicates the following rainfall levels:
i. A rainfall gauge 2.3km south-east of the property recorded 80mm
in 24 hours from 9.00am on 9 January 2011.
ii. A further 50mm was recorded between 6 .00am and 4.00pm on 11
January 2011. The peak intensity was approximately 52mm/hr
and lasted for approximately 30 minutes which corresponds to a
10year ARI.
iii. A rainfall gauge 4.5km north of the property recorded 120mm on 9
January 2011 and 10 January 2011.
iv. 95mm of rainfall was recorded over a 24 hour period on Tuesday
11 January 2011 with rainfall intensity peaking at 78mm/hr. This
72 hour period of nearly continuous rainfall is estimated to have a
2-5year ARI.
River level data taken from a gauge 14kms upstream from the site
indicates a peak level of 17.9mAHD at 2.00pm on 12 January 2011.
This level is 2.37m above the designated major flood level of 15.5m
AHD. Another gauge 6km downstream of the site indicates a peak level
of 12.9m AHD occurring at 5.50pm on 12 January 2011. This level is
approximately 3m above the designated major flood level of 10m AHD.
W interpolated the river level data and concluded that the peak river
level at the site would have been 14.4m AHD occurring at 4.40pm on
12 January 2011. The inundation which occurred at the site was the
result of flows within the Brisbane River backing up into the area of low
ground that lies to the north and east of the street and onwards towards
the site.
The aerial photographs taken on Thursday 13 January 2011 depict a
continuous body of water existed between the river and the site.
W opined that the small size of the catchment that drains towards the
property and into the unnamed tributary to the north-east of the
property means it is unlikely that sufficient local stormwater runoff was
generated for this to be a contributing factor to the inundation that
occurred at the property.
The floodwaters that inundated the area of the insured property can
almost entirely be attributed to flows from the Brisbane River.
As the ground level at the dwelling is located at approximately 14.4m
AHD, the dwelling is likely to have been inundated to a peak depth of
approximately 0.2m above the ground floor level during the event. This
inundation would have been caused by flows exceeding the confines of
the Brisbane River and backing up towards the property.
The peak flood level at the property occurred approximately 26 hours
after the end of the intense rainfall in the upper catchment.
21. The FSP submits that the evidence demonstrates the Applicant was in fact
sent the PDS. Further, she made admissions of receipt and read from the
Case No: 281093 Determination Page 7 of 11
PDS at the time of claim lodgement. The FSP further contends that Section
69 of the Act allows the PDS to be sent after policy inception and that this
will still comply with Section 35 of the Act.
22. The FSP denies that C misrepresented the policy coverage to the Applicant.
The script specifically states that flood is not covered and there was no
indication that C would have deviated from the protocols. Further, the
Applicant has not suggested that C informed her flood coverage existed. The
FSP also submits that C would be unlikely to st ate „everything‟ was covered.
In any event the PDS was provided to the Applicant and this would confirm
the terms of cover. The FSP also contends that the Applicant‟s recall of
events does not constitute evidence.
23. The account provided by the Applicant is that water pooled in the backyard,
not that any water entered the premises. The rainfall data demonstrates that
more rain fell prior to the Applicant‟s departure th an afterwards and was
altogether insufficient to inundate the property. If rainwater was responsible
for the inundation then it would have occurred prior to the time of the
Applicant‟s departure. Further, the topographical data indicates a clear
gradient from the Brisbane River to the property with no dips, depressions or
other significant topographical features.
24. The FSP relies on the assessor‟s report which confirms that the Applicant
was uncertain when water entered the property, the water did come up
gradually and was from creek or river water. The property was inundated by
water that approached from the north from the nearby park.
25. The FSP relies on the hydrology report which confirms the water which
inundated the home arose from creek or river water. This falls within the
policy definition of flood. Alternatively, even if the Applicant could
demonstrate that the storm event contributed to the inundation, then the
Wayne Tank principle would apply.
Issues
26. Whether the FSP orally misrepresented the policy to the Applicant at
inception.
27. Whether the FSP is entitled to rely on its policy terms and conditions.
28. Whether the FSP was entitled to decline the Applicant‟s claim for water
inundation.
Reasons for decision
29. Due to the nature of the dispute, the Financial Ombudsman Service (FOS)
has considered it appropriate to elevate the dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference. Thus, this dispute
has not been the subject of a FOS Recommendation and has proceeded
Case No: 281093 Determination Page 8 of 11
directly to Determination. The parties have been previously advised that a
Determination will be issued in this case.
30. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
31. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
32. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
33. The Panel considers that there are three discrete issues (listed above) which
will be dealt with separately below.
Whether the FSP orally misrepresented the policy to the Applicant at inception
34. The Panel notes the Applicant has alleged misrepresentation occurred
because the FSP stated she was insured for „everything‟. The FSP has
disputed this occurred and stated that the policy inception scripting included
a statement that flood was not covered.
35. The Panel notes the Applicant‟s recollection of the telephone call. Clearly
she was a direct witness to the telephone call incepting the policy and as
such she has a genuine belief that such representation was made.
Conversely, although the statement by G regarding the scripting of the
telephone call has some evidential weight, this is not direct evidence of
whether C stated to the Applicant that everything was covered.
36. Nevertheless, in order to demonstrate that a misrepresentation occurred the
Applicant has to establish that a false material statement of fact was made
which was intended to induce her to enter into the contract, that the FSP
intended it to do so and it was relied on by the Applicant to her detriment.
37. The alleged misrepresentation in this case was that the policy covered
„everything‟. This statement is somewhat vague an d it is unclear whether
such a statement referred to all the contents or every single event without
policy exclusions or both these items. The Panel has difficulty accepting that
the statement would induce the Applicant to believe everything was covered
without any policy restrictions. Further, the statement is quite vague and
does not constitute a proper representation of any particular point of
coverage.
38. The Panel further notes that there was no representation that flood was
covered or that the Applicant was induced into entering the contract on that
basis. The FSP has provided evidence that the scripting in fact included
confirmation to the contrary, that is, flood was not covered. If the scripting
was indeed followed, the Applicant would have received information that she
was not covered for everything.
39. The later production of the PDS would also demonstrate that the policy
covered certain events subject to restrictions.
Case No: 281093 Determination Page 9 of 11
40. The Panel does not accept that the evidence before it is sufficient to make a
finding of oral misrepresentation at policy inception.
Whether the FSP is entitled to rely on its policy terms and conditions
41. The Panel has reviewed the data provided by the FSP which evidences the
Applicant was mailed a PDS in 2004. There was no returned mail noted for
the Applicant‟s policy on the FSP‟s records. This would indicate that there
was no returned mail from the Applicant‟s address.
42. The Applicant‟s submissions are somewhat inconsistent. The Applicant
states she did not receive a PDS from the FSP. However, in her submissions
dated 24 November 2011 the Applicant submits “ she also does not recall
receiving a PDS prior to making the initial payment for the policy” . The Panel
notes the Applicant read from a PDS over the telephone at claim lodgement,
although it is now stated that this was extracted from the internet.
43. The Panel notes the Applicant‟s submissions are unclear whether she never
received a PDS at all or is intended to indicate non-receipt at policy
inception.
44. The Panel confirms that Section 69 of the Act allows the PDS to be provided
within 14 days of the policy inception if it is not practicable to have provided
the information prior. The information regarding whether the PDS was
received prior is disputed and unclear. However, if the Applicant has
received a PDS after policy inception then this would still enliven the FSP‟s
obligations under Section 35 of the Act.
45. The Panel accepts that the Applicant had received a copy of the PDS, which
included the flood exclusion in 2004. The Applicant therefore had the PDS
prior to the renewal and entry of the 2010-2011 policy.
46. Accordingly, the Panel finds that the FSP has provided the Applicant with
relevant notice of the policy terms and conditions prior to the relevant period
of insurance.
47. For completeness, the Panel also notes that the policy is written in plain
English and is appropriately indexed. It notes those events for which cover is
provided and also clearly states that flood is excluded from cover. In the
Panel‟s view had the Applicant read the policy she would have had little
difficulty in noting that damage caused by flood is excluded.
Whether the FSP was entitled t o decline the Applicant’s claim for water
inundation
48. The Panel notes there is only one expert hydrology report regarding the
inundation of the property.
49. The eye witness evidence of the Applicant indicates a pooling of stormwater
runoff at the time of her departure at 3.00pm on Monday 10 January 2011.
However, due to her necessary evacuation, the Applicant cannot provide
Case No: 281093 Determination Page 10 of 11
further evidence as to whether the source of inundation was directly from
stormwater runoff or river/creek water.
50. The expert opined, after reviewing rainfall data, that stormwater runoff was
unlikely to have caused the inundation. The Panel further notes the rainfall
substantially finished on 11 January 2011 and the inundation occurred most
likely in the early hours of 12 January 2011.
51. The Applicant is recorded by the assessor as stating that the water rose
gradually and that water came from stormwater runoff. Oddly, there is also a
statement that water came from the local river/creek. This evidence appears
to be somewhat contradictory and it is unclear regarding the source of
inundation.
52. It is also noted that at claim lodgement the Applicant is asked whether water
has come from lakes or rivers and she responds “probably”.
53. The Panel considers that the evidence of the Applicant on this aspect is
limited as she was not in attendance at the property during the inundation.
The Panel does accept, however, that the Applicant‟s property had water
pooled in the backyard. Further, that as of the time of evacuation the
Applicant‟s property had not be en inundated.
54. The hydrologist evidence is that the property was inundated by riverine
water. Whilst the Panel is again concerned that the hydrology report does
not provide evidence of initial inundation as well as peak inundation or the
drainage issues particularly, this does not nullify the evidential weight of the
hydrology report.
55. The Panel accepts water had pooled in the backyard, however, there is no
evidence that this water entered the home. Further, given the pooled water
had not entered the home pri or to the Applicant‟s evacuation and given the
relatively low level of rainfall after she evacuated, it appears unlikely that this
would have risen to such an extent as to inundate the home.
56. Rather, the evidence indicates that on the balance of probabilities the
property would have been inundated by the rising riverine water which would
have mixed with the pooled water and inundated the property. Unfortunately,
the mixture of stormwater runoff and flood water is deemed to be flood water
under Australian common law for insurance purposes.
57. Based on the evidence before it, the Panel accepts that the inundation did
arise from riverine water which falls under the policy exclusion of flood. The
flood exclusion in the policy is a general exclusion which applies to all cover
under the policy.
Determination
58. On the basis of the available information the Panel determines the FSP‟s
oral policy inception process did not disadvantage the Applicant.
Case No: 281093 Determination Page 11 of 11
59. The Panel determines the FSP is entitled to rely on the policy terms and
conditions.
60. On the basis of the available information the Panel determines the FSP has
appropriately declined the Applicant‟s claim for damage arising from water
which is properly classified as floodwater.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.