Home / Search / Determination 281049
Determination 281049
Flood exclusion denial of home claim
Summary
The applicant's Goodna home was damaged by January 2011 flooding and the insurer declined the claim under the flood exclusion. AFCA found the insurer had given the PDS under section 35 of the Insurance Contracts Act and that the damage came from water backing up Woogaroo Creek from the Brisbane River, which is flood.
The insurer's bulk mail-out evidence sufficed to show the PDS was provided, and water backed up from a creek by river flood is flood under the policy definition.
Issues
- Claim denial primary · not upheld“the FSP is entitled to deny the Applicant's claim.”
- Failure to disclose secondary · not upheld“the FSP has satisfied its Section 35 of the Act obligations and is entitled to rely upon its flood exclusion.”
Subjects and remedies
natural disasterno remedy
Related
Text of the determination
Case No: 281049 Determination Page 1 of 8
Case number: 281049
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
15 January 2013
Background
1. On 11 January 2011 the Applicant‟s home in Goodna Queensland was
inundated with water following intense rainfall in the area from about 9
January 2011 to about 12 January 2011.
2. The Financial Services Provider (FSP) denied liability for a claim made
under the Applicant‟s Listed Events Home Insurance policy on the ground
the damage was caused by flood water and as such was excluded from
cover provided by the policy.
3. The Applicant disputes the FSP‟s decision on the grounds the FSP failed to
discharge its obligations under Section 35 of the Insurance Contracts Act
1984 (the Act) and that the FSP has relied on a report which was
commissioned for another site.
Summary of Applicant’s position
4. The Applicant is legally represented. Any reference to the Applicant in this
determination will include his representative.
FSP’s failure to discharge its obligations u nder section 35 of the Act
5. The Applicant does not recall receiving a Product Disclosure Statement
(PDS) prior to the inundation of his home.
6. The FSP has not provided any documents that relate to the new business
renewal offered, nor has it provided any documents relating to when he first
incepted the policy.
7. The FSP has also not provided any evidence of its mail procedures,
standard practices, and business relationships or polices to ensure its
agents comply with the legislation. FOS has clearly stated in a previous
determination involving the FSP that it expects an FSP to be able to provide
documentary evidence that a PDS has been provided to the insured and
when it was provided.
Determination
Case No: 281049 Determination Page 2 of 8
8. The FSP has therefore conceded it cannot provide evidence required to
satisfy its obligations. As a result, standard cover applies and the claim
should be paid.
Evidence relied on by the FSP to deny the claim
9. The FSP relies on a hydrology report prepared for another site in the
Applicant‟s street.
10. The address for which the report was prepared is closer to Woogaroo Creek
than his property. The topographical map provided a point of comparison
with the Broadford Drive which has not been explained.
11. In relation to inundation by stormwater, the report states it is unlikely there
was sufficient local stormwater run-off for this to be a major contributing
factor. The report does not consider whether stormwater may have
inundated the house prior to any other type of water inundation.
12. It is clear the FSP has relied on a hydrology report prepared for a nearby
residence.
Summary of FSP’s position
13. The FSP states when the Applicant lodged his claim it transpired that the
Applicant‟s neighbour had already been through the IDR process. A
hydrologist attended the neighbour‟s property and reported on the cause of
the inundation. As the report concerns a property a few metres away, the
report was considered equally applicable to the Applicant‟s property.
14. The hydrologist concluded the inundation of the neighbour‟s property was
caused by flows exceeding the normal capacity of the Brisbane River
backing up Woogaroo Creek.
15. The policy defines flood as follows:
“ flood
the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it has been altered
or modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.”
16. The Applicant‟s property was located only a few metres from the Woogaroo
Creek and near to the Brisbane River. On the balance of probabilities the
most probable cause for the loss was damage by flood. However, the factual
evidence provided by the hydrologist demonstrates that flood was the cause
of the inundation and loss.
17. The Applicant‟s property is only a few metres from the property referred to in
the hydrologist‟s report and as such identical conditions apply. The cause of
loss was flood as was the case with the neighbour‟s claim.
Case No: 281049 Determination Page 3 of 8
18. The FSP relies on the following policy terms:
“Exclusions to your cover
...
We will not cover loss or damage as a result of, or caused by
...
flood”
19. The FSP provided evidence which it states demonstrates that the Applicant
did receive a PDS prior to the flood event.
Issues
20. Whether the FSP complied with its obligations pursuant to Section 35 of the
Act by clearly informing the Applicant of the relevant terms of the policy.
21. Whether the damage claimed was caused by flood.
Reasons for decision
22. There has been an exchange of material between the parties. Each party is
therefore aware of the issues and has had the opportunity to respond.
23. Prior to arriving at a decision the Panel has read and considered all the
material submitted.
Is the FSP entitled to rely on the terms of the policy?
24. By Statutory Declaration dated 12 June 2012, the Applicant states he does
not recall receiving a product disclosure statement from the FSP before his
home was inundated with water. He further stated he was not aware his
policy did not cover flood.
25. The Applicant argues that in this case standard cover applies and his claim
should be paid.
26. On the other hand, the FSP submits the Applicant was provided with a policy
document at inception of the policy and had therefore been clearly informed
of the relevant terms of the policy.
27. Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act, unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
Case No: 281049 Determination Page 4 of 8
28. By Statutory Declaration dated 17 November 2011 , the FSP‟s national
underwriting service manager deposed:
In 2006 the FSP undertook a programme to inform policyholders of
changes to the PDS. The process included sending a new PDS with
the renewal invitation.
Three bulk mail outs were undertaken based o n the policyholder‟s
renewal date. The renewal date determined in which bulk mail out they
would receive their letter.
The bulk mail outs occurred on 9 /10/06, 9/11/06 and 9/12/06. Given
the Applicant‟s policy renewal date of 21 April 2007 , a PDS was sent to
the Applicant with the covering letter in the bulk mail out commencing 9
November 2006.
A bar code on the letter is the coding for the mail agency to indicate the
documentation enclosed with the letter which in this case included the
PDS.
The mail system for the despatch of documentation verifies the
Applicant was issued a current PDS in November 2006.
29. By Statutory Declaration dated 15 September 2011, the general manager of
the FSP‟s mail house deposed:
He is responsible for supervising the process involving the production
and mailing of the FSP documentation to its customers.
When the files have been converted into records for each individual
they are given an individual tracking ID recorded as a bar code on the
left side of the schedule.
Tracking bar code, sequence number and envelope insertion
instructions are encoded in files despatched to appropriate laser
printers and mail inserters.
The printed records are checked.
Using the bar code each record is inserted into an envelope.
Instructions for automated inserts are contained in the print file or are
encoded on the human readable insertion instructions on the facing
page of each article.
The process records are checked again.
The mailing is lodged with Australia Post referring to the run/batch
number again checking the number of records lodged equal the file
count/insertion count.
30. The FSP had provided a sample of the letter referred to in the statutory
declarations which was posted to the policyholders. This letter includes the
following:
“ Please note that there are other changes and you should refer to the
enclosed Product Disclosure Statement (PDS) for the full terms and
conditions.
Case No: 281049 Determination Page 5 of 8
Please keep this new Product Disclosure Statement (PDS) in a safe place
with your other important documents.”
31. The FSP has provided strong evidence, including Statutory Declarations
attesting to the fact that there were 3 bulk mail outs of the 2006 PDS to all of
its customers. Although it is unable to particularise the Applicant as one of
those recipients, there is sufficient evidence to demonstrate that the FSP
had a general course of business and office system in place. The evidence,
particularly viewed from the perspective of the Applicant only asserting in his
Statutory Declaration: „I do not recall (Panel emphasis) receiving a product
disclosure statement from CGU‟ and „I do not recall (Panel emphasis)
receiving a product disclosure statement from CGU before my home was
inundated with water‟, in the Panel‟s opinion is sufficient for it to be satisfied,
on the balance of probabilities, that the Applicant would have received the
PDS. In the circumstances the Panel determines the FSP has complied with
section 35 and is entitled to rely upon its flood exclusion.
Cause of the damage
32. The FSP relies substantially on a hydrology report commissioned by it to
report on the cause of the inundation of a property located two doors from
the Applicant‟s property. Both houses are two storey constructions on the
same side of the street with the ground floor elevated above the level of the
road.
33. The Panel has considered the Applicant‟s arguments in relation to the
evidence relied on by the FSP, in particular the hydrology report. However,
given the widespread nature of flooding in the area, the Panel accepts the
FSP may rely on the report in so far as it is relevant to the circumstances of
the incident and in conjunction with other material.
34. A report prepared for the Insurance Council of Australia titled “Flooding in
the Brisbane River catchment January 2011 Volume 2 Summary of Findings”
(pii) stated:
“Floodwaters moving down the Brisbane River over the period 9 to 14 January
were made up of releases from Wivenhoe Dam and floodwaters from Lockyer
Creek and the Bremer River. The water level response to these „normal‟ flood
events in lower Lockyer Creek, in the lower Bremer River and the lower
Brisbane River was dwarfed by the subsequent water level rise associated
with releases from Wivenhoe Dam over the period 0600 hours on Tuesday 11
January to 0300 hours on the morning of Wednesday 12 January.
...
Given that rainfall across the Brisbane City LGA had ceased by 1800 hours
on Tuesday 11 January any flooding after this time will have been caused by
water flow inundation from the Brisbane River and its tributary creeks it being
noted that inundation along the tributaries was associated with backwater
flooding from the Brisbane River (which in turn was principally caused by the
dam release flood from Wivenhoe Dam).”
Case No: 281049 Determination Page 6 of 8
35. (Section7 p27)” of the ICA report provides the following rainfall behaviour
over 10 to 14 January 2011.
“Significant and widespread rainfall over Brisbane City LGA in the 72
hours to 0900 on 12 January.
The heaviest falls occurred in the 24 hours to 0900 on Monday 10
January.
Rainfalls before 0900 hours on 9 January were not significant.
N o rainfalls of note fell after 0900 hours on 12 January”
36. The hydrologist commissioned by the FSP to report on the cause of flooding
at the Applicant‟s neighbour‟s property provided the following relevant
information.
Ground levels indicate the Applicant‟s street has a short incline outside
the neighbour‟s propert y before declining to the creek.
The Brisbane River levels had a gradual but steady rise until about
0600 on 11 January. From this time the levels peaked at about 1600 on
12 January 2011.
At about 2300 on 11 January, flood water had reached the bottom of
the neighbour‟s driveway.
37. The hydrologist considered inundation from surface run-off was not a factor
in the inundation
“Due to the limited size of the local catchment (<1 square km) that drains to
the site and the low rainfall intensity (2 to 5 year ARI) that occurred in the
vicinity of the property at the time of inundation, it is unlikely that there was
sufficient local stormwater runoff for this to be a major contributing factor to
the inundatio n that occurred to the property” .
38. The hydrologist went on to state:
“The evidence indicates that rising levels in the Brisbane River would have
backed up Woogaroo Creek causing flooding of the lower lying areas adjacent
to the creek.
In our opinion, the in undation of [neighbour‟s property] was caused by flows
exceeding the normal capacity of the Brisbane River backing up into
Woogaroo Creek.”
39. The FSP‟s assessor reported the Applicant believed water came from
Toowoomba upstream of the Woogaroo Creek initially, but it was after they
left and they did not know where it came from. Water was coming up from
Woogaroo Creek quickly when they left the premises. The Applicant
assumed the property was inundated at about 11 .00pm on 11 January 2011.
40. The Panel accepts that the eventual damage was caused by flood water
from Woogaroo Creek, which backed up from the Brisbane River.
41. In considering whether the initial inundation of the property was caused by
surface runoff rainwater, the Panel has taken into account the following:
Case No: 281049 Determination Page 7 of 8
a. The Applicant‟s home is separated from the neighbour‟s home, which
was the subject of the hydrologist‟s report, by one residence. It
therefore is in close proximity to the Applicant‟s property.
b. The street has a short incline from 11.2m AHD outside th e neighbour‟s
property to 11.5m AHD before declining to the creek. The Applicant‟s
property therefore is on a slight fal l from the neighbour‟s property.
c. The neighbour observed water was at the foot of their driveway at
about 2300 on 11 January 2011. The floor level of the house is above
street level as is the floor level of the Applicant‟s home.
d. The hydrologist considered runoff rainwater was not a factor due to the
limited size of the local catchment area.
e. Any flooding after about 1800 hours on 11 January 2011 was
considered to have been caused by water flow from the Brisbane River
and backwater flooding in the tributaries due to the Wivenhoe Dam
releases.
f. The neighbour‟s property is about 150 metres from the creek. Hence
the Applicant‟s property is in relative close proximity to the Woogaroo
Creek.
42. Given the proximity of both properties to each other and the relatively
unchanged street environment in that distance, the Panel is of the opinion
that the initial inundation of both properties, on the balance of probabilities,
would by caused by the same water flow.
43. For these reasons, the Panel is persuaded the damage to the Applicant‟s
home was due to water which had backed up the Woogaroo Creek.
44. The policy defines flood to include the covering of normally dry land by water
escaping or released from the normal confines of a watercourse.
45. Accordingly, the Panel considers the FSP has discharged the onus that rests
with it to show the claim does not fall within the cover provided by the
Applicant‟s policy.
Determination
46. On the basis of the available information the Panel determines the FSP has
satisfied its Section 35 of the Act obligations and is entitled to rely upon its
flood exclusion.
Case No: 281049 Determination Page 8 of 8
47. The Panel determines, on the basis of the evidence presented, that the FSP
is entitled to deny the Applicant‟s claim.