Home / Financial Firm (Unknown - Insurer) / Determination 280054

Determination 280054

Storm damage to pool denied under hydrostatic pressure exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's fibreglass pool cracked after a November 2010 storm and the FSP denied the claim under the hydrostatic pressure exclusion. AFCA found the damage caused by excluded hydrostatic pressure and the FSP not liable for the pool or the pavers.

Once the applicant established a storm loss, the FSP met its onus to show the hydrostatic pressure exclusion applied, as the applicant's experts identified no other insured cause.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 280054 Determination Page 1 of 6 Case number: 280054 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition - Storm - Hydrostatic Pressure 26 November 2012 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP) from 16 July 2011 and the policy was current at the time of the loss. 2. On 16 November 2010, the Applicant lodged a claim with the FSP when she noticed the rain had lifted the floor of the fibreglass pool and cracked it after a storm on 11 November 2010. 3. The FSP denied the Applicant’s claim for the damaged pool on the grounds that the damage was caused by hydrostatic pressure for which cover is excluded under the policy. 4. The Applicant expects the FSP to honour the claim. Summary of Applicant’s position 5. The Applicant believes the damage sustained to the pool was a result of storm water runoff and relies on the findings of her pool experts. 6. The pool had withstood all kinds of weather events for eight years until the current storm event which had caused it to crack. 7. The Applicant’s pool expert says that no significant gap had existed between the paving and the drain before this event and the gap was caused by the extreme flow of water over the land and the pool. 8. The paving was not permeable prior to the loss event but became permeable as a result of the massive water flow. 9. She expects the FSP to accept the claim. Determination Case No: 280054 Determination Page 2 of 6 Summary of FSP’s position 10. The FSP relies on the findings of its loss assessor and engineer and maintains denial of the claim on the grounds that the policy excludes cover for loss or damage caused by hydrostatic pressure. 11. The FSP relies on the following policy provisions: “ 9. Storm, rainwater or run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. ‘storm’ means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. ‘rainwater’ means rain falling naturally from the sky onto the buildings and/or ground. ‘run - off’ means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: ... caused by: • soil movement including erosion, landslide, mudslide or subsidence, • shrinkage or expansion of earth or land, or • hydrostatic pressure;” Issue 12. Whether the FSP is entitled to deny the Applicant’s claim. Reasons for decision 13. Due to the nature of this dispute, FOS has considered it appropriate to expedite it in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 280054 Determination Page 3 of 6 14. This decision has been made by a Panel consisting of an Ombudsman, an insurance representative appointed by the Financial Ombudsman Service Board, and a consumer representative appointed by the Financial Ombudsman Service Board. 15. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 16. The onus of proof rests with the Applicant to establish that, on the balance of probabilities, she has suffered a loss caused by an insured risk. Once the Applicant has established that the loss was caused by a risk insured under the policy, the onus then shifts to the FSP to show that, on the balance of probabilities, the loss falls within an exclusion clause in the policy. 17. The Applicant has established that the loss was caused by a severe storm event in November 2010 and the onus rests with the FSP to prove that an exclusion under the policy applies to allow it to avoid liability for the loss. 18. The Applicant has not raised any issues regarding receipt of the policy documents and in the circumstances; the Panel is satisfied that the FSP has fulfilled its obligations in informing her of the terms and conditions of the policy. 19. After the lodgement of the claim, the FSP appointed an assessor and an engineer to investigate the circumstances surrounding the loss and to assess the claim. 20. The Applicant requested the manufacturer of the pool and the pool expert who initially installed the pool to comment on the engineer’s findings. 21. The expert reports are below: The FSP’s engineer’s report: “ Summary We agree that the rainfall was very heavy (as previously stated) and that the damage would not have developed had the storm not occurred. However, the pool does not comply with the requirements of AS1839:1994 in at least the following:  The normal operating water level is below the level of the surrounding ground.  The surface water drainage has not prevented damage from hydrostatic pressure.  Surface drainage has not intercepted water flowing across the pool site.  The hydrostatic valve has not relieved the external water pressure.  Some erosion has occurred of the materials around and below the drainage channel.  We are not aware of a fully piped drainage system or standpipe having been installed. (in the event that such systems have been installed, the damage which has occurred indicates that they have not performed adequately) Case No: 280054 Determination Page 4 of 6 4.0 Discussion and Conclusions We note that whilst the report claims to be endorsed by an engineer, the causation report has been written by the pool builder themselves, and is accompanied by a quotation to repair the damage. We remain of the opinion that the damage to the pool shell has occurred due to the increase in external water pressure as a result of significant volumes of surface water being able to drain into the materials and/or voids at the side of the pool, and to pond to a depth above the water level of the pool. As discussed above, the pool fails to meet the requirements of the relevant Australian Standard, particularly In relation to the management of surface water. Whilst [Pool Expert] have disagreed with our causation they have not presented an alternative mechanism by which the damage could have occurred. Had the pool installation complied with all of the requirements of AS1839, such a pressure imbalance should not have developed and the damage would not be expected to have occurred. The Applicant’s pool expert: “Our Conclusions The paving is not permeable and did not cause the problem The backfill is stabilised and therefore did not cause the problem The hydrostatic valve did work The surface drainage worked and is still working however the 100mm pipe connected to the box drain was torn away causing the surface drainage water to penetrate down the side of the pool causing a major wall deflection. This disaster was caused by a specific event namely an inundation that was way beyond the norm.” The manufacturer of the pool: “At the outset it should be noted that this pool was installed in 2002 and performed as required until a severe weather event in October 2010, an event which caused the problems to the pool. There is nothing to suggest that in the period this pool was serviceable that their was any defect or problem with the pool or its installation. Our findings agree with [Pool Expert] in that the damage to the pool shell is a result of intense rainfall This has led to a higher external pressure on the pool wall causing the failure. This does not imply that the pool backfill was excessively pours. The area around the pool has been seen to be suitably drained and the issue of drainage can not be included as a cause of the pool shell failure. [Engineer]'s comments about the permeable nature of the backfill is not based on any fact and indicates their lack of understanding on this issue. This further highlighted by [Engineer] referring to the backfill as unestablished where [Pool Expert] has demonstrated the amounts of cement stabilisation used in this pool shell installation, which is an industry standard. The comments by [Engineer] regarding the pool's hydrostatic valve being ineffective are unproven and place too great an emphasise on what part the valve had in this failure. The valve would have little influence on preventing a failure as the rapid rise of water level would not be taken up immediately by the valve ” (sic) Case No: 280054 Determination Page 5 of 6 The FSP’s engineer’s further response: “6.0 CONCLUSIONS Our conclusions on the basis of the above may be summarised as follows: The significant movement of the base and walls of the pool has been caused by the development of a significant imbalance between the internal and external water pressures on the fibreglass pool shell. This pressure imbalance has arisen due to a rapid rise in the groundwater levels around the perimeter of the pool in the course of the heavy rainfall which occurred during the storm. The rapid rise in the groundwater levels in the course of the storm has been caused by a combination of the heavy rainfall, the permeable nature of the surrounding ground, the poor surface drainage provisions in the immediate vicinity of the pool, and the inward deflection of the side wall of the pool under load. The unstabilised backfill materials have contributed to a significant increase in the inward lateral load exerted on the pool wall. AS1839 requires the backfill materials to be of cement stabilised sand. The required hydrostatic valve in the floor of the pool has either not been installed, or has not performed in accordance with the design specifications set out In AS1839.” 22. The Panel has carefully reviewed the material presented by the various experts and notes that there is no dispute the damage to the pool was caused by the insured events, storm, severe rains and storm water runoff. 23. However, the policy excludes cover for any damage caused as a result of hydrostatic pressure and the Panel is satisfied the hydrostatic pressure was caused by the storm event. 24. The Panel is aware that the experts were unable to view the hydrostatic pressure valve as the pool had not been cleaned during their visits. 25. This valve is designed to equalise the pressure between the water in a pool and outside the pool and presents imbalance of pressure. 26. Nevertheless, it appears the sudden surge in water as a result of heavy rain and water flowing in from the retai ning walls of the neighbour’s property followed by hydrostatic pressure on the pool could have affected the operation of the valve causing damage to the pool. 27. The FSP’s engineer has indicated that the pool has not been built according to the required Australian Building Standards at the time which has caused the sub fill to washaway, increasing the severity of the effect causing further damage. 28. The pool expert and the manufacturer reject this finding. However, it appears the pool manufacture agrees with the engineer that the damage to the pool was caused by pressure imbalance caused by the rapid rising water levels around the pool and that the hydrostatic pressure valve may have not operated at this time. Case No: 280054 Determination Page 6 of 6 29. The Panel notes that the Applicant’s experts have rej ected the rest of the findings of the FSP’s engineer but have failed to identify any other insured event which caused the loss. 30. Based on the material presented before the Panel and in the absence of any persuasive evidence from the Applicant identifying another cause of loss which was also an insured event under the policy, the Panel is satisfied on the balance of probabilities, the damage sustained to the pool was a result of hydrostatic pressure. 31. The FSP is therefore entitled to rely on its exclusion and deny liability for the Applicant’s claim for the damaged pool. Pool Surroundings 32. The Panel notes the Applicant’s recent response to the Service refers to the damage sustained to the pavers surrounding the pool caused by storm water runoff. The FSP has not presented its view regarding this part of the claim. 33. The Panel notes the pool expert has referred to the various other pools installed by it and the amount of cement mix used for backfill. However, it was unable to locate the details for the installation o f the Applicant’s pool. 34. Therefore, this evidence is not helpful in regard to the dispute at hand. 35. The Panel therefore relies on the FSP’s engineer’s findings and is satisfied that the damage to the pavers and the 100mm pipe connected to the box drain was a result of structural and inherent defects in the installation of the pool and the backfill material. 36. Accordingly, the FSP is not required to indemnify the Applicant for this part of the claim. Determination 37. On the basis of the available information, the Panel determines the FSP is not liable to indemnify the Applicant for the claimed loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.