The applicant's fibreglass pool cracked after a November 2010 storm and the FSP denied the claim under the hydrostatic pressure exclusion. AFCA found the damage caused by excluded hydrostatic pressure and the FSP not liable for the pool or the pavers.
Once the applicant established a storm loss, the FSP met its onus to show the hydrostatic pressure exclusion applied, as the applicant's experts identified no other insured cause.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 280054 Determination Page 1 of 6
Case number: 280054
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition - Storm - Hydrostatic Pressure
26 November 2012
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP) from 16 July 2011 and the policy was
current at the time of the loss.
2. On 16 November 2010, the Applicant lodged a claim with the FSP when she
noticed the rain had lifted the floor of the fibreglass pool and cracked it after
a storm on 11 November 2010.
3. The FSP denied the Applicant’s claim for the damaged pool on the grounds
that the damage was caused by hydrostatic pressure for which cover is
excluded under the policy.
4. The Applicant expects the FSP to honour the claim.
Summary of Applicant’s position
5. The Applicant believes the damage sustained to the pool was a result of
storm water runoff and relies on the findings of her pool experts.
6. The pool had withstood all kinds of weather events for eight years until the
current storm event which had caused it to crack.
7. The Applicant’s pool expert says that no significant gap had existed between
the paving and the drain before this event and the gap was caused by the
extreme flow of water over the land and the pool.
8. The paving was not permeable prior to the loss event but became permeable
as a result of the massive water flow.
9. She expects the FSP to accept the claim.
Determination
Case No: 280054 Determination Page 2 of 6
Summary of FSP’s position
10. The FSP relies on the findings of its loss assessor and engineer and
maintains denial of the claim on the grounds that the policy excludes cover
for loss or damage caused by hydrostatic pressure.
11. The FSP relies on the following policy provisions:
“ 9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or
contents cover)
We will pay for loss or damage caused by storm,
rainwater or run-off.
‘storm’ means violent wind (including cyclones and
tornadoes), thunderstorms and hail which may be
accompanied by rain or snow.
‘rainwater’ means rain falling naturally from the sky
onto the buildings and/or ground.
‘run - off’ means rainwater that has collected on or has
flowed across normally dry ground or has overflowed
from swimming pools or spas.
We will not pay for loss or damage:
...
caused by:
• soil movement including erosion, landslide,
mudslide or subsidence,
• shrinkage or expansion of earth or land, or
• hydrostatic pressure;”
Issue
12. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for decision
13. Due to the nature of this dispute, FOS has considered it appropriate to
expedite it in accordance with the Operational Guidelines to the FOS Terms
of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
Case No: 280054 Determination Page 3 of 6
14. This decision has been made by a Panel consisting of an Ombudsman, an
insurance representative appointed by the Financial Ombudsman Service
Board, and a consumer representative appointed by the Financial
Ombudsman Service Board.
15. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address
any issues raised.
16. The onus of proof rests with the Applicant to establish that, on the balance of
probabilities, she has suffered a loss caused by an insured risk. Once the
Applicant has established that the loss was caused by a risk insured under
the policy, the onus then shifts to the FSP to show that, on the balance of
probabilities, the loss falls within an exclusion clause in the policy.
17. The Applicant has established that the loss was caused by a severe storm
event in November 2010 and the onus rests with the FSP to prove that an
exclusion under the policy applies to allow it to avoid liability for the loss.
18. The Applicant has not raised any issues regarding receipt of the policy
documents and in the circumstances; the Panel is satisfied that the FSP has
fulfilled its obligations in informing her of the terms and conditions of the
policy.
19. After the lodgement of the claim, the FSP appointed an assessor and an
engineer to investigate the circumstances surrounding the loss and to
assess the claim.
20. The Applicant requested the manufacturer of the pool and the pool expert
who initially installed the pool to comment on the engineer’s findings.
21. The expert reports are below:
The FSP’s engineer’s report:
“ Summary
We agree that the rainfall was very heavy (as previously stated) and that the
damage would not have developed had the storm not occurred. However, the
pool does not comply with the requirements of AS1839:1994 in at least the
following:
The normal operating water level is below the level of the surrounding ground.
The surface water drainage has not prevented damage from hydrostatic
pressure.
Surface drainage has not intercepted water flowing across the pool site.
The hydrostatic valve has not relieved the external water pressure.
Some erosion has occurred of the materials around and below the drainage
channel.
We are not aware of a fully piped drainage system or standpipe having been
installed. (in the event that such systems have been installed, the damage
which has occurred indicates that they have not performed adequately)
Case No: 280054 Determination Page 4 of 6
4.0 Discussion and Conclusions
We note that whilst the report claims to be endorsed by an engineer, the
causation report has been written by the pool builder themselves, and is
accompanied by a quotation to repair the damage.
We remain of the opinion that the damage to the pool shell has occurred due
to the increase in external water pressure as a result of significant volumes of
surface water being able to drain into the materials and/or voids at the side of
the pool, and to pond to a depth above the water level of the pool. As
discussed above, the pool fails to meet the requirements of the relevant
Australian Standard, particularly In relation to the management of surface
water.
Whilst [Pool Expert] have disagreed with our causation they have not
presented an alternative mechanism by which the damage could have
occurred.
Had the pool installation complied with all of the requirements of AS1839,
such a pressure imbalance should not have developed and the damage would
not be expected to have occurred.
The Applicant’s pool expert:
“Our Conclusions
The paving is not permeable and did not cause the problem
The backfill is stabilised and therefore did not cause the problem
The hydrostatic valve did work
The surface drainage worked and is still working however the 100mm pipe
connected to the box drain was torn away causing the surface drainage water
to penetrate down the side of the pool causing a major wall deflection.
This disaster was caused by a specific event namely an inundation that was
way beyond the norm.”
The manufacturer of the pool:
“At the outset it should be noted that this pool was installed in 2002 and
performed as required until a severe weather event in October 2010, an event
which caused the problems to the pool. There is nothing to suggest that in the
period this pool was serviceable that their was any defect or problem with the
pool or its installation.
Our findings agree with [Pool Expert] in that the damage to the pool shell is a
result of intense rainfall This has led to a higher external pressure on the pool
wall causing the failure. This does not imply that the pool backfill was
excessively pours. The area around the pool has been seen to be suitably
drained and the issue of drainage can not be included as a cause of the pool
shell failure. [Engineer]'s comments about the permeable nature of the backfill
is not based on any fact and indicates their lack of understanding on this
issue. This further highlighted by [Engineer] referring to the backfill as
unestablished where [Pool Expert] has demonstrated the amounts of cement
stabilisation used in this pool shell installation, which is an industry standard.
The comments by [Engineer] regarding the pool's hydrostatic valve being
ineffective are unproven and place too great an emphasise on what part the
valve had in this failure. The valve would have little influence on preventing a
failure as the rapid rise of water level would not be taken up immediately by
the valve ” (sic)
Case No: 280054 Determination Page 5 of 6
The FSP’s engineer’s further response:
“6.0 CONCLUSIONS
Our conclusions on the basis of the above may be summarised as follows:
The significant movement of the base and walls of the pool has been caused
by the development of a significant imbalance between the internal and
external water pressures on the fibreglass pool shell.
This pressure imbalance has arisen due to a rapid rise in the groundwater
levels around the perimeter of the pool in the course of the heavy rainfall
which occurred during the storm.
The rapid rise in the groundwater levels in the course of the storm has been
caused by a combination of the heavy rainfall, the permeable nature of the
surrounding ground, the poor surface drainage provisions in the immediate
vicinity of the pool, and the inward deflection of the side wall of the pool under
load.
The unstabilised backfill materials have contributed to a significant increase in
the inward lateral load exerted on the pool wall. AS1839 requires the backfill
materials to be of cement stabilised sand.
The required hydrostatic valve in the floor of the pool has either not been
installed, or has not performed in accordance with the design specifications
set out In AS1839.”
22. The Panel has carefully reviewed the material presented by the various
experts and notes that there is no dispute the damage to the pool was
caused by the insured events, storm, severe rains and storm water runoff.
23. However, the policy excludes cover for any damage caused as a result of
hydrostatic pressure and the Panel is satisfied the hydrostatic pressure was
caused by the storm event.
24. The Panel is aware that the experts were unable to view the hydrostatic
pressure valve as the pool had not been cleaned during their visits.
25. This valve is designed to equalise the pressure between the water in a pool
and outside the pool and presents imbalance of pressure.
26. Nevertheless, it appears the sudden surge in water as a result of heavy rain
and water flowing in from the retai ning walls of the neighbour’s property
followed by hydrostatic pressure on the pool could have affected the
operation of the valve causing damage to the pool.
27. The FSP’s engineer has indicated that the pool has not been built according
to the required Australian Building Standards at the time which has caused
the sub fill to washaway, increasing the severity of the effect causing further
damage.
28. The pool expert and the manufacturer reject this finding. However, it appears
the pool manufacture agrees with the engineer that the damage to the pool
was caused by pressure imbalance caused by the rapid rising water levels
around the pool and that the hydrostatic pressure valve may have not
operated at this time.
Case No: 280054 Determination Page 6 of 6
29. The Panel notes that the Applicant’s experts have rej ected the rest of the
findings of the FSP’s engineer but have failed to identify any other insured
event which caused the loss.
30. Based on the material presented before the Panel and in the absence of any
persuasive evidence from the Applicant identifying another cause of loss
which was also an insured event under the policy, the Panel is satisfied on
the balance of probabilities, the damage sustained to the pool was a result of
hydrostatic pressure.
31. The FSP is therefore entitled to rely on its exclusion and deny liability for the
Applicant’s claim for the damaged pool.
Pool Surroundings
32. The Panel notes the Applicant’s recent response to the Service refers to the
damage sustained to the pavers surrounding the pool caused by storm water
runoff. The FSP has not presented its view regarding this part of the claim.
33. The Panel notes the pool expert has referred to the various other pools
installed by it and the amount of cement mix used for backfill. However, it
was unable to locate the details for the installation o f the Applicant’s pool.
34. Therefore, this evidence is not helpful in regard to the dispute at hand.
35. The Panel therefore relies on the FSP’s engineer’s findings and is satisfied
that the damage to the pavers and the 100mm pipe connected to the box
drain was a result of structural and inherent defects in the installation of the
pool and the backfill material.
36. Accordingly, the FSP is not required to indemnify the Applicant for this part
of the claim.
Determination
37. On the basis of the available information, the Panel determines the FSP is
not liable to indemnify the Applicant for the claimed loss.