Home / Financial Firm (Unknown - Insurer) / Determination 279658

Determination 279658

Flood exclusion denial of basement car park inundation claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-10
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata body corporate claimed for basement car park water damage during the January 2011 Brisbane River flood, and the insurer denied the claim as flood. AFCA found the water surcharged from stormwater pipes was flood as defined, rejected the clean-up water argument, and ordered nothing.

Water surcharging from stormwater pipes onto land after river backflow is flood under the policy definition, so the flood exclusion applies.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 279658 Determination Page 1 of 9 Case number: 279658 General Insurance - Domestic Insurance - Strata Complex - FSP Decision - Denial of Claim - Inundation - Consideration of Flood Definition 8 April 2013 Note the Applicant is represented by a broker: for ease of reference, submissions made on his behalf will appear as the ‘Applicant’. Background 1. The Applicant is a representative of a body corporate for one of two buildings insured with the Financial Services Provider (FSP). This policy represents the commercial building cover for the South tower of that complex. The policy was insured in the name of the body corporate. 2. On or around 12 January 2011, the insured property in South Bank was damaged as a result of water inundation at the time of the flood events that affected significant parts of Queensland. 3. The FSP relied upon the observations of its loss adjuster and two hydrologists from the same company to decline the claim. This was on the basis that it considered that the cause of the loss was a “flood”, which is excluded under the policy. 4. The Applicant disagrees with the decision and seeks indemnity for his loss. Summary of Applicant’ s position 5. The Applicant says that the loss was primarily caused by water incursion caused by contractors at other buildings pumping out floodwater from these buildings after the event. The insured building was not flooded until after the waters from the flood had started to recede. 6. Insofar as any water may have originated from the river, it was not a flood within the meaning attached to it under the policy. The water which inundated the premises never overflowed from the Brisbane River and was better classified as “underflow”. 7. The FSP‟s policy limits the definition of flood to only that water which “overflows onto land”. This was not the case with any of the water which ultimately made its way into the car park basement of the property. Determination Case No: 279658 Determination Page 2 of 9 Summary of FSP’s position 8. The FSP says that the policy does not respond to the loss as the proximate cause was the flooding of the Brisbane River. Flood is an excluded event under the policy. 9. Even if it were to be accepted that some water from the overflow of the contractor‟s work affected the water levels in the car park basement, this served only to be a second cause of the inundation, next to the flood which was the primary cause. Where two concurrent causes contribute to a loss, the Wayne Tank principle applies, with the excluded event prevailing and the FSP therefore remains entitled to reject the claim. 10. The FSP relies upon the following policy provisions: Pages 13-18 of the Product Disclosure Statement (PDS) “ General definitions – the meaning of some words ... Flood means when water that is normally contained in a Water Catchment System increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water. ... Insured Property means: a building or buildings, including: i outbuildings; ii fixtures and structural improvements; ... Insured Property does not include:  ...  Lot Owner‟s Contents and any other personal property of theirs;  ...  all other property You are not required to insure under the terms of the Strata Schemes Management Act, Strata Titles Act, Community Titles Act or similar legislation applying where Your Insured Property is situated, such as but not limited to: o ... o temporary wall, floor and ceiling coverings within a Lot/Unit, and mobile or fixed air-conditioning units servicing an individual Lot/Unit (Queensland). ... Water Catchment System Case No: 279658 Determination Page 3 of 9 means: a a river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry that only run during periods of rain; b a dam, reservoir, storm water channel or canal.” Page 24 of the PDS “ Policy 1 – Insured Property ... What we insure We insure You up to the Sum Insured shown for Policy 1 in the Schedule, against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which occurs du ring the Period of Insurance.” Page 31 of the PDS “ Exclusions – what we do not insure 1 We will not pay for loss or damage: a caused by Flood.” Issues 11. Whether the Applicant‟s loss was caused by flooding or some other cause to which the policy might respond. 12. Whether the policy responds to the Applicant‟s loss. Reasons for decision 13. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 14. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 15. This decision has been made by a Panel consisting of an Ombudsman, an insurance representative appointed by the Financial Ombudsman Service Board and a consumer representative appointed by the Financial Ombudsman Service Board. Case No: 279658 Determination Page 4 of 9 16. It is not in dispute that parts of the underground car park at the insured property were inundated with water as a result of a significant weather event that affected much of Queensland in early 2011. 17. The Applicant suggests that the South tower of the property was never inundated by any overland flow of water and that it was not inundated at all until after the Brisbane River began to recede and clean up operations were attempted at other buildings by contractors with specialised equipment. This resulted in overflow being directed towards the drainage system and then into the Applicant‟s basement car park. 18. The FSP is of the view that the Applicant‟s property was inundated by overflow from the Brisbane River through the underground stormwater pipe system. Any additional inundation from the cleanup operations was minor. 19. In effect, there are two potential periods of inundation: the first when water entered the complex from the stormwater pipe system (which the FSP believes was mostly responsible) and the second with the overflow from the neighbouring properties caused by the attempts to extricate the water from these premises (which is the Applicant‟s preferred explanation). 20. The damage inflicted through these events might broadly be classified as “accidental loss”, which is a covered event under the policy. The onus is therefore on the FSP to demonstrate that the loss was due to any excluded cause (in this case, a flood). 21. After the report of the loss, the FSP retained a loss adjuster, MY, to visit the site. The property was an apartment complex structured over four levels with approximately 74 units. MY noted in his report of 25 February 2011 that:  the water entered the basement car park of the premises to differe nt heights throughout the complex due to the slope of the surrounding land;  river water backed up the stormwater drainage system which then entered the basement car park from the northern end;  a representative of the property reported that there was no damage to the car park areas prior to the clean up works being commenced at the neighbouring properties, causing an inflow of water into the underground car park;  there was no significant inundation of the public car park and MY considered that the water entered through the stormwater system;  MY considered that a hydrologist should be appointed. 22. Photos attached to the report were of poor quality but appeared to confirm that the apartment complex was not subject to overland flooding (which is not suggested by the FSP in any event). Case No: 279658 Determination Page 5 of 9 23. As with a separate claim lodged for the damage sustained to the North tower (FOS reference: 278545), the Applicant contends that the majority (if not all) of the damage was sustained as a result of a substantial discharge of water into the street drainage system from the pumps used to clean out neighbouring areas. The water collected above the road level as the drains were reportedly unable to cope with the volume of water expelled. It is the Applicant‟s contention that this water late r made its way into the car park basement of the property. 24. The FSP retained a hydrologist (WR) to provide a site-specific report to consider the cause of the inundation. A previous report for the buildings was also considered for matter 278545 for the Northern tower and a copy was included with the submitted material for this claim. This report was to focus more specifically on the water pumped out from neighbouring properties and was from July 2012. It found that:  the respective properties (the North tower and the South tower) were inspected on 23 September 2011;  water marks on the walls of the basement indicate that it was inundated up to a depth of 0.1m at the northern end (although this was previously classified as the “southern” end in the report for th e Northern tower. This is presumably a typographical error). Inundation was also reported to 0.9m at the northern end (previously suggested as 1m);  the initial inundation (of the northern basement) took place sometime before 7.12pm on 12 January 2011. The southern basement, being set at a higher level, was not inundated at this time. The maximum depth throughout the property was not reached until the evening of 13 January 2011;  a representative for the Applicant suggested that the Brisbane River reached its maximum level at around 2.00am-3.00am on 13 January 2011, before it began to drop. Sometime between then and daybreak, the water in the basement car park of the property stopped rising. The water reached a maximum depth of about 0.2m in the northern end of the basement and had not entered the southern basement. Assets such as the lifts were not affected at this time. Water levels in the basement began to rise later that afternoon, even though the river was falling and workmen were observed pumping water out from other properties. Water surcharged in from the basement and through the northern basement wall. Fish and faeces were observed in the water. The water did not enter the basement through the respective car park entrances but up through the sumps and through the walls. The pumps could not be utilised to control the water level as the electricity had been disconnected. The water was not able to discharge into the stormwater system as it was clogged with “mud and debris” from the flood;  rainfall intensity at the time of the flooding of the area was not particularly intense, with the maximum one-hour rainfall intensity recorded on 9 January 2011 (28.3mm in an hour). No significant rainfall Case No: 279658 Determination Page 6 of 9 was recorded for the area after 3.00pm on 11 January 2011, which is well before water began to seep into the basement;  WR considered that the peak Brisbane River water level in the vicinity of the property was at about 3.30am on 13 January 2011. This was at 5.2m AHD (Australian Height Datum). The ground levels at the property were estimated to range between 6.0m AHD and 7.5m AHD;  the vehicle entrances for the respective basement car parks were estimated at 5.2m AHD (north entrance) and 6.8m AHD (south entrance);  the floor level of the northern end of the complex at basement level is about 0.9m lower than that it is for the southern end;  the building was not within the vicinity of flooding attributed to the Brisbane River identified after the event;  at the time of the Brisbane River peak levels, about half of the northern basement was flooded (0.4m) but the southern basement had not yet received water ingress;  in the eight hours after the peak, the water level in the northern basement only increased marginally  the maximum depth of inundation occurred around 7.30pm on 13 January 2011, around 16 hours after the peak level in the Brisbane River had been reached. At the time of the maximum inundation level in the basement, the Brisbane River had dropped approximately 1.3m below its peak;  the combined effect of overland flooding and the backflow flooding through the pipes left the ground conditions near the property saturated;  cracks can occur in stormwater pipes as a result of sustained and elevated water levels. Water from the saturated soil likely entered the sub-surface drainage system for the property and surcharged from the sumps to cause the inundation;  whilst water may have also seeped through the walls, WR was unable to directly estimate to what extent and did not consider this to be a significant factor;  normally, water collecting in the sumps of the car park basement would be pumped out into the municipal stormwater system, although this was not possible due to the loss of electricity;  water continued to flow into the basement of the complex even after the Brisbane River began to recede. WR did not consider this to be caused by the water being pumped out of nearby buildings but more of a consequence of the hydraulic pressure placed on the stormwater system as a result of the “sustained high floodwater levels”;  the estimated rate of water ingress into the basement was “two to three times greater” on the afternoon of 13 January 2011 than it had been in the morning, however the rate of water being pumped out of the nearby Case No: 279658 Determination Page 7 of 9 buildings was estimated to be much less than this and therefore not (in any meaningful way) responsible for the increased water levels into the basement of the building. 25. The evidence presented suggests that the Applicant‟s South tower basement car park was not inundated at all during the flooding event and did not sustain ingress from stormwater run-off. It was not until the flood water from the Brisbane River began to recede that ingress occurred and this may have involved a combination of backflow floodwater from the drainage pipes and the water from the clean up works from the other properties. 26. The amount of water to inundate the property attributable to the respective causes is unknown and probably cannot be quantified. Whilst the Applicant is of the view that no water came from the flood backflow in the stormwater system, the Panel considers this unlikely, though the extent of this inundation cannot be ascertained. 27. WR‟s evidence on the inundation from the secondary event is not particularly helpful. This is perhaps not surprising as the Panel considers that it would be almost impossible to delineate between which water may have originated from inside the stormwater pipes from the Brisbane River and which might have come from the work done at the properties. 28. Ultimately, the Panel considers that it is best served by considering each of the respective possible causes of the loss, noting that the original source of all the relevant water was almost certainly the Brisbane River. 29. WR accepted that the flooding of the subject property‟s basement lar gely occurred after the water levels of the Brisbane River began to subside but he considered that the water pumped from the nearby properties was almost a non-factor in the inundation. WR effectively considered that the loss still came from floodwater, albeit water stored on the surface of the ground and from within the existing stormwater pipe structure. 30. In this respect the Panel is in accord with WR‟s statement contained within the report of 24 October 2011: “ water that entered the property came from saturated ground around the building which was caused by a combination of overland flooding in the local area and flood water from the Brisbane River backing up and exfiltrating from the piped stormwater system” ; I n the Panel‟s view this constitutes „ flood ‟ as defined by the policy. 31. In so determining the Panel has paid due regard to the Applicant‟s assertion, that the policy description of flood requires it to „overflow‟ onto land, whereas arguably in this instance the water „underflowed‟ by virtue of its ema nating via subterranean pipes into an „underground car park‟. The relevant clause reads: “[flood] means when water that is normally contained in a Water Catchment System increases because of rainfall or snow melt (whether in the immediate Case No: 279658 Determination Page 8 of 9 region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water. ” 32. The Panel has carefully considered the Applicant‟s argument in this respect, but cannot agree with his assertion. Australian case law considers water surcharging through pipes, prior to the river source breaking its banks, as constituting „flood‟ for insurance purposes; further, common sense dictates that this water then ultimately „overflowed‟ out of the pipes onto land, namely the floor of the basement car- park. To describe „the land‟ in the basement car- park as anything other than the „land‟ contemplated in the PDS is to ascribe a totally artificial distinction to what was plainly intended by the definition. The Panel accordingly determines the water surcharging from the pipes onto the floor of the basement car-park constituted flood as defined in the PDS. 33. Whilst the Applicant was of the belief that the majority (if not all) of the water which infiltrated the basement emanated from the overflow discharged from the cleanout of nearby buildings, the evidence of WR clearly disagrees with this and WR considers it only a minor contributor. There is limited evidence to support either view, and WR ‟s analysis of the competing potential factors is unable to clearly identify to what extent each factor may have affected the inundation. 34. Accordingly, it devolves to the Panel to determine; having carefully weighed up WR‟s expert hydrological opinions against the Applicant‟s assertions in this regard, the Panel determines, on the balance of probabilities, the contribution of the „cleanout water‟ from the other buildings to be too small to have effected any damage to the basement car-park. Accordingly all the damage is attributable to the policy excluded event of flood. 35. The Panel has also given consideration to the issue of whether the Applicant‟s argument is assisted by the evidence that the pumps inside the complex were not functioning as the electricity had been turned off. 36. The Panel notes the FSP‟s hydrologist‟s statements to the effect that the water within the complex would have been pumped to the municipal piped stormwater system. 37. The Panel is satisfied that this municipal piped stormwater system was already unable to cope with the volume of water and as a consequence, this water is likely to have flowed back into the complex basement. 38. The Panel is satisfied that inundation in that fashion is properly described as flood. 39. The Panel is satisfied that the ultimate cause of the loss was the flooding of the river. Case No: 279658 Determination Page 9 of 9 Determination 40. On the basis of the available information, the Panel determines that the FSP is not required to indemnify the Applicant for the loss.