Determination 279591

Refusal to replace hallway and bedroom 3 carpet for uniformity after hail and water damage

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured's home suffered hail damage and later water damage in bedroom 2. The insurer replaced the bedroom 2 carpet but refused to replace hallway and bedroom 3 carpet for uniformity, and the alleged negligence by its builder was not proven. AFCA found in favour of the FSP.

Under the policy's same-room rule a hallway is not the same room as an adjoining room, so uniformity cover does not apply, and the builder's negligence was not established.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 279591 Determination Page 1 of 7 Case number: 279591 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision - Claim amount 06 May 2013 Background 1. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the background as set out in the Recommendation is accurate and is as follows. 2. The Applicants held a Home Buildings and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 3. A claim was lodged for damage to the insured property arising from the significant hail storms that occurred in Taylors Lake Victoria on 25 December 2011. 4. The FSP accepted the claim and authorised repairs to the insured property. 5. A short period after completion of the repairs, further water damage was noted by the Applicants including damage to the carpet in a bedroom. The FSP authorised repairs for this additional damage, however, they declined to provide indemnity for the cost to replace carpet in another bedroom and hallway. 6. The Applicants remain dissatisfied with the FSP‟s settlement offer and are seeking cover for the cost to replace the carpet in the other bedroom and hallway. 7. As the Applicants did not agree with the FSP‟s decision, the dispute was the subject of a Recommendation. The Recommendation was in favour of the FSP and was not accepted by the Applicants. The FSP accepted the Recommendation. In the circumstances, the matter has been referred to me for Determination. Summary of Applicants’ position 8. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the Applicants‟ position as set out in the Recommendation is accurate and is as follows. Determination Case No: 279591 Determination Page 2 of 7 9. The Applicants hold the following concerns in respect to the FSP‟s position:  The initial inspection and repairs of the insured dwelling‟s roof undertaken by the FSP‟s appointed consultants‟ “H” was not carried out properly. As a result, further damage to their home occurred as a tile over bedroom 2 that had been damaged i n the December storm had not been detected and replaced when the initial roof inspection was done.  The FSP has accepted to cover the resultant damage to the ceiling and replacement carpet in bedroom 2. However, as the carpet runs into the hallway and bedroom 3 it should also cover the cost to replace these portions of the carpet to maintain uniformity.  The additional damage occurred due to the fault of H having not completed a proper inspection of the roof tiles in the first place.  The FSP is incorrect in its position that the water, which caused the damage to bedroom 2, entered the home via gable flashing that had been filled with mortar and not a cracked tile above the bedroom. The gable flashing referred to, is situated a fair distance from bedroom 2. A plan of the house is produced by the Applicants to demonstrate the point. The Applicants say, water would have had to enter the ensuite bathroom and completely bypass the study (where there is no damage at all) before reaching the relevant bedroom.  They are astounded the FSP would not send an assessor to the property to carry out a visual inspection. They believe this would have established their position (ie) the flashing was not the point of entry for the water responsible for the damage in the bedroom.  SR replaced the broken tile when the Applicants advised H of the problem after the male Applicant inspected the roof from a ladder when the damage in the bedroom became apparent. Spare roof tiles were used to repair the damage.  A file note from the FSP indicates that at some stage the FSP had agreed to have all the carpet replaced as requested. 10. The Applicants are seeking for the FSP to authorise replacement of carpet in not only the effected bedroom, but also the hallway and bedroom 3 to maintain uniformity in both quality and colour. 11. The Applicants rejected the Recommendation and provided no further documentary information in support of their position but wrote a letter dated 17 February 2013 which in the main reiterated their position. Case No: 279591 Determination Page 3 of 7 Summary of FSP’ s position 12. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the FSP‟s position as set out in the Recommendation is accurate and is as follows. 13. The onus rests with the Applicants to establish that the damage in respect to which a claim is lodged is covered under the policy. It is an insured events policy that does not provide cover for loss or damage arising from all risks. 14. The FSP accepts that the Applicants have established damage arising from an insured event „Storm‟. Accordingly, on lodgement of the claim it appointed emergency services consultants „F‟ to attend the insured property and submit a report on the extent of damage. 15. The FSP had authorised repairs and/or replacement for the damage arising from the insured event under the claim. It refutes the Applicants‟ allegation that the additional damage located in March 2012 was due to its appointed builders‟ (H) negligence and that a hail damaged tile was over looked by H. The Applicants have not made available any evidence to substantiate their allegation in this regard. 16. Further, it maintains in the absence of any information to the contrary, it is entitled to rely upon H‟s report. The report provides that the additional damage to bedroom 2 was due to water which entered the dwelling via the gable flashing which had been filled with mortar. 17. In line with the policy, the FSP‟s obligation is to replace the damaged carpet in bedroom 2 and it is not liable to cover the cost to replace the undamaged sections of the carpet in the hallway and bedroom 3. Although it does acknowledge the policy allows for cover to achieve uniformity, this is limited to circumstances clearly explained within the policy provisions, which do not apply in this instance. 18. The FSP relies on the following policy provisions: “ … When we will repair or rebuild undamaged parts If we cannot match the new materials with the undamaged parts, if necessary, we will only pay extra to create a uniform appearance when: - Floor coverings are damaged (including tiles) We will pay extra to replace continuously joined undamaged floor coverings of the same material in the same room, stairs, hallway or passageway where the damage occurred. … What we mean by same room, stairs, hallway or passageway This applies to repairs to floor and wall coverings for home and contents claims Case No: 279591 Determination Page 4 of 7 Same room A room is an area starting and finishing at: - Its nearest walls - Nearest doorway, archway or similar opening of any width - A change in the floor or wall covering. A hallway next to a room is not the same room, even if it has the same floor or wall covering as the room. Any archway or similar opening separates a room unless it is a combined lounge-dining room Same hallway or passageway A passageway or hallway has the same meaning as a room. We will not combine a hallway and a room. ” 19. The FSP accepted the Recommendation and did not provide any further documentary information in support of its position, but made additional comments dated 12 March 2013 in which it refuted it was liable because of a typographical error in a file note which was not communicated to the Applicants and has not prejudiced the Applicants in any way. Issues 20. Whether the Applicants have established the additional damage subject to this claim was due to the negligence of the FSP‟s appointed representatives. 21. Whether the FSP is obliged to extend indemnity under the claim to costs associated with the replacement of carpet in the hallway and bedroom 3. Reasons for decision 22. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 23. Each FOS case is decided on its merits, taking into account the facts of the case. I have reviewed all the material submitted by the parties both before and after the Recommendation was issued, in order to reach my decision. I will only refer to the relevant submissions and materials raised. 24. The Recommendation has set out what the parties do not dispute and I am satisfied from reading the material both before and after the Recommendation, that the parties do not dispute the following:  The Applicants held an active home building and contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicants received the relevant policy documentation including the Product Disclosure Statement (PDS) and Certificate of Insurance. Case No: 279591 Determination Page 5 of 7  The insured dwelling was damaged during significant hails storms experienced in the vicinity of the property in December 2011.  The FSP accepted the claim and authorised repairs to damage found during its first assessment of the insured property. A short period later, further water damage was identified including damage to carpet in bedroom 2 which could not be restored and required replacement.  The FSP authorised repairs under the claim including damage to the ceiling and replacement of carpet in bedroom 2. The Applicants are satisfied with the quality of internal repairs authorised under the claim.  The issue in dispute is matching the carpet in the hall and bedroom 3 to the carpet now in bedroom 2. 25. I have considered carefully the various reports from F and H, quotes and invoices, file notes and various emails in support of the submissions to the Service. I am satisfied that the material relied upon has been exchanged between the parties each having had the opportunity to comment. So, in the interest of brevity I will not recite all the information save that I note the following. 26. The male Applicant wrote to the FSP on 5 March 2012 making his complaint and said: “I rang the company who supposedly fixed the roof on behalf of the FSP and told them that I had found a broken tile above the bedroom that had not been replaced and that I assumed was responsible for the damage which has been gradually happening since the Xmas day hailstorm with every new downpour. They advised that they would attend to its replacement today.” 27. The Applicants also wrote an email dated 6 August 2012 in which they advise; “the broken tile was replaced by a representative of SR when we advised H of the problem after inspecting the roof when the damage in the bedroom became apparent. Our spare roof tiles were even used to repair the damage”. 28. F attended and reported on 14 March 2012 about the extent of the damage in bedroom 2 but did not comment on the cause of the damage. 29. H also attended the property on 20 April 2012 and reported as follows: “ Cause / Circumstances (How damage occurred and causes) Customer reported further water ingress through roof. During our inspection we found that water was entering through a gable flashing that had been filled with mortar. This was drawing water in and onto the ceiling battens and then dripping onto plaster ceiling. We rectified the problem whilst onsite. We also noted that, although not the cause of water entry, the flashing between the two roof lines is poorly installed.” 30. However, H makes no specific comment about the allegation made by the Applicants that he had missed a broken tile from his initial inspection. Case No: 279591 Determination Page 6 of 7 31. I do also note from the report of H from a site visit on 17 January 2012 the following: “Customer reported storm damage to the roof, bathroom, living area and hallway. During our inspection we confirmed the cause of water ingress was due to hail damaged roof tiles. Resultant damage: Bedroom 1 and 2. Scope of Work – Roof repairs Tiled roof – Roof tiles – Inspect the tiled roof for any remaining storm damage.” 32. The Applicants provided a plan of the house that is annotated “the flashing in quest ion between house or garage” and an arrow shows the spot. I note there is an ensuite and study between that arrow and the room marked bed 2. 33. The Applicants have the onus to prove the damage to Bed 2 is caused by the failure of H to identify and repair the broken tile above Bed 2. In their favour, is the distance between the area where the flashing is (which the FSP says is the cause of the damage) and Bed 2. Against them is the Building Report from H dated 20 April 2012 and the Scope of Works dated 17 January 2012 which shows the scope included H to inspect the tiled roof for any remaining storm damage. This inspection may have not been done, or it may have been done and the broken tile was missed or the roof was inspected properly but the tile was not broke n at the time of that inspection. 34. I cannot say as H has not commented further on what the roof inspection did entail in January 2012 nor has he made any further comment on the arguments made by the Applicants that the damage to the flashing is too far from the site of the damage. 35. As for other possible evidence, the Applicants say that SR replaced the roof tile but there is no evidence from SR in this regard either, nor is there any expert evidence supporting their position. 36. The onus is on the Applicants to prove the damage was caused to Bed 2 because of the negligence of H. In my view, they have not satisfied me on the balance of probabilities that the damage to Bed 2 was caused by a tile broken in the storm, which was not detected by H in his inspection of the roof. 37. I can only make a decision on the evidence before me and I have a report from a builder H who explains why the water entered the roof above Bed 2. The Applicants have said this is unlikely but have not called any expert evidence to rebut it nor is there any material from SR to support their contentions. 38. I am aware of the difficulty in obtaining the evidence necessary to establish the Applicants‟ contentions but while I have alternatives (the evidence of H Case No: 279591 Determination Page 7 of 7 as set out in the report of 20 April and the possibility that H did inspect the roof over Bed 2 in January but the tile was not broken then) I find that the Applicants have not satisfied the difficult onus that they have to prove their case. 39. As I make this finding, I then turn to the ramifications if the damage is caused by an event to which the policy does respond. The FSP has accepted the policy responds and the damage to Bedroom 2 has been repaired. And in my view, having reviewed the policy and the house plan, the relevant policy terms and conditions as set out above are clear – the carpet in the hall and bedroom 3 are not in the same room where the damage occurred. 40. The policy makes it clear that a hallway next to a room is not the same room. And the FSP‟s poli cy will not combine a hallway and a room. 41. As for the contention by the Applicants that the Recommendation should be re considered “ taking into account inconsistencies in the recording of some of the events” I have reviewed the file notes and in all the ci rcumstances and tenor of those notes, I accept the explanation of the FSP that this was a “typo” and in my view no adverse consequences should flow especially as the Applicants were not informed about the note at the time and thus there were no prejudice to their position. 42. Therefore, I am not satisfied the Applicants have established an entitlement to indemnity for the cost to replace the carpet in the hallway and bedroom 3 under the policy. Determination 43. On the basis of the available information and for the reasons stated, I determine that:  the Applicants have not been able to establish that the additional damage to their home arose due to the negligence of the consultants appointed by the FSP;  the FSP in authorising repairs/replacement to the areas actua lly damaged by an insured event and not the adjoining areas, has fulfilled its obligations under the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.