Determination 279236

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$35,900
SourceAFCA PDF

Summary

Applicants' home and shed flooded in January 2011 and the FSP denied the claim as flood. AFCA found Avoca River flood damage to the dwelling was excluded, but stormwater damage to the shed and contents up to 40cm was covered, with interest on any cash settlement.

Overflow from the Avoca River was flood excluded under the policy, while stormwater that pooled over land not forming a natural watercourse was not flood, so the early shed damage is covered up to 40cm.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 279236 Determination Page 1 of 13 Case number: 279236 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 28 November 2012 Background 1. The Applicants‟ home and contents in Charlton, Victoria were insured under a personal insurance policy issued by the Financial Services Provider (FSP). The building was insured for $174,152 and the contents for $44,944. 2. On 14 January 2011 the property was inundated by water following extensive rain fall in the area causing damage estimated at about $35,900. 3. A claim under the policy was denied by the FSP on the ground the damage was caused by flood and as such excluded from cover provided by the policy. Summary of Applicants ’ position 4. The Applicants are represented by a law firm. Any reference to the Applicants in this determination will include the Applicants‟ representative. 5. The Applicants rely substantially on hydrological reports from „PM‟ commissioned by their representative. 6. The Applicants argue, based on the reports, the damage was caused by storm and rainwater runoff associated with heavy rainfall between 10 and 14 January 2011. 7. By letter dated 29 March 2011 to the FSP the Applicants advised:  On the morning of 14 January clear water was in their yard.  At about 10.30am it surrounded the house.  The water gradually built up and at 7.00pm they had 3 inches of clear water through the house.  The water came from the south east where the Yeungroon catchment lies.  This water was unable to enter the Yeungroon Creek as it was full. In addition roadwork in 1997 built up the St Arnaud-Charlton roads Determination Case No: 279236 Determination Page 2 of 13 causing the backwater to enter the Avoca River before rising river flood waters arrived. 8. The hydrologist PM concluded it was likely that rainwater which fell in the paddocks to the south and south east of Charlton would have accumulated and runoff along natural drainage lines into the town. 9. Based on the PM‟s report and information regarding the timing and colour of the inundation it is clear the inundation of the Applicants‟ home was storm and rainwater. Summary of FSP’s position 10. The FSP relies substantially on hydrologist reports from “WT” commissioned by it. 11. The FSP states, based on WT‟s reports, the source of water which inundated the Applicants‟ home was overbank flow and not stormwater runoff. 12. It is clear that two independent inundation events occurred at the property. a. The first occurred at about 11.00am on 14 January causing damage to items in the shed; b. The second occurred at about 6.45pm on 14 January and entered the main building. Evening inundation 13. Both experts agree this inundation was the result of overbank flow from the Avoca River. Morning inundation 14. The Applicants reported water began to pond around the dwelling at about 11.00am on 14 January 2011 but did not breach the sandbag walls set up around the home. It did however cause damage to the items in the shed. 15. The FSP submits that the cause of the morning inundation was overbank flow from the Avoca River and not stormwater runoff. 16. The FSP relies on the site specific report from hydrologist, WT. WT explained the volume and timing of storm water runoff generated by a rain event is a function of: a. Stormwater catchment area b. Intensity of rainfall Case No: 279236 Determination Page 3 of 13 c. Duration of rainfall d. Local drainage capacity. 17. WT concluded that stormwater runoff would not have affected the property after 8.00am on 14 January 2011. 18. WT explained that by 11.00am there had been multiple breakouts along the length of the Avoca River resulting in overflow. In his opinion this was responsible for the morning inundation at the property. 19. The FSP submits that both the morning and evening inundation events were caused by overbank flow from the Avoca River and therefore does not attract cover under the policy. 20. The FSP relies on the following policy terms: “ Word with special meaning ... “Flood’ means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharged from any sewerage or waste water systems due to pressure induced by flood water. ... What you are not insured for Under Section A – Home Cover we will not pay for: ... 2. Loss or damage to your property caused by: a Flood ...” Issue 21. Whether the damage was caused by flood water as defined by the policy. Reasons for decision 22. Due to the complex nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. The dispute has not been the subject of a FOS Recommendation and has proceeded direct to Determination. 23. The decision had been made by a Panel consisting of an Ombudsman, an independent representative with extensive experience in the insurance industry and an independent representative with extensive experience in consumer claims. Case No: 279236 Determination Page 4 of 13 24. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to respond. 25. Prior to arriving at a determination, the Panel has read and considered all the material submitted by the parties to FOS. 26. The policy is a defined events policy and the Applicants bear the onus of establishing on the balance of probabilities a loss that falls within the terms of the policy. Once established, the onus is the n on the FSP to establish the application of a relevant exclusion or limitation clause. 27. The Panel has been provided with hydrologist reports obtained by the FSP from WT and by the Applicants from PM.  According to WT in his report dated 18 February 2011: Historically Charlton has been flooded on both the east and west side with an area remaining flood free through the centre of town along the St Arnaud- Charlton Road.  Heavy rain fell in the area between 10 and 14 January. The largest fall was recorded at 9am on Friday 14 th  Flooding of the town followed a similar pattern to the September 2010 event but with a much greater volume of water in the eastern side of town. This suggests that either the Yeungroon Creek has transferred flows across the flood plains upstream of town or the Avoca River pushed more water into the flood plain further upstream. It is suggested that the Yeungroon Creek and the Avoca River flows merged to become one system.  Any flooding occurring after lunchtime can be directly attributed to Avoca River/Yuengroon flooding. 28. On 2 July 2012 WT reported:  The Applicants‟ property and shed were flooded firstly by water exceeding the capacity of the Calder Highway tributary of the Avoca River and the dwelling flooded later by water from the Avoca Ri ver directly. At the time of the inundation flows from the Calder Highway tributary would have been caused by breakouts from the Charlton-St Arnaud Road tributary, Yuengroon Creek and the Avoca River further upstream. Flooding from breakouts and transferred flows from the St Arnaud-Charlton tributary, Yeungroon Creek and Avoca River  Most of the flow caused by stormwater runoff generated from within Charlton and the Calder Highway tributary catchment would have passed through town by about 8.00am on 14 January.  Modelling suggests that the Avoca River and Yeungroon Creek transferred flows across the flood plain upstream of town which occurred from about 5.00am on 14 January. Case No: 279236 Determination Page 5 of 13 Flooding mechanisms at the Applicants’ property  The Applicants reported water was around their property from 11 .00am on 14 January. The water was flowing from the south east from the back to the front of their property. Damage to items in the shed and on the property occurred after 11am. Water entered the dwelling at about 6.45pm approaching their property from the north west overtopping the sandbags used to protect the front of the house.  Water first approached the property from a south easterly direction. This water was flowing along the drainage line of the Calder Highway tributary of the Avoca River, expanding out overbank (sic.).  Around 5am on 14 January most of the flow caused by runoff generated from the catchment of the Calder Highway tributary would have flowed downstream by about 8am.  Any continuing flows from about 8am would have been caused by overland flows from breakouts of the Charlton-St Arnaud Road tributary, Yeungroon Creek and later from the Avoca River from further upstream.  Water then approached from the northwest along Watson Street and Menzies Street. This water first came from a breakout from the Avoca River travelling up the Charlton-St Arnaud Road/Armstrong Street and later from the Avoca River within town. From about 6pm houses in the town were inundated directly by overflow from the Avoca River. Water entered the dwelling from the north west.  The Applicants‟ hydrologist PM in his report of 3 November 2011 maintained: The highest rainfall was 15mm per hour from 1700 to 0800 on 13 January (2011). Rainfall rates were persistently high from 2300 hours on 13 January to 0600 on 14 January. No rain fell after 0800 on 14 January.  The radar data for Charlton indicates the rainfall was highly concentrated in short duration bursts. The rainfall which produced the 15mm/hour actually occurred over a period of about 12 minutes.  This situation is similar for the rainfall over night on 13-14 January 2011.  The rainfall intensities in these bursts are much bigger than the recorded hourly rates. Overflow from local drainage systems  Given the intensity of rainfall which was much more than hourly rainfall rates overflow from local drainage systems and culverts was highly likely. Especially given that the drainage system was already close to capacity from earlier rainfall bursts.  The timing of overflow would correspond closely to the timing of the rainfall. Case No: 279236 Determination Page 6 of 13  The first possible incident of stormwater drainage overflow would have occurred around 0700 on 13 January. Any of the intense rainfall periods recorded between 13 and 14 January could have been responsible for overflow of stormwater drainage systems. The greater probability being from midnight to 0400 on 14 January.  Direct overflow is less likely after this time.  Without augmentation from other sources stormwater drainage overflow would be short lived. Runoff from surrounding areas  Runoff was possible from Charlton which does not enter the drainage systems and runoff from rural areas.  During periods of heavy rainfall bursts, water would have overflowed and contributed to surface runoff. Without augmentation from other sources stormwater drainage overflow would have been short-lived.  It is highly likely that rainfall which fell on 13 and 14 January was saturation overland flow and would have led to inundation of Charlton on 13 and 14 January before floodwater from the Avoca Ri ver entered the town.  Water falling south and east of Armstrong and High Streets will tend to move east with water to the west and north tending to move to the river.  Water runoff as overland flow would concentrate water in the eastern part of Charlton.  The combination of surface runoff from the surrounding area being directed toward east Charlton combined with periodic overflow from drainage systems in other parts of the town would lead to inundation by stormwater and locally derived surface water on the morning of 14 January.  That inundation from locally derived rather than Avoca River water is further supported by the changing sediment loads of water seen in Charlton. Yeungroon Creek  Yeungroon Creek is a former branch of the Avoca River which has been abandoned and filled in with flood deposits over many years. Much of its length has been infilled in the extent that there is no longer a well-defined channel. It acts as a natural drainage line.  The course of the creek is marked by a series of linear depressions which breakout from the Avoca River channel north of Wychitella Channel junction. Half way along its length it became defined by a line of vegetation. South of Charlton its course is marked by a linear depression and vegetation. East of Charlton it is marked by a more clearly defined channel. Case No: 279236 Determination Page 7 of 13 Direction of storm water and floodwaters  The combination of surface water from surrounding areas directed to east Charlton thus overloading the storm water drainage system in this part of town combined with periodic addition of overflow from stormwater drainage system in other parts of town would lead to tendency for the parts of Charlton adjacent to the depressions (see fig 1) to be inundated by stormwater and locally derived surface water on the morning of 14 January.  That inundation was from locally derived rather than Avoca River water is further supported by the changing sediment loads in the water seen in Charlton. Clear water  When the Avoca River overtopped its banks and Charlton was inundated by floodwater the source of that water can be clearly seen because of its high sediment load. Flooding from Avoca River  Minor flood level was reached at 0400 on 13 January. Moderate flood levels were reached at 2045 on 13 January. Major flood level was reached at 1715 on 14 January. Significant inundation of Charlton from the Avoca River did not begin until late afternoon on 14 January 2011 and became more severe through the evening and night. Some outlying parts of Charlton would have been inundated mid-afternoon. 29. In a subsequent report dated March 2012 PM stated: Storm water drainage  The stormwater drainage system empties directly into the Avoca close to Calder Highway bridge. As the river rose the stormwater outlet would have been inundated by the river water and the drainage system would have back filled to capacity preventing stormwater from draining away.  From the morning of 13 January (2011) onwards the stormwater drainage system would have been at full capacity and runoff rainwater would not be able to drain away. Stormwater accumulation therefore is a factor from mid morning on 13 January (2011) onwards. Clearwater  The first accounts of sediment laden water occurred at about 6.00pm (14 January 2011) associated with a rapid rise in water level.  Mixing of clear and muddy water was a gradual process and likely took some time for water sourced from the river to flow across the town and mix with locally sourced stormwater. Case No: 279236 Determination Page 8 of 13 Major flood level  Major flood level is 7.5m. This level was reached at 5.15pm on 14 January (2011). Water has to rise above this level for widespread inundation from the river to occur.  This indicates that significant inundation for flood water probably occurred after 5.15pm (14 January 2011). It is possible other lower points of the river allowed water to leave the river and inundate parts of the town earlier than this. Summary of to wn wide findings  The site visit confirmed that stormwater would have played a major role in the town flooding. The stormwater drainage system would have been inundated by rising water from the river long before the river rose over its banks.  The topography of the town reinforces the significance of the depression in the east of the town as a collection point for stormwater draining over the surface.  Modelling indicates this part of the town was inundated independently of the river long before the western part of town was inundated directly from the river.  Flooding across the town began in the east and progressed westward. A gradual rise from the clearly local water occurred up to about 5.30pm (14 January 2011) and sometime around 6pm (same day) a rapid rise associated with inundation for the river began. Site inspection of the Applicants’ property  Because of the raised construction of the house and the timing of the water entering the house it is likely that inundation of the interior of the house was due to the rise in water levels associated with the Avoca River overtopping its banks and inundating the town.  The timing of water lapping against the house and the depths that this reached before the onset of river flooding (up to the level of the house 30cm) it is likely that the foundations of the house were immersed in locally derived stormwater before the river flood water arrived. Summary 30. The evidence in relation to the source of the water is divided. The Panel accepts that the authors of the reports were highly competent professionals and well qualified to assess and report on the likely source of water which inundated the Applicants‟ property. 31. To assist in determining this dispute and reconciling the various expert opinions provided, the Panel Chair Ombudsman and a Panel Member conducted a site inspection of the Applicants‟ property on 27 June 201 2. The Case No: 279236 Determination Page 9 of 13 Applicants and a representative from the FSP were present. On that same day, the Panel Chair Ombudsman and a Panel Member conducted numerous visits and inspected various areas. The Panel notes the St Arnaud-Charlton Road had been built up to allow access to the airport during flooding. Although culverts were built under the road, local residents observed that the culverts were inadequate to allow the flood waters to disburse and diverted the waters into town. 32. The male Applicant is a former farmer who had moved into town. He advised that the water that entered his property entered from the back of his property from the south/south east. He considered it was a combination of water that came from the flood plains in the direction of the Yuengroon Creek a nd from the St Arnaud-Charlton Road that he believed diverted the runoff water towards Charlton. 33. The male Applicant explained that he had tarped and sand bagged all of the doors and windows of the home. There was a little bit of seepage under the tarp and water started to accumulate around the home by 4.00pm. Water was pouring in from the south/south east. By 6.45pm water came through to the back veranda and it was about a brick above the ground height. The water eventually inundated the home to the height of about 500mm. 34. The Applicants explained that there was water around the property by about 11.00am on 14 January 2011 with the water flowing towards the property from the south east. The shed was inundated at around 11.00am. Items in the shed included motor vehicles and various tools. 35. By 6.45pm the water was over topping the sand bags used to protect the front of the house. Shortly after this time, they were evacuated from the property by boat. 36. The expert evidence is consistent in relation to the source of the water which entered the home at about 6.45pm. This water entered the home from the north west. 37. WT states the water approached the property from two directions during the day of 14 January. At 11.00am the water was from breakouts from the Charlton St Arnaud Road tributary, Yeungroon Creek and Avoca River further upstream. The flow path was across farmland upstream of Charlton. 38. WT further states water then approached the property from the north west. This water was first from a breakout of the Avoca River travelling up Charlton-St Arnaud Road/Armstrong Street and later from the Avoca River within the town. 39. Following a site inspection of the Applicants‟ property PM (report 2) considered the inundation of the interior of the dwelling was due to the rise in water levels associated with the Avoca River overtopping its banks. Case No: 279236 Determination Page 10 of 13 40. The Panel is therefore persuaded that the water which inundated the Applicants‟ dwelling at about 6.45pm was water which had overflowed from the river. 41. Water which overflowed the Avoca River falls within the meaning given by the policy to flood. Loss or damage caused by flood is excluded from cover provided by the policy. 42. In these circumstances the Panel considers the damage caused to the interior of the Applicants‟ home is not cover ed by the policy. Source of water entering the property at about 11am 14 January 2011. 43. The Applicants described the water on their property at about 11.00am was coming through the backyard from the south east from the direction of the Yeungroon Creek. 44. According to WT the water was a combination of flows from breakout flows from Yeungroon Creek and the Avoca River further upstream from Charlton. It appears from the report that the Avoca River streamflow data on which the river levels were based were taken at Charlton (fig 3.4). 45. In discussing the streamflow data WT (3.2 para 4) observed: “There is no streamflow data available for Yeungroon Creek, the Charlton St Arnaud Road tributary or the Calder Highway tributary. It is important to note that while the recorded water level at the gauge can be used to indicate when water came directly from the Avoca River in the channel to Charlton, it will not provide any indication of timing flows across Charlton – namely from any breakouts upstream of the town from Yeungroon Creek or either the Charlton St Arnaud Road tributary or the Calder Highway tributary.” 46. Notwithstanding a gauge is located at Coonooer (fig 3.1 page 10), no information has therefore been provided to show the river levels further upstream or at what point further upstream the river overflowed or at what time the breakouts referred to occurred. 47. Given the source of the water and timing is critical to the outcome of this matter, the Panel is of the opinion that any references to unsubstantiated breakouts from the Avoca River further upstream must be treated with caution. Where evidence is to the contrary, the contrary evidence is to be preferred. 48. Following visits to the area by FOS Panel members, and based on discussion with all parties, the Panel is of the opinion the landscape over which the water flowed from the south and east of the town cannot be regarded as a natural watercourse. Although the area from which the water flowed is designated as “Yeungroon Creek”, that appellation alone cannot be taken as evidence of a watercourse. 49. The following ruling was made by the High Court in Gartner v Kidman [1962] HCA 27: 108 CLR 12 (30 May 1962): Case No: 279236 Determination Page 11 of 13 “This distinction between watercourse and depression follows the language of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a depression which took rainwater for about three months of a year fell short of the legal definition of a natural watercourse. To constitute such a watercourse as a matter of law, there must be a stream of water flowing in a defined channel or between something in the nature of banks. The stream may be very small and need not run, nor need the banks be clearly or sharply defined. But there must be a course, marked on earth by visible signs, along which water usually flows in order to constitute a watercourse such as creates riparian rights (1899VLR at p485 (at p16) 50. The landscape to the south and south east of the town does not have evidence of visible banks between which water flows, and further, water does not usually flow along this stretch of land, which is only vaguely described by a range of indentations and vegetation. 51. In the Panel‟s view the landscape may best be described as a flood plain over which water flows in a direction determined by the rise and fall of the land. 52. This view is further supported by the description given by PM who observed Yeungroon Creek has been infilled with flood deposits over many years. The course of the creek to the south of the town is marked by linear depressions and vegetation. Further, by email dated 18 July 2012, PM observed: “Until water from the Avoca started overspilling into Yeungroon Creek (which happened quite late) all of the water in this area is essentially local water flowing over grass (as [WT] acknowledge) and is not river wate r.” 53. Additionally, photographs accompanying the WT report of 2 July, apart from the gauge located downstream of Charlton, depict culverts including at the crossing of the Charlton-St Arnaud Road and flat expanses of land at a road crossing about 8km upstream of Charlton. 54. Accordingly the Panel accepts that water which came from the area to the south and south east of Charlton referred to as the Yeungroon Creek area may not be regarded as water which escaped from the normal confines of a natural watercourse. Presence of clear water 55. The Applicants described the water which inundated their property as clear. 56. According to the PM report the presence of clear water was indicative that it was not water from the Avoca River or from Yeungroon Creek. While WT accepted the general principle of clear water discussed by the PM report, WT did not accept that water from Yeungroon Creek would contain high levels of sediment. 57. While the Panel accepts that clear water of itself is not definitive, given the timing of the initial inundation reported by the Applicants, the direction from which the water originated and the hydrological evidence, the Panel is Case No: 279236 Determination Page 12 of 13 persuaded, on the balance of probabilities that the clear water from the south east which initially entered the Applicants‟ p roperty at about 11.00am was most likely stormwater/surface rainwater runoff and not floodwaters from the Avoca River. Conclusion 58. In the Panel‟s opinion the water which entered the interior of the Applicants‟ home at about 6.45pm on 14 January 2011 was flood water from the Avoca River and as such any damage caused does not fall within the cover provided by the policy. 59. In the Panel‟s opinion the water which entered the property from about 11.00am on 14 January 2011 until about 5.00pm, when the Avoca River reached major flood level, was stormwater/surface rainwater runoff from the landscape to the south east of the town. 60. The shed is built on a concrete slab at ground level such that any water flowing or ponding in the back yard is likely to have entered the shed as the depth increased as described by the Applicants. 61. In this case the initial damage to the shed and the contents of the shed fall within the cover provided by the policy. 62. Although the Panel is satisfied that the initial damage to the shed and the contents of the shed fall within the terms of the policy as storm water runoff, the Panel is satisfied that most likely the damage sustained to the primary residence was caused by flood waters inundating the property from approximately 6.45pm. 63. The Panel is satisfied that the evidence establishes by that time flood water from the Avoca River had combined with the surface rain water runoff and storm water runoff and that this was the cause of inundation of the property. As the Panel determines that this inundation was due to flood, then the FSP is entitled to rely upon the relevant exclusions to deny liability for the damage to the interior of the Applicants‟ main residence. 64. Insofar as the inundation of the shed is concerned, the Panel notes PM has suggested that between 20 and 45cms of inundation can reasonably be demonstrated to have been attributable to storm water. In the absence of any or precise estimation and giving consideration to all of the relevant evidence, the Panel is satisfied that it is fair in the circumstances that the FSP is liable for the damage shed and contents of the shed as a result of inundation to the height of 40cms. The Panel accepts that inundation above that height is most likely due to the subsequent flood waters entering the Appli cants‟ property. Determination 65. Based on the available material the Panel determines: Case No: 279236 Determination Page 13 of 13 a. The FSP was entitled to deny liability for the damage to the interior of the Applicants‟ home. b. The Applicants are entitled to payment for the damage to the shed and any contents of the shed for water inundation up to 40cm. The FSP is entitled to assess the damage in order to establish the sum payable. c. In the event the FSP settles any part of the claim by a cash payment, interest is to be paid in accordance with Section 57 of the Insurance Contracts Act 1984 on that sum from 30 March 2011 being the date of the FSP‟s final decision until the payment is made.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.