Home / Financial Firm (Unknown - Insurer) / Determination 279234

Determination 279234

Inundation claim denied as flood; flash flood cover applied in part

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicants claimed for home and contents inundation from the January 2011 Brisbane River flooding, which the FSP denied as flood. AFCA found part of the inundation was flash flood and ordered the FSP to meet repair and replacement costs for that damage, subject to policy caps and a scope of works, with no interest.

Flash flood cover applies to sudden flood caused by heavy rain within 24 hours, and inundation up to the determined levels occurred within that period while later flood water is excluded.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 279234 Determination Page 1 of 9 Case number: 279234 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of Claim - Inundation - Flood vs Flash Flood 22 February 2013 Background 1. The Applicants insured their home and contents with the Financial Services Provider (FSP). The policy was incepted on 28 January 2004 and renewed annually. The building was insured up to a sum of $237,000 and the contents for $76,000. 2. On or about 12 Janua ry 2011, the Applicants’ home in Chelmer was inundated as a result of extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. 4. The Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 5. The Applicants say that the damage was due to a flash flood, which is an insured event under the policy. 6. Their home was suddenly inundated on 12 January 2011 as a result of the heavy rain which fell less than 24 hours earlier. 7. They say their neighbour’s claim, which was inundated in similar circumstances, was recently paid following a FOS dispute. Summary of FSP’s position 8. The FSP says that the loss was caused by the flooding of the Brisbane River and that this is excluded under the policy. 9. It relies on a number of hydrology reports authored by SC and the following policy provisions to deny the Applicants’ claim : Determination Case No: 279234 Determination Page 2 of 9 Page 4 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off . ... Storm A violent disturbance of the atmosphere associated with strong w inds including a cyclone, light ning, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS Case No: 279234 Determination Page 3 of 9 “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher , but not exceeding your contents sum insured . ... ...” Issue 10. Whether the cause of the Applicants’ loss was covered under the policy. Reasons for decision 11. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS’s Terms of Reference. This dispute has not been the subject of a FOS Recommenda tion and has proceeded directly to Determination. 12. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 13. The Panel notes that the following matters are not in dispute:  The Applicants held a held home and contents policy with the FSP at the time of the loss which covered certain listed events;  The Applicants were in receipt of a PDS; Case No: 279234 Determination Page 4 of 9  The policy extended to provi de “Advanced cover”;  Their policy provides cover for Flash flood but not for flood;  Their home was inundated on 12 January 2011; 14. The Panel accepts that the FSP’s policy does not extend cover to circumstances where a loss is caused by a flood. The policy also distinguishes between flood, flash flood and stormwater run-off (the latter two of which are covered). It extends cover to damage from sudden flood events “caused by heavy rain that fell no more than 24 hours prior” to the flash flood. 15. The Applicants have a two storey home. They note that a stormwater drain runs through the rear of the property and consider that the speed of the inundation, after the heavy rain of the day before, indicates that their loss meets the criteria established under the policy for a “flash flood”. 16. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to investigate and report on the damage caused to the Applicants ’ property. The report estimated that there was about $120,000 worth of building damage and $60,000 of contents damage. The report notes in relation to the speculated cause of the loss that: “On the 11 th January 2011, the Brisbane River overflowed, causing widespread flooding. The insured premises was inundated to a height of approximately 1m into the upper storey (approx 3.4m above ground level).(sic)” 17. MY noted that the Brisbane River was only 500m away from the property. The home was set on stumps, with the upstairs living area set about 2.4m above the ground. The water peaked about 1m above this level, being about 3.4m above ground level. The Applicants suggested that water first entered the property on Tuesday afternoon or early evening (11 January 2011). 18. The FSP subsequently engaged a hydrologist, SC, to provide a report as to the damage. 19. SC provided a statutory declaration dated 31 July 2012 to evaluate the cause of the loss in the region surrounding and specifically affecting the Applicants ’ home. He found that:  A substantial amount of rain fell in the greater Brisbane area from 9 January 2011 and over the subsequent two days, which caused significant inflows into the Wivenhoe Dam, which peaked on the evening of 11 January 2011.  Rain also fell in the area of the Bremer River from 6.00am on 11 January 2011. This rain travelled along the Bremer River to the junction of the Brisbane River and ultimately contributed about 15-25% of its peak flow.  A “small proportion” of the overall depth of the Brisbane River “may be partially attributable to the rain that fell in the Bremer River catchment on Case No: 279234 Determination Page 5 of 9 11 Januar y 2011”, although the “overwhelming influence” was the rain that had fallen in the previous days.  The terrain data for the Applicants’ home shows that the property varies between 6.3m AHD (Australian Height Datum) and 7.1m AHD. The lowest level of the home is situated at about 6.6m AHD.  The terrain data for the Applicants’ home suggested that it would not have been “particularly vulnerable” to significant stormwater or run -off problems during the period.  Inundation from stormwater run- off requires “intense levels of rain” which is sufficient to overcome the stormwater drainage system. Any such run- off generally occurs during or very shortly after such an intense period of rainfall.  A review of the rainwater gauge at Corinda High Alert, approximately 3.7km from the Applicants ’ property and representative of its rainfall in the expert’s opinion, revealed that 85mm of rain fell over 9 and 10 January 2011, with a further 43mm falling on 11 January 2011. The most intense rainfall (15mm/hour) fell on 11 January 2011 between 10.00am and 11.00am.  Only 2mm was recorded on 12 January 2011 and this was between 3.00pm and 5.00pm.  The overall intensity of the rainfall was “very low” and unlikely to result in run-off or stormwater inundation to the property.  The water levels of the Brisbane River reached 6.3m AHD at approximately 1.13am on 12 January 2011. This level would have been sufficient to begin inundation of the property. By 2.26am, the river reached a level of 6.6m AHD, which would have been sufficient to begin inundation of the lower level of the home.  No rainfall was recorded after 5.00pm on 11 January 2011 and only a further 2mm (between 3.00pm and 5.00pm) over the next 24 hours. The lack of rainfall means that the loss did not occur as a result of stormwater run-off.  The Applicants’ property was inundated by floodwater from the rising levels of the Brisbane River.  Noting the drain located in close proximity to the property, it is possible that some backflow inundation occurred, which involved water from the Brisbane River backing up the stormwater pipes and emerging from the surrounding drains. Such a loss is still attributable to flooding.  The estimated height of inundation, which included about 70cm into the second level of the property, was about 9.3m AHD. The Brisbane River rose to a height of 9.3m AHD. Case No: 279234 Determination Page 6 of 9  The videos provided by the Applicants demonstrate the extent of inundation and the visuals are consistent with inundation “being caused by the rising levels of the Brisbane River”. 20. As a result of the report from SC, the FSP denied the claim on the basis that it considered the cause of the loss to be flooding from the Brisbane River. 21. The Panel accepts that these estimates may not be entirely accurate. However, having regard to the expert evidence and in the absence of any expert evidence to the contrary, the Panel accepts, on the balance of probabilities that the loss was attributable to flooding. The policy only extends to provide limited cover to flash flooding. FOS has determined in other disputes, followi ng consideration of all material exchanged, that the heavy rainfall commencing around 4.00am on 11 January 2011 was a proximate or effective cause of the adoption of the W4 release strategy from the Wivenhoe Dam. 22. The Service has previously determined that the releases from the dam, combined with the heavy rain over the Brisbane River from about 4.00am that day and the heavy rain that commenced falling over the Bremer River, was the proximate cause of inundation of many properties downstream of the Wivenhoe Dam. 23. Given the wording of the FSP’s policy in respect to flash flood, the Panel considered the inundation in these earlier Determinations is properly categorised as flash flood on the basis that it occurs as a result of the direct influence of heavy rainfall and that the inundation of the home occurs within 24 hours of the commencement of this heavy rainfall. 24. On the balance of probabilities, the Panel accepts that the rain which fell over the Wivenhoe Dam from 4.00am on 11 January 2011 (which led to the decision to change the release strategy from W3 to W4) combined with the heavy rain that fell over the Brisbane River from that time and was the proximate or effective cause of the inundation of the Applicants’ property. 25. For the Applicants’ claim to succeed and fall within the definition of “flash flood” within the terms of the policy, it is necessary to establish the property was inundated within 24 hours of this heavy rainfall. As the Panel accepts the heavy rainfall commenced at approximately 4.00am on 11 January 2011 the inundation would have to occur prior to 4.00am on 12 January 2011. 26. In consideration of this, SC provided further evidence as to his estimated time of inundation for the property, addressed in a “Key Conclusions” statement. SC’s statement in dicates, consistent with the report of 31 July 2012, the effect of the W4 releases first reached the vicinity of the Applicants’ property at 2.30pm on 11 January 2011. He estimated that the property was first inundated by the Brisbane River at 2.16am on 12 January 2011and by 4.00am on 12 January 2011 the property was inundated up to 0.3m above the relevant benchmark level. Case No: 279234 Determination Page 7 of 9 27. Based on this conclusion and the evidence that inundation occurred within the 24-hour period, the Panel accepts that at least part of the loss is attributable to flash flooding. 28. The benchmark level relied by SC was his estimate of the lowest point of the house. For the Applicants’ property, this was estimated to be at the north - eastern tip of the rearmost part of the home. 29. The Key Conclusion statement notes in his comments about the benchmark level states: “Elevated (possible storage areas)” 30. It appears from SC’s observations that he did not visit the property. 31. In order to assist the Panel to determine this matter the Panel Chair Ombudsman undertook a site visit of the property on 14 February 2013 together with the female Applicant and a representative of the FSP. 32. It could be seen that the contours on the property were quite variable and part of the house appears to have been dug in to the surrounding ground. 33. The lower level of the home has been built-in to accommodate an office, laundry, bar cupboards and storage. Although SC set the benchmark at 6.6m AHD it was apparent the lowest part of the house is an outdoor porch which appears to be about 300mm below this. From there this leads into the lower level of the house which is marginally above the porch area, so allowing for the slab, this would mean the lower level would be at about 6.4m AHD. 34. It was also noted that there is a separate shed on the property, and although no accurate level was available this appears to be at about 6.8m AHD. 35. It was further noted that SC had estimated the peak level at 4.00am on 12 January 2011 was at 6.9m AHD, although that appears slightly below the other estimation SC provided for neighbouring properties. On that basis, it was agreed with the FSP’s representative that a height of 7.0m AHD would be more appropriate. 36. Based on the above observations, and having considered what is fair in all the circumstances, the Panel is of the view that as at 4.00am on 12 January 2011, that is the time at which the FSP would be liable for damage under its flash flood event, the level of inundation would have been approximately 7.0m AHD. This would have resulted in inundation to a level of 600mm above floor level in the lower level of the house. 37. In addition, the shed would have been inundated to a level of about 200mm above its floor level. 38. Therefore, the Panel determines that the FSP is liable for damage caused by water inundation up to those levels. Case No: 279234 Determination Page 8 of 9 39. The Panel notes that the ultimate inundation of the property was 2.6m above the benchmark level. SC identified this peak inundation occurred at approximately 12.24am on 13 January 2011 (although later referred to in error as 12 January 2011). For the sake of clarity, the FSP is not liable for any damage occasioned by inundation above the levels noted in the preceding two paragraphs. 40. To this extent, the Panel is satisfied that the inundation of the Applicants’ property to the level of 0.6m above floor level of the lower level of the home and 0.2m above the floor level of the shed were caused by flooding that occurred with 24 hours of the heavy rain. Quantum 41. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $237,000 for the home with contents of $76,000. Pursuant to the policy cap for the insured event of “Flash flood and stormwater runoff”, the FSP is liable up to an amount of $118,500 for the damage to the building and $38,000 for the contents. 42. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained, or a breakdown of that loss. 43. It was noted that the lower level of the house contained some living and storage areas. In addition, it appears that some of the wall linings at this level were asbestos and as such repair options for this would be problematic. 44. It was also reported that the shed contained a large number of items. 45. There is insufficient information available to the Panel to determine the extent of the loss. Given the limited evidence, it would be appropriate for the FSP to undertake a full scope of works for both the lower level of the home and the shed to determine the extent of loss attributable to the levels of inundation determined. Once agreed, the FSP is required to settle the dispute based on the costing of the scope of works at current rates. 46. Whilst the Panel would normally determine that interest is payable from the rejection of the claim in this case as any cash settlement must be made on the basis of a current scope of works costed at current rates the Panel considers in the circumstances no interest should apply to this dispute. 47. Insofar as the FSP may have made payment of a compassionate s um to the Applicants, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Case No: 279234 Determination Page 9 of 9 Determination 48. The FSP is to meet the cost of repairs incurred by the Applicants and the cost of the replacement of items damaged as a result of the inundation of the property. Any payment is subject to the limitations expressed in paragraph 41 of this Determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.