Home / Financial Firm (Unknown - Insurer) / Determination 279160
Determination 279160
Partial denial of claim - wear and tear and maintenance exclusion
Summary
The complainant's roof leaked in a 2012 storm and the FSP denied the roof damage as wear, tear and maintenance related, while accepting the resulting internal water damage. AFCA agreed the FSP was entitled to deny liability for the roof damage.
The roof damage was excluded as wear, tear and lack of maintenance under the policy terms, and no evidence showed an earlier FSP inspection or notification failure caused the loss.
Issues
- Claim denial primary · not upheld
“I am satisfied that the FSP is entitled to deny liability with respect to the Applicant's current claim for roof damage... due to wear and tear and maintenance related issues.”
- Inadequate claim investigation secondary · not upheld
“Allegations of a failure to properly inspect the roof in 2010 are pure speculation and are not supported by the material exchanged.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 279160 Determination Page 1 of 5
Case number: 279160
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Partial Denial of Claim - Exclusion/Condition
26 March 2013
Background
1. This Determination follows the rejection of a Recommendation issued on
behalf of the Service on 15 November 2012. The Applicant has rejected the
Recommendation and maintains that the FSP is liable for the loss suffered.
2. The Applicant held a classic home and contents insurance policy with the
Financial Services Provider (FSP) covering the home building for the sum of
$820,000 and home contents for $256,000 with a $100 excess.
3. The Applicant originally lodged a claim with the FSP on 15 February 2010
following damage by storm. The FSP recorded the original claim as follows:
“In sd adv during heavey rain his tiled roof has leaked and they have water
dmg to the ceiling and one wall in the lounge room. (sic)”
4. The claim was subsequently accepted and repairs completed by the FSP
with respect to the resultant damage.
5. On 10 January 2012, the Applicant lodged a further claim with the FSP
seeking cover for damage by rain. The FSP recorded the following claim
description:
“following rain and wind i noticed rain coming thru lounge ceiling dripping on
floor. This claim is similar to a claim made 12 months ago and ins demanded
that he lodged a new claim and not have this referred back to the original
repairer...” (sic)
6. Following investigation of the latest claim, the FSP declined the Applicant’s
claim on the basis that the expert report identified a hole in the sarking under
the downpipe spreaders and flashing sagging at the base of a valley gutter
as being the cause of the inundation and maintained the damages were due
to wear and tear and not caused by the claimed storm.
7. Insofar as the Applicant claims that the damage was due to poor prior
repairs performed by the FSP, the FSP maintains that no prior roof repairs
were undertaken by its repairer and the claim declined on the basis of wear
and tear and maintenance related issues and excluded from cover.
Determination
Case No: 279160 Determination Page 2 of 5
8. The Applicant disputes the FSP’s decision and maintains that inadequate
and ineffective repairs were undertaken at the time of the original claim and
that this likely contributed to the damage relating to the current claim.
Summary of Applicant’s position
9. The Applicant believes the FSP had not properly repaired the property
following the original claim in 2010 and as a result of the failure to do so they
have suffered damage in the current claim. He believes the FSP failed to
exercise proper care and reporting to him regarding the current
circumstances of the claim.
10. The Applicant maintains the FSP has provided incorrect and misleading
information relating to the claim and maintains the condition of the roof when
assessed at the time of the current claim was identical to the condition of the
roof when assessed at the time of the prior claim. If a proper assessment
had been made with respect to the original claim and if any defects had been
identified, repairs could have been affected and no further damage would
have been sustained. The failure to correctly assess and report the damage
at the time of the first claim has led to the subsequent loss.
11. As maintenance issues were identified with the property when assessed in
2012, this raises the issue of the competencies and adequacies of the
original inspection in 2010. The Applicant believes it would have been
impossible not to have been aware with the level of maintenance issues at
the time of the 2010 inspection given the photographic evidence supporting
the 2012 inspection.
12. The Applicant believes the internal damage occurred in exactly the same
areas of the lounge room in 2010 and 2012 which supports his argument
that the 2010 inspection did not occur. The Applicant does not believe the
2010 claim was correctly assessed and maintains there is no compulsive or
conclusive evidence to support this fact.
Summary of FSP’ s position
13. The FSP maintains that the damage to the Applicant’s roof which is the
subject of the current claim has not been caused by an insured event. A
qualified professional has inspected the property and the cause of the
damage has been identified as due to maintenance issues which will need to
be addressed.
14. The FSP relies upon the assessor’s comments which note as follows:
Hole in sarking under downpipe spreaders
Lead flashing sagged at base of valley gutter
May need extra waterproofing where valley gutter runs under brickwork
at front corner of top floor brickwork.
Case No: 279160 Determination Page 3 of 5
15. The FSP believes the damage was not as a result of an insured event and is
therefore not required to cover that portion of the Applicant’s claim and refers
to the relevant policy exclusions which include:
“ What is not covered under any party of your policy
This section details what is not covered under any part of your policy.
We do not cover loss or damage:
...
Failing to take care of the home or contents
Caused by, or as a result of, your failure to:
take reasonable care of your home and contents
keep the home and contents in good condition and well maintained
fix faults and defects as soon as you become aware of them.
...
We do not cover:
Wear, tear, rust or mould
Loss or damage caused by wear, tear, rust, fading, gradual deterioration,
mould, rising damp, mildew, action of light, atmospheric or climatic conditions,
corrosion or rot unless this is covered under:
insured event 1 (storm and flood)
insured event 2 (burst pipes, leaks and overflows). ”
(Pages 45 to 49).
16. The FSP maintains it is entitled to rely upon the opinions of its assessor and
roofing expert in determining that the damage to the roof is not from an
insured event. Further, insofar as the Applicant alleges the 2012 damage
resulted from poor and incomplete repairs in 2010, the FSP submits that the
repairs completed following the 2010 claim were for internal damage only,
but at the time the roof was inspected, the water ingress was established to
have been caused by the sheer volume of water and the inability of the roof
drainage system to cope with the volume of water.
17. Upon rejection of the Recommendation, the FSP was given the opportunity
of providing further submissions and has relied upon the arguments
presented in its Notice of Response to support its position.
Issue
18. Whether the FSP is liable to meet the costs of the Applicant’s repair in
accordance with the terms of the policy.
Case No: 279160 Determination Page 4 of 5
Reasons for Decision
19. I have had the opportunity of reviewing the material exchanged in this matter
and I am satisfied that each party is aware of the issues in dispute and has
had the opportunity of addressing those issues prior to the preparation of this
Determination.
20. The FSP claims enquiry screen reveals that at 11.56am on 14 February
2010 the Applicant lodged a claim with respect to damage to the ceiling and
one wall of the lounge room of his property. According to the description,
heavy rain caused the tiled roof to leak and water damage to ceiling.
21. According to the file review note dated 25 March 2010, the FSP contacted
the Applicant and advised that the repairer report identified water entry due
to volume. The report identified no false or storm created openings.
According to the note the FSP contacted the Applicant and the Applicant
advised they believed there were additional factors that had contributed to
the water entry and that they would contact the repairer to discuss the next
action. The FSP arranged for the appropriate repairs to be completed. The
claims screen r eveals that the Applicant’s next claim was lodged on 10
January 2012 and related to a loss occurring on 8 January 2012. Following
rain and wind the Applicant noticed rain coming through the lounge ceiling
and dripping onto the floor. The claims screen identifies the previous claim
and notes that in the previous claim the FSP had repaired the resultant
damage including painting of the lounge room, ceiling and cornices. The
repairer reported that there was no storm damage openings and no
openings to repair.The FSP provided a copy of the repairer report dated 2
March 2010. That report refers to a meeting with the Applicant. The report
notes that the roof was a terracotta tile roof and that there was no storm
damage openings and no openings to repair. The cause of the water ingress
to the valley was from “the valley running under the brickwork and the
flashing has dammed causing the stormwater to back flow over the valley.
The report considered this to be due to the volume of water.Although the
Applicant has queried this position, I have no other information which would
dispute the explanation provided by the repairer in 2010 as the cause of the
damage sustained in February 2010. The FSP has provided a further
builder’s assessment report dated 17 January 2012. That assessment report
follows the Applicant’s current claim. That report identifies that a roofer
having inspected the roof considered two downpipe spreaders are leaking
through the tiles into the sarking. The rear leak is also leaking through where
the lead flashing has sagged at the bottom of the valley. The spreaders need
flashing to disperse the water on to the tiles. The front roof has a large hole
in the sarking where it is dripping into the ceiling. The FSP notes there was
resultant damage including water stains to the dining room, ceiling and
cornice. The FSP accepts liability for the resultant damage but maintains the
damage to the roof is due to lack of maintenance.I am satisfied that the
subsequent builder’s report can be relied upon to establi sh that most likely
the cause of damage to the Applicant’s property in 2012 was due to the
issues with the spreaders and sarking which are wear and tear and
maintenance related issues.I have been provided no other information to
Case No: 279160 Determination Page 5 of 5
dispute the findings of the building assessor that the damage as identified to
the roof is damage due to wear and tear and lack of maintenance. There is
no dispute that the Applicant had received the PDS from the FSP and no
dispute that the Applicant was aware of the terms and conditions of the PDS.
The terms and conditions are quite clear. They do not cover wear and tear,
rust, fading, gradual deterioration etc. There is nothing in the information
provided by the Applicant to suggest that the opening in the roof that led to
the damage was caused by anything other than wear and tear or lack of
maintenance. There is nothing in the material exchanged to suggest that the
wear and tear or gradual deterioration was caused by an insured event. The
Applicant’s main argument appears to be that if he had been made aware of
the maintenance related issues, he would have been able to attend to the
appropriate repairs and prevent the damage sustained in 2012. The
Applicant believes the FSP should have identified the maintenance issues
on inspecting the roof in 2010 and should have notified him of these issues
at that time. The Applicant’s view is the FSP’s failure to notify him has
directly caused and contributed to the current loss.On looking through the
material exchanged, I am satisfied that the FSP did not advise the Applicant
of any maintenance related issues at any time prior to the damage identified
in the builder assessment report of 17 January 2012. I am also satisfied
however that no such maintenance issues were previously identified. On
looking at the report from the earlier incident, no maintenance issues were
identified and there is no evidence before me to allow me to form a view that
such evidence would have been availab le in 2010. In the circumstances, I
am not satisfied that there is any evidence before me to identify either a
failure on behalf of the FSP to notify the Applicant of the maintenance issues
or a failure on behalf of the FSP to properly inspect the roof in 2010. In my
view such allegation by the Applicant are pure speculation and are not
supported by the material exchanged.I note the FSP accepts that the internal
damage to the Applicant’s property was caused as a result of rain water
damage. The FSP has advised that it is prepared to meet the costs
associated with the rainfall damage, but is not prepared to meet the
maintenance related issues that have caused the damage. In my view,
having considered all of the material, I accept that the FSP is not liable to
meet the maintenance costs associated with the roof damage and that it is
reasonable for the FSP to determine to either cash settle the Applicant for
the cost of the internal repairs or alternatively insist on the maintenance
related repairs being comp leted at the Applicant’s cost prior to the internal
repairs being affected.In this regard, I agree with the comments made in the
Recommendation that upon completion of the relevant maintenance repairs,
appropriate confirmation of these repairs should be provided to the FSP by
the Applicant and upon receipt of the same, resultant internal rain water
damage should be authorised for repair by the FSP. If the FSP decides to
cash settle the cost of the repairs, the FSP should do so without further
delay. Determination
37. Accordingly, I determine that the FSP is entitled to deny liability with respect
to the Applicant’s current claim for roof damage sustained through a storm in
January 2012 on the grounds that the damage is due to wear and tear and
maintenance related issues and excluded under the terms of the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.