Denial of soil movement damage to front retaining wall, driveway, paving and south wall
Text of the determination
Case No: 279101 Determination Page 1 of 13
Case number: 279101
General Insurance - Domestic Insurance - Home Building - Water Leak on
Property - Soil/Foundation Movement
20 September 2013
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the background as set out in the
Recommendation is accurate and is as follows.
2. The female Applicant held a home building insurance policy with the
Financial Services Provider (FSP) at the relevant time. The policy provided
cover for complete building replacement.
3. On or about 2 September 2009, the Applicants lodged a claim with the FSP.
The male Applicant served as the primary contact. The claim related to
damage caused to the property from a water leak from a damaged pipe
under the home.
4. The FSP accepted the claim and arranged for repairs to be conducted to the
house. Issues arose as to the extent of cover and the conduct of the FSP’s
service providers. The FSP also refused to cover the damage to the front
retaining wall, the driveway and the front south wall of the home.
5. The Applicants disagree with the decision and seek the complete and proper
repair of the home.
6. The Applicants did not agree with the FSP’s decision, hence the dispute
which was the subject of a Recommendation. The Recommendation was in
favour of the FSP and was not accepted by the Applicants. The FSP
accepted the Recommendation. In the circumstances, the matter has been
referred to me for Determination.
Summary of Applicants’ p osition
7. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicants’ position as set out in
the Recommendation is accurate and is as follows.
8. The Applicants say that the FSP has not handled the matter appropriately or
repaired the home well enough as new cracks have appeared in the property
Determination
Case No: 279101 Determination Page 2 of 13
since the work was completed and the property is sloping towards the front
as a result of insufficient underpinning works.
9. They insist that the damage to the front south wall and the front retaining
wall of the property are also related to the insured event and should be
covered.
10. A leak was first seen in 2007 at the front/side of the fence but the source of
the leak was not detected. The fence started to crack and warp. Leaking
occurred again in 2009 because of the leak from the pipe from the hot water
service.
11. The FSP’s assessor , “ BH ”, inspected the property in June and August 2010
and supports the Applicants but the FSP have used other advisors and
although repairs have been done they are inadequate and the damage is
returning and worsening.
12. The Applicants rejected the Recommendation and provided further
information in support of their position as set out in letters dated 4 April 2013,
9 April 2013 and 4 June 2013. They maintain the front of the house has to be
anchored or underpinned and the further damage is due to the FSP’s
substandard and incomplete tradesmen and workmanship.
13. Photographs are noted as “show(ing) further damage (as described) and
incomplete works (done the first time round) that are currently causing
further damage and that the house is still in movement.”
Summary of FSP’ s position
14. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP’s positio n as set out in the
Recommendation is accurate and is as follows.
15. The FSP says that it has covered the Applicants to the extent required under
the terms of the policy.
16. The Applicants have the onus to establish that the original damage was
caused as a result of an insured event and they have not been able to do
this.
17. Three expert reports attest to the cause of the claimed damage to the front
retaining wall, the driveway and the front south wall of the home and say it is
not related to the leak from the underground pipe.
18. The FSP relies on the following policy provisions:
Pages 8-11 of the Product Disclosure Statement (PDS)
“ What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
Case No: 279101 Determination Page 3 of 13
No – the conditions and exclusions that specifically apply to particular
insured events.
...
Yes
Liquid escaping suddenly and unexpectedly from a:
water main, drain, fixed pipe... ”
Page 14 of the PDS
“ What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
...
wear and tear, rust, deterioration or corrosion,
mechanical, structural, electrical, electronic or other failure or
breakdown...
mould, wet or dry rot, rising damp or dampness,
...
erosion, or washing away of soil, earth or gravel,
...
soil movement or settlement,
subsidence... unless caused by the insured event of earthquake,
...
the actions of trees, plants or their r oots...”
19. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position save to respond to the
Applicants in its email dated 7 May 2013.
Issues
20. Whether the FSP is obliged to cover the Applicants for the damage to the
front retaining wall, the driveway and/or the front south wall of the property.
21. Whether the additional damage located at the home was incurred as a result
of an insured event or faulty workmanship.
Reasons for Decision
22. There has been an exchange of material between each party and I am
satisfied each party has had an opportunity to reply to the issues raised.
23. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
Case No: 279101 Determination Page 4 of 13
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
24. Whilst the policyholder for this matter is the female Applicant, all discussions
in relation to the claim appear to have been with her son, the male Applicant.
For the purposes of this Recommendation, I shall refer to any matters
involving either Applicant collectively as relating to “the Applicants”.
Background
25. The FSP’s records show the Applicants lodged the claim on 2 September
2009 as there was water on the front lawn and extending to the street. The
Applicants had noticed a leak two years ago too but the water provider could
not detect it. This time the water provider detected the leak from the hot
water service and attended to fix it. The Applicants noted “cracks in my walls
and the archway has lowered .....not sure if this has been caused by the leak
....water under the house...”
26. The FSP sent an assessor, “ TL ”, who said the property needed to dry out for
six months before repairs could begin. Already a dispute about the cause of
the damage to the retaining wall at the front was in evidence. The FSP
required the original detection leak report and the excess water bills. This
claim was to be a separate claim as it arose from a separate and earlier
incident.
27. The assessor BH then attended the property and soil tests were arranged to
be done by “ SG ” and sent to BH. Water bills were also required.
28. On 25 June 2010, the FSP arranged for an engineer, “ FM ”, to attend to
comment on the cause of the damage to the wall and to get the other repairs
arranged. ALD were also engaged to confirm no further leaks.
29. Engineer FM did not agree that the burst pipe caused the retaining wall
damage. He said it was due to natural soil movement.
30. A new engineer, “ HC ”, was appointed as there had been an altercation with
FM and there was an allegation of bias.
31. The new engineer HC also said the retaining wall and driveway damage
were not caused by the leaking pipe.
32. Work was done on the scope of works and the works were likely to start in
January 2011 but there were delays for a variety of reasons. The works then
started and were undertaken for a number of months with a number of
contacts with the Applicants, the FSP and the assessor.
33. The FSP maintained the decline for the front fence and in May 2012 the
Applicants raised a concern regarding cracks in the front of the property, so
the FSP again requested an engineer’s report. The engineer HC said this
damage was also not due to the leaking pipe.
Case No: 279101 Determination Page 5 of 13
The Dispute
34. The Applicants have made many complaints about customer service, the
repairs done and the management of this claim to which I will refer later.
35. The nub of this dispute is regarding the denial of two parts of the Applicants’
claim; the damage to the front retaining wall of the home, the driveway and
the paving and (later on) the damage observed to the front south wall of the
home, that appears was not immediately apparent or not present at the time
that the original repairs were done.
36. I t is an accepted principle of insurance law that the onus rests with an
insured to prove, upon the balance of probabilities, that they have sustained
a loss caused by an event insured for under the policy in force at the date of
loss ( Regina Fur Co. L td v Bossom (1957) 2 Lloyd’s Rep 466) . Once
established the onus then shifts to the FSP to establish the application of
any exclusion on which it relies to deny or limit the claim.
37. It is not in dispute that the Applicants’ home was damaged as a result of an
insured event, which involved a leaking pipe under the premises discharging
water over a period of time which was identified in or about November 2009.
The dispute is about the extent of the damage.
38. I note also an earlier leak in or around 2006/07. The source of this leak does
not appear to have been identified. The Applicants told FM that the leak
stopped without any repair.
39. The FSP says it has attended to repairs in relation to the items affected by
the 2009 event. I also note the water company repaired the leaking pipe not
long after the Applicants identified the leak.
40. The issue in dispute is whether the FSP is entitled to deny indemnity
regarding damage to the front fence retaining wall, driveway and the front
south wall. It says it has expert opinions which support its position. It
contends the Applicants have failed to discharge the onus to establish a
valid claim for these areas and says it has demonstrated that the loss is
excluded under the policy.
41. I will now consider the expert opinions about the areas in dispute.
The Expert Opinions
Front retaining wall, driveway and paving
42. I have carefully reviewed all the relevant material submitted by the parties
and save where I make note specifically, I am satisfied the summary of the
material in this regard as set out in the Recommendation is accurate and is
as follows.
Case No: 279101 Determination Page 6 of 13
Opinion of BH
43. The Applicants rely strongly on the verbal opinion provided to them by the
FSP’s assessor, BH. He is described by them as a flood specialist from
Queensland and they say he was sent on 4 June, 10 June and 2 August
2010 to investigate the cause of the damage to the property after the FSP
spoke to the water provider.
44. The Applicants say BH told them that “all damages are caused by the
leak/flood and the soil was extremely saturated and is moving ” and that,
“(the FSP) should repair the Property and Dwellings in accordance to the
policy.”
45. No formal report was produced as BH is an internal loss adjuster for the
FSP. A report was typed directly into the FSP’s computer system on 17
March 2010 and noted:
“TL HAS ASSESSED THE PROPERTY IN NOV 09 AND JAN10 AND
SUGGESTED THE SUB-FLOOR BE ALLOWED TO DRY OUT FOR APPOX
6 MONTHS BEFORE ASSESSING THE DAMAGE.
I HAVE RETRIEVED PREVIOUS ASSESSMENTS COMPLETED BY TL AND
INSPECTED THE INSIDE OF THE HOME.
WHILST THE INTERNAL CRACKING TO ME IS CONSISTENT WITH
NORMAL MOVEMENT OF THE BUILDING DUE TO REACTIVE CLAY SOIL
FOUNDATIONS, IT[’]S ALSO CONSISTENT WITH HEAVE AND
[SUBSIDENCE] DUE TO SATURATED FOUNDATIONS.....
THE SUB FLOOR NOW LOOKS TO BE DRY AS THERE IS LARGE
CRACKS IN THE CLAY SURFACE. THE FRONT LAWN NEAR THE FRONT
RETANING WALL ALSO LOOKS DRY AND IS COVERED WITH DRIED
MOSS INDICATING THAT THE AREA WAS SATURATED.....”
46. BH also notes that the Applicants were frustrated by the FSP’s refusal to
accept the front retaining wall as part of the claim resulting from the burst
pipe. BH concluded:
“IT [IS] MY OPINION [THAT] THE DAMAGE IS INDICATIVE OF THE
BURSTING LEAKING EVENT.....
(but says further)
“....THE CLAIM IS FOR CONSIDERATION AT THIS STAGE AND WOULD
SUGGEST A SOIL TEST BE CARRIED OUT TO EXAMINE MOISTURE
LEVELS TO THE SUB- FLOOR.”
47. I accept from this note that BH was supportive of the Applicants but I do not
think this is his concluded and final view. He indicates to the FSP that it
should tell the Applicants that the “claim is for consideration”. BH does not
say the claim is for acceptance. He concludes that an expert report is
required - a soil test to show moisture levels and that the FSP is to examine
material provided from the water provider.
Case No: 279101 Determination Page 7 of 13
Opinion of SG dated 11 May 2010
48. SG was the geotechnical expert retained to look at the soil composition. The
salient parts of his report read:
there was some variation in the soil readings taken from the premises;
the soil moisture under the house was considered slightly higher than
normal at a depth of 1m but otherwise normal;
the soil moisture reading adjacent to the front of the house was
considered “to be within a normal range”;
the “slightly higher than normal soil moisture content of the sandy clay”
under th e home “would result in volumetric swelling and could be a
factor in the observed internal cracking of plaster”;
the cracking in the front retaining wall “is most likely due to 6m high
conifer tree” in the front yard, situated about 3m from the wall. SG
su ggested that the tree roots were likely exerting “significant pressure”
on the wall.
Opinion of FM dated 29 July 2010
49. An engineering expert, FM, was retained next to inspect the home. FM noted
that:
a number of large tress in close proximity to the house;
the moisture content of the soil is affected by the trees;
he noted the damage to the house and documented it;
there is a fall from the centre of the house to the SW and NE corner of
the house towards trees;
given the moderately reactive clay identified at the site, the soil will
swell with higher moisture content and shrink when it departs;
the wall cracking pattern and the floor level survey indicates differential
foundation movement with relative settlement noted at the north
eastern and south western region of the home;
contributing factors to the differential foundation settlement include:
o soil drying due to the proximity of trees to the home, combined
with the drought conditions over recent years;
o the impact of local water restrictions in recent years;
o seasonal changes in soil moisture contents amplified by the trees;
Case No: 279101 Determination Page 8 of 13
o unsatisfactory founding depth and size for the footings, given the
proximity of the trees; and
o the trees do not meet recommendations in Australian standards or
CSIRO publications.
if the leak from the broken pipe had caused significant damage to the
property, the soil would have expected to swell (or heave) not shrunk;
if heave had occurred, the floor level would be higher than its surrounds
but it is not as the fall in the floor is relatively uniform;
there were no identified issues with stormwater infrastructure in and
around the property – he confirmed this by reviewing the ALD report of
8 July 2010;
FM concluded “the observed distress (in the house) is most likely
caused by the foundation movement as a result of the contribution
factors outlined above and is not caused by the alleged broken water
pipe works in the house” .
Opinion of HC dated 22 October 2010
50. Because of the allegation of bias made by the Applicants against FM, the
FSP retained another structural engineer expert (HC) to inspect the property.
HC provided two reports, the first being from 22 October 2010, which
relevantly provided:
the property was purchased in or around 1986 and has a fall to the
south (the front);
the leaking water pipe was found under the bathroom of the home and
he was told it was repaired in or about September 2009;
extensive cracking and movement had been noticed in the front
driveway and brick fence. Some of the cracking showed “weathered
edges”, ind icating that it had been occurring for some time;
the front brick wall acts as a retaining wall as earth has been built up to
it;
he inspected under the floor and noted it was very dry but also saw
evidence of water having occurred underneath the house;
the floor levels had small variations of 10mm to 20mm over most areas
of the house;
he looked at DVD and CD of photos and noted the cracking and the
water escaping from the front fence area. He also saw water on the
video underneath the house where the pipe was repaired;
Case No: 279101 Determination Page 9 of 13
He also considered the soil tests done by SG;
He noted the leakage from the pipe had occurred over an unknown
period of time and caused a “considerable amount” of water to pool
under the home at the time (as evidenced in the Applicants’ vide o
recording);
He said the cracking to the house is typical of problems that occur due
to differential settlement of the footing and that occurs due to changes
in the moisture content of the foundation material;
a leaking pipe can affect the moisture content of the soil and cause
movement in the footings of the home – generally, HC considered the
observed movement inside the home to have been “minor”;
HC was satisfied that the movement in and around the home could be
attributed to the overflow from the leaking pipe;
HC was told of the previous leak from a water pipe from several years
earlier “occurred near the front fence area”. It was told it was repaired
when it was found;
the movement and cracking to the concrete paving and the driveway
are not due to the leaking water pipe but “typical of problems that occur
due to movement of the sub base” due to normal seasonal changes.
HC did not consider that this would have been affected by water from
the leaking pipe. He s aid the water from the leaking pipe “would not
have extended out particularly to the western pavement as a brick walls
occurs in this area”. He says: “in our opinion the water would not have
extended up to the concrete driveway area”;
He concludes: the cra cking and movement to the front fence is “typical
of problems that occur due to horizontal loads being applied to the
fence”. He notes the fence is acting as a retaining wall. He says no
weep holes were in the wall and this can allow water to build up in the
soil behind, during or after periods of heavy rain;
HC concluded that the “cracking and movement of the brick front fence
has resulted due to the fence being inadequately designed to act as a
retaining wall and the leaking water pipe has not resulted in movement
to the fence”. He says this even though he saw the video of the leaking
water. He says this water would not have built up to a great height
behind the wall and a heavy rainstorm would result in more water build
up;
He also noted the cracking showed weathered edges which indicated
to him the cracking had been occurring for some time;
He made certain recommendations for the general areas of repair and
said repairs could be done as the soil had now dried out sufficiently;
Case No: 279101 Determination Page 10 of 13
He said that if any further cracking occurred after the repairs it was due
to drought conditions that were then still applicable;
He also said the front fence should be demolished and a new wall built
as designed by an engineer.
51. Having read and considered the expert opinions and accompanying material
carefully, I am of the view that an insured event has occurred – that is, water
has leaked from a pipe and caused some damage to the house. Having
considered the photographs carefully, I agree that the paving in the driveway
and the front fence are cracked and in need of repair.
52. However, all the experts agree – the damage to the paving in the driveway
and the front fence is not a direct result of the leaking pipe in 2009. Based on
these opinions, in my view, the FSP is entitled to deny this part of the claim.
Even if I was to discount the opinion of FM because of the alleged altercation
with the Applicants, the reports from HC and SG are clear and unequivocal
and do not support the Applicants’ contentions.
53. As part of their submission to the Service, the Applicants provided a video
recording of the observed damage at the property but HC has seen this too
and considered it but it has not convinced him that the damage to the front
wall was caused by the leak from the pipe for the reasons he gives in his
report. Hence, in the absence of any other expert opinion, I accept the expert
opinion of HC.
54. The Applicants also relied heavily on BH but in my view, his was not a
concluded view. He was still awaiting the results of soil tests and as set out
ab ove, the soil tests were not supportive of the Applicants’ position.
Front south wall
55. After the repairs to the home had been completed, the Applicants contended
that the front south wall of the home had suffered further damage, too.
56. Therefore to address this, the FSP asked HC to attend the property and
inspect again.
HC’s report of 20 June 2012
57. HC noted that:
there was minor hairline cracking evident on the brick work “near the
roof line at the east end”. The problem was not apparent when the
property was previously inspected by him;
two large trees were noted in the vicinity of the south wall;
the damage to the wall is typical of problems attributable to differential
settlement of the footings;
Case No: 279101 Determination Page 11 of 13
changes in the moisture content of the soil can affect this. The
presence of the two trees on the property would contribute to the drying
out of the footings;
the water from the leaking pipe would have dissipated away from the
this area of the house and not affected the foundation material to the
south wall at the home;
in any event, he would have expected any problems to have been
apparent within 12 -18 months after the leak.
58. HC concluded that the cracking is minor: that it has resulted due to seasonal
changes in the moisture content of the soil and that two large trees growing
near this corner have affected the cracking too. He suggested tree root
barriers be installed.
59. In short, he concluded this cracking is not related to the leaking water pipe
that occurred around September 2009.
60. Having read and considered the expert opinion carefully, I am of the view the
damage to the front south wall is not a direct result of the leaking pipe in
2009. In the absence of any other expert opinion to the contrary, and based
on this opinion from HC, in my view, the FSP is entitled to deny this part of
the claim.
61. The Applicants have made a number of assertions about the cause of the
damage both before and after the Recommendation but in the absence of
independent evidence to support their assertions I am not persuaded on the
balance of probabilities, that an insured event has occurred which has
damaged the front retaining wall, driveway and paving or front south wall.
Claims Management
62. During this claim, on a number of occasions, the Applicants have expressed
dissatisfaction with the claims management by the FSP. After the
Recommendation, the Applicants say “(the FSP) has shown total disregard
and disrespect to us as a client/customer and towards our claim”.
63. I have considered all the material presented to me and I have read the
lengthy claims notes by the FSP. Having done that, I am of the view, that a
difficult and complex claim has been managed well and with regard and
respect. By and large, the response of the FSP has been timely and
responsive and in general, accords with industry standards. On the material
presented, I am not satisfied the FSP has managed this claim with
“disregard and disrespect.”
Complaints about the standard of repairs
64. After the Recommendation, the Applicants continued to complain that the
repairs were not adequately performed and that the underpinning was
Case No: 279101 Determination Page 12 of 13
insufficient. The Applicants list some complaints in the letters dated 4 April
2013 and more specifically in the letter dated 9 April 2013.
65. The FSP responded in its email dated 7 May 2013 that;
“The dispute is in relation to items that were not covered under the claim. This
information is in relation to faulty workmanship and this is the first time the Applicant
has advised that there is damage occurring due to faulty repairs. I would not be
able to provide a response to this information as (the FSP) has not assessed the
new issues raised by the Applicant to confirm if it would accept liability for these
damages.
(the FSP) would be happy to arrange an assessment of these damages if the
Applicant is willing to have someone attend. ”
66. Relevantly, the Applicants responded in the letter dated 4 June 2012 the
following:
“Yes, there is more damage due to their sub standard tradesmen and
workmanship that was/is incomplete that they originally had started.”
67. I do note from the FSP file notes that various complaints were made about
repairs around April 2012. The FSP arranged a quality assessment on or
about 3 April 2012 and it was agreed that an amount of $6,000 would be
paid to finalise the claim and this was done on or about 20 April 2012.
68. An assessor, “ NW ”, provided a report to the FSP on or about 4 May 2012 of
that assessment. I note an extract from the FSP’s notes as follows:
“ Photos taken: Yes
.
Observations.
(In)ternally that he was not happy with.
Minor cracks to the kitchen plasterboard ceiling and to the mitred cornice
joins.
Metal carpet/tile strip and cavity sliding door head fillet had not been installed.
Crack to the internal cornice join in the laundry above the cupboard.
Silicone seal around the sliding door/window unit.
Painting of the timber trimmer by the sliding door/window unit externally.
Laying of rio and concrete path (10.0m2).
Acid wash to bricks (north/western corner of dwelling).
Replacement of a bucket.
Discussions.
I advised (the Applicants) (FSP) would cash settle $6,000 for the above listed
works.
(The Applicants) seemed to be pleased with the offer and accepted that this
was the only option for the final settlement of this claim.
Case No: 279101 Determination Page 13 of 13
Other notes.
(FSP) to send (Applicants) a cheque for $6,000 as final payment/settlement of
this claim.”
(NW).
69. I do not have enough material to make a determination on this aspect of the
matter. In my view, the parties need to consider the current complaints about
the standard of repairs as set out in the letters dated 4 and 9 April 2013 and
need to ensure none of this has already been compensated for by the
payment of $6,000 in April 2012.
70. To resolve this aspect of the matter, I agree with the suggestion made by the
FSP that if the Applicants are willing to have someone attend the property,
the FSP can then assess these complaints about the allegedly inadequate
repairs and confirm if it will accept liability for these items.
71. I clarify that this assessment is only about the allegation of the inadequate
repairs. I note the opinion of HC that the effect of the leak from the pipe
should not be ongoing by this time. HC said: “In any event, I would have
expected any problems to have been apparent within 12 -18 months after
the leak.” Nearly four years have passed since the l eak was found and
repaired. There is no evidence that any complaints now continue to be linked
to this leak so this new assessment is only to deal with the allegation of
inadequate repairs and not any alleged new areas of damage.
72. For the sake of clarity also, this new assessment is not to deal with the claim
for damage to the front retaining wall, driveway and paving or front south
wall as I have found the FSP is not liable for that damage.
Determination
73. On the basis of the available information and for the reasons stated, I
determine that the FSP is not obliged to indemnify the Applicants for the
damage to the front retaining wall, driveway and paving or front south wall.
74. As for the claim made that some repairs were not adequately performed as
set out in th e Applicants’ letters dated 4 and 9 April 2013, on the basis of the
available information and for the reasons stated, I determine that if the
Applicants are willing to have someone attend the property, the FSP can
then assess these complaints about the allegedly inadequate repairs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.