Determination 279101

Denial of soil movement damage to front retaining wall, driveway, paving and south wall

FirmFinancial Firm (Unknown - Insurer)
Decided2013-09-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for damage to a front retaining wall, driveway, paving and south wall after a leaking pipe, and the FSP had paid $6,000 for other repairs. AFCA found the disputed structural damage was not caused by the leak and allowed a reassessment of the alleged inadequate repairs.

The independent expert evidence attributed the disputed damage to soil movement and tree roots, so the applicants did not establish that an insured event caused it.

Issues

Subjects and remedies

home or building damagereassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 279101 Determination Page 1 of 13 Case number: 279101 General Insurance - Domestic Insurance - Home Building - Water Leak on Property - Soil/Foundation Movement 20 September 2013 Background 1. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the background as set out in the Recommendation is accurate and is as follows. 2. The female Applicant held a home building insurance policy with the Financial Services Provider (FSP) at the relevant time. The policy provided cover for complete building replacement. 3. On or about 2 September 2009, the Applicants lodged a claim with the FSP. The male Applicant served as the primary contact. The claim related to damage caused to the property from a water leak from a damaged pipe under the home. 4. The FSP accepted the claim and arranged for repairs to be conducted to the house. Issues arose as to the extent of cover and the conduct of the FSP’s service providers. The FSP also refused to cover the damage to the front retaining wall, the driveway and the front south wall of the home. 5. The Applicants disagree with the decision and seek the complete and proper repair of the home. 6. The Applicants did not agree with the FSP’s decision, hence the dispute which was the subject of a Recommendation. The Recommendation was in favour of the FSP and was not accepted by the Applicants. The FSP accepted the Recommendation. In the circumstances, the matter has been referred to me for Determination. Summary of Applicants’ p osition 7. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the Applicants’ position as set out in the Recommendation is accurate and is as follows. 8. The Applicants say that the FSP has not handled the matter appropriately or repaired the home well enough as new cracks have appeared in the property Determination Case No: 279101 Determination Page 2 of 13 since the work was completed and the property is sloping towards the front as a result of insufficient underpinning works. 9. They insist that the damage to the front south wall and the front retaining wall of the property are also related to the insured event and should be covered. 10. A leak was first seen in 2007 at the front/side of the fence but the source of the leak was not detected. The fence started to crack and warp. Leaking occurred again in 2009 because of the leak from the pipe from the hot water service. 11. The FSP’s assessor , “ BH ”, inspected the property in June and August 2010 and supports the Applicants but the FSP have used other advisors and although repairs have been done they are inadequate and the damage is returning and worsening. 12. The Applicants rejected the Recommendation and provided further information in support of their position as set out in letters dated 4 April 2013, 9 April 2013 and 4 June 2013. They maintain the front of the house has to be anchored or underpinned and the further damage is due to the FSP’s substandard and incomplete tradesmen and workmanship. 13. Photographs are noted as “show(ing) further damage (as described) and incomplete works (done the first time round) that are currently causing further damage and that the house is still in movement.” Summary of FSP’ s position 14. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the FSP’s positio n as set out in the Recommendation is accurate and is as follows. 15. The FSP says that it has covered the Applicants to the extent required under the terms of the policy. 16. The Applicants have the onus to establish that the original damage was caused as a result of an insured event and they have not been able to do this. 17. Three expert reports attest to the cause of the claimed damage to the front retaining wall, the driveway and the front south wall of the home and say it is not related to the leak from the underground pipe. 18. The FSP relies on the following policy provisions: Pages 8-11 of the Product Disclosure Statement (PDS) “ What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, Case No: 279101 Determination Page 3 of 13 No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Liquid escaping suddenly and unexpectedly from a: water main, drain, fixed pipe... ” Page 14 of the PDS “ What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... wear and tear, rust, deterioration or corrosion, mechanical, structural, electrical, electronic or other failure or breakdown... mould, wet or dry rot, rising damp or dampness, ... erosion, or washing away of soil, earth or gravel, ... soil movement or settlement, subsidence... unless caused by the insured event of earthquake, ... the actions of trees, plants or their r oots...” 19. The FSP accepted the Recommendation and did not provide any further documentary information in support of its position save to respond to the Applicants in its email dated 7 May 2013. Issues 20. Whether the FSP is obliged to cover the Applicants for the damage to the front retaining wall, the driveway and/or the front south wall of the property. 21. Whether the additional damage located at the home was incurred as a result of an insured event or faulty workmanship. Reasons for Decision 22. There has been an exchange of material between each party and I am satisfied each party has had an opportunity to reply to the issues raised. 23. Each FOS case is decided on its merits, taking into account the facts of the case. I have reviewed all the material submitted by the parties both before Case No: 279101 Determination Page 4 of 13 and after the Recommendation was issued, in order to reach my decision. I will only refer to the relevant submissions and materials raised. 24. Whilst the policyholder for this matter is the female Applicant, all discussions in relation to the claim appear to have been with her son, the male Applicant. For the purposes of this Recommendation, I shall refer to any matters involving either Applicant collectively as relating to “the Applicants”. Background 25. The FSP’s records show the Applicants lodged the claim on 2 September 2009 as there was water on the front lawn and extending to the street. The Applicants had noticed a leak two years ago too but the water provider could not detect it. This time the water provider detected the leak from the hot water service and attended to fix it. The Applicants noted “cracks in my walls and the archway has lowered .....not sure if this has been caused by the leak ....water under the house...” 26. The FSP sent an assessor, “ TL ”, who said the property needed to dry out for six months before repairs could begin. Already a dispute about the cause of the damage to the retaining wall at the front was in evidence. The FSP required the original detection leak report and the excess water bills. This claim was to be a separate claim as it arose from a separate and earlier incident. 27. The assessor BH then attended the property and soil tests were arranged to be done by “ SG ” and sent to BH. Water bills were also required. 28. On 25 June 2010, the FSP arranged for an engineer, “ FM ”, to attend to comment on the cause of the damage to the wall and to get the other repairs arranged. ALD were also engaged to confirm no further leaks. 29. Engineer FM did not agree that the burst pipe caused the retaining wall damage. He said it was due to natural soil movement. 30. A new engineer, “ HC ”, was appointed as there had been an altercation with FM and there was an allegation of bias. 31. The new engineer HC also said the retaining wall and driveway damage were not caused by the leaking pipe. 32. Work was done on the scope of works and the works were likely to start in January 2011 but there were delays for a variety of reasons. The works then started and were undertaken for a number of months with a number of contacts with the Applicants, the FSP and the assessor. 33. The FSP maintained the decline for the front fence and in May 2012 the Applicants raised a concern regarding cracks in the front of the property, so the FSP again requested an engineer’s report. The engineer HC said this damage was also not due to the leaking pipe. Case No: 279101 Determination Page 5 of 13 The Dispute 34. The Applicants have made many complaints about customer service, the repairs done and the management of this claim to which I will refer later. 35. The nub of this dispute is regarding the denial of two parts of the Applicants’ claim; the damage to the front retaining wall of the home, the driveway and the paving and (later on) the damage observed to the front south wall of the home, that appears was not immediately apparent or not present at the time that the original repairs were done. 36. I t is an accepted principle of insurance law that the onus rests with an insured to prove, upon the balance of probabilities, that they have sustained a loss caused by an event insured for under the policy in force at the date of loss ( Regina Fur Co. L td v Bossom (1957) 2 Lloyd’s Rep 466) . Once established the onus then shifts to the FSP to establish the application of any exclusion on which it relies to deny or limit the claim. 37. It is not in dispute that the Applicants’ home was damaged as a result of an insured event, which involved a leaking pipe under the premises discharging water over a period of time which was identified in or about November 2009. The dispute is about the extent of the damage. 38. I note also an earlier leak in or around 2006/07. The source of this leak does not appear to have been identified. The Applicants told FM that the leak stopped without any repair. 39. The FSP says it has attended to repairs in relation to the items affected by the 2009 event. I also note the water company repaired the leaking pipe not long after the Applicants identified the leak. 40. The issue in dispute is whether the FSP is entitled to deny indemnity regarding damage to the front fence retaining wall, driveway and the front south wall. It says it has expert opinions which support its position. It contends the Applicants have failed to discharge the onus to establish a valid claim for these areas and says it has demonstrated that the loss is excluded under the policy. 41. I will now consider the expert opinions about the areas in dispute. The Expert Opinions Front retaining wall, driveway and paving 42. I have carefully reviewed all the relevant material submitted by the parties and save where I make note specifically, I am satisfied the summary of the material in this regard as set out in the Recommendation is accurate and is as follows. Case No: 279101 Determination Page 6 of 13 Opinion of BH 43. The Applicants rely strongly on the verbal opinion provided to them by the FSP’s assessor, BH. He is described by them as a flood specialist from Queensland and they say he was sent on 4 June, 10 June and 2 August 2010 to investigate the cause of the damage to the property after the FSP spoke to the water provider. 44. The Applicants say BH told them that “all damages are caused by the leak/flood and the soil was extremely saturated and is moving ” and that, “(the FSP) should repair the Property and Dwellings in accordance to the policy.” 45. No formal report was produced as BH is an internal loss adjuster for the FSP. A report was typed directly into the FSP’s computer system on 17 March 2010 and noted: “TL HAS ASSESSED THE PROPERTY IN NOV 09 AND JAN10 AND SUGGESTED THE SUB-FLOOR BE ALLOWED TO DRY OUT FOR APPOX 6 MONTHS BEFORE ASSESSING THE DAMAGE. I HAVE RETRIEVED PREVIOUS ASSESSMENTS COMPLETED BY TL AND INSPECTED THE INSIDE OF THE HOME. WHILST THE INTERNAL CRACKING TO ME IS CONSISTENT WITH NORMAL MOVEMENT OF THE BUILDING DUE TO REACTIVE CLAY SOIL FOUNDATIONS, IT[’]S ALSO CONSISTENT WITH HEAVE AND [SUBSIDENCE] DUE TO SATURATED FOUNDATIONS..... THE SUB FLOOR NOW LOOKS TO BE DRY AS THERE IS LARGE CRACKS IN THE CLAY SURFACE. THE FRONT LAWN NEAR THE FRONT RETANING WALL ALSO LOOKS DRY AND IS COVERED WITH DRIED MOSS INDICATING THAT THE AREA WAS SATURATED.....” 46. BH also notes that the Applicants were frustrated by the FSP’s refusal to accept the front retaining wall as part of the claim resulting from the burst pipe. BH concluded: “IT [IS] MY OPINION [THAT] THE DAMAGE IS INDICATIVE OF THE BURSTING LEAKING EVENT..... (but says further) “....THE CLAIM IS FOR CONSIDERATION AT THIS STAGE AND WOULD SUGGEST A SOIL TEST BE CARRIED OUT TO EXAMINE MOISTURE LEVELS TO THE SUB- FLOOR.” 47. I accept from this note that BH was supportive of the Applicants but I do not think this is his concluded and final view. He indicates to the FSP that it should tell the Applicants that the “claim is for consideration”. BH does not say the claim is for acceptance. He concludes that an expert report is required - a soil test to show moisture levels and that the FSP is to examine material provided from the water provider. Case No: 279101 Determination Page 7 of 13 Opinion of SG dated 11 May 2010 48. SG was the geotechnical expert retained to look at the soil composition. The salient parts of his report read: there was some variation in the soil readings taken from the premises; the soil moisture under the house was considered slightly higher than normal at a depth of 1m but otherwise normal; the soil moisture reading adjacent to the front of the house was considered “to be within a normal range”; the “slightly higher than normal soil moisture content of the sandy clay” under th e home “would result in volumetric swelling and could be a factor in the observed internal cracking of plaster”; the cracking in the front retaining wall “is most likely due to 6m high conifer tree” in the front yard, situated about 3m from the wall. SG su ggested that the tree roots were likely exerting “significant pressure” on the wall. Opinion of FM dated 29 July 2010 49. An engineering expert, FM, was retained next to inspect the home. FM noted that: a number of large tress in close proximity to the house; the moisture content of the soil is affected by the trees; he noted the damage to the house and documented it; there is a fall from the centre of the house to the SW and NE corner of the house towards trees; given the moderately reactive clay identified at the site, the soil will swell with higher moisture content and shrink when it departs; the wall cracking pattern and the floor level survey indicates differential foundation movement with relative settlement noted at the north eastern and south western region of the home; contributing factors to the differential foundation settlement include: o soil drying due to the proximity of trees to the home, combined with the drought conditions over recent years; o the impact of local water restrictions in recent years; o seasonal changes in soil moisture contents amplified by the trees; Case No: 279101 Determination Page 8 of 13 o unsatisfactory founding depth and size for the footings, given the proximity of the trees; and o the trees do not meet recommendations in Australian standards or CSIRO publications. if the leak from the broken pipe had caused significant damage to the property, the soil would have expected to swell (or heave) not shrunk; if heave had occurred, the floor level would be higher than its surrounds but it is not as the fall in the floor is relatively uniform; there were no identified issues with stormwater infrastructure in and around the property – he confirmed this by reviewing the ALD report of 8 July 2010; FM concluded “the observed distress (in the house) is most likely caused by the foundation movement as a result of the contribution factors outlined above and is not caused by the alleged broken water pipe works in the house” . Opinion of HC dated 22 October 2010 50. Because of the allegation of bias made by the Applicants against FM, the FSP retained another structural engineer expert (HC) to inspect the property. HC provided two reports, the first being from 22 October 2010, which relevantly provided: the property was purchased in or around 1986 and has a fall to the south (the front); the leaking water pipe was found under the bathroom of the home and he was told it was repaired in or about September 2009; extensive cracking and movement had been noticed in the front driveway and brick fence. Some of the cracking showed “weathered edges”, ind icating that it had been occurring for some time; the front brick wall acts as a retaining wall as earth has been built up to it; he inspected under the floor and noted it was very dry but also saw evidence of water having occurred underneath the house; the floor levels had small variations of 10mm to 20mm over most areas of the house; he looked at DVD and CD of photos and noted the cracking and the water escaping from the front fence area. He also saw water on the video underneath the house where the pipe was repaired; Case No: 279101 Determination Page 9 of 13 He also considered the soil tests done by SG; He noted the leakage from the pipe had occurred over an unknown period of time and caused a “considerable amount” of water to pool under the home at the time (as evidenced in the Applicants’ vide o recording); He said the cracking to the house is typical of problems that occur due to differential settlement of the footing and that occurs due to changes in the moisture content of the foundation material; a leaking pipe can affect the moisture content of the soil and cause movement in the footings of the home – generally, HC considered the observed movement inside the home to have been “minor”; HC was satisfied that the movement in and around the home could be attributed to the overflow from the leaking pipe; HC was told of the previous leak from a water pipe from several years earlier “occurred near the front fence area”. It was told it was repaired when it was found; the movement and cracking to the concrete paving and the driveway are not due to the leaking water pipe but “typical of problems that occur due to movement of the sub base” due to normal seasonal changes. HC did not consider that this would have been affected by water from the leaking pipe. He s aid the water from the leaking pipe “would not have extended out particularly to the western pavement as a brick walls occurs in this area”. He says: “in our opinion the water would not have extended up to the concrete driveway area”; He concludes: the cra cking and movement to the front fence is “typical of problems that occur due to horizontal loads being applied to the fence”. He notes the fence is acting as a retaining wall. He says no weep holes were in the wall and this can allow water to build up in the soil behind, during or after periods of heavy rain; HC concluded that the “cracking and movement of the brick front fence has resulted due to the fence being inadequately designed to act as a retaining wall and the leaking water pipe has not resulted in movement to the fence”. He says this even though he saw the video of the leaking water. He says this water would not have built up to a great height behind the wall and a heavy rainstorm would result in more water build up; He also noted the cracking showed weathered edges which indicated to him the cracking had been occurring for some time; He made certain recommendations for the general areas of repair and said repairs could be done as the soil had now dried out sufficiently; Case No: 279101 Determination Page 10 of 13 He said that if any further cracking occurred after the repairs it was due to drought conditions that were then still applicable; He also said the front fence should be demolished and a new wall built as designed by an engineer. 51. Having read and considered the expert opinions and accompanying material carefully, I am of the view that an insured event has occurred – that is, water has leaked from a pipe and caused some damage to the house. Having considered the photographs carefully, I agree that the paving in the driveway and the front fence are cracked and in need of repair. 52. However, all the experts agree – the damage to the paving in the driveway and the front fence is not a direct result of the leaking pipe in 2009. Based on these opinions, in my view, the FSP is entitled to deny this part of the claim. Even if I was to discount the opinion of FM because of the alleged altercation with the Applicants, the reports from HC and SG are clear and unequivocal and do not support the Applicants’ contentions. 53. As part of their submission to the Service, the Applicants provided a video recording of the observed damage at the property but HC has seen this too and considered it but it has not convinced him that the damage to the front wall was caused by the leak from the pipe for the reasons he gives in his report. Hence, in the absence of any other expert opinion, I accept the expert opinion of HC. 54. The Applicants also relied heavily on BH but in my view, his was not a concluded view. He was still awaiting the results of soil tests and as set out ab ove, the soil tests were not supportive of the Applicants’ position. Front south wall 55. After the repairs to the home had been completed, the Applicants contended that the front south wall of the home had suffered further damage, too. 56. Therefore to address this, the FSP asked HC to attend the property and inspect again. HC’s report of 20 June 2012 57. HC noted that: there was minor hairline cracking evident on the brick work “near the roof line at the east end”. The problem was not apparent when the property was previously inspected by him; two large trees were noted in the vicinity of the south wall; the damage to the wall is typical of problems attributable to differential settlement of the footings; Case No: 279101 Determination Page 11 of 13 changes in the moisture content of the soil can affect this. The presence of the two trees on the property would contribute to the drying out of the footings; the water from the leaking pipe would have dissipated away from the this area of the house and not affected the foundation material to the south wall at the home; in any event, he would have expected any problems to have been apparent within 12 -18 months after the leak. 58. HC concluded that the cracking is minor: that it has resulted due to seasonal changes in the moisture content of the soil and that two large trees growing near this corner have affected the cracking too. He suggested tree root barriers be installed. 59. In short, he concluded this cracking is not related to the leaking water pipe that occurred around September 2009. 60. Having read and considered the expert opinion carefully, I am of the view the damage to the front south wall is not a direct result of the leaking pipe in 2009. In the absence of any other expert opinion to the contrary, and based on this opinion from HC, in my view, the FSP is entitled to deny this part of the claim. 61. The Applicants have made a number of assertions about the cause of the damage both before and after the Recommendation but in the absence of independent evidence to support their assertions I am not persuaded on the balance of probabilities, that an insured event has occurred which has damaged the front retaining wall, driveway and paving or front south wall. Claims Management 62. During this claim, on a number of occasions, the Applicants have expressed dissatisfaction with the claims management by the FSP. After the Recommendation, the Applicants say “(the FSP) has shown total disregard and disrespect to us as a client/customer and towards our claim”. 63. I have considered all the material presented to me and I have read the lengthy claims notes by the FSP. Having done that, I am of the view, that a difficult and complex claim has been managed well and with regard and respect. By and large, the response of the FSP has been timely and responsive and in general, accords with industry standards. On the material presented, I am not satisfied the FSP has managed this claim with “disregard and disrespect.” Complaints about the standard of repairs 64. After the Recommendation, the Applicants continued to complain that the repairs were not adequately performed and that the underpinning was Case No: 279101 Determination Page 12 of 13 insufficient. The Applicants list some complaints in the letters dated 4 April 2013 and more specifically in the letter dated 9 April 2013. 65. The FSP responded in its email dated 7 May 2013 that; “The dispute is in relation to items that were not covered under the claim. This information is in relation to faulty workmanship and this is the first time the Applicant has advised that there is damage occurring due to faulty repairs. I would not be able to provide a response to this information as (the FSP) has not assessed the new issues raised by the Applicant to confirm if it would accept liability for these damages. (the FSP) would be happy to arrange an assessment of these damages if the Applicant is willing to have someone attend. ” 66. Relevantly, the Applicants responded in the letter dated 4 June 2012 the following: “Yes, there is more damage due to their sub standard tradesmen and workmanship that was/is incomplete that they originally had started.” 67. I do note from the FSP file notes that various complaints were made about repairs around April 2012. The FSP arranged a quality assessment on or about 3 April 2012 and it was agreed that an amount of $6,000 would be paid to finalise the claim and this was done on or about 20 April 2012. 68. An assessor, “ NW ”, provided a report to the FSP on or about 4 May 2012 of that assessment. I note an extract from the FSP’s notes as follows: “ Photos taken: Yes . Observations. (In)ternally that he was not happy with. Minor cracks to the kitchen plasterboard ceiling and to the mitred cornice joins. Metal carpet/tile strip and cavity sliding door head fillet had not been installed. Crack to the internal cornice join in the laundry above the cupboard. Silicone seal around the sliding door/window unit. Painting of the timber trimmer by the sliding door/window unit externally. Laying of rio and concrete path (10.0m2). Acid wash to bricks (north/western corner of dwelling). Replacement of a bucket. Discussions. I advised (the Applicants) (FSP) would cash settle $6,000 for the above listed works. (The Applicants) seemed to be pleased with the offer and accepted that this was the only option for the final settlement of this claim. Case No: 279101 Determination Page 13 of 13 Other notes. (FSP) to send (Applicants) a cheque for $6,000 as final payment/settlement of this claim.” (NW). 69. I do not have enough material to make a determination on this aspect of the matter. In my view, the parties need to consider the current complaints about the standard of repairs as set out in the letters dated 4 and 9 April 2013 and need to ensure none of this has already been compensated for by the payment of $6,000 in April 2012. 70. To resolve this aspect of the matter, I agree with the suggestion made by the FSP that if the Applicants are willing to have someone attend the property, the FSP can then assess these complaints about the allegedly inadequate repairs and confirm if it will accept liability for these items. 71. I clarify that this assessment is only about the allegation of the inadequate repairs. I note the opinion of HC that the effect of the leak from the pipe should not be ongoing by this time. HC said: “In any event, I would have expected any problems to have been apparent within 12 -18 months after the leak.” Nearly four years have passed since the l eak was found and repaired. There is no evidence that any complaints now continue to be linked to this leak so this new assessment is only to deal with the allegation of inadequate repairs and not any alleged new areas of damage. 72. For the sake of clarity also, this new assessment is not to deal with the claim for damage to the front retaining wall, driveway and paving or front south wall as I have found the FSP is not liable for that damage. Determination 73. On the basis of the available information and for the reasons stated, I determine that the FSP is not obliged to indemnify the Applicants for the damage to the front retaining wall, driveway and paving or front south wall. 74. As for the claim made that some repairs were not adequately performed as set out in th e Applicants’ letters dated 4 and 9 April 2013, on the basis of the available information and for the reasons stated, I determine that if the Applicants are willing to have someone attend the property, the FSP can then assess these complaints about the allegedly inadequate repairs.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.