Claim for council-ordered works denied: cover not triggered by illegal building work

FirmFinancial Firm (Unknown - Insurer)
Decided2013-06-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$70,500
SourceAFCA PDF

Summary

The insured claimed over $70,000 for works required by the council after purchase of a property with possible illegal building works. AFCA found he had not shown a loss within the policy's cover and upheld the denial.

The insured bore the onus to prove a loss caused by a covered risk, and the evidence did not show a council order to demolish or alter the structures.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 278999 Determination Page 1 of 8 Case number: 278999 General Insurance – Domestic Insurance – Home Owners Title Insurance Policy – Extent of cover 16 May 2012 Background 1. The Applicant took out a Home Owners Title Insurance policy on or about 7 December 2011 insuring him against a range of risks that may affect use and ownership of a property being purchased. 2. On or about 3 December 2011, the Applicant contacted a conveyancer, “KB”, and advised that he had purchased a property at Shalvey, NSW. At the time of the purchase the Applicant was informed by a third party that part of the structure may be illegal. 3. On or about the 7 December 2011, the Financial Services Provider (FSP) sent a letter to the Applicant by way of the conveyancer confirming the FSP‟s commitment to issue a policy of insurance. The letter informed the Applicant of his duty of disclosure. 4. On or about 16 December 2011 the Contract of Sale was settled and the Applicant became the owner of the property. Subsequently, the Applicant applied to the local Council for a building certificate. 5. The Council inspected the property and ordered certain works to be carried out, before a building certificate would be issued. 6. On or about 8 March 2011 the Applicant lodged a claim with the FSP for the costs involved in complying with the Council‟s requirements. 7. On or about 20 March 2011 the FSP wrote to the Applicant informing him of its decision to decline his claim on the grounds of non-disclosure and the policy not providing cover for elements of the claim. Summary of Applicant’s Position 8. The Applicant purchased the property situated at Shalvey, NSW, through auction on 6 December 2011 and insured the property with the FSP on or about that date. Determination Case No: 278999 Determination Page 2 of 8 9. On or about the 14 February 2011 he lodged an application with the local Council to acquire a building certificate in order to enable him to extend the residence. 10. A Council staff member attended his property for an inspection and informed him that the enclosed awning, carport and garage were illegally constructed. The Council further gave him a list of works that had to be completed before it would issue a building certificate. 11. The Applicant submits that he has incurred the following expenses to meet the Council‟s specifications:  Removal of an illegal structure at the rear of his residence $ 8,100  Repairs to existing garage $ 450  Construction of new extension at rear of his residence $61,950 Therefore, the total amount of his claim on the FSP is $70,500 . Summary of FSP’s Position 12. The FSP submits that when the Applicant contacted his conveyancer, KB, on or about 3 December 2011, the Applicant advised KB that a third party had informed him that part of the structure may be illegal. 13. On or about 7 December 2011, KB wrote to the Applicant ad vising that he was arranging title insurance as requested. On 7 December 2011, KB applied to the FSP for a „clean‟ Home Owners Gold policy. 14. On the same day the FSP sent a letter to the Applicant, care of KB, advising of the FSP‟s commitment to insure the A pplicant. This letter specifically drew attention to the duty of disclosure of any known risks including illegal building works. The Applicant has not disputed that he received the letter. 15. On or about 15 December 2011 the Applicant undertook a final inspection of the property and was put on notice that the garage may not have been approved. On 16 December 2011, the Contract of Sale was settled and the Applicant became the owner of the property. 16. On or about 14 February 2011, the Applicant lodged (through the conveyancer) an application with the Council for a building certificate. 17. The Council attended the property and inspected the dwelling, carport, garage and rear screen enclosure. In a letter dated 27 February 2012, the Council ordered the following works:  Provide certification from an appropriately qualified structural engineer attesting to the structural adequacy of the rear screen; Case No: 278999 Determination Page 3 of 8  Connect the downpipe attached to the guttering from the screen enclosure to an approved stormwater system;  Provide downpipes to the detached garage and connect to an approved stormwater system;  Provide suitable storm moulding to the rear sliding door leading from the kitchen area. 18. In a letter dated 5 June 2012, the Applicant stated he:  had completed repairs to the existing garag e to meet Council‟s requirements at a cost of $450; and  paid $8,100 to remove the „illegal structure‟. 19. In a further letter of claim dated 6 December 2012, the Applicant stated he:  had paid $630 to install new downpipes to both sides of the garage;  paid a structural engineer $500 to certify the sub-floor. 20. The FSP submits that documents obtained from the Council fail to mention the „illegal structure‟ was illegal or built without the approval of the Council. 21. The FSP understands that the Council only required certification from an appropriately qualified structural engineer to confirm the rear screen enclosure was built to relevant codes and standards and was structurally sound, to assist the Council in its decision on whether to issue a building certificate. 22. During the process of assessing the claim, it became evident that the Applicant had been informed that the property may be subject to illegal building works. The duty to disclose all known risks to the FSP is clearly stipulated in its letter dated 7 December 2011 and the policy. 23. The Applicant does not appear to dispute that he had a duty to disclose the known risks at the time he took out the policy. The Applicant chose not to inform the FSP of the possible risk for which he sought coverage and has therefore nullified a claim under the policy. 24. The policy extends cover for actual loss. The FSP reviewed building plans submitted to the Council and it became evident that part of the existing structure that allegedly the Council declared illegal, was intended to be removed and rebuilt in any event (the rear screened enclosure). 25. Therefore, it is questionable as to whether the Applicant would suffer any actual loss in respect to the rear screen enclosure and rear sliding door , as it was the Applicant ‟ s intention to remove/alter this structure in any event. 26. The FSP submits that it remains unclear what actual loss the Applicant has suffered under the policy in complying with the Council notice. The Applicant has stated that he suffered the following losses in complying with the notice: Case No: 278999 Determination Page 4 of 8  completed repairs to the existing garage to meet Council‟s requirements at a cost of $450;  removal of illegal structure at the rear of his residence $8,100;  installing the downpipes on a garage in the sum of $630;  $500 to pay a structural engineer to certify the subfloor; and  construction of a new extension at the rear of his residence $61,400. 27. The Applicant is therefore claiming a total cost in excess of $70,000 in order to comply with the Council‟s notice. 28. However, the FSP submits that documents obtained from the Council fail to mention the „illegal structure‟ was illegal; or built without approval from the Council. 29. The FSP submits that the Applicant did not comply with paragraph 1 of the Council ‟ s letter dated 27 February 2012 but proceeded to demolish the rear screen enclosure to make way for the proposed additions, additions which the Applicant had proposed to build prior to his application for a building certificate. 30. The policy of insurance provides cover when an insured suffers actual loss in complying with a notice or an order from a Council. 31. The Council required the Applicant to attend to four sets of required works before it would consider issuing a building certificate. Demolishing the identified str uctures and/or renovating parts of the Applicant‟s property were not included in the notice. 32. The Applicant obtained certification in relation to the sub floor, however, it remains unclear what floor this was in relation to and whether it was in response to paragraph 1 of the notice. 33. The FSP considers that the Applicant‟s actual loss suffered in complying with the Council‟s notice to be no more than $1,600. However, on a fair and reasonable basis, the FSP has offered the Applicant a cash settlement of $5,000 in full and final settlement of his claim. 34. The FSP relies on the following policy/contract provisions: ‘1.4 YOUR DUTY OF DISCLOSURE ... With your Home Owners GOLD policy, you must disclose any matter that you become aware of prior to the Policy Date that may impact on coverage. If you become aware of something and you are not sure whether to disclose it to us, simply contact us using the telephone number in paragraph 1.2 above and we can discuss this with you. Case No: 278999 Determination Page 5 of 8 If you fail to comply with your duty of disclosure in respect of tis (sic) policy, [FSP] may be entitled to reduce its liability under Home Owners GOLD in respect of a claim or may cancel the contract of general insurance. If your non-disclosure is fraudulent, [FSP] may also have the option of avoiding the Home Owners GOLD from its beginning. ... 3. COVERAGE STATEMENT This policy insures your ownership interest in the Land described in the Schedule. Your insurance, as described in the Covered Risks below, is effective on the Policy Date. Your insurance is limited by the Exclusions and additional matters that may be contained in paragraph 4 of the Schedule, the Conditions which you should read carefully and your duty of disclosure which is summarised in the introduction to this Policy. We insure you against actual loss resulting from Covered Risks up to the Policy Amount, and any costs, legal fees and expenses we have to pay under this policy. We do not insure you in respect of destruction of or damage to a building on the Land. This policy is not complete without the Schedule. ... 4. COVERED RISKS PROPERTY INQUIRY RISKS OCCURRING BEFORE THE POLICY DATE ... 4.6 Any loss or damage to the insured, other than relating to a boundary fence or wall, because under the provisions of the relevant Laws there is illegal Building Work and: (a) the insured is ordered to demolish, alter, add to or repair any building, or part thereof, on the Land; ... and this would have been disclosed if an appropriate inquiry had been made on or before the Policy Date. ... 5. EXCLUSIONS ... 5.4 RISKS: 5.4.1 that are created, allowed, or agreed to by you; 5.4.2 that are actually known to you, but not to us, on the Policy Date – unless they appeared in the Public Records;‟ Case No: 278999 Determination Page 6 of 8 Issues 35. Whether the Applicant failed in his duty of disclosure in not declaring that part of the residence had been built illegally. 36. Whether the FSP is liable to indemnify the Applicant for any loss suffered by him. Reasons for Decision 37. Due to the nature of the dispute, the FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been subject to a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 38. The onus of proof is on the Applicant to establish, on the balance of probabilities, that he has suffered a loss caused by a risk insured against. Once the Applicant has established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 39. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence it is not necessary to go into all of this material other than when relevant. 40. In view of the fact that he was about to purchase a property, the Applicant took out a comprehensive title insurance policy attaching from 16 December 2011. A diary note from his conveyancer‟s file reveals that the Applicant had been warned that part of the building may be illegally constructed. 41. On or about 14 February 2012, the Applicant lodged an application with the local Council for a building certificate. The Council attended the property and inspected the dwelling, carport, garage and rear screen enclosure. 42. In a letter dated 27 February 2012, the Council ordered the following works to be carried out before it would issue the certificate:  Provide certification from an appropriately qualified structural engineer attesting to the structural adequacy of the rear screen enclosure.  Connect the downpipe attached to the guttering from the screen enclosure to an approved stormwater system.  Provide downpipes to the detached garage and connect to an approved stormwater system.  Provide suitable storm moulding to the rear sliding door leading from the kitchen. Case No: 278999 Determination Page 7 of 8 There was no mention of any illegal structures at that time , or any direction to demolish anything. 43. On or about 8 March 2012, the Applicant lodged a claim on the FSP. However, there was no clear explanation as to what was the basis of his claim. 44. It eventuated that the Applicant was claiming for:  Removal of an „illegal structure‟ $ 8,100  Repairs to the garage $ 450  Construction of an extension to the rear of his residence $61,400 45. The Applicant increased his claim to include:  Installation of downpipes on the garage $630  Structural engineer‟s fee $500 resulting in a total claim in excess of $70,000. 46. In his Referral Notice dated 28 March 2012, the Applicant stated that after attending his property, the Council informed him that the enclosed awning, carport and garage were illegally constructed. However, he has not submitted any evidence to substantiate his claim, or that he had been directed to demolish anything. 47. The policy of insurance provides cover for: “ 4.6 Any loss or damage to the insured, other than relating to a boundary fence or wall, because under the provisions of the relevant Laws there is illegal Building Work and: (a) the insured is ordered to demolish, alter, add to or repair any building, or part thereof, on the Land; ... and this would have been disclosed if an appropriate inquiry had been made on or before the Policy Date.” 48. The onus is on the Applicant to establish that, on the balance of probabilities, he has a claim that falls within the cover provided by the policy of insurance. 49. On the evidence submitted, I find that the Applicant has not met this onus and determine that the FSP is entitled to deny the Applicant‟s claim. 50. The Applicant has recently submitted further correspondence from the Council dated 17 May 2013 and suggested that it is conclusive in his favour. But it is not. This letter does not indicate that the Council required the “illegal structures” to be removed. 51. Had it been necessary to do so, I would also have considered that the Applicant failed in his duty to notify the FSP about possible illegal structures on the Case No: 278999 Determination Page 8 of 8 property. It seems plain that when he bought the property he was aware of the possible illegality. Determination 52. I determine that the FSP was entitled to deny the Applican t‟s claim .