Water inundation claim declined under flood exclusion; misrepresentation at inception alleged
Text of the determination
Case No: 278275 Determination Page 1 of 13
Case number: 278275
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
18 March 2013
Background
1. The Applicant and a co-insured hold a Home Building and Contents policy
with the Financial Services Provider. The policy provides cover of up to
$214,000 on the building and $46,448 on the contents subject to a $300
excess.
2. During 11-12 January 2011 the i nsured building situated at One Mile
Queensland, was inundated with water causing loss and damage to both
building and contents.
3. The FSP declined the claim on the basis the loss and damage arose from
flood which is an excluded cause of loss.
4. The Applicant disputes the declinature on the basis that the loss and
damage arose from storm water run-off which is an insured event. The
Applicant further states the FSP failed to meet its obligations under Section
35 of the Insurance Contracts Act 1984 (“the Act”) a nd misrepresented the
policy at inception.
5. The Applicant has legal representation; reference to Applicant will therefore
include both those parties.
Summary of Applicant’s position
6. The Applicant relies on the following policy terms:
“Flood
Is the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.
Flood is not covered by this Policy.
...
Storm
Determination
Case No: 278275 Determination Page 2 of 13
Is a violent wind, cyclone, tornado, thunderstorm or hail which may be
accompanied by rain or snow, or a sudden, excessive runoff of water as a
direct result of a storm in your local area. It does not mean persistent rain by
itself.”
7. The Applicant provides the following information regarding the inundation to
his property:
There is a small drain at the back of the insured property which not only
drains water from the property itself but three other residences o n “G
Street”.
The other properties on G Street are higher than the Applicant‟s
property which supports that water would run-off in this direction. In fact
this stormwater run-off led to a claim in 2010.
From 9 January 2011 onwards, there was heavy rain which turned into
storms/lightening on 11 January 2011. The rainfall became so heavy
that water could not go down the stormwater drains and was pooling in
the street.
The co-insured recalls water pooling in the backyard from the drain on
11 January 2011 at around 10.30am. At this time the water was ankle
deep (or 15cm).
At 3.30pm the co-insured noted that water was rising through the drains
at the front of the property. The water kept getting deeper and mixed
with rainwater to begin slowly moving towards the insured property.
The property was likely inundated shortly after the evacuation of the
property at 5.00pm on 11 January 2011, as by this stage water was
30cm deep in the yard. At this time the water had just entered the
house from the back. The ICA Hydrology report indicates that there
was rainfall at 5pm.
8. The Applicant does not recall receiving the policy documentation including
the Product Disclosure Statement (PDS). The Applicant submits that under
Section 35 of the Act, the FSP must provide notice of any exclusions relied
on such as the flood exclusion. The Corporations Act 2001 also requires
clear, concise and effective disclosure.
9. The Applicant notes the following from the telephone conversation between
himself and an FSP employee prior to inception:
“Applicant: Getting flood insurance is really expensive
FSP employee: No you can‟t get flood insurance as far as I know...now we‟re
talking about flood from a water catchment area...you know..a lake, river,
creek or the sea. We‟re not talking about rain water damage or if a pipe
bursts...you are covered for that. Ok...I‟ll just find the car one...”
10. The Applicant notes the statement regarding flood insurance being
expensive related to his intention to obtain other quotations. The Applicant
submits the FSP‟ s statement that he could not get flood insurance was a
misrepresentation and he believed it applied generally. Flood insurance is
available from other insurers and is standard cover under the Act. The
Case No: 278275 Determination Page 3 of 13
Applicant relied on the misrepresentation to his detriment as he was clearly
concerned about flood. However, on the basis of the misrepresentation he
did not consider other policies which do cover flood.
11. The Applicant contends that the FSP also told him the policy would cover
him in the event of rain or storm inundating the property. The Applicant was
provided with a significantly different explanation of flood and cover than that
provided in the policy. Further a perusal of the PDS in light of this
misrepresentation would not have assisted the Applicant‟s un derstanding of
the flood exclusion.
12. The Applicant particularly notes that he was informed flood caused by rain
and blocked drains would be covered. Further, that the source of inundation
arose from water being unable to go into the drain in the backyard and water
unable to drain into the stormwater drains.
13. The Applicant notes the production of a PDS would not have cured these
misrepresentations.
14. The Applicant submits that the inundation by stormwater run-off occurred
and this was a direct result of storm, accordingly it is covered by the policy.
The Applicant and the co-insured also assert that water was noted pooling in
the street and unable to drain or bubbling out of the drain prior to 5.00pm on
11 January 2011. This supports a finding the property was subject to
stormwater inundation prior to riverine flooding. The Applicant contends that
the initial inundation arose from overfilled stormwater drains, runoff from the
neighbouring property, storm activity and rainwater. Further, the Wayne
Tank principle does not apply as it is a separate and distinct event from the
eventual flood.
15. The Applicant is critical of the site specific hydrology report from hydrology
company “W” for the following reasons:
The report relies on assertions, assumptions and generalities to
support its findings and very few sources of evidence are provided.
No evidence has been provided to support the statements and
conclusions reached in relation to the local catchment size and rainfall
ARI intensity. This is particularly given the data highlights the extreme
weather conditions which resulted in 230mm of rain recorded from 8 -11
January 2011 (from a gauge 2.7km from the insured property).
The statement by W that the property does not receive much
stormwater run-off from neighbouring properties is incorrect.
There is also a failure to properly recognise the Applicant‟s home is
located lower than surrounding properties.
The report does not properly address the Applicant‟s allegation that the
property was initially inundated as a result of „su dden, excessive run-off
of water as a direct result of storm ‟ and that it was then subsequently
inundated by riverine flooding from the Bremer River.
Case No: 278275 Determination Page 4 of 13
The peak water level does not address the initial cause of inundation to
the property.
Summary of FSP’s position
16. The FSP relies on the following policy terms and conditions:
“Storm
If your home or contents suffer loss or damage caused by
i. A violent wind, cyclone or tornado,
ii. Thunderstorm or hail which may be accompanied by rain or snow, or
iii. A sudden, excessive run-off of water as a direct result of a storm in your
local area.
We will under contents insurance
iv. Replace or repair your damaged contents
We will under buildings insurance
v. Rebuild or repair that part of your home that was damaged
...
However
vi. We will NOT cover loss or damage caused by flood” .
17. The FSP relies on an assessor‟s report dated 21 January 2011 from which
the Panel notes the following:
The damage estimate was $45,000 to the building and the entire
insured sum for contents.
Water entered from the front of the house and from the direction of the
creek.
The Applicant is uncertain what time the water entered as it was after
he evacuated.
The water rose quickly and peaked at 1.34m.
18. The FSP relies on W‟s hydrology report dated 29 March 2011 from which the
Panel notes the following:
W has provided a summary of the tenant‟s recollections as follows (The
Panel observes it appears the female co-insured, the Applicant and the
female co- insured‟s mother were all present at the risk address in the
course of the day on 11 January 2011):
i. On 11 January 2011 the co-insured noted water rising through the
drain at the front of the home.
ii. On the Applicant‟s return to town he was informed that One Mile
Bridge was closed and sought an alternative route home. He
arrived home to observe water from the Bremer River had risen to
the corner of M Street and G Street.
Case No: 278275 Determination Page 5 of 13
iii. At 5.30pm the rising Bremer overtopped the gutter by 500mm and
they evacuated their property.
iv. The water peaked at 1150mm above the ground floor of the house
(equivalent to a flood level of approximately 22.6mAHD).
v. On 12 January 2011 the water had started to recede and at 9am
the water was 500mm above the ground level of the house.
vi. By 10am the water had receded further to 100mm above the
ground level of the house.
vii. The property receives minimal runoff from the neighbouring
property during most storm events however, no inundation of the
property has occurred from this.
Due to the small size of the local catchment that drains to the tributary
at the property and the moderate rainfall intensity of 10-20year ARI, it is
unlikely that there was sufficient local rainfall runoff to contribute to
inundation at the property.
According to the river level information at “W alert” and “OMB Alert” the
water level in the Bremer River directly north east of the property at
3.30pm on Tuesday 11 January 2011 was approximately 17.3m AHD.
At this time runoff in the catchment at the subject property would have
been allowed to drain towards the Bremer River.
The gauges also indicate the peak of the river level occurred at
12.30am on Wednesday 12 January 2011 and this would have
occurred at 22.6m AHD.
Based on terrain information, the peak level would have caused flood
waters from the Bremer River to rise via an unnamed watercourse
shown to the east of the property to inundate the property directly.
A review of the middle and upper Bremer catchment rainfall records
from a number of gauges indicate the high intensity rainfall that led to
the peak level in the Bremer River ceased at around 3pm.
It is W‟s opinion the inundation of the insured property was caused by
water escaping the confines of the Bremer River channel backing up a
small tributary and expanding across the property.
19. The FSP relies on additional memorandum from W dated 7 October 2011.
The Panel notes the following from same:
Available terrain data in the vicinity of the property shows the ground
level at the property is approximately 21m AHD. Interpolated water
levels between the W alert and OMB alert suggests flows from the
Bremer River would have started to inundate the property at
approximately 5pm on Tuesday 11 January 2011.
On the basis of the peak rainfall intensity recorded near the property
and conservatively assuming that all rainfall generated surface runoff,
the peak flow due solely to stormwater runoff through the rear of the
property would have been in the order of 15l/s. Standard open channel
flow hydraulic calculations show this would have generated a depth of
Case No: 278275 Determination Page 6 of 13
flow of less than 10mm through the property. This is unlikely to have
been sufficient to inundate the dwelling.
Based on available topographic mapping in the vicinity of the property,
the level on the top of the stormwater drain at the corner of M Street
and G Street is approximately 19m AHD. The interpolated level in the
Bremer River in the vicinity of the property suggests that this level
would have been reached at approximately 3.30pm on Tuesday 11
January 2011, which indicates that water escaping from the drain at the
corner of M Street and G Street was backflow from the Bremer River.
20. The FSP relies on a Statutory Declaration from “GC” from which the Panel
notes the following:
GC is employed as part of the FSP‟s „print development team‟.
GC reviewed the records kept by the FSP and found the Applicant‟s
policy incepted by the FSP on 17 July 2007 for coverage of the building
and contents.
The FSP sent a request to the mail-house on 18 July 2007 requesting a
print of the policy document and inclusion of the PDS.
The record shows the documentation was sent to Australia Post on 19
July 2007 and sent out.
The Applicant‟s policy was renewed on or about 13 June 2010. The
request was sent to the mail-house on 13 June 2010.
The mail-house acknowledged receipt of the request and printed the
renewal documents.
The mail-house sent the renewal document‟s to the insured‟s address
which was sent out by Australia Post.
21. The FSP relies on a Statutory Declaration from “DP” from which the Panel
notes the following:
DP is employed as part of the FSP‟s „customer and channel support
resolutions consultant‟.
The policy file associated with the Applicant was created on the FSP‟s
systems on 17 July 2007.
The policy documents including the PDS were sent to the Applicant on
18 July 2007.
Renewal documents were sent to the Applicant‟s addre ss on 5 August
2008, 7 June 2009, 13 June 2010 and 12 June 2011.
The FSP has not received any mail return from the Applicant‟s address.
22. The FSP has also enclosed and referred to ICA Hydrology reports which it
states clearly indicate the cause of inundation at the property was flooding.
In particular the FSP notes the river gauge at OMB recorded 21.35m of
water at 12.30am on 12 January 2011. Further, a second river gauge “B”
Case No: 278275 Determination Page 7 of 13
recorded 21.58m of water at 10.30am on 12 January 2011. These gauges
are between 1.5- 2kms from the Applicant‟s property.
23. The FSP disputes that it misrepresented the policy to the Applicant at the
time of the policy inception. The FSP has provided the following transcript
excerpt:
“FSP: Now [Applicant‟s name] the documents we‟ll send out today
will detail what you are and are not covered for.
The Applicant: Yep
The FSP: When we may refuse or reduce a claim and how we collect,
use and disclose your personal information. Now would you
like more information now or are you happy to proceed and
read the detail in the documents later?
The Applicant: I am happy to proceed. The flood, the flood, that‟s dear isn‟t it
getting flood?
The FSP: Sorry say again?
The Applicant: Flood, getting flood insurance is very expensive?
The FSP: No you can‟t get flood insurance as far as I know. Now we‟re
talking about flood from a water catchment area.
The Applicant: Oh right.
The FSP: You know like a lake, river, creek or the sea. We‟re not talking
about rain water damage.
The Applicant: Okay.
The FSP: Or if a pipe bursts, you are covered for that. Okay so just on
that I‟ll just sign the car one.
The Applicant: So if it rains, all the drains block up and my house gets
flooded, we‟re covered by that?
The FSP: That‟s correct. Okay so now I‟ll just put your details i n and what
was your date of birth again?
24. The FSP submits the statements cannot be interpreted as misleading. The
Applicant was clearly informed as to the existence of the flood exclusion on
the property. The FSP informed the Applicant the PDS would be sent out
and this document would outline the terms and exclusions. The provision of
this document would have addressed any shortcomings in the oral
representations made to the Applicant (which shortcomings are specifically
denied). The statements were furthermore consistent with the policy terms.
25. The FSP also notes that the representation of cover referred to the FSP‟s
policy rather than insurers generally – which is evident from the context of
the statements. Further there is no evidence from the Applicant tha t he
would have taken up coverage for flood for the same price given that price
was an important issue to him.
26. The FSP has produced evidence that the policy documentation, including the
PDS, was posted to the Applicant‟s address. If the policy did not meet the
Applicant‟s needs then he was free to cancel same.
Case No: 278275 Determination Page 8 of 13
27. The terms of the policy are unambiguous and clearly exclude flood. Further,
the Applicant has failed to demonstrate the loss or damage arose from any
initial storm event.
28. The FSP submits that the policy only responds to insured events listed within
the PDS and the policy does not cover flooding. The cause of the loss or
damage to the property was not sudden, excessive runoff of water as a
result of a storm. The proximate cause of the loss was flood by overland
inundation as there was no significant rainfall event in the local area at the
time of the loss. The FSP relies on the site specific hydrology report and
memorandum in this regard.
29. The FSP therefore contends that it has met is obligations under Section 35
of the Act.
30. There was no significant rainfall event to account for the alleged excessive
run-off of water which the Applicant submitted was the cause of inundation.
The FSP notes that only 220mm of rain fell over Amberley from 9-12
January 2011 which is approximately 5km from the property. The FSP
contends that the ICA Hydrology reports indicate the inundation by flood
would have occurred on 11 January 2011.
31. The FSP further notes the peak of the Bremer River north east of the
property occurred at 12.30am on 12 January 2011 at a level of 22.6m AHD
which mirrors the peak level of the flood event at the property.
32. The FSP further contends that even if FOS accepted there was loss or
damage to the property caused by storm and not flood, that the Wayne Tank
principle should be applied. This is on the basis that the flood occurred
contemporaneously with the storm.
Issues
33. Whether the FSP is entitled to rely on its policy terms and conditions.
34. Whether the FSP has properly declined the Applicant‟s claim for loss and
damage arising from water inundation.
Reasons for decision
35. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
36. The Panel has read each party‟s subm issions and materials and will only
refer to the relevant submissions and materials raised.
37. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
Case No: 278275 Determination Page 9 of 13
38. On 12 March 2013, the Panel Chair Ombudsman attended on site where he
met with the Applicant and a representative of the FSP.
39. The Panel considers there are two discrete issues (as listed above) and will
deal with each separately.
Whether the FSP is entitled to rely on its policy terms and conditions
40. The Applicant has stated he does not recall receiving the policy
documentation including the PDS after inception.
41. The Panel has reviewed the proof of dispatch pertaining to the provision of
the policy documentation.
42. The Panel is satisfied that the original policy document together with the
PDS was mailed out to the Applicant on 19 July 2007 and that there was no
returned mail from the Applicant‟s address.
43. Based on the evidence, the Panel is therefore satisfied that the FSP has met
is obligations under Section 35 of the Act.
44. The Panel notes the Applicant has raised the issue of misrepresentation in
relation to the telephone call incepting the policy.
45. The Panel has considered the comments regarding the flood exclusion and
whether the FSP incorrectly represented no insurer would cover flood. The
Panel considers the statements made in this regard are unclear. The
statement that you cannot get flood insurance appears to be in the context of
the FSP‟s policy. The Panel notes that the ambiguity in the statement is not
capable of constituting a positive misrepresentation. This is particularly in
relation to the policy exclusion of flood.
46. The Panel, however, is troubled by the statements made in relation to the
drains. Whilst the Applicant is informed that water from a lake, river, creek or
sea would not be covered, he is informed water from a drain would be. The
Applicant has specifically sought clarification as to whether cover would
extend if the drains blocked up during rainfall and the home was flooded.
The FSP provides a positive statement that such a scenario would indeed be
covered. There are no qualifying statements provided to the Applicant to
make him aware of scenarios where this may not be the case.
47. The statement from the FSP would certainly be capable of inducing the
Applicant to believe that he was covered in the event that his property was
flooded by any water from the drains or which pooled due to the state of the
drains.
48. The question before the Panel is whether the policy wording was sufficient to
counter any potential misrepresentation that all water from drains would be
covered.
Case No: 278275 Determination Page 10 of 13
49. The policy wording states that home and contents would be covered if
damaged by a sudden, excessive run-off of water as a direct result of a
storm in the local area. The only relevant exclusion listed in this matter would
be that of flood. The definition of flood listed includes those stated by the
FSP in its telephone call with the Applicant. However it also adds water
escaping from the confines of any reservoir, channel, canal or dam.
50. The Panel notes that channel or canal have been defined in common law.
However, there is no indication that the Applicant would have understood
these systems to include a drain. Consequently the Panel deems it unlikely
that the Applicant would understand a drain as falling within this flood
exclusion given the policy terms used. This is particularly in light of the
positive representations made to him that such a circumstance would in fact
be covered. The Panel does not consider that the representation of cover
would in fact be overridden by the production of the policy terms and
conditions in such circumstances.
51. It would appear that whilst the Applicant may have accepted the flood
exclusion in the policy, nevertheless he still acted on the representation of
cover when entering the policy. Accordingly, the Panel finds that the FSP
would be bound by any loss or damage arising from rainwater that could not
drain. However, the FSP is not liable for flood damage from overland riverine
inundation as the Panel finds there was no misrepresentation in relation to
same.
Whether the FSP is liable to make payment of the Applicant’s claim
52. The Panel notes the Certificate of Insurance current at the time of the loss
records the Applicant had included the optional coverage of Accidental
Damage (AD) to the policy. Accordingly, as it is settled insurance law that as
the loss suffered by the Applicant in this instance falls within the AD
coverage, the FSP bears the onus of proof demonstrating all the loss was
attributable to the excluded policy event of flood. The Panel has been
provided with somewhat contrary eyewitness evidence concerning the
inundation events on 11 January 2011. The FSP via its site specific
hydrologist report of 28/3/2011states in part: “W engineers attended (risk
address) on the 8 th of March 2011 at approximately 5.00pm. The tenant was
at home and was also present during the time period and events referred to
above. He provided us with his recollection of events. On the 11 th of January
2011, the Applicant‟ s wife (the co-insured) noticed water rising through the
drain in front of (risk address) no time was specified.” The Applicant has
provided evidence via his legal representative to FOS of his version of
events and disputes the statements as recorded by the FSP. It is unclear
why the evidence is so varied. At the site visit on 12 March 2013, the Panel
Chair Ombudsman was able to clarify the eyewitness evidence of the
Applicant‟s wife.
53. The eyewitness evidence is that there was heavy rain which turned into
storms/lightening on 11 January 2011. The rainfall became so heavy that the
water could not enter the storm drains and began pooling in the street. At
Case No: 278275 Determination Page 11 of 13
appr oximately 10.30am on 11 January 2011 the water was 15cm deep and
was pooling at the backyard drain, at 3.30pm the water commenced rising
through the drains at the front of the property and mixed with rainwater. By
5pm the water was 30cm deep in the yard and water had just entered the
house from the back.
54. The Panel notes that the ground levels in the vicinity of the property are
recorded by the hydrology expert as approximately 21m AHD. It is unclear
from the hydrology report as to what the floor levels of the home itself was or
whether the terrain of the residence is lower than the ground levels in the
vicinity of the property. This is particularly relevant given the Applicant‟s
statements that his property is lower than neighbouring properties which is
why he receives run-off from these other properties. The Panel is somewhat
concerned by the absence of this information.
55. The Panel Chair Ombudsman observed that there was a significant variation
in the ground level of the property. The front of the property that borders [M]
Street is much lower than the rear. The pergola area at the rear of the
property, which is at a similar height to the floor level of the home, is lower
than the rear garden bed that borders the property. The level of the property
behind the Applicant‟s property is higher again.
56. The hydrologist and the assessor have both given different peak inundation
levels inside the home as 1150mm (115cm) and 1.34cm respectively. The
Panel is uncertain why the difference of 19cm in the reported inundation
levels has occurred or if one recorded level is more accurate over the other.
The Applicant advised the Panel Chair Ombudsman that inundation was to
1,200mm (120cms) through the home.
57. The hydrologist has indicated that the inundation of 115cm would be the
equivalent to a flood level peak of 22.6m AHD, reached in the Bremer River
at 12.30am on 12 January 2011.
58. The hydrologist has provided evidence that water from the Bremer River
would have commenced backing up through the drain at the corner of M and
G Streets around 3.30pm on Tuesday 11 January 2011. Further, whilst the
hydrologist has considered there may have been 10mm stormwater runoff at
the property, W maintains that the flows from the river would have started to
inundate the property at approximately 5pm on Tuesday 11 January 2011.
There is further a suggestion that the inundation of the insured property was
caused by water escaping the confines of the Bremer River channel backing
up a small tributary and expanding across the property.
59. The Panel notes the evidence from the hydrologist does not address the
floor levels, site specific ground levels, surcharging drain inundation levels or
precisely when the small tributary would have overtopped its banks or if the
tributary rose prior to the Bremer River and caused the back flow of the
drains. It is not precisely clear what level the river reached at 5pm and
whether the Bremer River overtopped from the main watercourse or the
small tributary at this point. This is particularly given the stated land levels of
21m AHD and the peak level of the river occurring at 22.6m AHD at 12.30pm
Case No: 278275 Determination Page 12 of 13
on 12 January 2011.The Panel also notes that the hydrology estimations are
not consistent with the eyewitness evidence of the female Applicant. The
Panel is of the view that this may in part be because of the significant
variation in height at the property and the hydrologist‟s vague statement that
the river would have started to inundate the property at 5.00pm on 11
January 2011. The Panel needs to address the question, „which part of the
property‟?
60. As stated, the front of the property that borders [M] Street is significantly
lower than the floor level of the home. The Panel Chair Ombudsman
estimated, with the naked eye, that it was at least 2m lower. The female
Applicant says that when she left the property at 5.00pm, she evacuated in
her motor vehicle that was parked in [M] Street and the water was about a
foot (30cms) deep. The Panel is satisfied that the river could not have
inundated the home at that time as the Applicant‟s motor vehicle would have
been under water.
61. The female Applicant also confirms that at 5.00pm, water was 30cms deep
in the rear yard and lapping at the rear doors.
62. The Panel Chair Ombudsman observed that the pergola in the rear yard is
two red gum sleepers (vertical), lower than the border of the property, which
is lower than the height of the property to the rear of the Applicant‟s property.
63. The Applicant advised that stormwater runoff from the rear properties was
rushing from those properties with a waterfall effect over the red gum
sleepers and into the confines of the pergola.
64. Having considered all of the evidence, the Panel is satisfied that it was this
stormwater runoff that first entered the home, prior to the arrival of the river
water, which needed to rise a significant distance to be capable of inundating
the home.
65. The Panel has limited evidence on how much of the inundation was from
stormwater run-off and how much inundation would be from the back flow
and the direct overtopping of the Bremer River banks.
66. The Panel considers that the time frame between the backflow
commencement at 3.30pm on 11 January 2011, the water entering the home
at 5.00pm on 11 January 2011 and the final peak of the Bremer River (and
inundation level) at 12.30am on 12 January 2011 suggests that the property
would have had several hours of water inundation prior to the back flow and
overtopping of the Bremer River banks inundating the home. Again, having
regard to all of the evidence and the Panel‟s experience in determining
numerous matters arising from the 2011 storm events in Brisbane and the
Ipswich area, the Panel considers that 200mm through the home is a
reasonable allowance for stormwater inundation, prior to the arrival of flood
water.
Case No: 278275 Determination Page 13 of 13
67. The parties are asked to work together cooperatively to resolve the question
of the impact or loss arising from an inundation to the level of 200mm
through the home.
Determination
68. The Panel determines the FSP has satisfied Section 35 of the Act in respect
of its flood exclusion and may rely upon same; to the extent the Panel has
determined the FSP to be bound by the verbal misrepresentation at policy
initiation concerning „water unable to drain‟, the height of loss attributable to
„stormwater runoff‟ is considered to be sufficient to satisfy all the loss.
69. The Panel determines that the FSP is to provide coverage under the policy
for loss representing an inundation of 200mm pursuant to stormwater runoff
through the home.
70. Should the FSP elect to cash settle any part of this claim, then the FSP is to
pay interest at the statutory rate from the date of denial of the claim to the
date of settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.